Seven Hills OH Request For Lease.pdf
PDF 10 MB Posted
- Solicitation number
- 57-39035-23-NRS
About this file
This document is a Request for Lease Proposal from the United States Department of Agriculture (USDA) to lease office and related space in Seven Hills, Ohio (Cuyahoga County). The USDA is seeking offers from interested parties to provide the required office and related space.
The key details are as follows: The solicitation number is 57-39035-23-NRS, and the deadline for submitting offers is April 29, 2024. All offerors must be registered and active in the System for Award Management (SAM) at sam.gov. Unsolicited offers must confirm they are within the delineated area and not within a 100 or 500 year flood plain. The USDA reserves the right to reject any unsolicited offers. Offers submitted beyond the April 29, 2024 deadline are subject to rejection, as are any submissions received without documentation of ownership and/or written authorization to represent owners.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment No. 2 Initial Offer Extension.pdf | ||
| Amendment No. 1 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
GENERAL SERVICES ADMINISTRATION PAGE 1 of 3 GSA FORM 12000 (May 2015)
PRELEASE
FIRE PROTECTION AND LIFE SAFETY EVALUATION FOR AN OFFICE BUILDING
The prelease form contains two parts that must be completed depending on which floor the proposed offered space is located within a building. Part A must be completed when an offered space is located below the 6th floor of a building.
Part A shall be completed by the Offeror or their authorized representative. Part B must be completed when an offered space is located on or above the 6th floor of a building. Part B shall be completed by a professional engineer. The Fundamental Code Requirements apply to Part A and Part B.
Fundamental Code Requirements
a. The offered building shall be evaluated for compliance with the most recent edition of the building and fire code adopted by the jurisdiction in which the building is located; with the exception that the technical egress requirements of the building shall be evaluated based on the egress requirements of the most recent edition of the National Fire Protection Association (NFPA) 101, Life Safety Code. (Note: a building with a Certificate of Occupancy indicating that a building fully complies with the International Building Code shall be deemed to comply with this requirement.) All areas that do not meet the above stated criteria shall be identified as to the extent that they do comply.
b. A fire escape located on the floor(s) where the offered space is located shall not be counted as an approved exit stair.
c. An interlocking or scissor stair located on the floor(s) where the offered space is located shall only count as one exit stair.
d. The number of floors used to determine when Part A or Part B is applicable is based on counting the number of floors starting from the street floor.
LEASE NO. 57-39035-23-NR EXHIBIT L
RLP EXHIBIT G
GENERAL SERVICES ADMINISTRATION PAGE 2 of 3 GSA FORM 12000 (May 2015)
PART A
The Offeror or their representative shall complete Part A. Part A consists of a series of short answer and yes/no/not applicable questions related to general building information and fire protection and life safety systems. Upon completion of Part A, the Offeror must sign and date the “Offeror’s Statement”. Part A is applicable to offered space located below the 6th floor of the building.
I. BUILDING ADDRESS
Building Name:
Building Address:
City:
State:
9-Digit Zip Code:
II. GENERAL BUILDING INFORMATION
a. Identify each floor on which space is offered and the square footage of space on each floor offered to Government:
Floor Sq. Ft. Per Floor
b. Identify the total number of floors in the building starting at the street floor:
c. Identify the total number of floors in the building below the street floor:
d. Identify which floor(s) in the building permit reentry from the exit stair enclosure to the interior of the building:
III. OTHER USES IN BUILDING (Check All That Apply) Restaurants Laboratories Storage Retail
Parking Garage
Other (list)
IV. AUTOMATIC FIRE SPRINKLER SYSTEM
Please Check YES, NO, or N/A to the following questions: YES NO N/A
a. Is an automatic fire sprinkler system installed throughout the building?
b. If automatic fire sprinklers are installed within the building, is the automatic fire sprinkler system maintained in accordance with the applicable local codes or NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems?
V. FIRE ALARM SYSTEM
Please Check YES, NO, N/A to the following questions: YES NO N/A
a. Is a fire alarm system installed in the building?
b. Is an emergency voice/alarm communication system installed in the building?
c. If a fire alarm system is installed in the building, are audible devices (e.g., horns, bells, speakers, etc.) installed on the floor in which the offered space is located in the building?
d. If a fire alarm system is installed in the building, are strobe devices installed on the floor in which the offered space is located in the building?
e. If a fire alarm system is installed in the building, is the fire alarm system over 25 years old?
f. If a fire alarm system is installed in the building, does the operation of the fire alarm system automatically notify the local fire department via any of the following means: directly to the local fire department, to the (911) public communications center, to a central station, to a remote supervising station, or to a proprietary supervising station?
g. If a fire alarm system is installed in the building, is the fire alarm system maintained in accordance with the applicable local codes or NFPA 72, National Fire Alarm and Signaling Code?
RLP EXHIBIT G
GENERAL SERVICES ADMINISTRATION PAGE 3 of 3 GSA FORM 12000 (May 2015)
VI. EXIT SIGNS & EMERGENCY LIGHTING
a. Are exit signs installed in the paths of egress travel to the exit stairs or exits?
b. Is emergency lighting installed in the paths of egress travel to the exit stairs or exits?
c. If an emergency lighting system is installed in the building, is the emergency lighting system arranged to provide illumination automatically in the event of any interruption of the building’s normal lighting system?
VII. ELEVATORS
Are elevators installed in the building?
If elevators are installed in the building, are the elevator cars equipped with a telephone or another two-way communication system?
If elevators are installed in the building, are the elevators recalled by smoke detectors located in the elevator lobbies and elevator machine rooms?
VIII. ADDITONAL INFORMATION
OFFEROR’S STATEMENT
I hereby attest that the above information is complete and accurate to the best of my knowledge.
Signature: Date:
Printed Name:
Title:
Name of Firm:
Fundamental Code Requirements
a. The offered building shall be evaluated for compliance with the most recent edition of the building and fire code adopted by the jurisdiction in which the building is located; with the exception that the technical egress requirements of the buildin...
b. A fire escape located on the floor(s) where the offered space is located shall not be counted as an approved exit stair.
c. An interlocking or scissor stair located on the floor(s) where the offered space is located shall only count as one exit stair.
d. The number of floors used to determine when Part A or Part B is applicable is based on counting the number of floors starting from the street floor.
LESSOR'S ANNUAL COST STATEMENT
Important - Read attached "Instructions"
OMB Control Number: 3090-0086 Expiration Date: 12/31/2022
4. Building Name and Address (Number, Street, City, State, and Zip Code)
SECTION I - ESTIMATED ANNUAL COST OF SERVICES AND UTILITIES
FURNISHED BY LESSOR AS PART OF RENTAL CONSIDERATION
3. Rental Area (Square Feet)
SERVICES AND UTILITIES
A. CLEANING, JANITOR AND/OR CHAR SERVICE
B. HEATING
C. ELECTRICAL
D. PLUMBING
5. Salaries
FOR GOVERNMENT
USE ONLY
LESSOR'S ANNUAL COST FOR
(a) Entire Building
8. Salaries
10. System Maintenance and Repair
11. Current for Light and Power
12. Replacement of Bulbs, Tires, Starters
13. Power for Special Equipment
9. Fuel ("X" one)
E. AIR CONDITIONING
F. ELEVATORS
GSA 1217 (REV. 11/2016)
6. Supplies (Wax, cleaners, cloths, etc.)
7. Contract Services (Window washing, waste and snow removal)
14. System Maintenance and Repair (Ballasts, Fixtures, etc.)
15. Water (For all purposes) (Include Sewage Charges)
16. Supplies (Soap, towels, tissues not in 6 above)
(b) Government-Leased Area
2. Statement Date1. Request for Lease Proposals (RLP)
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 3090-0086. We estimate that it will take 2 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
17. System Maintenance and Repair
18. Utilities (Include electricity, if not in C11)
19. System Maintenance and Repair
21. System Maintenance and Repair
GENERAL SERVICES ADMINISTRATION
20. Salaries (Operators, starters, etc.)
Oil Gas Coal Electric
3A. Entire Building 3B. Leased by Government
G. MISCELLANEOUS (To the extent not included on Page 1)
22. Building Engineer and/or Manager
23. Security (Watchperson, guards, not janitors)
25. Lawn and Landscaping Maintenance
26. Other (Explain on separate sheet)
27. TOTAL
34. Signature of:
28. Real Estate Taxes
29. Insurance (Hazard, Liability, etc.)
30. Building Maintenance and Reserves for Replacement
31. Lease Commission
32. Management
TYPED NAME AND TITLE SIGNATURE DATE
34C.
35A. 35B. 35C.
LESSOR'S CERTIFICATION - The amounts entered in Columns (a) and (b) represent my best estimate as to the annual costs of services, utilities, and ownership.
33. TOTAL
34A.
24. Social Security Tax and Workperson's Compensation Insurance
SECTION II - ESTIMATED ANNUAL COST OF OWNERSHIP EXCLUSIVE OF CAPITAL CHARGES
34B.
GSA 1217 (REV. 11/2016) PAGE 2
Owner Legal Agent
INSTRUCTIONS
In acquiring space by lease, it is the established policy of GSA to enter into leases only at rental charges which are consistent with prevailing scales in the community for facilities.
ITEM NUMBER
SECTION I
ESTIMATED ANNUAL COST OF SERVICES AND UTILITIES
SECTION II
ESTIMATED ANNUAL COST OF OWNERSHIP EXCLUSIVE OF CAPITAL CHARGES
1. Enter the Government lease or Request for Lease Proposals (RLP) number, if available.
2. Enter the date that your statement was prepared and signed.
3. A. Enter in this block a computation of the rentable area (multiple tenancy basis) for the entire building. The rentable area shall be computed by measurement to the inside finish of permanent outer building walls to the inside finish of corridor walls (actual or proposed) or to other permanent partitions, or both. Rentable space is the area for which a tenant is charged rent. It is determined by the building owner and may vary by city or by building within the same city. The rentable space may include a share of building support/common areas such as elevator lobbies, building corridors, and floor service areas. Floor services areas typically include restrooms, janitor rooms, telephone closets, electrical closets, and mechanical rooms.
The rentable space generally does not include the vertical building penetrations and their enclosing walls, such as stairs, elevator shafts, and vertical ducts.
3. B. Enter in this block a computation of the rentable area to be rented to the Government. For this area, follow the procedure as outlined above, except that measurements are to be made only to the center of the partitions which separate the area to be rented by the Government from adjoining rented or rentable areas.
4. Identify the property by name and address.
5. - 26. The services and utilities listed in this section are required in most of our rented space whether furnished by the Government or the Lessor.
Carefully review the Request for Lease Proposals (RLP) and/or the proposed lease to identify those services and utilities to be furnished by you as part of the rental consideration. Then enter your best cost estimate, or the actual cost from the previous year, for each of these services and utilities in column (a) for the entire building and in column (b) for the area to be rented to the Government. If any service or utility furnished for the space rented by the Government is not furnished throughout the building, or the cost of a service or utility furnished to the Government space exceeds the cost of the same service or utility furnished to other rented space, explain on a separate sheet. For convenience, each major category has been divided into separate items such as salaries and supplies so that they may be entered when applicable. However, in the event that your records are not maintained for each item contained in Section I, 5 through 26, the total for a major category (A through F) may be entered under the category heading in columns (a) and (b) in lieu of the specific items. System maintenance and repairs includes the annual cost of such items as oiling, inspecting, cleaning, regulating, and routine replacement costs.
Items 28 through 32 will be useful in the Government's determination of the fair market value of the space to be rented and shall be completed irrespective of whether Section I is applicable, as follows:
28. Include all applicable real estate taxes imposed upon the property.
29. Enter the annual cost of fire, liability, and other insurance carried on the real estate.
31. Enter any lease commission which you may be responsible for due to the Government leasing action.
32. Include administrative expenses such as agency fees, legal fees, auditing, and advertising. Do not include financial charges such as income or corporate taxes or organization expense.
34. - 35. Complete Lessor certification.
30. Enter the annual cost of wages, materials, and outside services used in repairs and maintenance of the building itself and all similar repairs and maintenance of the building itself and all similar repairs and maintenance costs not included in Section I above (Heating, Electrical, Plumbing, Air Conditioning, and Elevators). This includes major repairs and changes in the nature of a permanent improvement such as annual cost to replace relatively short-lived items such as boiler, compressors, elevators, and roof coverings.
GSA 1217 (REV. 11/2016) PAGE 3
Rachel.Geiselman
Highlight a Entire BuildingA CLEANING JANITOR ANDOR CHAR SERVICE 5 Salaries:
b GovernmentLeased AreaA CLEANING JANITOR ANDOR CHAR SERVICE 5 Salaries:
FOR GOVERNMENT USE ONLYA CLEANING JANITOR ANDOR CHAR SERVICE 5 Salaries:
a Entire Building6 Supplies Wax cleaners cloths etc:
b GovernmentLeased Area6 Supplies Wax cleaners cloths etc:
FOR GOVERNMENT USE ONLY6 Supplies Wax cleaners cloths etc:
a Entire Building7 Contract Services Window washing waste and snow removal:
b GovernmentLeased Area7 Contract Services Window washing waste and snow removal:
FOR GOVERNMENT USE ONLY7 Contract Services Window washing waste and snow removal:
a Entire BuildingB HEATING 8 Salaries:
b GovernmentLeased AreaB HEATING 8 Salaries:
FOR GOVERNMENT USE ONLYB HEATING 8 Salaries:
Oil: Off
Gas: Off
Coal: Off
Electric: Off a Entire Building9 Fuel X one Oil Gas Coal Electric:
b GovernmentLeased Area9 Fuel X one Oil Gas Coal Electric:
FOR GOVERNMENT USE ONLY9 Fuel X one Oil Gas Coal Electric:
a Entire Building10 System Maintenance and Repair:
b GovernmentLeased Area10 System Maintenance and Repair:
FOR GOVERNMENT USE ONLY10 System Maintenance and Repair:
a Entire BuildingC ELECTRICAL 11 Current for Light and Power:
b GovernmentLeased AreaC ELECTRICAL 11 Current for Light and Power:
FOR GOVERNMENT USE ONLYC ELECTRICAL 11 Current for Light and Power:
a Entire Building12 Replacement of Bulbs Tires Starters:
b GovernmentLeased Area12 Replacement of Bulbs Tires Starters:
FOR GOVERNMENT USE ONLY12 Replacement of Bulbs Tires Starters:
a Entire Building13 Power for Special Equipment:
b GovernmentLeased Area13 Power for Special Equipment:
FOR GOVERNMENT USE ONLY13 Power for Special Equipment:
a Entire Building14 System Maintenance and Repair Ballasts Fixtures etc:
b GovernmentLeased Area14 System Maintenance and Repair Ballasts Fixtures etc:
FOR GOVERNMENT USE ONLY14 System Maintenance and Repair Ballasts Fixtures etc:
a Entire BuildingD PLUMBING 15 Water For all purposes Include Sewage Charges:
b GovernmentLeased AreaD PLUMBING 15 Water For all purposes Include Sewage Charges:
FOR GOVERNMENT USE ONLYD PLUMBING 15 Water For all purposes Include Sewage Charges:
a Entire Building16 Supplies Soap towels tissues not in 6 above:
b GovernmentLeased Area16 Supplies Soap towels tissues not in 6 above:
FOR GOVERNMENT USE ONLY16 Supplies Soap towels tissues not in 6 above:
a Entire Building17 System Maintenance and Repair:
b GovernmentLeased Area17 System Maintenance and Repair:
FOR GOVERNMENT USE ONLY17 System Maintenance and Repair:
a Entire BuildingE AIR CONDITIONING 18 Utilities Include electricity if not in C11:
b GovernmentLeased AreaE AIR CONDITIONING 18 Utilities Include electricity if not in C11:
FOR GOVERNMENT USE ONLYE AIR CONDITIONING 18 Utilities Include electricity if not in C11:
a Entire Building19 System Maintenance and Repair:
b GovernmentLeased Area19 System Maintenance and Repair:
FOR GOVERNMENT USE ONLY19 System Maintenance and Repair:
a Entire BuildingF ELEVATORS 20 Salaries Operators starters etc:
b GovernmentLeased AreaF ELEVATORS 20 Salaries Operators starters etc:
FOR GOVERNMENT USE ONLYF ELEVATORS 20 Salaries Operators starters etc:
a Entire Building21 System Maintenance and Repair:
b GovernmentLeased Area21 System Maintenance and Repair:
FOR GOVERNMENT USE ONLY21 System Maintenance and Repair:
Owner: Off
Legal Agent: Off
34A:
34C:
35C:
COMMENTS:
Signature1:
G MISCELLANEOUS To the extent not included on Page 1 22 Building Engineer andor Manager:
0:
2:
1:
23 Security Watchperson guards not janitors:
0:
2:
1:
24 Social Security Tax and Workpersons Compensation Insurance:
0:
2:
1:
25 Lawn and Landscaping Maintenance:
0:
2:
1:
26 Other Explain on separate sheet:
0:
2:
1:
28 Real Estate Taxes:
0:
2:
1:
29 Insurance Hazard Liability etc:
0:
2:
1:
30 Building Maintenance and Reserves for Replacement:
0:
2:
1:
31 Lease Commission:
0:
2:
1:
32 Management:
0:
2:
1:
Lines 5-26 TOTAL Column (b):
Lines 5-26 TOTAL Column (a):
Lines 5-26 TOTAL Column (c):
Lines 28-32 TOTAL Column (a):
Lines 28-32 TOTAL Column (b):
Lines 28-32 TOTAL Column (c):
RSF of Entire Building:
RSF Leased to Government:
Date Completed by Offeror:
Addres of Leased Premises:
RLP Number:
35A:
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
PAGE
c. Amortization Interest Rate:
c. Amortization Interest Rate:
This Offer is in response to Request for Lease Proposals (RLP) Number:
SECTION I - BUILDING OVERVIEW
RENT TABLE
1. Building Name
13. Full Term of the Lease
16. Shell Rent
17. Operating Costs (Refer to Line 27 on the GSA 1217)
The initial Shell Rent is a total annual dollar amount of
18. Tenant Improvement (TI) Rent
d. Amortization Period in Months:
b. Total TI:
The Operating Cost base is a total annual dollar amount of
a. TI Allowance per ABOA SF:
(stated in RLP; leave blank for turnkey)
('a' above multiplied by offered ABOA SF or turnkey price)
Does the initial Shell Rent offered change during the term of the lease?
14. Firm Term of the Lease
9. ABOA SF of Offered Space
10. RSF of Offered Space
11. CAF of Offered Space
Y. Annual Rate $ Per RSF
Z. Annual Rate $ Per ABOA SF
X. Annual Rent
15. Number of Days Notice
12. Floor(s) and/or Suite(s) of Offered Space
3. City, State and 9-Digit ZIP Code
a. Total Surface
b. Total Structured
c. Is all the parking onsite?
d. Number of spaces required by local code, if applicable:
After the Firm Term, the Government may terminate the Lease by providing advanced written notice to the Lessor. Indicate the minimum number of days the Government must provide prior written notice by.
a. General Purpose/Office:
b. Warehouse:
c. Other:
5. Total Rentable Square Feet (RSF) in Building
Building Space Breakout
8. Total Building Parking Under Offeror's Control
7. Building Common Area Factor (CAF)
7. Building Common Area Factor (CAF)
6. Total ANSI/BOMA Occupant Area (ABOA) Square Feet (SF) in Building
4. Number of Floors in Building
2. Building Street Address
OMB Control Number: 3090-0086 Expiration Date: 1/31/2026
PROPOSAL TO LEASE SPACE
(See Paperwork Reduction Act Statement in Section V)
SECTION II - PRIMARY OFFER DETAILS
GENERAL SERVICES ADMINISTRATION
GSA 1364 (REV. 1/2023)
d. Amortization Period in Months:
b. Total BSAC:
('a' above multiplied by offered ABOA SF or total cost)
a. BSAC Amount per ABOA SF:
19. Building Specific Amortized Capital (BSAC) Rent
g. Reserved Structured:
h. Number of Spaces Offered:
f. Number of Spaces Offered:
e. Reserved Surface:
c. General Structured:
d. Number of Spaces Offered:
b. Number of Spaces Offered:
a. General Surface:
20. Parking Required by the RLP
21. Rent for Non-Standard Circumstances
The RLP requires a non-standard rental component applicable only under specific conditions outlined in the Lease called:
22. TOTAL INITIAL RENT
b. Lessor's Project Management fee will be:
Percent of Total Construction Costs
The RLP outlines how fees may apply. Fees are not applicable for turnkey pricing.
23. Fee Schedule
a. Architectural/Engineering fees will be (choose one):
(Parking spaces and associated costs offered to meet the requirements outlined in the RLP shall be detailed in Box 20).
Enter initial rental figures only. Scheduled step rents for Shell rent and Parking rates must be entered in Section VI, Addendum.
per space per month per space per month per space per month per space per month
(if stated in RLP)
SECTION III - ADDITIONAL FINANCIAL ASPECTS OF THE OFFER
24. Are you offering free rent?
25. Are you offering free space?
27. Commissions
If applicable, enter the commission distribution and ATTACH BROKER COMMISSION
AGREEMENT.
28. Adjustment for Vacant Premises
31. Heating, Ventilation, and Air Conditioning (HVAC) Overtime Rate
26. Are you offering renewal options?
a. If yes, enter the number of free months being offered.
a. If yes, how much free space, in addition to the space offered in Box 9 above, is being offered?
If yes, fill out 'Renewal Options' in Section VI, Addendum.
Explain complex tax parcel arrangements in Section VI, Addendum.
b. What rent components are included in the free rent?
a. RSF of Tax Parcel
b. Percent of Occupancy
b. Owner's Representative Commission
b. Select one of the options below:
c. Total Number of Zones, Floors, or Spaces
d. If the Government used 1 hour of overtime HVAC for the entire offered space, it would owe:
(Multiply 31a times 31c)
a. Tenant's Representative Commission
29. Adjustment for Reduced Services
30. Tax Parcel Percent of Government Occupancy a.
-PER-
GSA 1364 (REV. 1/2023)
rate per hour
SECTION IV - BUILDING AND PROPERTY INFORMATION
Total Land Costs:
The total approximate construction cost to achieve Lease shell standards is:
34. Select the approximate level of construction necessary to meet the building shell requirements:
33. Provide the year and a brief description of the last major building renovation, if applicable.
32. In what year was the original building construction completed and ready for initial occupancy?
(Choose one)
Land Site Size:
Sunday
Start
End
Saturday
Start
End
End
Start
Monday - Friday
35. What are the Building's normal hours of operations for HVAC included in the Operating Costs?
36. With regard to Fire Protection and Life Safety:
37. With regard to Accessibility (Architectural Barriers Act Accessibility Standard - ABAAS):
38. With regard to Asbestos-Containing Material (ACM): (Select all that apply)
39. With regard to Flood Plains:
or
40. With regard to Seismic Safety of the Building:
GSA 1364 (REV. 1/2023)
With regard to offerors falling into a statutory exception category above, the Offeror has evaluated energy efficiency and conservation improvements and has determined:
41. With regard to ENERGY STAR®:
42. With regard to Historic Preference:
a. Is the Building a Historic Property?
b. Is the Building within an Historic District?
43. With regard to Historically Underutilized Business Zones (HUBZone) Price Evaluation Preference:
SECTION V - OWNER IDENTIFICATION AND OFFEROR CERTIFICATION
46. City, State and 9-Digit ZIP Code
45. Owner Street Address
44. Recorded Owner Name
49. Offeror Street Address
48. Offeror Name
47. Unique Entity Identifier (UEI)
b. Telephone
a. Email
51. Contact Information
50. City, State and 9-Digit ZIP Code
52. Offeror's Interest in the Property
By signing this form, you acknowledge having read the RLP with attachments in its entirety. No deviations are allowed unless authorized by the Lease Contracting Officer (LCO).
By submitting this offer, the offeror agrees to lease the premises described within the offer to the United States of America upon the Lease Contracting Officer's acceptance of the offer. The offeror acknowledges they have read and fully understand the Request for Lease Proposals and agrees to honor the terms and conditions specified in their offer and to full compliance with and acceptance of the Request for Lease Proposals and its attachments.
53. Does your offer request any deviation from the RLP?
This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 3090-0086. We estimate that it will take 2.3 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
PAPERWORK REDUCTION ACT STATEMENT
SECTION VI - ADDENDUM
A. Step Rent
Shell Rent and Parking steps should be detailed if the initial amount stated in the Rent Table above does NOT remain the same for the full term of the Lease. Shell Rent step amounts should be stated in Annual Rent for the entire Leased space. Parking step rents should be stated as a dollar amount per space per month.
Rent Type
Beginning Year
Through Year
Amount Will Be ($)
Per
B. Renewal Options
Renewal Options are optional unless required by the RLP. Only renewal options that are required by the RLP will factor into the Government's financial analysis of the Offer.
Option Number
Duration in Years
Annual Shell Rate per RSF
Number of Days Notice to Exercise Option
C. Additional Tax Parcel Information
Is the offered space part of multiple tax bills or multiple buildings on a single tax parcel?
If 'YES', use the boxes below to account for the total number of buildings, associated RSF, and tax parcel associated with the overall space offered to the Government. Attach the legal description(s) of the offered property/properties as part of your overall RLP submission.
Building
Building RSF
Tax Parcel ID Number
Tax Parcel
D. Additional Remarks or Conditions with Respect to this Offer
Any deviations from the RLP requirements must be requested prior to the request for final proposal revisions. If the Offeror requests any deviations, GSA at its sole discretion will make the decision whether to accept the deviation.
GSA 1364 (REV. 1/2023)
11.0.0.20130303.1.892433.887364
GSA 1364 - Proposal to Lease Space
CurrentPage:
21x. If applicable, enter the Rent for Non-Standard Circumstances Annual Rent.:
21y. If applicable, Enter the Rent for Non-Standard Circumstances Annual Rate per RSF.:
21z. If applicable, enter the Rent for Non-Standard Circumstances Annual Rate per ABOA SF.:
Enter the Request for Lease Proposals (RLP) Number related to this offer.: 57-39035-23-NR
9. Enter the ABOA SF of Offered Space.:
13. Enter the Full Term of the Lease in Months.:
14. Enter the Firm Term of the Lease in Months.:
10. Enter the RSF of Offered Space.:
11. Enter the CAF of Offered Space.:
16x. Enter the Initial Shell Annual Rent.:
17x. Enter the Operating Costs Annual Rent.:
18x. Tenant Improvement Annual Rent (This field is auto-calculated).:
17y. Operating Costs Annual Rate per RSF (This field is auto-calculated).:
17z. Operating Costs Annual Rate per ABOA SF (This field is auto-calculated).:
18y. Tenant Improvement Annual Rate per RSF (This field is auto-calculated).:
18z. Tenant Improvement Annual Rate per ABOA SF (This field is auto-calculated).:
16z. Initial Shell Annual Rate per ABOA SF (This field is auto-calculated).:
16y. Initial Shell Annual Rate per RSF (This field is auto-calculated).:
Section 6 Addendum Part D, Enter additional Remarks or Conditions with Respect to this Offer.: Not Applicable
15. Enter the Number of Days Notice to terminate after the firm term.:
8a. Enter the Building Total Surface Parking Under Offeror's Control.:
8b. Enter the Building Total Structured Parking Under Offeror's Control. :
5c. Building Space Breakout: Enter the amount of Square Feet Not General Purpose, Office, or Warehouse.:
8d. Enter the number of parking spaces required by local code, if applicable.:
5a. Building Space Breakout: Enter the amount of General Purpose Office in Square Feet.:
5b. Building Space Breakout: Enter the amount of Warehouse in Square Feet.:
7. Enter the Building Common Area Factor (CAF).:
6. Enter the Total American National Standards Institute (ANSI)/Building Owners and Managers Association (BOMA) Occupant Area (ABOA) Square Feet (SF) in the Building.:
5. Enter the Total Rentable Square Feet (RSF) in the Building.: 0
8c. Click here to select, "Yes" the Building's reported parking is onsite.: 0
8c. Click here to select, "No" the Building's reported parking is NOT onsite.: 0
16. Click here to select, "No" the initial Shell Rent offered did NOT change during the term of the lease.: 0
16. Click here to select, "Yes" the initial Shell Rent offered change during the term of the lease.: 0
18a. Enter the Tenant Improvement Allowance per ABOA SF.:
18b. Enter the Total Tenant Improvement Amount.:
18d. Enter the Tenant Improvement Amortization Period in Months.:
19d. Enter the Building Specific Amortized Capital Amortization Period in Months.:
19z. Building Specific Amortized Capital Annual Rate per ABOA SF (This field is auto-calculated).:
19y. Building Specific Amortized Capital Annual Rate per RSF (This field is auto-calculated).:
19x. Building Specific Amortized Capital Annual Rent (This field is auto-calculated).:
20h. Enter the Number of Reserved Structured Spaces Offered.:
20f. Enter the Number of Reserved Surface Spaces Offered.:
20d. Enter the Number of General Structured Spaces Offered.:
20b. Enter the Number of General Surface Spaces Offered.:
20x. Parking Annual Rent (This field is auto-calculated).: 0.00000000
22z. Total Initial Annual Rate per ABOA SF (This field is auto-calculated).:
22y. Total Initial Annual Rate per RSF (This field is auto-calculated).:
23b. Enter the Lessor's Project Management Fee Percent of Total Construction Cost Amount.:
23a. If Architectural Engineering Fees will be a Flat Fee was selected, enter the Dollar Amount.:
23a. If Architectural Engineering Fees will be a dollar amount per ABOA SF was selected, enter the Dollar Amount. :
23a. If Architectural Engineering Fees will be a percent of total construction costs was selected, enter the Percent Amount.:
23a. Click here to select Architectural Engineering Fees will be a percent of total construction costs.: 0
23a. Click here to select Architectural Engineering Fees will be a dollar amount per ABOA SF.: 0
23a. Click here to select Architectural Engineering Fees will be a flat fee.: 0
20a. Enter the General Surface Parking Cost Per Space Per Month.:
20c. Enter the General Structured Parking Cost Per Space Per Month.:
20e. Enter the Reserved Surface Parking Cost Per Space Per Month.:
20g. Enter the Reserved Structured Parking Cost Per Space Per Month.:
19b. Enter the Total Building Specific Amortized Capital Amount.:
19a. Enter the Building Specific Amortized Capital Amount per ABOA SF.:
19c. Enter the Building Specific Amortized Capital Amortization Interest Rate.:
18c. Enter the Tenant Improvement Amortization Interest Rate.:
22x. Total Initial Annual Rent (This field is auto-calculated).: 0.00000000
29. Enter the Adjustment for Reduced Services Amount per ABOA SF.:
24a. If "Yes" was selected, enter the number of free rent months offered, if applicable.:
24b. Click here to select, "Shell rent" component is included in any free rent offered.: 0
24b. Click here to select, "Tenant Improvement (TI)" rent component is included in any free rent offered.: 0
24b. Click here to select, "Parking" rent component is included in any free rent offered.: 0
24b. Click here to select, "Non-Standard " rent component is included in any free rent offered.: 0
24b. Click here to select, "Operating Costs" rent component is included in any free rent offered.: 0
24b. Click here to select, "Building Specific Amortized Capital (BSAC)" rent component is included in any free rent offered.: 0
24. Click here to select, "No" I am NOT offering free rent.: 0
24. Click here to select, "Yes" I am offering free rent.: 0
25. Click here to select, "No" I am NOT offering free space.: 0
26. Click here to select, "Yes" I am offering renewal options.: 0
26. Click here to select, "No" I am NOT offering renewal options.: 0
25. Click here to select, "Yes" I am offering free space.: 0
25a. If "Yes" was selected, enter the amount of ABOA SF free space offered in addition to the space offered in box 9, if applicable.:
30a. Enter the RSF of Tax Parcel.:
30b. Enter the Percent of Tax Parcel Occupied by Government.:
28. Enter the Adjustment for Vacant Premises Amount per ABOA SF.:
31b. Click here to select "Space" as an option for dividing up the total HVAC service area.: 0
31b. Click here to select "Floor" as an option for dividing up the total HVAC service area.: 0
31b. Click here to select "Zone" as an option for dividing up the total HVAC service area.: 0
31c. Enter the Total Number of HVAC Zones, Floors, or Spaces in the offered space.:
31d. Charge to the Government for 1 hour of overtime HVAC, 31a times 31c (this field is auto-calculated).: 0.00
31a. Enter the Heating, Ventilation and Air Conditioning (HVAC) overtime rate per hour.:
34c. Click here to select, "The requirements of the Lease will be satisfied through the construction of a new building.": 0
34b. Click here to select, "the building already meets all the Lease shell requirements, no improvements are necessary.": 0
34a. Enter the Construction cost to meet shell standards.:
34a. Click here to select, "improvements to the existing building will be required to meet the Lease shell requirements.": 0
32. Enter the Year of Original Building Construction Completion and Initial Occupancy.:
34c. Enter the Total Land Costs.:
34c. Click here to select, "Acres" for the Land Site Size amount. : 0
34c. Click here to select, "SF" for the Land Site Size amount. : 0
34c. Enter the Land Site Size.:
35. Building Normal hours of operation - Sunday - End Time, choose one of the following: 4 AM, 4:30 AM, 5 AM, 5:30 AM, 6 AM, 6:30 AM, 7 AM, 7:30 AM, 8 AM, 8:30 AM, 9 AM, 9:30 AM, 10 AM, 10:30 AM, 11 AM, 11:30 AM, 12 Noon, 12:30 PM, 1 PM, 1:30 PM, 2 PM, 2:30 PM, 3 PM, 3:30 PM, 4 PM, 4:30 PM, 5 PM, 5:30 PM, 6 PM, 6:30 PM, 7 PM, 7:30 PM, 8 PM, 8:30 PM, 9 PM, 9:30 PM, 10 PM, 10:30 PM, 11 PM, 11:30 PM, 12 Midnight, 12:30 AM, 1 AM, 1:30 AM, 2 AM, 2:30 AM, 3 AM, 3:30 AM:
36c. Click here to select, "the Property does NOT meet the Lease fire protection/life safety standards and will NOT be upgraded.": 0
36b. Click here to select, "the Property will be improved to meet the Lease fire protection life safety standards.": 0
36a. Click here to select, "The Property meets the Lease fire protection/life safety standards.": 0
37c. Click here to select, "the Property does NOT meet the Lease accessibility standards and will NOT be upgraded.": 0
37b. Click here to select, "the Property will be improved to meet the Lease accessibility standards.": 0
37a. Click here to select, "the Property meets the Lease accessibility standards.": 0
38e. Click here to select, "the Building contains ACM and abatement will be completed prior to occupancy.": 0
38d. Click here to select, "the Building contains ACM that does not fall within any of the above categories.": 0
38c. Click here to select, "the Building contains thermal system insulation ACM which is not damaged or subject to damage by routine operations.": 0
38a. Click here to select, "the Building contains no ACM.": 0
39a. Click here to select, "the Property is in a base (100 year) floodplain.": 0
39b. Click here to select, "the Property is in a 500 year floodplain.": 0
39c. Click here to select, "the Property is NOT in a floodplain.": 0
38b. Click here to select, "the Building contains undamaged, nonfriable ACM.: 0
40a. Click here to select, "the RLP does NOT contain seismic requirements.": 0
40b. Click here to select, "the Building either fully meets RLP seismic requirements or meets an exemption.": 0
40c. Click here to select, "the Building will be retrofitted to meet RLP seismic requirements it does not currently meet.": 0
40d. Click here to select, "the Building will be constructed to meet RLP seismic requirements.": 0
40e. Click here to select, "the Building will NOT meet RLP seismic requirements.": 0
41 b iii (ii). Click here to select, "there are no cost effective improvements and supporting documentation is attached to this offer.": 0
41 b iii (i). Click here to select, "cost effective improvements have been identified and are attached to this offer.": 0
41 b iii 3. Click here to select, "the Lease is for 10,000 RSF or less.": 0
41 b iii 2. Click here to select, "the Lease would be in a building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of Historic Places.": 0
41 b iii 1. Click here to select, "a Government agency already occupies the building and this offer is to keep them in the same space.": 0
41biii. Click here to select, "the Property meets one of the statutory exceptions listed below.": 0
41bii. Click here to select, "the existing building cannot obtain the Energy Star Label due to insufficient occupancy.": 0
41bi. Click here to select, "the Property is new construction.": 0
41b. Click here to select, "the Property has NOT received the Energy Star Label within the past twelve months but falls into one of the following categories.": 0
41a. Enter the date you received the Energy Star Label within the past twelve months.:
41a. Click here to select, "the Property has received the Energy Star Label within the past twelve months.": 0
42a. Click here to select, "the Building is a Historic Property.": 0
42a. Click here to select, "the Building is NOT a Historic Property.": 0
42b. Click here to select, "the Building is NOT within a Historic District.": 0
42b. Click here to select, "the Building is within a Historic District.": 0
43a. Click here to select, "you are a HUB Zone Small Business Concern (SBC) Offeror and you elect to waive the price evaluation preference.": 0
43b. Click here to select, "you are a HUB Zone SBC Offeror and you do not waive the price evaluation preference.": 0
43c. Click here to select, "you are NOT a HUB Zone SBC Offeror and question 43 does not apply.": 0
52. Click here to select, "Agent/Broker." : 0
52. Click here to select, "your relationship to the recorded Building Ownership is something other than Owner, Agent or Broker.": 0
52. Click here to select, "Owner of the Property (Offeror and Recorded Owner are the same person). : 0
53. Click here to select, "you are NOT requesting a deviation from the RLP.": 0
53. Click here to select, "Yes - I request a deviation from the LCO.": 0
Sign here if you are the Offeror. :
If you are the Offeror, enter the date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).:
Section 6 Addendum Part A Step Rent, Rent Type column, select rent type to escalate in the drop down.:
Section 6 Addendum Part A Step Rent, Beginning Year column, select year the step rent type for this row will begin from the drop down.:
Section 6 Addendum Part A Step Rent, Through Year column, select year the step rent type for this row will end from the drop down.:
Section 6 Addendum Part A Step Rent, Amount Will Be column, enter the step rent amount for the Rent Type in this row. :
Section 6 Addendum Part A Step Rent, Per column, time division designation for the Rent Type and Amount appropriate for this row.:
Click here to add another Step Rent row.:
Click here to remove the Step Rent row at the bottom of the Step Rent table.:
Section 6 Addendum Part B Renewal Options, Option Number column, from the drop down, identify the Option Period proposed beginning with 1 for the first, 2 for the second, etc.:
Section 6 Addendum Part B Renewal Options, Duration in Years column, select the duration in years for the option proposed in this row from the drop down.:
Section 6 Addendum Part B Renewal Options, Annual Shell Rate per RSF column, enter the annual shell rate per RSF for the option proposed in this row.:
Section 6 Addendum Part B Renewal Options, Number of Days Notice to Exercise Option column, enter the number of days notice to exercise the option for the option proposed in this row.:
Click here to add another Renewal Option row.:
Click here to remove the Renewal Option row at the bottom of the renewal option table.:
Click here to select, "Yes, the offered space is part of multiple tax bills or multiple buildings on a single tax parcel.": 0
Click here to select, "No, the offered space is NOT part of multiple tax bills or multiple buildings on a single tax parcel.": 0
Section 6 Addendum Part C, Building column, from the drop down, identify the building described in this row starting with building 1 for the first, 2 for the second, etc.:
Section 6 Addendum Part C, Building RSF column, enter the building RSF for the building described in this row that is applicable to the Tax Parcel outlined in the next rows.:
Section 6 Addendum Part C, Tax Parcel column, from the drop-down, identify the tax parcel order number applicable to the Building RSF reported in this row starting with Tax Parcel 1.:
Section 6 Addendum Part C, Tax Parcel ID Number column, enter the tax parcel ID number applicable to the tax parcel order number reported in this row.:
Click here to add another Additional Tax Parcel Information row to report an additional building or tax parcel.:
Click here to remove the Tax Parcel Information row at the bottom of the Additional Tax Parcel Information table.:
GSA Template 3516 PAGE 1 (REV 12/23)
SOLICITATION PROVISIONS
(Acquisition of Leasehold Interests in Real Property)
1. 552.270-1 INSTRUCTIONS TO OFFERORS – ACQUISITION OF LEASEHOLD INTERESTS IN
REAL PROPERTY (JUN 2011)
(a) Definitions. As used in this provision—
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
“In writing, writing or written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals.
(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages Offers must be:
(i) Submitted on the forms prescribed and furnished by the Government as a part of this solicitation or on copies of those forms, and
(ii) Signed. The person signing an offer must initial each erasure or change appearing on any offer form. If the offeror is a partnership, the names of the partners composing the firm must be included with the offer.
(2) Late proposals and revisions.
(i) The Government will not consider any proposal received at the office designated in the solicitation after the exact time specified for receipt of offers unless it is received before the Government makes award and it meets at least one of the following conditions:
(A) It was sent by registered or certified mail not later than the fifth calendar day before the date specified for receipt of offers (e.g., an offer submitted in response to a solicitation requiring receipt of offers by the 20th of the month must have been mailed by the 15th).
(B) It was sent by mail (or telegram or facsimile, if authorized) or hand-carried (including delivery by a commercial carrier) if it is determined by the Government that the late receipt was due primarily to Government mishandling after receipt at the Government installation.
(C) It was sent by U.S. Postal Service Express Mail Next Day Service-Post Office to Addressee, not later than 5:00 p.m. at the place of mailing two working days prior to the date specified for receipt of proposals. The term “working days” excludes weekends and U.S. Federal holidays.
(D) It was transmitted through an electronic commerce method authorized by the solicitation and was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals.
(E) There is acceptable evidence to establish that it was received at the activity designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers, and
GSA Template 3516 PAGE 2 (REV 12/23) that the Contracting Officer determines that accepting the late offer would not unduly delay the procurement.
(F) It is the only proposal received.
(ii) Any modification or revision of a proposal or response to request for information, including any final proposal revision, is subject to the same conditions as in paragraphs (c)(2)(i)(A) through (c)(2)(i)(E) of this provision.
(iii) The only acceptable evidence to establish the date of mailing of a late proposal or modification or revision sent either by registered or certified mail is the U.S. or Canadian Postal Service postmark both on the envelope or wrapper and on the original receipt from the U.S. or Canadian Postal Service. Both postmarks must show a legible date or the proposal, response to a request for information, or modification or revision shall be processed as if mailed late. “Postmark” means a printed, stamped, or otherwise placed impression (exclusive of a postage meter machine impression) that is readily identifiable without further action as having been supplied and affixed by employees of the U.S. or Canadian Postal Service on the date of mailing. Therefore, offerors or respondents should request the postal clerk to place a legible hand cancellation bull’s eye postmark on both the receipt and the envelope or wrapper.
(iv) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(v) The only acceptable evidence to establish the date of mailing of a late offer, modification or revision, or withdrawal sent by Express Mail Next Day Service-Post Office to Addressee is the date entered by the post office receiving clerk on the “Express Mail Next Day Service-Post Office to Addressee” label and the postmark on both the envelope or wrapper and on the original receipt from the U.S. Postal Service. “Postmark” has the same meaning as defined in paragraph (c)(2)(iii) of this provision, excluding postmarks of the Canadian Postal Service. Therefore, offerors or respondents should request the postal clerk to place a legible hand cancellation bull’s eye postmark on both the receipt and the envelope or wrapper.
(vi) Notwithstanding paragraph (c)(2)(i) of this provision, a late modification or revision of an otherwise successful proposal that makes its terms more favorable to the Government will be considered at any time it is received and may be accepted.
(vii) An offeror may withdraw its proposal by written notice or telegram (including mailgram) received at any time before award. If the solicitation authorizes facsimile proposals, an offeror may withdraw its proposal via facsimile received at any time before award, subject to the conditions specified in the provision entitled “Facsimile Proposals.” Proposals may be withdrawn in person by an offeror or an authorized representative, if the representative’s identity is made known and the representative signs a receipt for the proposal before award.
(viii) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .