Serv C25-005 Leasing of Deionized Water Treatment Systems - Appendix A2 (PMXG) 2024.docx

DOCX document 31 KB Posted

Attached to
DE-IONIZED WATER SYSTEM LEASE AND MAINTENANCE Federal contract opportunity
Solicitation number
FA813225Q0006
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is an equipment listing appendix (Appendix A2) for deionized water treatment systems at the 76 PMXG (Propulsion Maintenance Group). The document details 26 specific locations requiring deionized water treatment systems, primarily in Buildings 3001, 9001, and 3221. The majority of systems require 9" PE Tri Bed cylinders with 12-month replacement schedules. The equipment serves various types of machinery including Mart washers, Better Engineering units, Hotsy hand wash stations, plasma spray systems, and cleaning tanks. A few locations specifically require 9" PE 2-Bed systems with 6-month replacement schedules, notably for plasma spray applications.

View the file

Other files for this federal contract opportunity

Other files attached to DE-IONIZED WATER SYSTEM LEASE AND MAINTENANCE, newest first.
File Type Posted
Serv C25-005 Leasing of Deionized Water Treatment Systems - PWS.pdf PDF
Serv C25-005 Leasing of Deionized Water Treatment Systems - Appendix A1 (CMXG).pdf PDF
FA813225Q0006 De-Ionized Water Treatment Sys Lease and Mx.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sep 11, 2024

APPENDIX A2

EQUIPMENT LISTING FOR 76 PMXG

One system shall be at the following locations.

No
Bldg
Post
Shop
Cylinder Size

(Inches) Replacement Sch.

Est. Annual Usage

1
3001
E-91
Powerflush
9” PE Tri Bed
12
2
3001
F-92
Mart 72
9” PE Tri Bed
12
3
3001
J-85
Mart 60
9” PE Tri Bed
12
4
3001
M-89
Hotsy Hand Wash
9” PE Tri Bed
12
5
3001
P-81
Mart Tornado 40
9” PE Tri Bed
12
6
3001
P-97
Better Engineering
9” PE Tri Bed
12
7
3001
Q-85
Better Engineering
9” PE Tri Bed
12
8
3001
U-83
Better Engineering
9” PE Tri Bed
12
9
3001
V-106
Better Engineering
9” PE Tri Bed
12
10
3001
W-87
Mart 40
9” PE Tri Bed
12
11
3001
W-109
Better Engineering
9” PE Tri Bed
12
12
9001
CC40
Better Engineering
9” PE Tri Bed
12
13
3001
X-85
Mart Tornado 40
9” PE Tri Bed
12
14
3001
X-91
Better Engineering
9” PE Tri Bed
12
15
3001
Y-77
Mart Tornado 40
9” PE Tri Bed
12
16
214
A-7
BlueWave Ultrasonic
9” PE Tri Bed
12
17
9001
DD37
Hurricane 84
9” PE Tri Bed
12
18
9001
DD38
Hotsy Hand Wash
9” PE Tri Bed
12
19
3221
B-17
Hotsy Hand Wash
9” PE Tri Bed
12
20
3001
I-73
Plasma Spray
9” PE 2-Bed
6
21
3221
K-1 & K-3
Plasma Spray (There are two)
9” PE 2-Bed
6
22
3001
Z-77
Mart Tornado 40
9” PE Tri Bed
12
23
3221
D-19
Cleaning Tank 203
9” PE Tri Bed
12
24
3001
D97
Case NDI
9” PE Tri Bed
12
25
3001
K73
Plasma Spray
9” PE Tri Bed
12
26
3001
M-57
Bearing Shop
9”
6

File details come from the government source that posted it. Updated .