SEKI_328469_Specifications_Final_Stamped_1.pdf
PDF 6 MB Posted
- Attached to
- SEKI: REHAB CLOVER CREEK WASTEWATER DISPOSAL
- Solicitation number
- DOIPFBO260008
About this file
Summary of SEKI Specifications and Contract Documents
This is a comprehensive specification document and related federal contract opportunity for the rehabilitation of the Clover Creek Wastewater Disposal System at Sequoia & Kings Canyon National Park. The project involves demolition, repair, and restoration of existing effluent storage tanks, installation of new solar photovoltaic systems, replacement of damaged wastewater disposal infrastructure, and implementation of a new Supervisory Control and Data Acquisition (SCADA) system. Key deliverables include rehabilitation of 250,000-gallon and 15,000-gallon effluent storage tanks with new coatings and controls; design and installation of a solar power system with battery backup and emergency generator transfer capability; replacement of damaged spray field and leach field piping, solenoid valves, air relief valves, and monitoring wells; and programming of SCADA systems to interface with existing controls at the Clover Creek Wastewater Treatment Plant. The project is located at 6,800 feet elevation in a remote area subject to winter road closures (November through April), requiring careful sequencing and coordination with continuous wastewater system operations. Three contract line items are defined: (1) rehabilitation of effluent storage tanks and controls (lump sum), (2) power system including solar panels, batteries, and SCADA (lump sum), and (3) disposal field system repairs and replacements (lump sum).
The Department of the Interior National Park Service issued a pre-solicitation Sources Sought notice (DOIPFBO260008) requesting responses from interested contractors by February 17, 2026. The specifications detail extensive requirements across construction divisions including site management, demolition, concrete work, structural steel, metal fabrications, coatings, electrical systems (Division 26), and utility work. Critical constraints include an eight-hour maximum service disruption window for effluent disposal system shutdown, requirement for phase one operational commissioning before phase two tree removal work, mandatory archaeologically sensitive area monitoring, environmental protection protocols including equipment cleaning requirements to prevent invasive species, lead-safe work practices, hazardous materials management, and post-construction restoration. The contractor must coordinate with hazardous tree removal operations occurring concurrently on site and provide one year of SCADA system maintenance and support post-commissioning. All work is subject to National Park Service operational continuity requirements and federal environmental compliance standards including NPDES permit requirements and water quality standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources_Sought_Worksheet_1.pdf | ||
| SEKI_328469_Plans_Final_Stamped-Reduced_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This page was intentionally left blank
SEKI 328469 SEALS PAGE
NPS DSC Division 1 Specifications National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SEKI 328469
Civil Engineer Mechanical Engineer
Electrical Engineer Structural Engineer
12/12/2025 12/12/2025
SEKI 328469 TOC - 1
TABLE OF CONTENTS
Project Specifications
Table of Contents
SEKI 328469
TABLE OF CONTENTS
DIVISION 1 � GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 26 01 Contract Modification Procedures
01 27 00 Definition of Contract Line Items
01 31 00 Project Management and Coordination
01 32 16 Construction Schedule
01 32 33 Photographic Documentation
01 33 23 Submittal Procedures
01 35 13 Natural, Cultural, and Physical Resource Protection
01 35 23 Safety Requirements
01 40 00 Quality Requirements
01 42 00 Reference Standards
01 50 00 Temporary Facilities and Controls
01 57 19.12 Noise and Acoustics Management
01 57 23 Temporary Storm Water Pollution Prevention (SWPP)
01 67 00 Product Requirements
01 73 40 Execution
01 74 19 Construction Waste Management and Disposal
01 77 00 Closeout Procedures
01 78 23 Operation and Maintenance (O&M) Data
01 79 00 Demonstration and Training
DIVISION 1 � SUPPLEMENTAL DOCUMENTS
Appendix A - Leon Environmental Asbestos and Lead Report
Appendix B - Letter of Compliance for Additional Environmental Mitigations
Appendix C - Hot Work Permit Form
Appendix D - Vehicle Inspection Map
Appendix E � Project Waste Management Plan Worksheet
DIVISION 2 � EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 3 � CONCRETE
03 30 00 Cast-In-Place Concrete
03 62 00 Non-Shrink Grout
DIVISION 5 � METALS
SEKI 328469 TOC - 2
TABLE OF CONTENTS
05 12 00 Structural Steel Framing
05 50 00 Metal Fabrications
05 52 00 Handrails and Railings
DIVISION 9 � FINISHES
09 96 00 High Performance Industrial Coatings
DIVISION 10 � SPECIALTIES
10 14 23 Identification Signs
DIVISION 26 � Electrical
26 05 00 Electrical Basic Requirements
26 05 19 Wire and Cable 600 Volt and Below
26 05 26 Grounding and Bonding
26 05 33 Raceways and Boxes
26 05 43 Electrical Exterior Underground
26 08 13 Acceptance Testing
26 99 00 Photovoltaic Modules
DIVISION 31 � EARTHWORK
31 05 25 Utility Line Marking
31 10 00 Site Clearing
31 23 00 Earthwork
31 23 33 Trenching, Backfilling, and Compacting for Utilities
DIVISION 32 � EXTERIOR IMPROVEMENTS
32 01 01 Tree Protection
32 11 23 Aggregate Course
DIVISION 33 - UTILITIES
33 34 00 Spray Field Disposal System
DIVISION 40 � PROCESS INTERCONNETIONS
40 61 13 Process Control System General Requirements
40 61 21 Process Control System Testing
40 61 96 Process Control Descriptions
40 63 43 Programmable Logic Controller (PLC) Control System
40 68 13 Process Control (HMI) Software
40 68 63 Configuration of HMI Software and Reports
SEKI 328469 01 11 00 - 1
SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Work Phases
3. Government-Furnished Materials
4. Construction Contractor Use of Site
5. Public Use of Site
6. Conduct of Operations
7. Work Restrictions
8. Special Construction Requirements
9. Soils Investigation Report
10. Additional Reports
1.2 WORK COVERED BY CONTRACT DOCUMENTS
Project Location: The project is located in Sequoia & Kings Canyons National Park in the Red
Fir area at the Clover Creek wastewater treatment plant and disposal fields. The site is approximately 6800 ft above sea level. Road access is not available when there is snow and is generally closed from November through April, with intermittent closures due to weather occurring earlier and later. The Contractor shall maintain a weather watch and ensure no equipment will be stuck in the snow and the system will be fully operational at the seasonal closure(s). The park does not plow this road. Winter snow of 6 ft is common.
1. The Contractor is required to submit a Construction Phasing Plan, Tank Tie-In Plan, Tank&
Sewer Main Bypass Plan, and Sanitary Sewer Overflow Plan for approval.
2. Continued operation of a minimum of three spray fields, equivalent to the size of fields J, M, and N combined) is required for the summer season, generally April through
November, dependent on weather. Summer flows average 35,000 gpd with maximum flows of 85K gpd occurring over holiday periods. These flows are too high for leach field use.
3. Maximum permitted flows with all fields operational are 95K gpd for spray fields (summer use only) and 82K gpd for leach fields (winter).
4. Operation and access to valves controlling flow to fields in use are required at all times as current operation is manual (there is no power at the site) and requires manually turning valves in the vaults. Transfer of fields requires one working day to complete and requires a two week advance request.
5. Any disruption in effluent disposal shall require a Tie-In Plan and Checklist to include
Emergency Contact information, List of Parts on Hand and Onsite, Required
Measurements for Pipes, Vaults, Valves, etc., Spare Parts Onsite, Work Sequence and
Durations. Service disruption shall strictly be limited to 8 hours total, regardless of
SEKI 328469 01 11 00 - 2
whether it begins at 4PM or 4AM, the repair must be made within 8 hours, ideally when the CCWWTP is staffed, as effluent storage at the WWTP is limited.
6. The Contractor shall submit a Sewer Spill Containment Plan for approval. Any effluent spills shall be treated as a Sanitary Sewer Overflow (SSO) and require reporting to the
California state Water Control Board.
B. The Work consists of:
1. Rehabilitating components of the wastewater disposal system at Clover Creek, which were damaged by the KNP Fire. The work includes, but is not limited to, the following:
a. Demolition, repair and restoration of the existing 250,000 and 15,000 gallon effluent storage tanks to their full operational capacity, including emptying, cleaning, sandblasting, and recoating, and structural repairs and replacements, installation of new tank control valves, piping, SCADA system. Replacing the power generation system with a new solar/battery power system to ensure reliable operation of the wastewater system and demolishing propane fueled piston generator.
b. Replacing damaged wastewater disposal components, including valves, spray heads, and other associated infrastructure required for proper function of the disposal system.
c. Demolition, disposal, and replacement of burned leach field and spray field lines, spray heads, electrical conduit, valve and control vaults, gate valves, solenoid valves, air relief valves, and portions of monitoring wells, marking posts and nameplates, and associated equipment as required for a complete and operational system and as shown on the contract drawings.
d. Installation of a new electronic control system (SCADA) to control tank flows, flows to all leach and spray field lines, operation of all valves, and that interfaces with the existing control system at the Clover Creek Wastewater Treatment Plant
(CCWWTP). This includes providing testing for functionality and interface, providing training to park WWTP operators, and providing 1 year of service support and maintenance. Demolition of all existing components required and as shown on the contract drawings.
e. Installation of a new photovoltaic system to provide the necessary power to the system, design/build of the rack, pole, and foundation by a CA State licensed
Structural Engineer, to include calculations, maintenance free batteries, an emergency generator transfer switch, and all associated control and monitoring systems for a complete and operational system. Demolition of all existing components required and as shown on the contract drawings.
f. Coordination with hazardous tree removal work occurring concurrently with this project. Coordination with park staff for continuous operation of the system during construction. Preparation of Construction Phasing Plan, Tank Tie-In Plan, Tank &
Sewer Main Bypass Plan, and Sanitary Sewer Overflow Plan, and other plans and submittals as noted in these contract drawings and specifications.
g. All closeout documents as listed in these contract documents and As-Built survey by a CA State Licensed Land Surveyor, and preparation and submittal of As-Built
Drawings.
C. Project will be constructed under a single prime contract.
D. The project shall have delayed notice to proceed for work on one portion of the site, in order to accommodate felling and removal of hazardous trees in that one portion of the site. Refer to the construction plans for additional information.
SEKI 328469 01 11 00 - 3
1.3 GOVERNMENT-FURNISHED MATERIALS
A. No Government-furnished materials are anticipated.
B. In case of Government -furnished materials:
1. The government will arrange and pay for delivery of Government-furnished items according to Construction Contractor's Construction Schedule.
2. Construction Contractor is responsible for initial inspection, receiving, unloading, and handling Government-furnished items at Project site.
3. The government will inspect delivered items for damage after delivery. Construction
Contractor shall be present for and assist in Government's inspection.
4. Government will arrange for replacement if Government-furnished items are damaged, defective, or missing.
5. Construction Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.
6. If Government-furnished items are damaged as a result of Construction Contractor's operations, Construction Contractor shall repair or replace them.
7. Construction Contractor shall install and otherwise incorporate Government-furnished items into Work.
1.4 CONSTRUCTION CONTRACTOR USE OF SITE
A. General: Construction Contractor shall have limited use of site for construction operations. Limit use of premises to work in areas indicated in the drawings. Do not disturb portions of the Project site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to disturbance limits, as shown on drawings, and staging areas.
2. Park operation of the sewage effluent conveyance, storage, and disposal systems will be continuous during construction. Access to the site for government personnel shall not be limited. Access roads shall remain unrestricted unless temporary closure is authorized on a case-by-case basis by the contracting officer.
B. Storage of Materials: Confine storage of materials to staging area shown on plans.
C. Parking: Confine parking to Tank area and Control Building area as shown on sheets C1.1 and
C2.2. Do not park on roadways, access must be maintained at all times.
D. Stockpiling: Confine stockpiling to the staging areas as shown on sheets C1.1 and C2.2.
E. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Do not remove, injure, or destroy trees or other plants, including post-fire growth without prior approval. Consult with Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
SEKI 328469 01 11 00 - 4
3. Do not fasten ropes, cables, or guys to existing trees.
4. Carefully supervise excavating, grading, filling, and other construction operations near trees, including post-fire growth, to prevent damage.
5. See Appendix B �Letter of Compliance for Additional Environmental Mitigations� for additional environmental mitigations.
F. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to
Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials. There shall be no storage of materials at the helispot located near the driveway entrance to General�s Highway. Access to the helispot shall remain open at all times.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
G. Construction Camp: Establishment of a dedicated construction camp within Sequoia National
Park will not be permitted. The contractor is responsible for securing housing for its employees outside the park. While the use of existing developed housing or camping areas within the park may be considered, availability is extremely limited and should not be relied upon. Any such use is subject to prior written approval by the Superintendent and will only be authorized if space is not already allocated for NPS personnel or other essential operations. If accommodations within the park are approved, the contractor will be charged the applicable commercial rate for any housing or campsite provided.
H. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. There is a 22� length restriction going up the switch backs via Ash Mountain entrance. A special permit will not relieve Construction
Contractor of liability for damage which may result from moving of equipment.
I. Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined.
1.5 PUBLIC USE OF SITE
A. The immediate area surrounding construction will be closed to the public during construction.
B. Construction Contractor shall conduct his operations to ensure the least inconvenience to public.
1.6 CONDUCT OF OPERATIONS
A. Construction Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or outside of the On-Site Work Hours may not be performed without prior consent from the Contracting Officer. Submit requests 2 business days in advance of the work to the Contracting Officer for approval.
SEKI 328469 01 11 00 - 5
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.7 WORK RESTRICTIONS
A. On-Site Work Hours: Work will be limited to 7 a.m. to 7 p.m., Monday through Friday, excluding
Federal holidays, except when otherwise indicated.
B. Existing Utilities
1. Existing Utilities: Notify Contracting Officer of proposed locations and times for excavation.
2. Construction Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: Do not interrupt operation of the effluent conveyance and disposal systems at any time without prior coordination with SEKI Utilities Department through the
Contracting Officer.
1. Notify Contracting Officer not less than ten business days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer�s written permission.
3. Hours and length of Utility Shutdowns: Maximum disruption of effluent conveyance and disposal systems shall be subject to the following constraints.
4. Any disruption in effluent disposal shall require a Tie-In Plan and Checklist to include
Emergency Contact information, List of Parts on Hand and Onsite, Required
Measurements for Pipes, Vaults, Valves, etc., Spare Parts Onsite, Work Sequence and
Durations. Service disruption shall strictly be limited to 8 hrs total, regardless of whether it begins at 4PM or 4AM, the repair must be made within 8 hrs, ideally when the
CCWWTP is staffed, as effluent storage at the WWTP is limited.
5. At the end of the construction season all electronic control systems must be complete and operational and integrated with the existing system at the Clover Creek WWTP to allow remote operation of the disposal system from the WWTP.
D. Nonsmoking Building/Tobacco Use/Vaping: Smoking is not permitted outside within the park at any time due to extreme fire danger. Smoking or vaping is only allowed within a personal vehicle, and no ashes, butts, or other residual shall be dropped or disposed of outside. Contractor must also adhere to park/local fire restrictions.
1.8 SPECIAL CONSTRUCTION REQUIREMENTS
A. Access to the site, and to many park roads, is disrupted during winter months due to weather conditions. In recent years, the site has become inaccessible in November and remained inaccessible until the end of April. Weather conditions vary each year, and contractor shall plan construction operations accordingly to account for winter shut-down and occasional weather events that may occur outside of the observations presented herein from recent years. Contractor
SEKI 328469 01 11 00 - 6
shall build a minimum of 5 working days of weather or road delays due to rock falls, floods, or other hazards into their construction schedule.
1.9 REQUIRED MITIGATIONS
A. See Section 01 35 13 �Natural, Cultural, and Physical Resources Protection� and Appendix B
�Letter of Compliance for Additional Environmental Mitigations�.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
SEKI 328469 01 26 01 - 1
CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 � CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor�s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager (PM), Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
SEKI 328469 01 26 01 - 2
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation � Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
SEKI 328469 01 26 01 - 3
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.
Include as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder�s Risk Insurance: Covers the contractor�s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government�s form.
SEKI 328469 01 26 01 - 4
3. Requests for extensions of contract time as a result of change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 "Construction Schedule", for time impact analysis requirements. TIA and associated costs shall be received with the proposal by the date shown within the Request for Proposal letter. Contractor�s failure to submit within the specified time frame will be construed as the Contractor waiving right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer (CO) in native format upon request.
5. Contractor shall review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing hours required for each craft directly engaged in modification work. Any work proposed requiring overtime work or premium pay shall be itemized separately. Rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, Federal Insurance Contributions Act (FICA), FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. Labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. Estimated cost for materials shall include quotes from multiple sources. Material prices shall include applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for work being performed.
2. Do not include costs for "miscellaneous tools and equipment", in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 shall be broken out separately.
3. Regardless of ownership, rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. United States (U.S.) Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
SEKI 328469 01 26 01 - 5
4. Estimated equipment rates shall include operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per Federal Acquisition Regulation (FAR) 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate full rate for equipment only for duration that equipment will be utilized to accomplish work of the modification.
6. Standby unit rates used in accordance with paragraph 1.3, D, 2, above. If the U.S. Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then 1/2 of equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, established standby rate shall apply from the first day of the delay.
8. Equipment not used and on job site for up to five consecutive days may be classified at standby rates, provided the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work.
Equipment still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead������10% Profit�������...10%
2. Total aggregate limit of markup (OH&P) for Contractor and Subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If Contractors form a partnership, partnership may only receive home office overhead and profit in same amount as an individual Contractor (refer to paragraph 1.3,E,1 above). It is the responsibility of the partners to decide on division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, overhead and profit mark-ups are required on net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
SEKI 328469 01 26 01 - 6
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 01 26 01
SEKI 328469 01 27 00 - 1
DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 � DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of work, include costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item Number 1: Rehabilitation and Reconstruction of Existing Effluent Storage
Tanks and Controls
1. This item consists of the rehabilitation of the 250,000-gallon effluent storage tank and the adjacent 15,000 gallon surge tank, including all necessary repairs/improvements to bring the 15,000 gallon tank on-line and to refurbish the 250,000-gallon tank to full operational capacity. The scope includes mobilization, site preparation, tank inspection, tank emptying, cleaning, disposal of effluent, structural repairs, interior and sandblasting, new interior and exterior coating, new tank level and flow sensers, new ladders, fall protection, manhole gaskets, telemetry, valving, valve boxes, concrete collars and asphalt pavement patches, and SCADA system connections, testing, disinfection, training, and other work as outlined in the contract documents. Work also includes demolition and disposal, cleaning, sandblasting, and recoating, and structural repairs and replacements, installation of new tank control valves, piping, SCADA system, and demonstration and training of the system for park staff.
2. Contractor shall coordinate with hazardous tree removal work occurring concurrently with this project. Coordination with park staff for continuous operation of the system during construction. Preparation of Construction Phasing Plan, Tank Tie-In Plan, Tank& Sewer
Main Bypass Plan, Sanitary Sewer Overflow Plan, and other plans and submittals as noted in these contract drawings and specifications.
3. Contractor shall prepare and submit all Closeout Documents as listed in these contract documents and As-Built survey by a CA State Licensed Land Surveyor, and preparation and submittal of As-Built Drawings.
4. Measurement for payment will be based on the lump sum for the complete replacement and commissioning of the new power system.
5. Payment will be made at the contract lump sum price.
SEKI 328469 01 27 00 - 2
B. Contract Line Item Number 2: Power System
1. Contractor shall provide, install, and program a new electronic Supervisory Control and
Data Acquisition (SCADA) system to control tank flows, flows to all leach and spray field lines, operation of all valves, monitors tank levels for display at the CCWWTP, and that interfaces with the existing Tesco control system at the Clover Creek Wastewater
Treatment Plant (CCWWTP), but is not proprietary. Work includes mobilization, site preparation, equipment removal, installation of the new power system, electrical connections, testing, and commissioning as specified in the contract documents. This includes providing programming testing for functionality and interface with existing
CCWWTP system, providing demonstration and training to park WWTP operators, and providing 1 year of service support and maintenance.
2. Work includes demolition, removal or salvage (per contract documents), and disposal of the existing Thermoelectric Generator (TEG) power system (salvage), and removal and disposal of the piston generator and propane tank, piping, appurtenances and concrete foundation, and demolition, removal, and disposal of the existing transformer and concrete pad, valves and valve boxes, pull boxes and hand holds, conduit, wiring, panels and all other existing components as shown on the contract drawings and required for a complete and operational system.
3. Contractor shall provide and install a new photovoltaic system to provide the necessary power to the system, design/build the rack, pole, and foundation by a CA State licensed
Structural Engineer, and prepare and submit calculations and drawings.
4. Contractor shall provide install maintenance free batteries, an emergency generator transfer switch, and all associated control and monitoring systems for a complete and operational system. Work includes demolition and disposal of all existing components required and as shown on the contract drawings.
5. Contractor shall provide archeological and cultural monitoring by Contractor hired, NPS approved monitor(s), for any excavation in archeologically and culturally sensitive areas as shown on the contract drawings.
6. Contractor shall prepare and submit of all Closeout Documents as listed in these contract documents and As-Built survey by a CA State Licensed Land Surveyor, and preparation and submittal of As-Built Drawings.
7. Measurement for payment will be based on the lump sum for the complete rehabilitation, including all associated work as specified. No additional measurement will be made for the extent of repairs; all work is included in the lump sum.
8. Payment will be made at the contract lump sum price.
C. Contract Line Item Number 3: Disposal Field System Repairs & Replacements
1. This item consists of the removal, disposal and replacement of damaged wastewater disposal system components, including components of the effluent conveyance system, including spray field piping and heads, leach field piping, drain rock, and geotextile fabric, main and lateral piping, vault repair and/or replacement as shown on the contract drawings, valves, thrust blocks, marking posts and nameplates, air relief valves, monitoring wells, solenoid valves, and all associated infrastructure for a complete and operational system.
This work includes mobilization, removal and disposal of damaged components, installation of new components, testing, for a complete and operational system and as outlined in the contract documents, and post construction restoration of site.
2. Work includes coordination with hazardous tree removal work occurring concurrently with this project, and coordination with park staff to provide continuous operation of the system during construction, preparation and submittal of Construction Phasing Plan, Tank Tie-In
Plan, Tank& Sewer Main Bypass Plan, and Sanitary Sewer Overflow Plan, and other plans and submittals as noted in these contract drawings and specifications.
SEKI 328469 01 27 00 - 3
3. Preparation and submittal of all Closeout Documents as listed in these contract documents and As-Built survey by a CA State Licensed Land Surveyor, and preparation and submittal of As-Built Drawings.
4. Measurement for payment will be based on the lump sum for the complete repairs and component replacement, including all associated work.
5. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
SEKI 328469 01 27 00 - 4
SEKI 328469 01 31 00 - 1
PROJECT MANAGEMENT AND COORDINATION
01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination
3. Submittals
4. Coordination Drawings
5. Requests for Information (RFIs)
6. NPS Project Management and Communication Software
7. Project Meetings
8. Environmental Coordination
9. Permits
B. Related Requirements:
1. Section 01 32 16 "Construction Schedule" for preparing and submitting Construction
Contractor�s construction schedule.
2. Section 01 73 40 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.
1.2 DEFINITIONS
A. Agency with Jurisdiction
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Coordinate closely with:
a. Park Utility Department. Provide tentative notice of work elements that will impact operation of the any part of the disposal system, with regular updates until the work occurs.
b. Hazard Tree Contractor. Hazard tree felling and removal work may be occurring during execution of the work of this contract. Close coordination with the hazard tree contractor is mandated in order to maintain access for both contractors and ensure safe execution of the work.
SEKI 328469 01 31 00 - 2
2. Schedule construction operations in sequence required to obtain best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
3. Coordinate installation of different components with other Construction Contractors to ensure maximum accessibility for required maintenance, service, and repair.
4. Make provisions to accommodate items scheduled for later installation.
5. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of components, including mechanical and electrical.
6. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other Construction Contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to:
1. Preparation of Construction Contractor Construction Schedule
2. Preparation of the Schedule of Values
3. Installation and removal of temporary facilities and controls
4. Delivery and processing of submittals
5. Progress meetings
6. Permit requirements
7. Pre-installation conferences/Preparatory Phase Meetings
8. Project closeout activities
9. Commissioning activities
1.4 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination
Drawings on reproductions of Contract Documents or standard printed data. Include following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
b. Indicate dimensions shown on Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Contracting Officer (CO) for resolution of such conflicts.
c. Indicate space requirements for routine maintenance and anticipated replacement of components during the life of the installation.
SEKI 328469 01 31 00 - 3
d. Show location and size of access doors required for access to concealed dampers, valves, and controls.
e. Indicate required installation sequences.
2. Refer to individual Sections for Coordination Drawing requirements for Work in those
Sections.
3. Follow NPS DSC Electronic Drawing Standards. See CAD/BIM (Computer Aided
Design/Building Information Modeling) & Drafting Standards page > DSC Requirements section.
B. Coordination Digital Data Files: Prepare coordination digital data files according to:
1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.
2. File Submittal Format: Submit or post coordination drawing files using Portable Document
Format (PDF) file format.
3. Contracting Officer will furnish Construction Contractor one set of digital data files
(AutoCad.dwg) of Drawings for use in preparing coordination digital data files.
a. Contracting Officer makes no representations as to accuracy or completeness of digital data files as they relate to Drawings.
b. Digital Data Software Program: Drawings are available in AutoCad.dwg.
C. Division 1 Documents:
1. Letter designating Project Superintendent
2. Construction Schedule
3. Construction Phasing Plan
4. A Comprehensive Schedule of Values
5. Accident Prevention Plan
6. A List of Subcontractors for this project
7. Written statements from Subcontractors certifying compliance with applicable labor standard clauses.
8. Certificates of Insurance and Standard Form SF1413 for Contactor and all Subcontractors
9. Waste Management Plan
10. Quality Control Plan
11. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP)
12. Tank Tie-In Plan
13. Tank & Sewer Main Bypass Plan
14. Sanitary Sewer Overflow Plan
D. Provide items listed to Contracting Officer at least one week prior to Pre-Construction
Conference, or as directed by Contracting Officer.
1. Failure to submit items may result in:
a. Construction conference may be cancelled, Notice to Proceed may not be issued, and Contracting Officer will consider other contractual remedies.
b. Work shall not commence until written Notice to Proceed has been issued and
Certificates of Insurance and SF1413 documents are received for Construction
Contractor and all Subcontractors.
SEKI 328469 01 31 00 - 4
1.5 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of
Contract Documents, Construction Contractor shall prepare and submit an RFI utilizing form created on NPS project management and communication software.
1. Contracting Officer will not respond to RFIs submitted by other entities controlled by
Construction Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of RFI: Include detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially
2. Date
3. RFI subject
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Construction Contractor's suggested resolution: If suggested resolution impacts Contract
Time or Contract Sum, Construction Contractor shall state impact in RFI.
8. Construction Contractor's signature
9. Requested date for response
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. RFI Form: Complete and submit on NPS project management and communication software, if applicable.
D. Contracting Officer�s Action: Contracting Officer will review each RFI, determine action required, and respond. Contracting Officer will determine critical nature of each RFI and issue response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Construction Contractor's means and methods.
d. Requests for coordination information already indicated in Contract Documents.
e. Requests for adjustments in Contract Time or Contract Sum.
f. Requests for interpretation of Architect's actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. Contracting Officer's action may include a request for additional information; time for response will date from time of receipt of additional information.
SEKI 328469 01 31 00 - 5
3. Contracting Officer's action on RFIs may result in need for a change to Contract Time or
Contract Sum. All contract changes will be processed following terms and conditions of contract.
1.6 PROJECT MANAGEMENT AND COMMUNICATION SOFTWARE
A. Use to manage project communication and document sharing during contract period on:
1. Project directory
2. Project correspondence
3. Meeting agendas and minutes
4. Contract modifications forms and logs
5. RFI form and processing
6. Task and issue management
7. Photo documentation
8. Baseline schedule, schedule updates and calendar management
9. Submittal form and processing
10. Payment coordination documentation
11. Reminder and tracking functions
12. Archiving functions
13. Notification of submittal and RFI statuses and current responsible party
14. Permits and addendums
B. Some documents are not suitable to be shared using NPS project management and communication software. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared and shall be coordinated with project team as appropriate.
1.7 PROJECT MEETINGS
A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Construction Contractor. Meeting agenda will include the following as a minimum:
1. Roles & Responsibilities / Lines of Authority
2. Park rules and regulations
3. Jobsite Safety
4. Resolution of comments on required Division 1 documents
5. Coordination of Subcontractors
6. Labor law application
7. Modifications
8. Payments to Construction Contractor
9. Payroll reports
10. Contract time
11. Liquidated damages
12. Construction Contractor Performance Evaluation
13. Display of Hotline posters
14. Notice to proceed
15. Correspondence procedures
16. NPS project management and communication software
SEKI 328469 01 31 00 - 6
17. Acceptance/rejection of work
18. Progress meetings
19. Submittal procedures
20. Environmental requirements
21. Substantial completion procedures
22. Close out activities
23. Permit requirements
24. As-constructed drawings/operation and maintenance (O&M) manuals.
25. Saturday, Sunday, holiday and night work.
26. Reference materials
27. Value engineering
28. Schedule of Values
B. Progress Meetings: Contractor will schedule and conduct weekly meetings with the CO, Contracting Officer�s Representative (COR), and Construction Manager at Risk (CMR).
1. Attendees: In addition to Government Representatives, each Construction Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented.
Participants at meeting shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Meeting agenda will include:
a. Approval of minutes of previous meetings
b. Safety
c. Corrective Action log
d. Submittal status
e. Review of off-site fabrication and delivery schedules.
f. Requests for information (RFI) and other issues.
g. Modifications
h. Work in progress and projected.
1) Status of required inspections (Special Inspections, Accessibility, etc.)
i. Inspections of work in progress and projected (Special inspections, Accessibility, etc.)
j. Construction Schedule update (provide updated Critical Path Method (CPM)).
k. Status of Project Record Drawings and O&M manuals.
l. Other business relating to work.
m. Permit requirements
C. Preinstallation Conferences/Preparatory Phase Meetings: Conduct at Project site before each construction activity that requires coordination with other construction, or that requires a
Preparatory Phase Meeting outlined in Specification 01 40 00.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend meeting.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .