Serv C26-145E Atlas Copco Compressor Core Repair - 05 - PWS.pdf

PDF 315 KB Posted

Attached to
Altas Copco Compressor Repair
Solicitation number
FA8125-26-Q-0080
Issued by

About this file

This is a Performance Work Statement (PWS) for the repair and upgrade of an Atlas Copco HMH8-4 Air Compressor Core (Model M8-40121) located at Tinker Air Force Base, Oklahoma, effective July 1, 2026.

The contractor must provide comprehensive repair, restoration, and modernization services for the compressor core, including all labor, parts, tools, equipment, test equipment, materials, quality control, transportation, and inspection activities. Key services required include: complete core repair and restoration with installation of replacement parts per the Component Disassembly Report; mandatory equipment upgrades including installation of a modernized split line o-ring, tell-tale assembly, seal tubing assembly, main oil pump sleeve bearing, and idler gear sleeve bearing; complete diagnostic teardown and inspection of the Inlet Guide Vane (IGV) assembly and customer-supplied spare parts; and secure crating and preparation of the repaired compressor core for return shipment. The contractor must provide written Estimate Repair Reports within one business day of inspection completion and final Service Reports within five business days of completion, including detailed labor cost breakdowns and verification that performance checks confirm operational condition. All repairs require documented Contracting Officer approval before initiation. The contractor must be Atlas Copco-trained, designate a Contract Manager fluent in English within ten business days of award, and maintain all documentation and certifications regarding environmental compliance, hazardous materials handling, safety protocols, and security/OPSEC training. Equipment must be returned within five business days of repair completion using the fastest traceable shipping method with FOB Destination to Tinker AFB. The contractor shall achieve 100 percent compliance with service reporting requirements, off-site repair restrictions, and equipment return timelines as specified in the Service Summary performance assessment table.

View the file

Other files

File Type Posted
Fully_Executed_ServC26-145E_Altas_Compssr_Repair_Redacted.pdf PDF
FA8125-26-Q-0080.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

(PWS) FOR

Serv C26-145E Atlas Copco Compressor Core Repair M8-40121

(TINKER AIR FORCE BASE, OK)

Prepared by OC-ALC/OBCA and

AFSC/PZIMA

01 July 2026

Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.

Section One

1.0 Description of Services

1.0.1 The contractor shall provide all required parts, labor, upgrades, and materials necessary to restore the Atlas Copco HMH8-4 Air Compressor Core (M8-40121) to a fully operational and Original Equipment Manufacturer (OEM)-compliant state. The end result shall be a completely assembled, upgraded, and inspected compressor core, along with evaluated sub-assemblies, packaged and ready for return transit.

1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform a one-time Core Repair, Upgrade, and Inspection service for the Oklahoma City–Air Logistics Complex (OC- ALC). The equipment is listed in Attachment 1, Appendix B (Off-Base).

1.1.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.

1.2 Known Problems: The Atlas Copco HMH8-4 Air Compressor Core (Serial Number/Model:

M8-40121) requires comprehensive repair and modernization to address the following known mechanical issues, wear-and-tear failures, and obsolescence risks identified during evaluation:

• Core Hardware and Consumables: Worn, degraded, or failed internal hardware and consumables as documented in the Component Disassembly Report (CDR) that prevent the unit from meeting OEM performance standards.

• Internal seals and tubing: Degradation of aging sealing elements, requiring replacement with an upgraded split line o-ring and a modernized seal tubing assembly to prevent critical oil and air leaks.

• Oil and Alignment Monitoring: Missing or outdated monitoring pathways, requiring the installation of a new tell-tale assembly to ensure proper oil routing and leak detection.

• Rotary and Gear Bearings: Severe wear on high-stress bearing surfaces, requiring the replacement of the main oil pump sleeve bearing and the idler gear sleeve bearing to restore structural integrity and prevent rotational binding or catastrophic gear failure.

• Inlet Guide Vane (IGV) Assembly: Unverified operational status and potential internal wear of the IGV assembly, requiring a complete diagnostic teardown and visual inspection of all sub-components to identify hidden faults.

1.3 Requested Services: The contractor shall perform a one-time, comprehensive service to restore, upgrade, and verify the Atlas Copco HMH8-4 Air Compressor Core. The following definitive services are required:

1.3.1 Core Repair and Restoration: The contractor shall execute a complete repair and restoration of the compressor core. This includes the installation of all necessary replacement parts, hardware, and consumables as identified in the Component Disassembly Report (CDR) to return the unit to full operational functionality.

1.3.2 Mandatory Equipment Upgrades: The contractor shall perform required system upgrades to address known equipment obsolescence. This service includes the installation of a modernized split line o-ring, tell-tale assembly, seal tubing assembly, main oil pump sleeve bearing, and idler gear sleeve bearing.

1.3.3 Diagnostic Inspection of Ancillary Components: The contractor shall perform a complete teardown and diagnostic inspection of the Inlet Guide Vane (IGV) assembly. Additionally, the contractor shall conduct a visual inspection of all customer-supplied spare parts to assess their condition.

1.3.4 Preparation for Transport: The contractor shall provide all necessary logistical services, including securely crating the repaired compressor core, the inspected IGV assembly, and all associated parts for return shipment.

1.4 Over and Above (O&A): O&A is defined as work discovered during the course of performing the repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) R-DFARS 252.217-7028 and R-DFARS PGI 217.7701.

1.5 Malfunction and Notification Process: Upon occurrence of an equipment or system malfunction, the Government Point of Contact (GPOC) will contact the Contractor by telephone, email, or fax and provide information below. If the GPOC notifies the Contractor via telephone, the GPOC will provide a written copy of the request by email or fax.

• the equipment identification number (ID#)

• A brief description of the malfunction

• location of equipment

• name and telephone number of the Point of Contact (POC)

1.5.1 Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days.

1.6 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the GPOC by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:

• the equipment ID#

• date of evaluation

• description of findings and recommendations

• required parts and part numbers (P/N)

• cost of parts

• number of parts needed

• estimated labor hours required to complete the repair

1.6.1 Any recommendations cited shall consider:

• the priority of the requested service

• available source for obtaining new parts

• the availability of the new parts

• shipping and delivery schedules of parts

• other factors which may be peculiar to the specific repair requirement

1.7 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The GPOC will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.

1.7.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the GPOC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The GPOC will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.

1.8 Service Report: Upon completion of any maintenance the Contractor shall provide a draft, written Service Report to the GPOC and SME. The Contractor shall provide, by email, the final service report within 5 business days to the GPOC. At a minimum, the final service report shall contain the following information:

• Company Name

• Requested service date

• Contract #

• Equipment ID #

• Description of Services provided

• Additional Services recommended (if any)

• Printed Name and Signature of Technician who performed the Services (electronic signatures are acceptable)

• Printed Name and Signature of on-site SME or GPOC (electronic signatures are acceptable)

• Start and Completion dates

• Complete Breakdown of the Labor Cost (hours and rate)

• Materials and Parts used

• Details of any other charges

• Printed Name and Signature stating only new parts and materials were used (electronic signatures are acceptable)

• Written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)

1.9 Off-Site Repair: The Contractor shall not remove from the premises any system, sub-system or peripheral at any time in order to affect repair without the written consent of the Government.

1.9.1 The Contractor shall provide written documentation which supports a request to remove from the premises any system, sub-system or peripheral. Said written documentation and request shall include, as a minimum, the information listed below.

• contract number

• part number, OC #, S/N, as applicable

• description of the part, OC #, S/N, as applicable

• corresponding estimate repair report number

1.9.2 When determined necessary by the GPOC to ship items to the Contractor’s off-site facility for repair, the Contractor shall arrange for the scheduling, repair of the failed item and provide the appropriate shipping data to the GPOC. The GPOC will process the required shipping documents and arrange for transportation of the item to the appropriate shipping bay for packaging, shipment, and transporting to the designated off-site facilities Free on Board (FOB) destination [see GFP Attachment (Off-Base)].

1.10 Return of Equipment: (SS) Upon completion of the approved repair, the Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall provide documentation that the performance check has been completed and the equipment is in working order IAW paragraph 1.8, Service Report, of this PWS.

The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimate Repair Report.

1.11 Delivery: The Contractor shall ship all repaired and non-repairable equipment by the fastest and most traceable method in order to arrive within five (5) business days after the repair completion date.

1.12 Shipping: The Contractor shall provide to the GPOC, the date equipment was shipped out, shipment identification information and include contract number on the shipping paper work with a Free On Board (FOB) Destination. The ship to address is listed below.

ATTN: SURVEILLANCE GPOC or POC/Contract No: _____________

OC-ALC/OBC

Bldg. 3001 Staff Dr. Door G70 Post N68 Tinker AFB, OK 73145-3052

1.13 Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The GPOC will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or GPOC.

1.14 Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.

1.15 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.16 Special Qualifications: The Contractor shall provide personnel with the following special qualifications:

• Atlas Copco trained technicians

1.17 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and GPOC, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.18 Environmental Certification: The Government will ensure the part or equipment is clean, drained and purged before it is transferred to the Contractor for repair. The Government will provide written certification of such to the Contractor prior to shipment or pick up of the part or equipment. Certification will be by official correspondence with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said certification will contain description of the part or equipment, make, model, serial number, and OC number (if applicable). This certification will be provided to the GPOC three (3) business days prior to the pick-up or shipment of the part or equipment. The GPOC will, in turn, provide it to the Contractor within two (2) business days prior to the pick-up or shipment of the part or equipment.

1.18.1 The Contractor shall ensure and provide written certification that the repaired part or equipment is cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB.

Certification shall be by official correspondence with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said certification shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to the GPOC two (2) business days prior to the return of the part or equipment.

1.19 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

1.19.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (DAFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil <http://www.e-publishing.af.mil> for downloading or ordering.”

1.20 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the GPOC within ten (10) days after award. Upon GPOC receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

1.20.1 The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the GPOC monthly, the last business day of each month, or when the required work is completed. The GPOC will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.

1.21 Safety Data Sheet (SDS) and Labeling: Upon GPOC receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

1.21.1 The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the GPOC, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the GPOC prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s);

pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The GPOC will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the GPOC if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.

1.22 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the GPOC within ten (10) days after award. Upon GPOC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

1.22.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the GPOC if the required waste containers are not available on site.

1.23 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Wastewater Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the GPOC within ten (10) days after award. The GPOC will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

1.24 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure wastewater discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide official correspondence ten (10) calendar days after contract award date to the GPOC from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.

1.25 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental spills to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

1.25.1 One (1) copy to CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

1.26 Environmental Training: Upon GPOC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

1.26.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;

http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 <http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000> and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the GPOC for approval within ten (10) calendar days after contract award date. Once written approval is received from the GPOC, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the GPOC, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFB HWMP, “Hazardous Waste Management”.

1.27 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the GPOC will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable http://www.e-publishing.af.mil/ records management regulations in accordance with AFI 33-322, Records Management and Information Governance Program, as modified by AFI 33-322_DAFGM2025-01.

1.28 OC-ALC Security and OPSEC training: All Contractor personnel working on base in the OC-ALC shall be required to read the OC-ALC Security and OPSEC briefings. The GPOC will ensure the Security and OPSEC briefings are available for review by the Contractor. The Contractor shall provide the GPOC with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW DoDM 5200.01_AFMAN 16-1404 (Volumes 1-3), “Information Security Program”, [Verify exact new Volume/Chapter/Paragraph 9.2(6); DAFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4; and OC-ALC 16-1404, “OC-ALC Security’, Paragraph 7.

1.28.1 The original contract sponsor shall ensure delivery personnel are made aware that any photography or videography are not allowed on Tinker Air Force Base or its associated areas.

Additionally, the disclosure (sharing) of any Department of Defense information, obtained from or while on Tinker Air Force Base, is unauthorized. Unauthorized disclosure can lead to severe penalties, including fines, imprisonment, and administrative action.

1.29 Foreign Nationals: The Contractor shall notify the GPOC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

1.30 Safety and Health off Government Installations: While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. During the execution of the contract, the Contractor shall notify the CO, GPOC, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property in which the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00.

1.30.1 Mishap notifications shall contain, as a minimum, the following information:

• Contract, Contract Number, Name and Title of Person(s) Reporting

• Date, Time and exact location of accident/incident

• Brief Narrative of accident/incident (Events leading to accident/incident)

• Cause of accident/incident, if known

• Estimated cost of accident/incident (material and labor to repair/replace)

• Nomenclature of equipment and personnel involved in accident/incident

• Corrective actions (taken or proposed)

• Other pertinent information

1.30.2 If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

1.31 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the GPOC shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:

a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.

b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.

c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.

d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip

1.32 Speak Up for Safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.

1.32.1 A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.

1.32.2 Government personnel are empowered to intercede in events that pose imminent danger to personnel or catastrophic damage to property.

1.33 Contractor Manpower Reporting (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields in the Service Contract Report (SCR) at www.SAM.gov.

1.33.1 Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year Contractors may direct questions to the SAM.gov service desk (https://www.fsd.gov/fsd-gov/home.do).

1.34 Reporting Period: Contractors are required to input data by 31 October of each year. (Only for Contracts over $3 Million)

1.35 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

http://www.state.gov/g/tip http://www.sam.gov/ https://www.fsd.gov/fsd-gov/home.do

1.36 User Guide: Data for Air Force service requirements must be input at www.sam.gov. A quick start user guide is available at on the SAM.gov website at https://sam.gov/SAM/transcript/SCR_QSG.pdf. In addition, a full user guides for contractors and government personnel are available at https://www.sam.gov/SAM/pages/public/help/samUserGuides.jsf.

https://sam.gov/SAM/transcript/SCR_QSG.pdf https://www.sam.gov/SAM/pages/public/help/samUserGuides.jsf

Section Two

Performance Assessment

The Contractor shall be aware that in the absence of any contract requirement from the Service Summary (SS) does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following SS requirements are accomplished:

EXAMPLE TABLE ONLY

Service Summary (SS) Table 2-1

SS PERFORMANCE OBJECTIVE PWS

PARA.

PERFORMANCE

THRESHOLD

SS 1 Service Report 1.8 100% Compliance

SS 2

Off-Site Repair: The Contractor shall not remove from the premises any system, sub-system or peripheral at any time in order to affect repair without the written consent of the Government.

1.9 100% Compliance

SS 3

Return of Equipment: Upon completion of the approved repair, the Contractor shall conduct a performance check on the repaired equipment to verify it is restored to operational condition. The Contractor shall provide documentation that the performance check has been completed and the equipment is in working order IAW paragraph 1.8 Service Report, of this PWS. The Contractor shall return the repaired equipment to the Government within the timeframe identified on the Estimate Repair Report.

1.10 100% Compliance

SECTION THREE

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Government Furnished Property (GFP).

3.1.1. GFP - Repair/Maintenance

Off-Base. Not Applicable or Narrative Below.

The Contractor shall ensure all GFP is secured at the close of each workday. The Government retains title to all GFP, until the Government properly disposes of the GFP as authorized by law or regulation. This GFP shall not be used for the performance of any other contract. The applicable Government Property contract clauses will be cited in the solicitation/contract. The GFP is identified in Attachment #Appendix A.

3.1.2.1. GFP Shipment to Contractor’s Facility. In accordance with PWS Section One.

3.1.2.2. GFP Return Shipment to Government. In accordance with PWS Section One.

3.1.2.3. Loss of Government Property. In accordance with the Government Property contract clauses.

3.1.2.4. GFP Identification Labels. When applicable, the Contractor shall clearly label (without damaging) GFP to distinguish it from Contractor Furnished Property IAW with the contract terms and conditions and this PWS.

Prepared by OC-ALC/OBCA and AFSC/PZIMA
01 July 2026
3.1. Government Furnished Property (GFP).

File details come from the government source that posted it. Updated .