Serv C25-005 Leasing of Deionized Water Treatment Systems - Appendix A2 (PMXG) 2024.docx
DOCX document 31 KB Posted
- Attached to
- DE-IONIZED WATER SYSTEM LEASE AND MAINTENANCE Federal contract opportunity
- Solicitation number
- FA813225Q0006
About this file
This is an equipment listing appendix (Appendix A2) for deionized water treatment systems at the 76 PMXG (Propulsion Maintenance Group). The document details 26 specific locations requiring deionized water treatment systems, primarily in Buildings 3001, 9001, and 3221. The majority of systems require 9" PE Tri Bed cylinders with 12-month replacement schedules. The equipment serves various types of machinery including Mart washers, Better Engineering units, Hotsy hand wash stations, plasma spray systems, and cleaning tanks. A few locations specifically require 9" PE 2-Bed systems with 6-month replacement schedules, notably for plasma spray applications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Serv C25-005 Leasing of Deionized Water Treatment Systems - PWS.pdf | ||
| Serv C25-005 Leasing of Deionized Water Treatment Systems - Appendix A1 (CMXG).pdf | ||
| FA813225Q0006 De-Ionized Water Treatment Sys Lease and Mx.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sep 11, 2024
APPENDIX A2
EQUIPMENT LISTING FOR 76 PMXG
One system shall be at the following locations.
| No |
| Bldg |
| Post |
| Shop |
| Cylinder Size |
(Inches) Replacement Sch.
Est. Annual Usage
| 1 |
| 3001 |
| E-91 |
| Powerflush |
| 9” PE Tri Bed |
| 12 |
| 2 |
| 3001 |
| F-92 |
| Mart 72 |
| 9” PE Tri Bed |
| 12 |
| 3 |
| 3001 |
| J-85 |
| Mart 60 |
| 9” PE Tri Bed |
| 12 |
| 4 |
| 3001 |
| M-89 |
| Hotsy Hand Wash |
| 9” PE Tri Bed |
| 12 |
| 5 |
| 3001 |
| P-81 |
| Mart Tornado 40 |
| 9” PE Tri Bed |
| 12 |
| 6 |
| 3001 |
| P-97 |
| Better Engineering |
| 9” PE Tri Bed |
| 12 |
| 7 |
| 3001 |
| Q-85 |
| Better Engineering |
| 9” PE Tri Bed |
| 12 |
| 8 |
| 3001 |
| U-83 |
| Better Engineering |
| 9” PE Tri Bed |
| 12 |
| 9 |
| 3001 |
| V-106 |
| Better Engineering |
| 9” PE Tri Bed |
| 12 |
| 10 |
| 3001 |
| W-87 |
| Mart 40 |
| 9” PE Tri Bed |
| 12 |
| 11 |
| 3001 |
| W-109 |
| Better Engineering |
| 9” PE Tri Bed |
| 12 |
| 12 |
| 9001 |
| CC40 |
| Better Engineering |
| 9” PE Tri Bed |
| 12 |
| 13 |
| 3001 |
| X-85 |
| Mart Tornado 40 |
| 9” PE Tri Bed |
| 12 |
| 14 |
| 3001 |
| X-91 |
| Better Engineering |
| 9” PE Tri Bed |
| 12 |
| 15 |
| 3001 |
| Y-77 |
| Mart Tornado 40 |
| 9” PE Tri Bed |
| 12 |
| 16 |
| 214 |
| A-7 |
| BlueWave Ultrasonic |
| 9” PE Tri Bed |
| 12 |
| 17 |
| 9001 |
| DD37 |
| Hurricane 84 |
| 9” PE Tri Bed |
| 12 |
| 18 |
| 9001 |
| DD38 |
| Hotsy Hand Wash |
| 9” PE Tri Bed |
| 12 |
| 19 |
| 3221 |
| B-17 |
| Hotsy Hand Wash |
| 9” PE Tri Bed |
| 12 |
| 20 |
| 3001 |
| I-73 |
| Plasma Spray |
| 9” PE 2-Bed |
| 6 |
| 21 |
| 3221 |
| K-1 & K-3 |
| Plasma Spray (There are two) |
| 9” PE 2-Bed |
| 6 |
| 22 |
| 3001 |
| Z-77 |
| Mart Tornado 40 |
| 9” PE Tri Bed |
| 12 |
| 23 |
| 3221 |
| D-19 |
| Cleaning Tank 203 |
| 9” PE Tri Bed |
| 12 |
| 24 |
| 3001 |
| D97 |
| Case NDI |
| 9” PE Tri Bed |
| 12 |
| 25 |
| 3001 |
| K73 |
| Plasma Spray |
| 9” PE Tri Bed |
| 12 |
| 26 |
| 3001 |
| M-57 |
| Bearing Shop |
| 9” |
| 6 |
File details come from the government source that posted it. Updated .