SEKI_328469_Plans_Final_Stamped-Reduced_1.pdf

PDF 18 MB Posted

Attached to
SEKI: REHAB CLOVER CREEK WASTEWATER DISPOSAL
Solicitation number
DOIPFBO260008
Issued by

About this file

This document is a final construction drawing set for the Post KNP Fire Rehabilitation of Red Fir/Clover Creek wastewater disposal system at Sequoia & Kings Canyon National Park in California. The project, managed by the National Park Service Denver Service Center, involves comprehensive repairs and upgrades to the 250,000-gallon effluent storage tank, 15,000-gallon bypass tank, disposal field infrastructure, and associated electrical and control systems.

The construction work encompasses replacement of all main line gate valves, air release valves, and deficient spray heads (45 total); rehabilitation of 17 leach field zones and 13 spray field zones; installation of new solenoid valves with pullboxes at each location; replacement of all monitoring wells; and replacement of zone identification posts with brass name tags (24 total). The 250K gallon storage tank requires sandblasting of interior and exterior surfaces to bare metal, recoating, replacement of hinged access manway gaskets, installation of new pressure transmitters and level sensors, and structural roof framing demolition and replacement including new interior ladder, fall protection anchors, and guardrails. The 15K gallon tank requires similar interior/exterior sandblasting and recoating, replacement of 24-inch diameter hinged access manway gaskets, new float valve assembly installation, and modifications to the concrete valve vault including new gate valves and flowmeter. Electrical work includes demolition and replacement of burnt panelboards, transformers, and battery chargers; installation of new solar panels with mounting hardware; new PLC controls and instrumentation; and conduit routing throughout the site. The project site is located at approximately 6,800 feet elevation with seasonal road closures and requires compliance with environmental mitigation requirements, wildlife protection protocols, and OSHA safety standards. Contractor shall submit construction phasing plans, tank tie-in plans, bypass plans, and sewer overflow containment plans for approval prior to work initiation.

View the file

Other files

File Type Posted
Sources_Sought_Worksheet_1.pdf PDF
SEKI_328469_Specifications_Final_Stamped_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE OF MILES

35 0 35

STATE

NATIONAL PARK SERVICE

DENVER SERVICE CENTER REGION COUNTY

DEPARTMENT OF THE INTERIOR

UNITED STATES LOCATION WITHIN PARK

NAME OF PARK

TITLE OF DRAWING

38TULARE CALIFORNIA OF

PKG.

NO. SHEET

DRAWING NO.

SEQUOIA & KINGS CANYON NATIONAL PARK

PACIFIC WEST

CALIFORNIA

POST KNP FIRE REHABILITATION OF

RED FIR / CLOVER CREEK

FINAL CONSTRUCTION DRAWINGS

195497

102CLOVER CREEK WASTEWATER DISPOSAL

N

KINGS CANYON

NATIONAL PARK

SEQUOIA

N.P.

DEATH

VALLEY

NATIONAL

PARK

YOSEMITE

NATIONAL

PARK

CHERRY

DAM MONO

LAKE

FLORENCE

LAKE

PINE FLAT LAKE

TERMINUS

DAM

FRESNO

KER

N

R

IVER

DORST

GRANT

GROVE

TO FRESNO

CEDAR

GROVE CHARLOTTE

LAKE

RAE

LAKES

LeCONTE

CANYON

JOHN

MUIR

WILDERNESS

INYO

NATIONAL

FOREST

JOHN

MUIR

WILDERNESS

V.C.

MIDDLE

FORK KINGS

RIVER

SO

U

TH

FO

RK

RIVER

KI

N

G S

INYO

NATIONAL

FOREST

SEQUOIA

FOREST

KERN

CANYON

SOUTH

FORK

HOCKETT

MEADOW

MINERAL

KING

LOOKOUT

POINT

ROCK

CREEK

CRABTREE

MT. WHITNEY

ROARING

RIVER

KINGS CANYON

SEQUOIA

ATWELL

MILL

ASH

MOUNTAIN

HOSPITAL

ROCK

POTWISHA

LODGEPOLE

PEAR

LAKE

BEARPAW

MEADOW

LITTLE

FIVE LAKES

MONARCH

WILDERNESS

AREA

JENNIE LAKES

WILDERNESS

AREA

KETTLE

R

ID

G E

LeCONTE

DIVIDE

JOHN MUIR

& PACIFIC

CREST TRAIL

BUCKEYE

FLAT

McCLURE

MEADOW

TO

VISALIA

TYNDALL

CREEK

HIGH

SIERRA

TRAIL

COLD

SPRINGS

SIERRA

NATIONAL

FOREST

SEQUOIA

NATIONAL

FOREST

NATIONAL GOLDEN TROUT

WILDERNESS AREA

GIANT FOREST

WUKSACHI

VILLAGE

HUME

LAKE

CRYSTAL

CAVE

KINGS

CANYON

LODGE

V.C.

V.C.

HQ.

SCALE OF MILES

SCALE OF KILOMETERS

0 4

0 8

8 12

PICNIC AREA

LODGING

CAMPGROUND

RANGER STATION

PARK HEADQUARTERS

VISITOR CENTER

CREEK

PARK BOUNDARY

PAVED ROAD

COUNTY LINE

TRAIL

LEGEND

CLOVER CREEK WASTEWATER DISPOSAL

SEQUOIA - KINGS CANYON NATIONAL PARK

THIS PROJECT

/5

/2

:2 2:

P

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\G

EN

ER

AL

S

H

EE

TS

_T

EM

PL

AT

E.

D W

G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

195497

2 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C1.0 GENERAL NOTES, INDEX,

AND ABBREVIATIONS

AWWA AMERICAN WATER WORKS ASSOCIATION

C.I. CAST IRON

CO SEWER CLEANOUT OR CONTRACTING OFFICER

DIA. DIAMETER

E EASTING

ETC ET CETERA

I.D. INSIDE DIAMETER

LF LINEAR FEET

MAX. MAXIMUM

MH MANHOLE

MIN. MINIMUM

N NORTHING

NO. NUMBER

NPS NATIONAL PARK SERVICE

NTS NOT TO SCALE

O.S.H.A OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

PMIS PROJECT MANAGEMENT INFORMATION SYSTEM

PRV PRESSURE REDUCING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

SCE SOUTHERN CALIFORNIA EDISON

SCH SCHEDULE

SEKI SEQUOIA AND KINGS CANYON NATIONAL PARK

TYP TYPICAL

ABBREVIATIONS

DISPOSAL FIELD LINE TO BE REPAIRED

EXISTING VAULT

EXISTING EFFLUENT SPRAY HEAD

EXISTING IN LINE GATE VALVE

EXISTING AIR RELEASE VALVE

ARV

EDGE OF DIRT TRACK

EDGE OF ASPHALT

EXISTING MONITORING WELL

DISPOSAL FIELD LINE

LEGEND

SHEET INDEX

SHEET NO. SUB-SHEET

NO. SHEET TITLE

1 - COVER

2 C1.0 GENERAL NOTES, INDEX, AND ABBREVIATIONS

3 C1.1 GENERAL NOTES CONTINUED

4 C1.2 EXISTING CONDITIONS OVERVIEW

5 C1.3 SYSTEM AS-BUILTS

6 C2.0 DISPOSAL FIELD REPAIRS

7 C2.1 DISPOSAL FIELD REPAIRS POINT TABLES

8 C2.2 TANK AREA PLAN

9 C3.0 DISPOSAL FIELD REPAIR DETAILS 1

10 C3.1 DISPOSAL FIELD REPAIR DETAILS 2

11 C3.2 DISPOSAL FIELD REPAIR DETAILS 3

12 S1.0 250K GAL STORAGE TANK FOUNDATION PLAN

13 S2.0 250K GAL STORAGE TANK ROOF FRAMING DEMOLITION PLAN

14 S3.0 250K GAL STORAGE TANK ROOF FRAMING PLAN

15 S4.0 250K GAL STORAGE TANK SECTION AND DETAILS

16 M1.0 EXISTING 15K GAL EFFLUENT STORAGE TANK MODIFICATIONS

17 M2.0 PHOTOS OF 15K GAL EFFLUENT STORAGE TANK AND APPURTENANCES

18 E1.1 ELECTRICAL LEGEND & ABBREVIATIONS

19 E1.2 ELECTRICAL ONE LINE DIAGRAM AND SCHEDULES

20 E1.3 ELECTRICAL PLC PANEL WIRING DIAGRAM

21 E1.4 ELECTRICAL I/O WIRING RELAY OUTPUT WIRING SLOT -1

22 E1.5 ELECTRICAL I/O WIRING RELAY OUTPUT WIRING SLOT -2

23 E1.6 I/O WIRING RELAY OUTPUT DIGITAL & ANALOG INPUT WIRING SLOTS - 3,

4 & 5

24 E1.7 ELECTRICAL NETWORK BLOCK DIAGRAM

25 E2.1 ELECTRICAL OVERALL SITE DEMO PLAN

26 E2.2 DEMO CONTROL BUILDING ENLARGED PLAN

27 E2.3 DEMO PLAN ENLARGED TANK PLAN

28 E2.4 ELECTRICAL DEMO PHOTOS 1

29 E2.5 ELECTRICAL DEMO PHOTOS 2

30 E3.0 ELECTRICAL OVERALL SITE PLAN

31 E3.1 ELECTRICAL SITE PLAN 1

32 E3.2 ELECTRICAL SITE PLAN 2

33 E3.3 ELECTRICAL SITE PLAN 3

34 E3.4 ELECTRICAL SITE PLAN 4

35 E3.5 ELECTRICAL TANKS ENLARGED POWER PLAN

36 E3.6 ELECTRICAL CONTROL BUILDING ENLARGED PLAN

37 E3.7 ELECTRICAL PHOTOS

38 E3.8 ELECTRICAL DETAILS

1. CARE MUST BE TAKEN TO MINIMIZE GROUND DISTURBANCE ON THIS SITE, PROTECT NATURAL & CULTURAL RESOURCES IN THE PROJECT AREA INCLUDING VEGETATION, LANDSCAPE FEATURES, & BOULDERS UNLESS

OTHERWISE SPECIFIED.

2. THE UTILITIES SHOWN IN THESE CONSTRUCTION DRAWINGS ARE INDICATED IN ACCORDANCE WITH AVAILABLE RECORDS. ALL UTILITIES MAY NOT BE SHOWN AND THOSE WHICH ARE SHOWN MAY NOT BE SHOWN ACCURATELY. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING TO DETERMINE AND VERIFY EXACT LOCATIONS, ELEVATIONS AND SIZES OF ALL EXISTING UTILITIES. NO TOPOGRAPHIC OR UTILITY LOCATE SURVEY WAS PERFORMED FOR THIS PROJECT. ALL BASE-MAPPING AND LINE WORK WAS CREATED FROM AVAILABLE GOVERNMENT RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL NPS AND NON-NPS OWNED UTILITIES. IF ANY EXISTING UTILITY IS DAMAGED DURING CONSTRUCTION, CONTACT AND COORDINATE WITH THE UTILITY PROVIDER IMMEDIATELY. REPAIR OR REPLACE THE DAMAGED EXISTING UTILITY PER THE UTILITY PROVIDER'S RECOMMENDATIONS AND REQUIREMENTS AT NO COST TO NPS. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 2 FEET SEPARATION BETWEEN ALL EXISTING OR NEW DRY UTILITIES AND ALL EXISTING OR NEW WATER AND SEWER

INSTALLATIONS. REFER TO TRENCHING DETAILS.

3. MATERIAL STAGING LOCATIONS & REQUIREMENTS SHALL BE COORDINATED WITH THE CONTRACTING

OFFICER PRIOR TO CONSTRUCTION, PER THE PROJECT SPECIFICATIONS.

4. COORDINATE WITH CONTRACTING OFFICER BEFORE BEGINNING ANY WORK.

5. ALL MINOR OBSTRUCTIONS MAY NOT BE SHOWN ON CONSTRUCTION DRAWINGS. THE CONTRACTOR SHALL REVIEW THE SITE PLANS AND DETERMINE THE CONDITIONS WITH REGARD TO THE EXISTENCE OF FENCES, DRIVEWAYS, TREES, BOULDERS, CONCRETE AND ASPHALT, CULVERTS, UTILITIES AND OTHER SITE IMPROVEMENTS AND MISCELLANEOUS OBSTACLES THAT MAY INTERFERE WITH CONSTRUCTION PRIOR TO

SUBMITTING BID.

6. PROVIDE TEMPORARY SUPPORT FOR EXISTING WET (WATER, SANIATRY SEWER, ETC.) AND DRY UTILITIES (GAS, POWER, ETC.) THAT CROSS THE TRENCH UNTIL BACKFILLING OF TRENCH IS COMPLETE.

7. CONSTRUCTION SHALL COMPLY WITH ENVIRONMENTAL PROTECTION AGENCY REGULATIONS,

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, AND STATE OF CALIFORNIA REGULATIONS.

8. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND MAINTAINING A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AS SPECIFIED IN SECTION 01 57 23. THE CONTRACTOR SHALL NOT INTRODUCE OR TRANSPORT EXOTIC AND NON-NATIVE PLANTS INTO THE PARK. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ROADSIDE DITCHES, SWALES AND PREVENT EROSION THROUGHOUT THE PROJECT. SEE APPENDIX B "LETTER OF COMPLIANCE FOR ADDITIONAL ENVIRONMENTAL MITIGATIONS" FOR

ADDITIONAL ENVIRONMENTAL MITIGATIONS.

9. ENSURE THAT EQUIPMENT IS FREE OF MUD, DIRT, AND PLANT PARTS BEFORE IT IS DELIVERED. TELL THE RENTAL AGENT IN ADVANCE THAT THOROUGH CLEANING IS REQUIRED. INSPECTION BY PARK RESOURCES STAFF IS REQUIRED PRIOR TO EQUIPMENT ENTERING THE PARK. REQUEST INSPECTION A MINIMUM OF ONE WEEK IN ADVANCE. INSPECTIONS ARE PERFORMED M-F, EXCLUDING HOLIDAYS BETWEEN 8:00 AM AND 4:00 PM AT A LOCATION OUTSIDE OF THE PARK ENTRANCE - SEE APPENDIX D "VEHICLE INSPECTION MAP".

10. STRIP TOPSOIL AND STOCKPILE FOR REPLACEMENT IN ALL AREAS OF EXCAVATION AND DISTURBANCE. USE ON-SITE FILL MATERIALS WHENEVER POSSIBLE. IF IMPORTED SOIL OR AGGREGATE IS REQUIRED, THE MATERIAL SOURCE REQUIRES INSPECTION OF THE FACILITY AND THE SPECIFIC MATERIAL BY PARK RESOURCES STAFF FOR APPROVAL AS WEED-FREE. STRAW PRODUCTS (I.E. "CERTIFIED WEED-FREE STRAW" AND OTHER STRAW PRODUCTS) ARE NOT AUTHORIZED ON PROJECT WORK SITES DUE TO THE HIGH RISK OF IMPORTING NON-NATIVE PLANTS AND SEEDS. INSTEAD, USE AN EXCELSIOR (ASPEN FIBER) OR COIR (COCONUT FIBER) PRODUCT FOR EROSION CONTROL, SEDIMENT FILTRATION, OR OTHER NEEDS.THIS

REQUIRES A MINIMUM TWO WEEK NOTICE FOR INSPECTION SCHEDULING.

11. RESTORE ALL SURFACES DISTURBED AS SPECIFIED AND SHOWN ON THE CONSTRUCTION DRAWINGS.

12. EVERY ATTEMPT HAS BEEN MADE TO ENSURE THE ACCURACY OF THE DRAWINGS THROUGH FIELD VERIFICATION & EXISTING PLAN REVIEW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY EXISTING CONDITIONS, SIZES, QUANTITIES, AND TO COORDINATE ALL ASPECTS OF THE PROJECT BEFORE CONSTRUCTION, ORDERING, AND INSTALLATION OF ANY COMPONENT. NOTIFY CONTRACTING OFFICER

IMMEDIATELY FOR WRITTEN CLARIFICATION IF ANY DISCREPANCY EXISTS.

13. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE CONTRACTOR IS EXPECTED TO USE QUALITY, ACCEPTABLE, CONSTRUCTION PRACTICES AND TECHNIQUES FOR THE EXTENT

& TYPE OF WORK DESCRIBED HEREIN.

14. CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS AND REGULATIONS AS PRESCRIBED BY THE LATEST EDITION OF THE INTERNATIONAL EXISTING BUILDING CODE, INTERNATIONAL BUILDING CODE INCLUDING APPENDICES, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL PLUMBING CODE, EPA ONSITE WASTEWATER TREATMENT SYSTEMS MANUAL, INTERNATIONAL FIRE CODE, AMERICAN NATIONAL STANDARDS, NFPA 101, NATIONAL ELECTRIC CODE, INTERNATIONAL ENERGY CONSERVATION CODE, THE

ARCHITECTURAL BARRIERS ACT, AND ANY APPLICABLE LOCAL CODES AND REGULATIONS.

15. THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING ACCURATE AS-BUILT INFORMATION. CONTRACTOR SHALL DOCUMENT AS-BUILT CONSTRUCTION DRAWINGS, TO INCLUDE AN -BUILT SURVEY BY A CA LICENSED LAND SURVEYOR OF ALL IMPROVEMENTS OR MODIFICATIONS. INFORMATION SHALL INCLUDE HORIZONTAL AND VERTICAL INFORMATION, INCLUDING PIPE, CONDUIT INVERTS, CONDUIT, VAULT, AND PULL BOX

INVERTS, SIZES AND MATERIALS FOR ALL UNDERGROUND UTILITIES.

16. DO NOT SCALE DRAWINGS. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE CONTRACTING OFFICER IMMEDIATELY FOR WRITTEN CLARIFICATION.

17. CONTRACTOR(S) SHALL GUARANTEE THEIR WORK FOR A PERIOD OF NO LESS THAN ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. CONTRACTOR(S) SHALL REPLACE ALL DEFECTIVE PARTS & SUPPLIES

AT THEIR COST.

/5

/2

:2 2:

P

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\G

EN

ER

AL

S

H

EE

TS

_T

EM

PL

AT

E.

D W

G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

3 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C1.1

/5

/2

:2 2:

P

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\G

EN

ER

AL

S

H

EE

TS

_T

EM

PL

AT

E.

D W

G

GENERAL NOTES

CONTINUED

18. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS, AND LABOR REQUIRED TO COMPLETE THE WORK INDICATED. THIS INCLUDES ALL ACCESSORIES, FINISHES, AND SYSTEMS NECESSARY AND APPLICABLE TO

ENSURE A COMPLETE & FUNCTIONAL PROJECT UPON COMPLETION.

19. ANY ITEM SHOWN OR REFERENCED IN ONE INSTANCE SHALL BE AS IF SHOWN IN ALL INSTANCES, UNLESS

OTHERWISE NOTED.

20. CONTRACTOR IS TO REFER TO ALL DRAWINGS, SPECIFICATIONS, AND REQUIREMENTS OF CONTRACT INCLUDED FOR DESCRIPTION OF THE WORK. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL REQUIREMENTS AMONG THE DRAWINGS, SPECIFICATIONS, REQUIREMENTS OF CONTRACT, THE WORK OF ALL THEIR EMPLOYEES, SUB-CONTRACTORS, SUB-SUB-CONTRACTORS, AND ANY PERSON OR TRADE

PARTICIPATING IN ANY ASPECTS OF THE WORK.

21. COORDINATE QUESTIONABLE FIELD CONDITIONS IN WRITING WITH THE CONTRACTING OFFICER THROUGH

RFIS OR AT PROGRESS MEETINGS WITH QUALIFIED PERSONNEL CAPABLE OF ADVISING AND

RECOMMENDING APPROPRIATE SOLUTIONS.

22. FINAL DECISION(S) AFFECTING THE WORK WILL BE DOCUMENTED IN WRITING BY THE CONTRACTING OFFICER. DO NOT PROCEED WITH WORK WITHOUT WRITTEN DOCUMENTATION. FAILURE TO DO SO SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUBJECT TO REJECTION, REMOVAL, REPAIR, AND REPLACEMENT OF THE WORK AS DIRECTED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST.

23. THE CONTRACTOR SHALL MAINTAIN A CLEAN WORKSITE. EXTREME DILIGENCE MUST BE USED ON THE SITE ENSURING THAT ALL TRASH, INCLUDING SMALL REFUSE, IS CONTAINED. WIND AND OTHER ENVIRONMENTAL CONDITIONS OR WEATHER PATTERNS DO NOT RELIEVE THE CONTRACTOR OF THIS RESPONSIBILITY.

GARBAGE, TRASH, AND OTHER SOLID WASTE ASSOCIATED WITH CONSTRUCTION OPERATIONS WILL BE DISPOSED OF IN BEAR PROOF TRASH BINS AND DISPOSED OF WEEKLY OR SOONER IF WARRANTED, OUTSIDE THE PARK. BEAR PROOF TRASH BINS OR DUMPSTERS MUST REMAIN CLOSED AND LOCKED AT ALL TIMES, INCLUDING DUMPSTERS WITH BARS. ALL FOOD, INCLUDING EMPTY COOLERS, WILL BE STORED IN BEAR-PROOF CONTAINERS, OR COVERED AND PLACED IN LOCKED VEHICLES OUT OF SIGHT TO ENSURE WILDLIFE CANNOT SEE OR OBTAIN IT. SPILLED FOOD WILL BE CLEANED UP IMMEDIATELY. THE PROJECT SITE WILL BE CLEANED UP AT THE END OF EACH DAY THE WORK IS BEING CONDUCTED (I.E., TRASH DISPOSED OF/SECURED APPROPRIATELY, SCRAP MATERIALS PICKED UP) TO MINIMIZE THE LIKELIHOOD OF WILDLIFE VISITING THE SITE. ALL CONTRACTOR PERSONNEL WILL BE TRAINED ON BEAR SAFETY.

24. THE IMPROVEMENTS TO THE DISPOSAL FIELD WILL HAPPEN ONCE THE FIRST PHASE OF THE TREE REMOVAL PROJECT IS COMPLETED. THE NPS WILL BE REMOVING APPROXIMATELY 1,400 DEAD TREES THROUGHOUT THE DISPOSAL FIELD AREA. THE TREE REMOVAL PHASES WILL BE DELINEATED ON THE PLANS ONCE THE NPS HAS DEFINED THE AREAS. ANY DAMAGE DONE TO THE DISPOSAL FIELD WILL BE

INCLUDED INTO THE CONTRACT.

25. THE CONTRACTOR IS REQUIRED TO SUBMIT A CONSTRUCTION PHASING PLAN, TANK TIE-IN PLAN, TANK &

SEWER MAIN BYPASS PLAN,AND SANITARY SEWER OVERFLOW PLAN FOR APPROVAL.

26. CONTINUED OPERATION OF A MIMIMUM OF THREE SPRAY FIELDS, EQUIVALENT TO THE SIZE OF FIELDS J, M, AND N COMBINED) IS REQURED FOR THE SUMMER SEASON, GENERALLY APRIL THROUGH NOVEMBER, DEPENDENT ON WEATHER. SUMMER FLOWS AVERAGE 35,000 GPD WITH MAXIMUM FLOWS OF 85K GPD

OCCURING ON OVER HOLIDAY PERIODS. THESE FLOWS ARE TOO HIGH FOR LEACH FIELD USE.

27. MAXIMUM PERMITED FLOWS WITH ALL FIELDS OPERATIONAL ARE 95K GPD FOR SPRAY FIELDS (SUMMER

USE ONLY) AND 82K GPD FOR LEACH FIELDS (WINTER).

28. OPERATION AND ACCESS TO VALVES CONTROLLING FLOW TO FIELDS IN USE ARE REQUIRED AT ALL TIMES AS CURRENT OPERATION IS MANUAL (THERE IS NO POWER AT THE SITE) AND REQUIRES MANUALLY TURNING VALVES IN THE VAULTS. TRANSFER OF FIELDS REQUIRES ONE WORKING DAY TO COMPLETE AND

REQUIRES A TWO WEEK ADVANCE REQUEST.

29. ANY DISRUPTION IN EFFLUENT DISPOSAL SHALL REQUIRE A TIE-IN PLAN AND CHECKLIST TO INCLUDE EMERGENCY CONTACT INFORMATION, LIST OF PARTS ON HAND AND ONSITE, REQUIRED MEASUREMENTS FOR PIPES, VAULTS, VALVES, ETC., SPARE PARTS ONSITE, WORK SEQUENCE AND DURATIONS. SERVICE DISRUPTION SHALL STRICTLY BE LIMITED TO 8 HRS TOTAL, REGARDLESS OF WHETHER IT BEGINS AT 4PM OR 4AM, THE REPAIR MUST BE MADE WITHIN 8 HRS, IDEALLY WHEN THE CCWWTP IS STAFFED, AS EFFLUENT

STORAGE AT THE WWTP IS LIMITED.

30. THE CONTRACTOR SHALL SUBMIT A SEWER SPILL CONTAINMENT PLAN FOR APPROVAL. ANY EFFLUENT SPILLS SHALL BE TREATED AS A SANITARY SEWER OVERFLOW (SSO) AND REQUIRES REPORTING TO THE

CALIFORNIA STATE WATER CONTROL BOARD.

31. THE SITE AT APPROXIMATELY 6,800 FT ABOVE SEA LEVEL. ROAD ACCESS IS NOT AVAILABLE WHEN THERE IS SNOW AND IS GENERALLY CLOSED FROM NOVEMBER THROUGH APRIL, WITH INTERMITTENT CLOSURES DUE TO WEATHER OCCURRING EARLIER AND LATER. THE CONTRACTOR SHALL MAINTAIN A WEATHER WATCH AND ENSURE NO EQUIPMENT WILL BE STUCK IN THE SNOW AND THE SYSTEM WILL BE FULLY OPERATIONAL AT THE SEASONAL CLOSURE(S). THE PARK DOES NOT PLOW THIS ROAD. WINTER SNOW OF 6 FT IS COMMON.

32. SEQUOIA AND KINGS NATIONAL PARKS IS A HIGH PUBLIC USE FACILITY. CONTRACTOR SHALL PROTECT THE PUBLIC FROM ALL OPERATIONS AND WORK AREAS. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, ALL STAGING AREAS, WORK SITES, MATERIAL HANDLING AREAS AND TEMPORARY SOURCES OF WATER.

33. SEQUOIA AND KINGS NATIONAL PARKS IS HOME TO BEARS AND OTHER WILD ANIMALS THAT WILL FORAGE FOR FOOD. ALL WORK AREAS ARE TO BE KEPT CLEAN OF ATTRACTIVE MATERIALS SUCH AS FOOD, GREASE, GARBAGE, AND DEBRIS.

34. EMERGENCY SERVICES WITHIN THE PARK ARE LIMITED. THE CONTRACTOR SHALL DEVELOP A SAFETY PLAN IN ACCORDANCE WITH THE SPECIFICATIONS. IN ADDITION, THE CONTRACTOR SHALL PROVIDE TRAINING TO ALL EMPLOYEES AND POST THE EMERGENCY CONTACTS, LOCATION OF THE HOSPITAL, AND OTHER

EMERGENCY SERVICES.

35. POLICE, RANGER SERVICES, AND FIRE PROTECTION ARE PROVIDED BY THE NATIONAL PARK SERVICE.

CONTRACTOR SHALL ESTABLISH CONTACTS WITH THESE SERVICES AND KEEP THEM APPRISED OF WORK

SCHEDULES, TRAFFIC CONTROL AND WORK PROGRESS.

36. CONTRACTOR SHALL MAINTAIN A LIST OF COMMONLY ASKED QUESTIONS WITH ANSWERS FOR USE WHEN DISCUSSING THE PROJECT WITH THE PUBLIC. ADDITIONAL PUBLIC INQUIRY NOT ADDRESSED ON THE LIST SHALL BE REFERRED TO THE CONTRACTING OFFICER. THE PROJECT PURPOSE AND ANTICIPATED QUESTIONS/ANSWERS FROM THE GENERAL PUBLIC WILL BE PREPARED BY THE NATIONAL PARK SERVICE

AND WILL BE PROVIDED TO THE CONTRACTOR.

37. CONTRACTOR SHALL MAINTAIN ON-SITE AND IN ALL VEHICLES A COPY OF THE SPILL PREVENTION AND RESPONSE PLAN. ALL PERSONNEL SHALL BE TRAINED IN THE CONDITIONS OF THE PLAN AND SHALL BE

FULLY KNOWLEDGEABLE OF THE REPORTING REQUIREMENTS AND PROCEDURES.

38. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE PROJECT PLANS AND

SPECIFICATIONS UNLESS OTHERWISE NOTED.

39. THE CONTRACTOR SHALL CONFORM TO THE RULES AND REGULATIONS OF THE FEDERAL OSHA

CONSTRUCTION SAFETY ORDINANCE PERTAINING TO EXCAVATIONS AND TRENCHES.

40. ALL WORK SHALL BE SUBJECT TO THE INSPECTION AND APPROVAL OF THE NPS. WORK SHALL NOT BE

COVERED PRIOR TO INSPECTION AND APPROVAL. REJECTED WORK SHALL BE REDONE AT THE

CONTRACTOR'S EXPENSE.

41. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER CONTRACTORS WITHIN THE PARK.

42. THE CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER AND PARK AND SCE (SOUTHER CAL EDISON) OF

PROPOSED LOCATIONS AND TIMES FOR EXCAVATION.

43. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PREVENTING DAMAGE TO EXISTING UTILITIES.

THE GOVERNMENT HAS ATTEMPTED TO SHOW THE APPROXIMATE LOCATION OF MAJOR UTILITIES ON THE DRAWINGS INCLUDING WATER LINES, SEWER LINES, AND PRIMARY ELECTRICAL LINES. SMALL SEWER SERVICES AND WATER LINES, SECONDARY ELECTRICAL AND TELEPHONE LINES HAVE NOT BEEN SHOWN.

THE CONTRACTOR SHALL SWEEP ALL SITES AND ALIGNMENTS AFFECTED BY CONSTRUCTION OPERATIONS WITH SUITABLE DETECTION DEVICES. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT, 800-227-2600 AND THE NATIONAL PARK SERVICE A MINIMUM OF TWO WORK WEEKS PRIOR TO EXCAVATING FOR COORDINATING AND MARKING THE LOCATION OF UNDERGROUND UTILITIES. THE AREAS PLANNED FOR EXCAVATION SHALL BE OUTLINED BY THE CONTRACTOR IN WHITE MARKING PAINT WITH "USA" WRITTEN AT A HIGHLY VISIBLE LOCATION ADJACENT TO THE EXCAVATION AREA. IN AREAS TO BE EXCAVATED, THE LOCATION OF ALL EXISTING DIRECT BURIAL PRIMARY ELECTRICAL CABLE SHALL BE MARKED ON THE GROUND SURFACE OR ON THE PAVEMENT. IN ADDITION, THE LOCATION OF ALL SEWER CROSSINGS OR OTHER UNDERGROUND UTILITIES OR KNOWN OBSTRUCTIONS SHALL ALSO BE CLEARLY MARKED AHEAD OF EXCAVATION FOR CONSTRUCTION. THE CONTRACTOR SHALL REMOVE ALL PAINT MARKINGS AS SOON AS EXCAVATION IS COMPLETED. IF DAMAGE OCCURS, REPAIR OF UTILITY SHALL BE PERFORMED AT NO

ADDITIONAL COST TO THE GOVERNMENT.

44. CONTRACTOR SHALL POTHOLE BY HAND ALL UTILITIES PRIOR TO USE OF EXCAVATORS OR BACKHOES.

CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL DAMAGED CONDUCTORS AT NO ADDITIONAL

COST TO THE GOVERNMENT.

45. EXISTING BURIED UTILITIES ARE INDICATED ON THE DRAWINGS WHERE SUCH UTILITIES ARE KNOWN. THE LOCATION AND EXTENT OF SUCH UTILITIES ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE, PROTECT AND MAINTAIN ALL EXISTING UTILITIES WHETHER OR NOT SHOWN ON THE DRAWINGS. ONLY ACTUAL POTHOLE EXCAVATION WILL REVEAL THE TYPES, EXTENT, SIZES, LOCATIONS AND DEPTHS OF SUCH UNDERGROUND UTILITIES. A REASONABLE EFFORT HAS BEEN MADE TO LOCATE AND DELINEATE ALL KNOWN UNDERGROUND UTILITIES. HOWEVER, THE NPS, THE UTILITY OWNER

AND THE CONTRACTING OFFICER CAN ASSUME NO RESPONSIBILITY FOR THE COMPLETENESS OR

ACCURACY OF THE DELINEATION OF SUCH UNDERGROUND UTILITIES WHICH MAY BE ENCOUNTERED.

46. ANY EXISTING UTILITY STRUCTURE INCLUDING BUT NOT LIMITED TO VALVE BOXES, SEWER AND STORM MANHOLES AND INLETS, ELECTRICAL, WATER, AND GAS BOXES AND VAULTS OCCURRING IN THE LOCATION

OF PROPOSED IMPROVEMENTS SHALL BE PROTECTED AND RESET UNLESS OTHERWISE NOTED.

47. IF THERE ARE ANY DISCREPANCIES BETWEEN DIMENSIONS IN DRAWINGS AND EXISTING CONDITIONS

WHICH WILL AFFECT THE WORK, THE CONTRACTOR SHALL BRING SUCH DISCREPANCIES TO THE

ATTENTION OF THE CONTRACTING OFFICER FOR ADJUSTMENT BEFORE PROCEEDING WITH THE WORK. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER FITTING OF ALL WORK AND FOR THE

COORDINATION OF ALL TRADES, SUBCONTRACTORS AND PERSONS ENGAGED UPON THE CONTRACT.

48. TRUCKS HAULING DIRT AND DEBRIS SHALL BE COVERED TO REDUCE WIND BLOWN DUST AND SPILLS.

49. ON DRY DAYS, DIRT OR DEBRIS SPILLED ONTO PAVED SURFACES SHALL BE SWEPT UP IMMEDIATELY TO REDUCE RESUSPENSION OF PARTICULATE MATTER CAUSED BY VEHICLE MOVEMENT. APPROACH ROUTES TO CONSTRUCTION SITES SHALL BE CLEANED DAILY OF CONSTRUCTION RELATED DIRT IN DRY WEATHER.

50. THE COST OF PROTECTION AND/OR REPAIR OF THE CONTRACTOR'S WORK AS AFFECTED BY STORM WATERS DURING INCLEMENT WEATHER SHALL BE THE CONTRACTOR'S RESPONSIBILITY UNTIL THE IMPROVEMENTS HAVE BEEN ACCEPTED BY THE NPS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO ADJACENT PROPERTIES OR IMPROVEMENTS AS A RESULT OF NOT PROTECTING SUCH AREAS

FROM STORM WATERS FLOWING OUT OF THE WORK AREA.

51. THE COST OF CORRECTIVE WORK REQUIRED FOR COMPLETION AND/OR ACCEPTANCE OF THE WORK

NECESSITATED BECAUSE OF UNSATISFACTORY WORKMANSHIP OR MATERIALS SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

GENERAL NOTES CONTINUED 52. PRIOR TO THE CONCLUSION OF THE WORK, THE CONTRACTOR SHALL REPAIR OR REPLACE IN KIND ALL DAMAGED PROPERTY FOR WHICH THE CONTRACTOR IS RESPONSIBLE (INCLUDING CURBS, GUTTERS, SIDEWALKS, SLABS, PORCHES, STEPS, ROADS, AND PATHS). THE WORK SITE AND ADJACENT AREAS SHALL BE CLEANED UP. THIS REPAIR AND REPLACEMENT, AND CLEAN UP WORK SHALL BE SUBJECT TO THE

APPROVAL AND ACCEPTANCE OF THE NPS.

53. SHOWN LATERAL LOCATIONS ARE APPROXIMATE ONLY. EXACT LOCATIONS SHALL BE DETERMINED BY THE

CONTRACTOR.

54. NOT ALL TOPOGRAPHY OR VEGETATION IS SHOWN. CONTRACTOR SHALL VISIT SITE TO BECOME

ACQUAINTED WITH ACCESS AND VEHICLE RESTRICTIONS.

55. POTHOLE ALL VAULT OR HAND HOLE LOCATIONS TO CONFIRM DEPTHS PRIOR TO ORDERING PRECAST

ELEMENTS.

56. CONTRACTOR SHALL PREPARE ACCURATE AS-BUILT DRAWINGS OF ALL PROJECT WORK. THE AS-BUILT DRAWINGS SHALL INCLUDE ALL LOCATIONS AND ELEVATIONS OF ALL ANGLE POINTS AND FITTINGS OF NEW UTILITIES AND ABANDONED LINES. CONTRACTOR SHALL HAVE A CA LICENSED LAND SURVEYOR LOCATE ALL ELECTRIC FEATURES, INCLUDING UNDERGROUND CONDUIT, HAND HOLES, AND VAULTS, (HORIZONTAL AND

VERTICAL) PRIOR TO TRENCH BACKFILL.

57. CONTRACTOR SHALL RESTORE ALL AREAS TO EXISTING CONDITIONS, UNLESS OTHERWISE NOTED, FOLLOWING CONSTRUCTION.

58. TRENCHES SHALL BE COMPACTED TO 90% FOR UNPAVED AREAS AND 95% FOR PAVED AREAS AND AREAS

BENEATH STRUCTURES.

59. THE CONTRACTOR SHALL COMPLY WITH THE ENVIRONMENTAL MITIGATION REQUIREMENTS PER THE

SPECIFICATIONS AND AS NOTED ON CONTRACT DRAWINGS.

1. DEMOLITION DRAWINGS ARE BASED ON CASUAL FIELD OBSERVATIONS AND EXISTING RECORD DOCUMENTS. REPORT DISCREPANCIES TO ENGINEER OR OWNER PRIOR TO DEMOLITION OF ELECTRICAL

SYSTEMS.

2. ENSURE EXISTING BOXES, WIRING CONNECTIONS AND OTHER INSTALLATIONS TO REMAIN ACTIVE HAVE

ACCESS.

1. ALL ELECTRICAL DISTRIBUTION RELATED WORK SHALL CONFORM TO SCE COMPANY GREENBOOK STANDARDS, WHICH IS THE BASIS FOR ALL SEQUOIA AND KINGS CANYON NATIONAL PARK UTILITY AND

DISTRIBUTION CONSTRUCTION WORK.

2. ALL UNDERGROUND ELECTRICAL AND DATA CONDUIT SHALL BE SCHEDULE 40 PVC. INSTALL MARKING TAPE ABOVE ALL UNDERGROUND CONDUITS AND DUCT BANKS. ALL 90 DEGREE ELBOWS UP TO EQUIPMENT

SHALL BE PVC-COATED GRS CONDUITS.

3. CONTRACTOR SHALL LOCATE ALL UTILITIES BY POT HOLING. EXISTING UTILITIES SHOWN HAVE BEEN GATHERED FROM EXISTING RECORDS, WHICH ARE NOT COMPLETE. CONTRACTOR SHALL POT HOLE PRIOR

TO DIGGING.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ROUTING ALL CONDUITS INCLUDING THOSE SHOWN ON ONE LINES AND ANY HOME RUNS. SEE SPECIFICATIONS FOR CONDUIT INSTALLATION REQUIREMENTS.

CONDUIT ROUTINGS AND STUB-UP LOCATIONS SHOWN ARE APPROXIMATE. EXACT ROUTINGS SHALL BE

INSTALLED AS REQUIRED FOR EQUIPMENT INSTALLATION, FREE OF ANY INTERFERENCES.

5. ALL ABOVE GROUND CONDUIT SHALL BE GRS.

6. LABEL EACH/ALL HAND HOLES (HH) AND/OR PULL BOXES (PB). LABEL CABLES AT EACH HH, PB, AND TERMINATION POINT. LABELS SHALL USE 6 INCH RED VINYL, STENCIL PUNCHED TAGS, ATTACHED WITH UV STABLE WIRE ZIP TIES. INCLUDE DISTANCE AND DIRECTION OF ALL CONDUCTORS AT ALL ACCESS POINTS AS WELL AS NUMBER OF ACCESS POINTS ALONG THE CIRCUIT ROUTE. FOR EXAMPLE: “TO BLDG 3001, 265’ NE VIA 3 PBs".

7. BUNDLE, COLOR CODE, AND LABEL EACH FEEDER CIRCUIT AT ALL HHS AND PBS WHERE MORE THAN ONE

FEEDER IS PRESENT IN THE BOX, AS WELL AS SINGLE FEEDER CIRCUITS IN A BOX.

8. UNDERGROUND ELECTRIC LINES ARE SCHEMATIC IN NATURE AS SHOWN ON THE DRAWINGS. CONTRACTOR SHALL ADJUST ROUTES TO AVOID EXISTING UTILITIES, BOULDERS, AND TREES AS NECESSARY.

9. CONDUITS SHALL BE CLEANED AND MANDRELED TO ENSURE AN INTACT PATHWAY. CONTRACTOR SHALL REMOVE DIRT, MUD AND DEBRIS FROM THE CONDUIT BY SWABBING, FLUSHING AND BLOWING THE CONDUIT

FREE IF REQUIRED. SEE SPECIFICATION 26 05 43.

ELECTRICAL DEMOLITION NOTES

GENERAL ELECTRIC NOTES

ARV

E

E

E

E

T

T

T

T

T POINT TABLES - ORIGINAL

EXPLODED COPIES

EXCEL REFERENCE

E

E

T

E

E

T

/1

2/

:5 0:

A

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\D

IS

PO

SA

L

FI

EL

D R

EP

AI

R S.

D W

G

N

SCALE IN FEET

0 200 400

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

4 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C1.2 EXISTING CONDITIONS

OVERVIEW

WUKSACHI LODGE

GENERALS HWY

SENSITIVE CULTURAL

BOUNDARY

TANK AREA

SEE INSERT, THIS SHEET

DISPOSAL FIELD AREA.

SEE SHEET C2.0 FOR REPAIRS

DIRT TRACK

ACCESS ROAD

CONTROL BUILDING AREA

SEE INSERT, THIS SHEET

GENERAL NOTES:

1. NO TOPOGRAPHIC OR UTILITY LOCATE SURVEY WAS PERFORMED FOR THIS

PROJECT. ALL BASE-MAPPING AND LINE WORK WAS CREATED FROM AVAILABLE

GOVERNMENT RECORDS.

2. CONTRACTOR TO ENSURE GATE IS CLOSED AND LOCKED EACH NIGHT.

3. THE HELIPAD NEEDS ACCESS AT ALL TIME AND SHALL NOT BE USED FOR PARKING,

STORAGE, OR STAGING.

DISPOSAL FIELD LINE

EXISTING VAULT

EXISTING EFFLUENT SPRAY HEAD

EXISTING IN LINE GATE VALVE

EXISTING AIR RELEASE VALVE

ARV

EDGE OF DIRT TRACK

EDGE OF ASPHALT

LEGEND

EXISTING EFFLUENT

TRANSPORT PIPE

TANK AREA

N

SCALE IN FEET

0 50 100

PROPOSED 40' X 40'

STAGING AND LAY

DOWN AREA

EXISTING 250,000 GAL

EFFLUENT STORAGE TANK

EXISTING 6"

EFFLUENT

TRANSPORT PIPE

EXISTING FLOW

CONTROL VAULT

EXISTING 15K GAL

EFFLUENT BY-PASS

STORAGE TANK

EXISTING

ELECTRICAL PULL

BOX

CONTROL BUILDING

AREA

N

SCALE IN FEET

0 20 40

EXISTING

PROPANE

TANK

EXISTING CONTROL

BUILDING

EXISTING

TEG

EXISTING

VALVE VAULT

HELIPAD

ACCESS

GATE

EXISTING FLOW

METER VAULT

EXISTING

DRAIN LINES

SEE SHEET C2.2

EXISTING MONITORING WELL

PARKING, STAGING, AND

STOCKPILING AVAILABLE

AROUND CONTROL

BUILDING. ACCESS MUST

BE MAINTAINED AT ALL

TIMES.

EXISTING FLOW

CONTROL VAULT

SEE ELECTRICAL SHEETS

AREA ABANDONED

/1 2/

:5

0:

A M

G

AL

EN

.R

EA

M

C :\D

JA

-P

W W

O R

K\ D

JA

-P

R O

D \D

M S1

\D

IS

PO

SA

L

FI

EL

D

R

EP

AI

R

S.

D

W G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

5 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C1.3 SYSTEM AS-BUILTS

ARV

E

T

/1

2/

:5 0:

A

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\D

IS

PO

SA

L

FI

EL

D R

EP

AI

R S.

D W

G

N

SCALE IN FEET

0 100 200

EXISTING CONTROL

BUILDING

EXISTING PROPANE

TANK TO BE REMOVED

REPLACE ALL SPRAY HEADS ON SECTIONS OF

PIPE BEING REPLACED

SPRAY ZONE J

39 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE G

172 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE H

299 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE I

915 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE O

SPRAY ZONE P

299 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE Q

111 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE N

80 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE M

LEACH FIELD ZONE # 5

180 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE L

62 LF OF PIPE TO BE

REPAIRED/REPLACED

SPRAY ZONE K

167 LF OF PIPE TO

BE REPAIRED/

REPLACED

LEACH FIELD ZONE # 6

LEACH FIELD ZONE # 9

LEACH FIELD ZONE # 8

LEACH FIELD ZONE # 7

72 LF OF PIPE TO BE

REPAIRED/REPLACED

LEACH FIELD ZONE # 10

LEACH FIELD ZONE # 11

LEACH FIELD ZONE # 12

LEACH FIELD ZONE # 13

LEACH FIELD ZONE # 14

LEACH FIELD ZONE # 15

LEACH FIELD ZONE # 16LEACH FIELD ZONE # 17

89 LF OF PIPE TO BE

REPAIRED/REPLACED

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

6 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C2.0 DISPOSAL FIELD REPAIRS

GENERAL CONSTRUCTION NOTES:

ALL MAIN LINE GATE VALVES TO BE REPLACED

ALL AIR RELEASE VALVE TO BE REPLACED

ALL DEFICIENT SPRAY HEADS TO BE REPLACED. 45 TOTAL

ALL ZONE IDENTIFICATION POSTS TO BE REPLACED WITH NEW

POSTS WITH BRASS NAME TAGS. 24 TOTAL.

ALL MONITORING WELLS TO BE REHABILITATED

ALL SOLENOID VALVES ARE TO BE REPLACED AND NEW PULL

BOXES INSTALLED AT EACH VALVE LOCATION.

4 4

4 4

C C3.0

A C3.1

B C3.1

TREE REMOVAL AREA #2

TREE REMOVAL AREA #1

GENERAL NOTES:

1. ALL REPAIR AREAS WERE PROVIDED BY THE NPS. IF THE CONTRACTOR

ENCOUNTERS ADDITIONAL ITEMS THAT NEED TO BE REPAIRED, IMMEDIATE

COORDINATION WITH THE CO WILL BE REQUIRED.

2. CONTRACTOR TO COORDINATE THE TREE REMOVAL AREAS / PHASES WITH

THE CO PRIOR TO CONSTRUCTION. TREE REMOVAL TO BE DONE BY

OTHERS.

3. THE DISPOSAL FIELD MAIN LINES ARE ASSUMED TO BE 4" PVC FROM NPS

PROVIDED AS-BUILTS. CONTRACTOR TO FIELD VERIFY THE SIZE AND

MATERIAL BEFORE REPAIRS.

4. THE SPRINKLER HEAD LATERAL LINES ARE ASSUMED TO BE 1" - 2 12" FROM

NPS PROVIDED AS-BUILTS. MATERIAL IS UNKNOWN. CONTRACTOR TO

FIELD VERIFY THE SIZE AND MATERIAL BEFORE REPAIRS.

5. ALL SPRAY HEAD LATERAL LINES BEING REPAIRED NEED TO SLOPE BACK

TO DRAIN TO THE VALVE BOX.

6. LEACH FIELDS 1-4 AND SPRAY FIELDS A-F ARE NOT IN USE.

7. THE CONTRACTOR IS REQUIRED TO SUBMIT A CONSTRUCTION PHASING

PLAN, TANK TIE-IN PLAN, TANK& SEWER MAIN BYPASS PLAN, AND

SANITARY SEWER OVERFLOW PLAN FOR APPROVAL.

8. CONTINUED OPERATION OF A MIMIMUM OF THREE SPRAY FIELDS,

EQUIVALENT TO THE SIZE OF FIELDS J, M, AND N COMBINED) IS REQURED

FOR THE SUMMER SEASON, GENERALLY APRIL THROUGH NOVEMBER,

DEPENDENT ON WEATHER. SUMMER FLOWS AVERAGE 35,000 GPD WITH

MAXIMUM FLOWS OF 85K GPD OCCURING ON OVER HOLIDAY PERIODS.

THESE FLOWS ARE TOO HIGH FOR LEACH FIELD USE.

9. MAXIMUM PERMITED FLOWS WITH ALL FIELDS OPERATIONAL ARE 95K GPD

FOR SPRAY FIELDS (SUMMER USE ONLY) AND 82K GPD FOR LEACH FIELDS

(WINTER).

10. OPERATION AND ACCESS TO VALVES CONTROLLING FLOW TO FIELDS IN

USE ARE REQUIRED AT ALL TIMES AS CURRENT OPERATION IS MANUAL

(THERE IS NO POWER AT THE SITE) AND REQUIRES MANUALLY TURNING

VALVES IN THE VAULTS. TRANSFER OF FIELDS REQUIRES ONE WORKING

DAY TO COMPLETE AND REQUIRES A TWO WEEK ADVANCE REQUEST.

11. ANY DISRUPTION IN EFFLUENT DISPOSAL SHALL REQUIRE A TIE-IN PLAN

AND CHECKLIST TO INCLUDE EMERGENCY CONTACT INFORMATION, LIST

OF PARTS ON HAND AND ONSITE, REQUIRED MEASUREMENTS FOR PIPES,

VAULTS, VALVES, ETC., SPARE PARTS ONSITE, WORK SEQUENCE AND

DURATIONS. SERVICE DISRUPTION SHALL STRICTLY BE LIMITED TO 8 HRS

TOTAL, REGARDLESS OF WHETHER IT BEGINS AT 4PM OR 4AM, THE REPAIR

MUST BE MADE WITHIN 8 HRS, IDEALLY WHEN THE CCWWTP IS STAFFED,

AS EFFLUENT STORAGE AT THE WWTP IS LIMITED.

12. THE CONTRACTOR SHALL SUBMIT A SEWER SPILL CONTAINMENT PLAN

FOR APPROVAL. ANY EFFLUENT SPILLS SHALL BE TREATED AS A

SANITARY SEWER OVERFLOW (SSO) AND REQUIRES REPORTING TO THE

CALIFORNIA STATE WATER CONTROL BOARD.

MONITORING WELL #1 MONITORING WELL #2

MONITORING WELL #3 MONITORING WELL #4

MONITORING WELL #6

MONITORING WELL #5

MONITORING WELL #7 MONITORING WELL #8

MONITORING WELL #1

MONITORING WELL #3

MONITORING WELL #2

MONITORING WELL #5

MONITORING WELL #4

MONITORING WELL #6

MONITORING WELL #7

MONITORING WELL #8

C C3.1

E C3.1

DISPOSAL FIELD LINE TO BE REPAIRED

EXISTING VAULT

EXISTING EFFLUENT SPRAY HEAD

EXISTING IN LINE GATE VALVE

EXISTING AIR RELEASE VALVE

ARV

EDGE OF DIRT TRACK

EDGE OF ASPHALT

LEGEND

EXISTING MONITORING WELL

6 D C3.1

E3.8

TYPICAL LEACH FIELD

LINE REPLACEMENT

C C3.2

TYPICAL SPRAY FIELD

LINE REPLACEMENT

A C3.0

DISPOSAL FIELD REPAIR POINTS

OBJECT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

AIR RELEASE VALVE

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

GATE VALVE / PRV VAULT

ID TAG NORTHING

1680140.75

1680273.96

1680268.20

1680414.99

1680515.12

1679758.30

1679948.25

1680005.75

1680043.84

1680518.59

1680764.27

1681135.90

1681167.96

EASTING

7068973.97

7069053.41

7068851.90

7068743.83

7068670.29

7068885.51

7068650.97

7068657.50

7068654.46

7068635.72

7068576.80

7068580.71

7068651.44

DISPOSAL FIELD REPAIR POINTS

OBJECT

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

ID TAG NORTHING

1679708.61

1679773.21

1679762.47

1680094.41

1680154.14

1680042.64

1680065.77

1680281.25

1680506.87

1680432.65

1680492.89

1680565.96

1680620.69

1680601.50

1680862.85

1680888.15

1680822.36

1680896.25

1680802.02

1680754.78

1680834.60

1680794.13

1680700.14

1680817.77

1680881.97

1681027.24

1681083.97

1680896.64

1680958.28

1681012.81

EASTING

7069056.31

7069067.66

7069008.03

7069216.77

7069214.39

7068651.35

7068724.74

7068823.28

7068911.86

7068852.76

7068858.89

7068858.59

7068895.77

7068848.33

7068567.23

7068834.82

7069007.64

7069196.03

7069259.16

7069240.82

7069236.55

7069206.93

7069172.32

7069168.24

7069192.85

7069358.27

7069384.67

7069255.76

7069253.44

7069266.30

DISPOSAL FIELD REPAIR POINTS

OBJECT

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

ID TAG NORTHING

1680009.92

1679984.62

1679925.01

1679896.97

1679922.96

1680505.02

1680491.17

1680480.43

1680464.32

1680438.30

1680258.14

1680189.85

1679754.23

1679724.42

1680117.00

1680300.25

1679547.80

1679713.46

1679896.78

1679948.43

1680009.26

1680054.27

1680102.73

1680157.63

1680268.44

1680310.55

1680379.36

1680621.78

1680603.59

1680585.27

EASTING

7069244.84

7069193.46

7069124.34

7069093.66

7069071.11

7069340.93

7069278.76

7069230.77

7069180.50

7069123.70

7069010.34

7068920.97

7068879.75

7068762.91

7068830.02

7068785.34

7068527.62

7068637.88

7068639.23

7068645.89

7068653.96

7068641.47

7068600.89

7068559.17

7068538.43

7068542.94

7068585.70

7068900.92

7068853.45

7068817.86

DISPOSAL FIELD REPAIR POINTS

OBJECT

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

SOLENOID VALVE

ID TAG NORTHING

1680532.16

1680608.66

1680715.73

1680825.75

1680577.04

1680874.21

1680886.08

1680898.33

1680908.54

1680919.83

1680936.50

1680946.57

1680996.37

1681066.97

1680946.40

1680434.95

EASTING

7068741.50

7069060.84

7068995.60

7069009.17

7068551.72

7069291.40

7069256.22

7069198.12

7069128.66

7069059.76

7068961.17

7068882.47

7068704.56

7068578.58

7068831.70

7068620.32

DISPOSAL FIELD REPAIR POINTS

OBJECT

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

SPRAY HEAD

ID TAG NORTHING

1681069.23

1681115.89

1681053.42

1681115.64

1681043.03

1681094.75

1681051.51

1681100.01

1680989.43

1681010.52

1681076.99

1681110.57

1681060.02

1681102.30

1681138.94

EASTING

7069313.83

7069353.63

7069248.17

7069281.59

7069197.21

7069226.40

7069124.97

7069162.24

7068972.44

7068896.92

7068992.81

7069038.47

7068885.37

7068927.54

7068982.65

DISPOSAL FIELD REPAIR POINTS

OBJECT

MONITORING WELL

MONITORING WELL

MONITORING WELL

MONITORING WELL

MONITORING WELL

MONITORING WELL

MONITORING WELL

MONITORING WELL

ID TAG NORTHING

1679465.67

1679534.51

1679653.91

1680046.33

1680144.56

1680768.74

1680671.23

1681090.00

EASTING

7068605.87

7068771.48

7068839.42

7069358.10

7069055.66

7069360.72

7069080.05

7068802.41

Q477

Q476

Q473

P493

P494

N434

N435

L461

K368

K375

K374

K373

K377

H325

A238

I345

I365

I366

I358

I359

I348

I347

I346

I362

I363

I353

I354

I355

I356

I357

I351

I352

H343

H344

H339

H340

H333

H328

H330

H331

G320

G321

G322

P3

P2

P1

Q2

Q1

O5

O4

O3

O2

O1

L1

N4

N3

N2

N1

M4

M3

M2

M1

J4

K4

K3

K2

MW7

MW8

MW6

MW5

MW4

MW3

MW2

MW1

K1

J2

I2

I1

H4

H3

H2

H1

G3

G1

J1

G2

J3

/1

2/

:5 0:

A

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\D

IS

PO

SA

L

FI

EL

D R

EP

AI

R S.

D W

G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

7 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C2.1 DISPOSAL FIELD REPAIRS

POINT TABLES

NOTES:

1. THESE POINTS WERE COLLECTED USING A SUB-METER TRIMBLE DATA COLLECTOR.

CONTRACTOR TO VERIFY ALL REPLACEMENT APPURTENANCES AND CONFIRM

ASSOCIATED ID TAG IN FIELD WITH FINAL APPROVAL FROM CO.

2. ALL SOLENOID VALVES, GATE VALVES, PRV VAULTS, AND MONITORING WELLS TO

RECEIVE NEW IDENTIFICATION POSTS. 67 TOTAL. SEE DETAIL C/C3.0.

T

/1

2/

:5 0:

A

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\D

IS

PO

SA

L

FI

EL

D R

EP

AI

R S.

D W

G

N

SCALE IN FEET

0 10 20

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

8 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C2.2 TANK AREA PLAN

PROPOSED 40' X 40' STAGING, LAY

DOWN, AND CRANE PAD AREA

(GRADING NOT ALLOWED)

250,000 GAL EFFLUENT STORAGE TANK. SEE

SHEETS S1.0 THROUGH S4.0 FOR STRUCTURAL

IMPROVEMENTS, AND ELECTRICAL SHEETS

FOR CONTROL IMPROVEMENTS

FLOW CONTROL VAULT.

SEE SHEET C3.0

15,000 GAL EFFLUENT BY-PASS

STORAGE TANK.

SEE SHEETS M1.0 AND M2.0

EXISTING 6"

EFFLUENT

TRANSPORT PIPE

EXISTING 6" EFFLUENT

TRANSPORT PIPE TO

TANK

EXISTING 8" TANK

OVERFLOW PIPE TO

DAYLIGHT

EXISTING 6"

EFFLUENT

TRANSPORT PIPE

EXISTING 6" EFFLUENT

TRANSPORT PIPE TO

DISPOSAL AREA

FLOW METER VAULT.

SEE SHEET M1.0

EXISTING EFFLUENT BYPASS LINE

PIPE. CURRENTLY DISCONNECTED

AT CONTROL VAULT

EXISTING 4" VAULT

OVERFLOW PIPE TO DAYLIGHT

EXISTING ELECTRICAL PULL BOX.

SEE ELECTRICAL SHEETS

ELECTRICAL PANELBOARD AND TRANSFORMER.

SEE ELECTRICAL SHEETS

EXISTING UNDERGROUND CONDUIT.

APPROXIMATE LOCATION

ACCESS ROAD

250,000 GALLON EFFLUENT STORAGE TANK

15,000 GALLON EFFLUENT STORAGE TANK

FLOW CONTROL VAULT

PROPOSED STAGING AREA - EXISTING CONDITIONS

PROPOSED ACCESS, PARKING

AND STORAGE AREA

FLOW CONTROL VAULT.

SEE SHEET M1.0

GENERAL NOTES:

1. STAGING AND PARKING IS NOT ALLOWED THE ROAD. ACCESS MUST

BE MAINTAINED AT ALL TIMES.

2. CONTRACTOR IS RESPONSIBLE FOR CLEARING FALLEN TREES IN

THE PROPOSED STAGING AREA WEST OF THE 250K GALLON

EFFLUENT STORAGE TANK.

3. CONTRACTOR TO SUBMIT CRANE PAD PLAN AND SPECIFICATIONS

TO THE CO FOR APPROVAL.

4. THE 250K GALLON TANK AT THE SITE PROVIDES STORAGE DURING

RAIN EVENTS WHEN THE SPRAY FIELDS CANNOT BE USED (PER

PERMIT), AND ENABLES MEASURED FLOW TO THE DISPOSAL

FIELDS.

5. REPAIRS AND CONNECTIONS TO THE 15K GALLON TANK SHALL BE

MADE PRIOR TO TAKING THE 250K GALLON TANK OFFLINE FOR

REPAIRS. ONCE ONLINE, THIS TANK WILL PROVIDE A SMALL

STORAGE BUFFER. THIS REQUIRES ISOLATION OF THE 250K TANK,

RECONNECTING THE PIPING TO THE 15K TANK AND OPENING THE

GATE VALVE TO THE 15K. CONTRACTOR TO SUBMIT A

BYPASS/SEQUENCING AND TIE-IN PLAN FOR APPROVAL SHOWING

HOW FLOW AND TANKS WILL BE CONTROLLED DURING

CONSTRUCTION AND SWITCH OVERS.

6. THE 250K GALLON TANK WILL BE REQUIRED TO BE EMPTIED AND

CLEANED PRIOR TO REPAIR. COORDINATE CLOSELY THE SEKI

FACILITIES. THE TANK DOES NOT DRAIN COMPLETELY. THE

CONTRACTOR IS REQUIRED TO VACUUM OUT THE REMAINING

EFFLUENT AND SLUDGE, USING SQUEEGIES AND VACUUM. THE

SLUDGE MAY BE DISPOSED OF AT THE CLOVER CREEK

WASTEWATER TREATMENT PLANT (CC WWTP).

/1

2/

:5 0:

A

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\D

IS

PO

SA

L

FI

EL

D R

EP

AI

R S.

D W

G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

9 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C3.0 DISPOSAL FIELD REPAIR

DETAILS 1

20' MAX ALLOWABLE

DISTURBANCE LIMITS

EXCAVATOR

TRENCH EXCAVATION

SPOIL PILE

PIPE STAGING/

LAYOUT AREA

B C3.0

TRENCH EXCAVATION DISTURBANCE LIMITS

NTS

NTS

A

C3.0

STANDARD SPRAY FIELD TRENCH

NTS

E

C3.0

TOPSOIL PATCH SECTION

NTS

F

C3.0

GRAVEL PATCH SECTION

4"

6"4"

6"

BACKSLOPE AS SPECIFIED

TO CONFORM TO O.S.H.A.

REGULATIONS

INSTALL 3" WIDE

WARNING TAPE

18" MAX. DEPTH

VERTICAL TRENCH WALLS WITH

SHORING TO CONFORM TO

O.S.H.A. REGULATIONS SUBGRADE OR

GROUND SURFACE

SLOPING, BENCHING AND/OR

SUPPORT SYSTEMS IN THIS

AREA TO CONFORM TO O.S.H.A

REGULATIONS

TRENCH WIDTH=O.D. OF PIPE PLUS 2'

MINIMUM TRENCH WIDE = 2.5'

TYPE 2 PIPE BEDDING WHERE

REQUIRED FOR SOFT OR

UNSTABLE FOUNDATION.

SELECT TYPE 1 BEDDING MATERIAL

PLACED IN 6" LAYERS & COMPACTED

AS SPECIFIED IN SECTION 31 23 33

"TRENCHING, BACKFILLING, AND

COMPACTING FOR UTILITIES"

NON-ORGANIC NATIVE

BACKFILL MATERIAL

(COMPACT AS SPECIFIED)

COMPACTED TRENCH BACKFILL

REPLACE WITH

SALVAGED TOPSOIL - 4"

COMPACTED TRENCH

BACKFILL

CRUSHED BASE MATERIAL,

6" COMPACTED DEPTH

(PLACED & COMPACTED PER

SECTION 32 11 23)

RESTORE SURFACE TO

EXISTING CONDITIONS

EFFLUENT MAIN, CONTRACTOR TO

VERIFY SIZE AND MATERIAL OF PIPE

TYPE 1 PIPE BEDDING

PLACED IN 6" MAX.

LAYERS AND COMPACTED

THOROUGHLY.

#14 COPPER TRACE WIRE

SEE SECTION 31 05 25.

PIPE SPRING LINE

" M

IN

IM

U M

DRIVE POST MINIMUM

OF 24" INTO GROUND

2 3 8" GALVANIZED

STEEL U-CHANNEL

SIGN POST

3'-0"

6" X 4" SPRAY FIELD

ZONE IDENTIFICATION

SIGN WITH 4" TEXT

HEIGHT

FINISH GRADE

C C3.0

DISPOSAL ZONE AND VALVE IDENTIFICATION SIGN

NTS

TRENCH WIDTH=O.D. OF PIPE PLUS 2'

3'-0"

H

REMOVE INFLUENT EXISTING

FLOWMETER & REPLACE

W/ NEW 6" BADGER M200 MAG

METER OR APPROVED EQUAL

REPLACE EXISTING TANK LEVEL SENSOR WITH KELLER

ACCULEVEL SUBMERSIBLE LEVEL TRANSMITTER OR

APPROVED EQUAL, CONNECT TO JUNCTION BOX AND

RUN SIGNAL WIRE TO CONTROL BUILDING,

REMOVE THE TOP 6" OF THE

CONCRETE VAULT DRILL IN ANCHORS

AND POUR THE TOP 6" BACK AND CAST

IN HALLIDAY H-20 RATED ALUMINUM

ACCESS HATCH WITH INTEGRATED

FALL PROTECTION GRATE OR

APPROVED EQUAL

D C3.0

FLOW CONTROL VAULT - 250,000 GAL TANK

NTS

NOTES:

1. NEW POSTS TO BE 2 3 8" GALVANIZED U-CHANNEL STEEL POSTS WITH LABEL CLAMPS.

2. NEW LABELS TO BE BRASS ENGRAVED NAME TAGS WITH ID FROM REPAIR POINT

TABLE.

3. REMOVE ALL EXISTING RED PLASTIC LABEL TAGS ON ALL SPRINKLER HEADS.

LEACH FIELD 12

CONTROL VALVE

4" LETTERS

(TYP)

AIR RELEASE

VALVE

MAIN LINE

VALVE

LATERAL VALVE

B12"

5"

MOUNTING

HOLES

TYPICAL NAMEPLATES

12"

24" MIN

5' -0

5'

-0

7'-0"

EXISTING GRADE

#14 COPPER TRACE WIRE.

TERMINATE IN COILS IN

BOXES FOR MAINTENANCE

AND LOCATING, TYPICAL.

SEE SECTION 31 05 25.

CONCRETE COLLAR

ASPHALT PATCH

6" WIDE X 6" THICK

CONCRETE COLLAR

1' WIDE X 4" THICK ASPHALT

PATCH. MATCH TO EXISTING

2/

:5 0:

A

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\D

IS

PO

SA

L

FI

EL

D R

EP

AI

R S.

D W

G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

10 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C3.1 DISPOSAL FIELD REPAIR

DETAILS 2

M

IN

IM

U

M C

O

VE

R

NEW 6" ADJUSTABLE C.I.

VALVE BOX SET PLUMB

AND CENTER OVER VALVE

OPERATING NUT

NEW C.I. VALVE BOX BELL

NEW PLUG VALVE

NEW CONCRETE GATE

VALVE THRUST BLOCK

FOOTNOTES:

1. CONCRETE THRUST BLOCKS WILL ONLY BE INSTALLED ON VALVES AND

FITTINGS THAT CONNECT TO AN EXISTING EFFLUENT SYSTEM WHERE THE

RESTRAINT CONFIGURATION OF THE EXISTING SYSTEM IS UNKNOWN.

2. IF THE CONTRACTOR FINDS THE EXISTING VALVE BOX TO BE IN GOOD

CONDITION, IT CAN BE REUSED WITH APPROVAL FROM THE CO.

FINISH GROUND

NEW MECHANICAL

JOINT RESTRAINT

BEDDING MATERIAL

UNDISTURBED SOIL

NTS

A

C3.1

PLUG VALVE DETAIL

UNION VALVE

GALV. TEE & PLUG

CURB STOP

BRONZE OR COPPER SCREENED

OPENING 100 MESH MAX.

STREET ELBOW

PIPE

SUPPORT (TYP.)

CORP.

STOP

EXISTING EFFLUENT MAIN.

30" TYPICAL BURY DEPTH

1" SADDLE CONNECTION TO

PVC MAIN. CONTRACTOR TO

VERIFY SIZE AND MATERIAL

BEFORE REPAIR

1" GALV. PIPE, SCH.40

BITUMINOUS COATED

& WRAPPED W/ 2

LAYERS VINYL TAPE

UNION VALVE TO

REMOVE AND SEAL FOR

WINTERIZING

AIR RELEASE VALVE

CURB STOP

BOX LID

DRAIN PIT WITH 8 CU FT

OF 3/8" GRAVEL.

EXTENSION TYPE

BASE CURB BOX

MOUNT RISER TO STEEL

POST WITH STAINLESS

STEEL RIGID PIPE STRAPS

NTS

B

C3.1

AIR RELEASE VALVE DETAIL NTS

C C3.1

EFFLUENT SPRAY HEAD REPLACEMENT DETAIL

EXISTING

SPRINKLER LATERAL

SADDLE TAP

SADDLE TAP

ATTACH 1/2" STAINLESS STEEL

RISER PIPE TO STEEL T-POST

USING GALVANIZED WIRE AT

THE TOP MIDDLE AND BOTTOM

OF T-POST

CONCRETE BLOCK

3/4" STAINLESS STEEL PIPE

EFFLUENT SPRINKLER

HEAD, REPLACE IN

KIND

FINISH GROUND

NTS

D

C3.1

SOLENOID VALVE VAULT REHAB DETAIL

REPLACE EXISTING

SOLENOID VALVES IN KIND

REPLACE ANY BROKEN

OR MISPLACED RIGID

FOAM INSULATION

RE-RUN ALL WIRING TO EACH

SOLENOID VALVE VAULT, SEE

ELECTRICAL SHEETS

PROTECT ALL EXISTING

PLUMBING IN PLACE

STEEL T-POST

THREADED CAP

4" SCH 80 PVC

FEMALE ADAPTER

CONCRETE

SURFACE SEAL

MALE

ADAPTER

4" SLOTTED

SCH 40 PVC

CAP

4" SCH 80 PVC

PEA GRAVEL

EXISTING GROUND

' T

YP

IC

AL

3'

(R

EP

LA

C

E)

3' (R

EP

LA

C E)

1' -6

SLOPE TO DRAIN

NTS

E

C3.1

MONITORING WELL REHAB DETAIL

NOTES:

1. REPLACE ALL MONITORING WELLS DOWN TO A MINIMUM OF 3 FEET BELOW

EXISTING GRADE, OR DEEPER IF BURN DAMAGE IS PRESENT.

2. INSTALL NEW CONCRETE COLLARS ON ALL MONITORING WELLS.

12" I.D.

12" MIN. ALL AROUND

EX

IS

TI

N

G

3/4" STAINLESS STEEL PIPE

2/

:5 0:

A

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\D

IS

PO

SA

L

FI

EL

D R

EP

AI

R S.

D W

G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

11 38

GR

GR

BE

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469C3.2 DISPOSAL FIELD REPAIR

DETAILS 3

LINE NO. 14" PERFORATIONS

IN 47' SECTION

TYPICAL

SPACING, INCHES

LINE 1

LINE 2

LINE 3

LINE 4

LINE 5

' M

IN

(T

YP

2 12" SCH 40 PVC

PERFORATED

8"4"

CAP

4" PVC

CONTROL VALVE

DRILL PRECISE

4" HOLES, SPACING

AS INDICATED IN

TABLE BELOW

SIDE

VIEW

END

VIEW

CAP & THRUST

BLOCK

47' 47'

FIRST 14" HOLE

1.5 X TYPICAL

SPACE FROM

END (TYP) LENGTH OF TRENCH = 100'

DRILL 3 8" HOLE

THRU CAP AT

TOP

TYPICAL END

NTS

A

C3.2

TYPICAL LEACH FIELD LAYOUT

1 3 4 5 6 7 8

2 12"2 12"2 12"2"2"1 12"

1" 1 14 "

LATERAL PIPE SIZE (Unless Noted Otherwise)

NUMBER OF HEADS DOWNSTREAM

NTS

B

C3.2

LATERAL PIPE SIZE

1' 6"

4' -6

1'-6"

GEOTEXTILE

FABRIC

2-1/2" SCH 40 PVC

PERFORATED LATERAL.

1 12"x3 4"

DRAIN ROCK

NATIVE SOIL

NTS

C

C3.2

TYPICAL LEACH FIELD TRENCH

AREA OF PEELING

PAINT & CORROSION

(E) WELD, TYP

INJECT VOIDED AREAS WITH

NON-SHRINK GROUT, TYP

REPLACE GASKETS AT 30"Ø

HINGED ACCESS MH, ENSURE

GASKETS ARE SECURED IN

PLACE AS HATCH IS OPENED

& CLOSED; TYP

(E) STEEL LADDER

& CAGE TO REMAIN

SCALE

250k GALLON STORAGE TANK FLOOR PLAN

A

S1.0

WELD CLOSED

DRILLED HOLE

SANDBLAST UPPER TANK

INTERIOR DOWN TO BARE

METAL & RECOAT. SPOT WIRE

BRUSH FLOOR & LOWER TANK

DOWN TO BARE METAL &

RECOAT; SEE DETAIL 1/S501

REPLACE GASKETS AT

30"Ø HINGED ACCESS

MH, TYP

/1

0/

:4 0:

P

M G

AL

EN

.R

EA

M C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\7

0.

S

EK

I S

TO

R

AG

E

TA

N

K

FO

U N

D

AT

IO

N

.D W

G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

250K GAL STORAGE

TANK FOUNDATION PLAN

195497

12 38

TE

KM

AG

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469S1.0

N 4'2'1'0 8'3'4'

SCALE OF FEET

A

GOVERNING DESIGN CODES:

A.ANSI/AWWA D100-21 WELDED CARBON STEEL TANKS FOR WATER STORAGE

B. CALIFORNIA BUILDING CODE (CBC 2022)

C.AMERICAN INSTITUTE FOR STEEL CONSTRUCTION 15TH EDITION (AISC 360-16)

D.OSHA STANDARD 1910 (FALL PROTECTION)

DESIGN LOAD CRITERIA:

A. ROOF LIVE LOAD

· 20 PSF

B. ROOF SNOW LOAD

· 250 PSF (PER NPS)

C.WIND LOADS

· ULTIMATE DESIGN WIND SPEED (3 SEC GUST), VULT = 95 MPH

· ALLOWABLE DESIGN WIND SPEED (3 SEC GUST), VASD = 74 MPH

· EXPOSURE CATEGORY = C

· SURFACE ROUGHNESS = C

· WIND UPLIFT = 9.3 PSF (ULT)

STRUCTURAL STEEL:

A.ALL STRUCTURAL STEEL SHALL BE DETAILED FABRICATED AND ERECTED IN ACCORDANCE WITH

THE AISC MANUAL OF STEEL CONSTRUCTION AND THE AISC CODE OF STANDARD PRACTICE.

B.MATERIAL REQUIREMENTS:

· WIDE FLANGE SHAPES = ASTM A992, GRADE 50

· ROUND HSS SHAPES = ASTM A500, GRADE C (Fy = 50 KSI)

· ANGLES, CHANNELS, AND PLATES = ASTM A36, GRADE 36

· STRUCTURAL BOLTS, NUTS, & WASHERS = ASTM F3125, GRADE A325 TYPE 1

C.WELDED CONNECTIONS:

· WELDING ELECTRODES = E70

· WELD IN ACCORDANCE WITH AWS D1.1 STRUCTURAL WELDING CODE. A CERTIFIED WELDER IS

REQUIRED.

· MINIMUM FILLET WELD SIZE = 3/16"

D.GROUTING:

· SHALL BE 5000 PSI, NON-SHRINK, NON-METALLIC, AND MEET THE REQUIREMENTS OF ASTM C1107.

REFERENCE SPEC SECTION 03 62 00 FOR GROUTING REQUIREMENTS

E. EXISTING 250k GALLON TANK WORK:

· SANDBLAST EXISTING TANK INTERIOR AND EXTERIOR WALL, AND FLOOR AND APPURTENANCES

TO BARE METAL, CLEAN, DEGREASE, PRIMER, AND RECOAT PER SPEC. SECTION 09 96 00.

SURFACE AREA IS APPROXIMATELY 9,000 SF. ALL PAINT BLASTING WASTE (PAINT PARTICLES, ABRASIVE MEDIA, RUST, METAL, ETC) SHOULD BE COLLECTED AND DISPOSED OF PROPERLY

· REPLACE 30" DIAMETER HINGED ACCESS MANWAY GASKET, NUTS, BOLTS, AND WASHERS

(TYPICAL OF 2)

· INSTALL NEW PRESSURE TRANSMITTER. SEE ELECTRICAL DRAWINGS

· INSTALL NEW NIKESON LIQUILEVEL EBS OR AN APPROVED EQUAL. SEE ELECTRICAL DRAWINGS

· INSTALL NEW INFLUENT 4" DIAMETER FLOAT VALVE ASSEMBLY

F. QUALITY ASSURANCE PLAN:

GENERAL REQUIREMENTS:

· THE OWNER SHALL BE RESPONSIBLE FOR HIRING THE SPECIAL INSPECTOR(S) & MUST INCUR ALL

ASSOCIATED COSTS PER IBC-2021

· THE PERMIT APPLICANT SHALL SUBMIT A STATEMENT OF SPECIAL INSPECTIONS PREPARED BY

THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE PER IBC-2021. THE

STATEMENT OF SPECIAL INSPECTIONS SHALL BE AS SHOWN BELOW

· SPECIAL INSPECTORS SHALL SUBMIT INSPECTION REPORTS TO THE CONTRACTING OFFICER.

THE REPORTS SHALL BE PREPARED IN ACCORDANCE WITH THE REQUIREMENTS CONTAINED IN

THE IBC-2021

· ALL OTHER NORMAL INSPECTIONS & TESTING NOT INCLUDED IN THE SPECIAL INSPECTION (i.e.

SOILS COMPACTION TESTING, CONCRETE SAMPLING & TESTING, PERMIT AGENCY INSPECTION,

ETC) SHALL BE PAID FOR BY THE GENERAL CONTRACTOR. ALL NORMAL TESTING & INSPECTIONS AS WELL AS ALL QUALITY ASSURANCE TESTING & INSPECTIONS (SPECIAL INSPECTIONS) SHALL

BE COORDINATED & SCHEDULED BY THE GENERAL CONTRACTOR TO FIT WITHIN THE WORKFLOW

OF THE PROJECT

STRUCTURAL GENERAL NOTES

INDICATES AREA OF POTENTIAL

VOIDS UNDER TANK

12/12/2025

SCALE

250K GAL TANK ROOF DEMOLITION PLAN

A

S2.0

(E) STEEL LADDER

& CAGE TO REMAIN

DEMO & REMOVE 30"SQ

ROOF ACCESS HATCH

& INTERIOR LADDER

DEMO & REMOVE

GUARDRAIL

30"Ø HINGED

ACCESS MH TO

REMAIN, TYP

8" WSP DOUBLE

ELBOW VENT, TYP

DEMO & REMOVE

ROOF GIRDERS &

SUPPLEMENTARY

STEEL ANGLES

DEMO & REMOVE

CENTER MANHOLE

DEMO & REMOVE

CENTER RING &

BRACES

DEMO & REMOVE

COLUMN CAPITALS

DEMO & REMOVE

ROOF DECK

SANDBLAST TANK

EXTERIOR DOWN TO

BARE METAL & RECOAT

8" OVERFLOW

DRAIN TO REMAIN

6" FE TO REMAIN

/1

0/

2:

:1

PM

K

R

IS

TA

.S

C O

TT

C

:\D

JA

-P W

W O

R K\

D

JA

-P R

O D

\D M

S1

\7

0.

S

EK

I S

TO

R

AG

E

TA

N

K R

O O

F

PL

AN

.D

W G

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

250K GAL STORAGE

TANK ROOF FRAMING

DEMOLITION PLAN

195497

13 38

TE

KM

AG

12/12/2025

RED FIR / CLOVER CREEK

SEQUOIA & KINGS CANYON NATIONAL PARK

328469S2.0

4'2'1'0 8'3'4'

SCALE OF FEET

A

N

NOTE: ALL EXISTING APPURTENANCES ON THE ROOF ARE TO BE REPLACED

SCALE

EXISTING 250K…

This is the start of the file's text. The full file is on GovTribe.