Sewage_Equipment_Coating_-_Price_Page.docx

DOCX document 17 KB Posted

Attached to
Sewage Equipment Coating Application and Repair Services
Solicitation number
26-P-00212
Issued by
Hillsborough County, Florida

About this file

This is a bid response price page for sewage equipment coating application and repair services solicited by the City of Tampa for the Howard F. Curren Advanced Wastewater Treatment Plant. The City seeks a qualified vendor to provide inspection, repair, preparation, fabrication, and application of abrasion and corrosion-resistant coatings to sewage treatment equipment including pumps, pipes, and related heavy industrial components. Required services encompass autoclave treatment, sandblasting, decontamination, ceramic coating, powder coating, epoxy coating, polyuria application, fiberglass repair and fabrication, metal repair, machine shop work, and precision balancing. Sealed bids must be submitted electronically by 3:00 p.m. on Tuesday, April 21, 2026. The initial contract award period is one year from the effective date with four optional one-year renewal periods and up to three supplemental thirty-day unilateral extension periods. The vendor must provide equipment pickup and delivery within 24 hours of notification or within 4 hours for emergency conditions, respond to routine requests within eight hours and emergency requests within two hours, and provide a one-year workmanship warranty.

The price page requests unit costs and total line item costs for nine coating application services (50 hours each for autoclave, sandblasting, decontamination, ceramic coating, powder coating, and epoxy coating; 25 hours for polyuria application; 250 square feet each for piping and painting), two fiberglass services (50 hours each for repair and fabrication), three machine shop services (50 hours each for metal repair, machine shop, and balancing), six coating materials (25 gallons each), three rental equipment items (1 day each for scaffolding, scissor lift, and air compressor), replacement parts pricing with a markup not to exceed 10 percent of $35,000, and overtime work costs estimated at $2,000 with applicable markup percentage. This is a sheltered market contract exclusively for certified Small Local Business Enterprises (SLBEs), with a five percent bid discount available to SLBE bidders not to exceed $10,000. The estimated contract value is $50,000, encompassing all labor, equipment, materials, transportation, and expendable supplies without additional charges unless rental equipment is pre-approved by the City. Qualified bidders must demonstrate active engagement in applying coatings to heavy industrial organizations, maintain a fully operational in-house machine shop, provide references from at least three clients within the past five years, hold lead-based paint removal certification, offer 24/7 service availability with a minimum of three employees certified in polyuria application, and employ all lead fiberglass technicians with at least 10 years of related experience.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID RESPONSE FOR

SEWAGE EQUIPMENT COATING APPLICATION AND REPAIR SERVICES

A. COATING APPLICATIONS FOR EQUIPMENT

ESTIMATED QUANTITY *

(A)

UNIT

ITEM DESCRIPTION

UNIT COST

(B)

TOTAL LINE ITEM COST ($)

(C) = (A) x (B)

50
HOURS
AUTOCLAVE
$ _________
$ ________________
50
HOURS
SANDBLASTING
$ _________
$ ________________
50
HOURS
DECONTAMINATION
$ _________
$ ________________
50
HOURS
CERAMIC COATING
$ _________
$ ________________
50
HOURS
POWDER COATING
$ _________
$ ________________
50
HOURS
EPOXY COATING
$ _________
$ ________________
25
HOURS
POLYURIA APPLICATION
$ _________
$ ________________
250
SQUARE FOOT
PIPING, ETC.
$ _________
$ ________________
250
SQUARE FOOT
PAINTING
$ _________
$ ________________

* = More or Less

TOTAL COST FOR COATING APPLICATIONS: $ _________________

B. FIBERGLASS REPAIR AND FABRICATION

ESTIMATED QUANTITY *

(A)

UNIT

ITEM DESCRIPTION

UNIT COST

(B)

TOTAL LINE ITEM COST ($)

(C) = (A) x (B)

50
HOURS
FIBERGLASS REPAIR
$ _________
$ ________________
50
HOURS
FIBERGLASS FABRICATION
$ _________
$ ________________

TOTAL COST FOR FIBERGLASS WORK $__________________

C. MACHINE SHOP AND REPAIR COSTS – ADDITIONAL REPAIRS NOT SPECIFED

ESTIMATED QUANTITY *

(A)

UNIT

ITEM DESCRIPTION

UNIT COST

(B)

TOTAL LINE ITEM COST ($)

(C) = (A) x (B)

50
HOURS
METAL REPAIR
$ _________
$ ________________
50
HOURS
MACHINE SHOP
$ _________
$ ________________
50
HOURS
BALANCING
$ _________
$ ________________

TOTAL COST FOR MACHINE SHOP & REPAIR: $ _________________

D. COATING MATERIALS – CERAMIC, CORROCOAT, POWDERCOATING, EPOXY PAINT, POLYURIA

ESTIMATED QUANTITY *

(A)

UNIT

ITEM DESCRIPTION

UNIT COST

(B)

TOTAL LINE ITEM COST ($)

(C) = (A) x (B)

25
GALLON
CORROCOAT HTE
$ _________
$ ________________
25
GALLON
CORROGLAS FLUIDGLIDE
$ _________
$ ________________
25
GALLON
CORROGLASS SERIES 200
$ _________
$ ________________
25
GALLON
CARBOGUARD 890
$ _________
$ ________________
25
GALLON
EPOXY PAINT
$ _________
$ ________________
25
GALLON
POLYURIA
$ _________
$ ________________

E. RENTAL EQUIPMENT PRICING:

ESTIMATED QUANTITY *

(A)

UNIT

ITEM DESCRIPTION

UNIT COST

(B)

TOTAL LINE ITEM COST ($)

(C) = (A) x (B)

1 DAY
1
SCAFFOLDING
$ _________
$ ________________
1 DAY
1
SCISSOR LIFT
$ _________
$ ________________
1 DAY
1
AIR COMPRESSOR
$ _________
$ ________________

F. REPLACEMENT PARTS PRICING:

Replacement Part Cost Markup Percentage (not to exceed 10%) _____% of $35,000 $____________

G. OVERTIME WORK ESTIMATED AT $2000 ($2000 X % OF MARK UP) $ _________________

(Example $2000 x 150% = $3000 in overtime work cost)

TOTAL AMOUNT OF BID (A + B + C + D + E + F +G): $ __________________

File details come from the government source that posted it. Updated .