SEKI_328469_Plans_Final_Stamped-Reduced_1.pdf
PDF 18 MB Posted
- Attached to
- SEKI: REHAB CLOVER CREEK WASTEWATER DISPOSAL
- Solicitation number
- DOIPFBO260008
About this file
This document is a final construction drawing set for the Post KNP Fire Rehabilitation of Red Fir/Clover Creek wastewater disposal system at Sequoia & Kings Canyon National Park in California. The project, managed by the National Park Service Denver Service Center, involves comprehensive repairs and upgrades to the 250,000-gallon effluent storage tank, 15,000-gallon bypass tank, disposal field infrastructure, and associated electrical and control systems.
The construction work encompasses replacement of all main line gate valves, air release valves, and deficient spray heads (45 total); rehabilitation of 17 leach field zones and 13 spray field zones; installation of new solenoid valves with pullboxes at each location; replacement of all monitoring wells; and replacement of zone identification posts with brass name tags (24 total). The 250K gallon storage tank requires sandblasting of interior and exterior surfaces to bare metal, recoating, replacement of hinged access manway gaskets, installation of new pressure transmitters and level sensors, and structural roof framing demolition and replacement including new interior ladder, fall protection anchors, and guardrails. The 15K gallon tank requires similar interior/exterior sandblasting and recoating, replacement of 24-inch diameter hinged access manway gaskets, new float valve assembly installation, and modifications to the concrete valve vault including new gate valves and flowmeter. Electrical work includes demolition and replacement of burnt panelboards, transformers, and battery chargers; installation of new solar panels with mounting hardware; new PLC controls and instrumentation; and conduit routing throughout the site. The project site is located at approximately 6,800 feet elevation with seasonal road closures and requires compliance with environmental mitigation requirements, wildlife protection protocols, and OSHA safety standards. Contractor shall submit construction phasing plans, tank tie-in plans, bypass plans, and sewer overflow containment plans for approval prior to work initiation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources_Sought_Worksheet_1.pdf | ||
| SEKI_328469_Specifications_Final_Stamped_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE OF MILES
35 0 35
STATE
NATIONAL PARK SERVICE
DENVER SERVICE CENTER REGION COUNTY
DEPARTMENT OF THE INTERIOR
UNITED STATES LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING
38TULARE CALIFORNIA OF
PKG.
NO. SHEET
DRAWING NO.
SEQUOIA & KINGS CANYON NATIONAL PARK
PACIFIC WEST
CALIFORNIA
POST KNP FIRE REHABILITATION OF
RED FIR / CLOVER CREEK
FINAL CONSTRUCTION DRAWINGS
195497
102CLOVER CREEK WASTEWATER DISPOSAL
N
KINGS CANYON
NATIONAL PARK
SEQUOIA
N.P.
DEATH
VALLEY
NATIONAL
PARK
YOSEMITE
NATIONAL
PARK
CHERRY
DAM MONO
LAKE
FLORENCE
LAKE
PINE FLAT LAKE
TERMINUS
DAM
FRESNO
KER
N
R
IVER
DORST
GRANT
GROVE
TO FRESNO
CEDAR
GROVE CHARLOTTE
LAKE
RAE
LAKES
LeCONTE
CANYON
JOHN
MUIR
WILDERNESS
INYO
NATIONAL
FOREST
JOHN
MUIR
WILDERNESS
V.C.
MIDDLE
FORK KINGS
RIVER
SO
U
TH
FO
RK
RIVER
KI
N
G S
INYO
NATIONAL
FOREST
SEQUOIA
FOREST
KERN
CANYON
SOUTH
FORK
HOCKETT
MEADOW
MINERAL
KING
LOOKOUT
POINT
ROCK
CREEK
CRABTREE
MT. WHITNEY
ROARING
RIVER
KINGS CANYON
SEQUOIA
ATWELL
MILL
ASH
MOUNTAIN
HOSPITAL
ROCK
POTWISHA
LODGEPOLE
PEAR
LAKE
BEARPAW
MEADOW
LITTLE
FIVE LAKES
MONARCH
WILDERNESS
AREA
JENNIE LAKES
WILDERNESS
AREA
KETTLE
R
ID
G E
LeCONTE
DIVIDE
JOHN MUIR
& PACIFIC
CREST TRAIL
BUCKEYE
FLAT
McCLURE
MEADOW
TO
VISALIA
TYNDALL
CREEK
HIGH
SIERRA
TRAIL
COLD
SPRINGS
SIERRA
NATIONAL
FOREST
SEQUOIA
NATIONAL
FOREST
NATIONAL GOLDEN TROUT
WILDERNESS AREA
GIANT FOREST
WUKSACHI
VILLAGE
HUME
LAKE
CRYSTAL
CAVE
KINGS
CANYON
LODGE
V.C.
V.C.
HQ.
SCALE OF MILES
SCALE OF KILOMETERS
0 4
0 8
8 12
PICNIC AREA
LODGING
CAMPGROUND
RANGER STATION
PARK HEADQUARTERS
VISITOR CENTER
CREEK
PARK BOUNDARY
PAVED ROAD
COUNTY LINE
TRAIL
LEGEND
CLOVER CREEK WASTEWATER DISPOSAL
SEQUOIA - KINGS CANYON NATIONAL PARK
THIS PROJECT
/5
/2
:2 2:
P
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\G
EN
ER
AL
S
H
EE
TS
_T
EM
PL
AT
E.
D W
G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
195497
2 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C1.0 GENERAL NOTES, INDEX,
AND ABBREVIATIONS
AWWA AMERICAN WATER WORKS ASSOCIATION
C.I. CAST IRON
CO SEWER CLEANOUT OR CONTRACTING OFFICER
DIA. DIAMETER
E EASTING
ETC ET CETERA
I.D. INSIDE DIAMETER
LF LINEAR FEET
MAX. MAXIMUM
MH MANHOLE
MIN. MINIMUM
N NORTHING
NO. NUMBER
NPS NATIONAL PARK SERVICE
NTS NOT TO SCALE
O.S.H.A OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PMIS PROJECT MANAGEMENT INFORMATION SYSTEM
PRV PRESSURE REDUCING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
SCE SOUTHERN CALIFORNIA EDISON
SCH SCHEDULE
SEKI SEQUOIA AND KINGS CANYON NATIONAL PARK
TYP TYPICAL
ABBREVIATIONS
DISPOSAL FIELD LINE TO BE REPAIRED
EXISTING VAULT
EXISTING EFFLUENT SPRAY HEAD
EXISTING IN LINE GATE VALVE
EXISTING AIR RELEASE VALVE
ARV
EDGE OF DIRT TRACK
EDGE OF ASPHALT
EXISTING MONITORING WELL
DISPOSAL FIELD LINE
LEGEND
SHEET INDEX
SHEET NO. SUB-SHEET
NO. SHEET TITLE
1 - COVER
2 C1.0 GENERAL NOTES, INDEX, AND ABBREVIATIONS
3 C1.1 GENERAL NOTES CONTINUED
4 C1.2 EXISTING CONDITIONS OVERVIEW
5 C1.3 SYSTEM AS-BUILTS
6 C2.0 DISPOSAL FIELD REPAIRS
7 C2.1 DISPOSAL FIELD REPAIRS POINT TABLES
8 C2.2 TANK AREA PLAN
9 C3.0 DISPOSAL FIELD REPAIR DETAILS 1
10 C3.1 DISPOSAL FIELD REPAIR DETAILS 2
11 C3.2 DISPOSAL FIELD REPAIR DETAILS 3
12 S1.0 250K GAL STORAGE TANK FOUNDATION PLAN
13 S2.0 250K GAL STORAGE TANK ROOF FRAMING DEMOLITION PLAN
14 S3.0 250K GAL STORAGE TANK ROOF FRAMING PLAN
15 S4.0 250K GAL STORAGE TANK SECTION AND DETAILS
16 M1.0 EXISTING 15K GAL EFFLUENT STORAGE TANK MODIFICATIONS
17 M2.0 PHOTOS OF 15K GAL EFFLUENT STORAGE TANK AND APPURTENANCES
18 E1.1 ELECTRICAL LEGEND & ABBREVIATIONS
19 E1.2 ELECTRICAL ONE LINE DIAGRAM AND SCHEDULES
20 E1.3 ELECTRICAL PLC PANEL WIRING DIAGRAM
21 E1.4 ELECTRICAL I/O WIRING RELAY OUTPUT WIRING SLOT -1
22 E1.5 ELECTRICAL I/O WIRING RELAY OUTPUT WIRING SLOT -2
23 E1.6 I/O WIRING RELAY OUTPUT DIGITAL & ANALOG INPUT WIRING SLOTS - 3,
4 & 5
24 E1.7 ELECTRICAL NETWORK BLOCK DIAGRAM
25 E2.1 ELECTRICAL OVERALL SITE DEMO PLAN
26 E2.2 DEMO CONTROL BUILDING ENLARGED PLAN
27 E2.3 DEMO PLAN ENLARGED TANK PLAN
28 E2.4 ELECTRICAL DEMO PHOTOS 1
29 E2.5 ELECTRICAL DEMO PHOTOS 2
30 E3.0 ELECTRICAL OVERALL SITE PLAN
31 E3.1 ELECTRICAL SITE PLAN 1
32 E3.2 ELECTRICAL SITE PLAN 2
33 E3.3 ELECTRICAL SITE PLAN 3
34 E3.4 ELECTRICAL SITE PLAN 4
35 E3.5 ELECTRICAL TANKS ENLARGED POWER PLAN
36 E3.6 ELECTRICAL CONTROL BUILDING ENLARGED PLAN
37 E3.7 ELECTRICAL PHOTOS
38 E3.8 ELECTRICAL DETAILS
1. CARE MUST BE TAKEN TO MINIMIZE GROUND DISTURBANCE ON THIS SITE, PROTECT NATURAL & CULTURAL RESOURCES IN THE PROJECT AREA INCLUDING VEGETATION, LANDSCAPE FEATURES, & BOULDERS UNLESS
OTHERWISE SPECIFIED.
2. THE UTILITIES SHOWN IN THESE CONSTRUCTION DRAWINGS ARE INDICATED IN ACCORDANCE WITH AVAILABLE RECORDS. ALL UTILITIES MAY NOT BE SHOWN AND THOSE WHICH ARE SHOWN MAY NOT BE SHOWN ACCURATELY. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING TO DETERMINE AND VERIFY EXACT LOCATIONS, ELEVATIONS AND SIZES OF ALL EXISTING UTILITIES. NO TOPOGRAPHIC OR UTILITY LOCATE SURVEY WAS PERFORMED FOR THIS PROJECT. ALL BASE-MAPPING AND LINE WORK WAS CREATED FROM AVAILABLE GOVERNMENT RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL NPS AND NON-NPS OWNED UTILITIES. IF ANY EXISTING UTILITY IS DAMAGED DURING CONSTRUCTION, CONTACT AND COORDINATE WITH THE UTILITY PROVIDER IMMEDIATELY. REPAIR OR REPLACE THE DAMAGED EXISTING UTILITY PER THE UTILITY PROVIDER'S RECOMMENDATIONS AND REQUIREMENTS AT NO COST TO NPS. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 2 FEET SEPARATION BETWEEN ALL EXISTING OR NEW DRY UTILITIES AND ALL EXISTING OR NEW WATER AND SEWER
INSTALLATIONS. REFER TO TRENCHING DETAILS.
3. MATERIAL STAGING LOCATIONS & REQUIREMENTS SHALL BE COORDINATED WITH THE CONTRACTING
OFFICER PRIOR TO CONSTRUCTION, PER THE PROJECT SPECIFICATIONS.
4. COORDINATE WITH CONTRACTING OFFICER BEFORE BEGINNING ANY WORK.
5. ALL MINOR OBSTRUCTIONS MAY NOT BE SHOWN ON CONSTRUCTION DRAWINGS. THE CONTRACTOR SHALL REVIEW THE SITE PLANS AND DETERMINE THE CONDITIONS WITH REGARD TO THE EXISTENCE OF FENCES, DRIVEWAYS, TREES, BOULDERS, CONCRETE AND ASPHALT, CULVERTS, UTILITIES AND OTHER SITE IMPROVEMENTS AND MISCELLANEOUS OBSTACLES THAT MAY INTERFERE WITH CONSTRUCTION PRIOR TO
SUBMITTING BID.
6. PROVIDE TEMPORARY SUPPORT FOR EXISTING WET (WATER, SANIATRY SEWER, ETC.) AND DRY UTILITIES (GAS, POWER, ETC.) THAT CROSS THE TRENCH UNTIL BACKFILLING OF TRENCH IS COMPLETE.
7. CONSTRUCTION SHALL COMPLY WITH ENVIRONMENTAL PROTECTION AGENCY REGULATIONS,
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, AND STATE OF CALIFORNIA REGULATIONS.
8. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND MAINTAINING A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AS SPECIFIED IN SECTION 01 57 23. THE CONTRACTOR SHALL NOT INTRODUCE OR TRANSPORT EXOTIC AND NON-NATIVE PLANTS INTO THE PARK. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ROADSIDE DITCHES, SWALES AND PREVENT EROSION THROUGHOUT THE PROJECT. SEE APPENDIX B "LETTER OF COMPLIANCE FOR ADDITIONAL ENVIRONMENTAL MITIGATIONS" FOR
ADDITIONAL ENVIRONMENTAL MITIGATIONS.
9. ENSURE THAT EQUIPMENT IS FREE OF MUD, DIRT, AND PLANT PARTS BEFORE IT IS DELIVERED. TELL THE RENTAL AGENT IN ADVANCE THAT THOROUGH CLEANING IS REQUIRED. INSPECTION BY PARK RESOURCES STAFF IS REQUIRED PRIOR TO EQUIPMENT ENTERING THE PARK. REQUEST INSPECTION A MINIMUM OF ONE WEEK IN ADVANCE. INSPECTIONS ARE PERFORMED M-F, EXCLUDING HOLIDAYS BETWEEN 8:00 AM AND 4:00 PM AT A LOCATION OUTSIDE OF THE PARK ENTRANCE - SEE APPENDIX D "VEHICLE INSPECTION MAP".
10. STRIP TOPSOIL AND STOCKPILE FOR REPLACEMENT IN ALL AREAS OF EXCAVATION AND DISTURBANCE. USE ON-SITE FILL MATERIALS WHENEVER POSSIBLE. IF IMPORTED SOIL OR AGGREGATE IS REQUIRED, THE MATERIAL SOURCE REQUIRES INSPECTION OF THE FACILITY AND THE SPECIFIC MATERIAL BY PARK RESOURCES STAFF FOR APPROVAL AS WEED-FREE. STRAW PRODUCTS (I.E. "CERTIFIED WEED-FREE STRAW" AND OTHER STRAW PRODUCTS) ARE NOT AUTHORIZED ON PROJECT WORK SITES DUE TO THE HIGH RISK OF IMPORTING NON-NATIVE PLANTS AND SEEDS. INSTEAD, USE AN EXCELSIOR (ASPEN FIBER) OR COIR (COCONUT FIBER) PRODUCT FOR EROSION CONTROL, SEDIMENT FILTRATION, OR OTHER NEEDS.THIS
REQUIRES A MINIMUM TWO WEEK NOTICE FOR INSPECTION SCHEDULING.
11. RESTORE ALL SURFACES DISTURBED AS SPECIFIED AND SHOWN ON THE CONSTRUCTION DRAWINGS.
12. EVERY ATTEMPT HAS BEEN MADE TO ENSURE THE ACCURACY OF THE DRAWINGS THROUGH FIELD VERIFICATION & EXISTING PLAN REVIEW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY EXISTING CONDITIONS, SIZES, QUANTITIES, AND TO COORDINATE ALL ASPECTS OF THE PROJECT BEFORE CONSTRUCTION, ORDERING, AND INSTALLATION OF ANY COMPONENT. NOTIFY CONTRACTING OFFICER
IMMEDIATELY FOR WRITTEN CLARIFICATION IF ANY DISCREPANCY EXISTS.
13. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE CONTRACTOR IS EXPECTED TO USE QUALITY, ACCEPTABLE, CONSTRUCTION PRACTICES AND TECHNIQUES FOR THE EXTENT
& TYPE OF WORK DESCRIBED HEREIN.
14. CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS AND REGULATIONS AS PRESCRIBED BY THE LATEST EDITION OF THE INTERNATIONAL EXISTING BUILDING CODE, INTERNATIONAL BUILDING CODE INCLUDING APPENDICES, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL PLUMBING CODE, EPA ONSITE WASTEWATER TREATMENT SYSTEMS MANUAL, INTERNATIONAL FIRE CODE, AMERICAN NATIONAL STANDARDS, NFPA 101, NATIONAL ELECTRIC CODE, INTERNATIONAL ENERGY CONSERVATION CODE, THE
ARCHITECTURAL BARRIERS ACT, AND ANY APPLICABLE LOCAL CODES AND REGULATIONS.
15. THE CONTRACTOR IS RESPONSIBLE FOR DOCUMENTING ACCURATE AS-BUILT INFORMATION. CONTRACTOR SHALL DOCUMENT AS-BUILT CONSTRUCTION DRAWINGS, TO INCLUDE AN -BUILT SURVEY BY A CA LICENSED LAND SURVEYOR OF ALL IMPROVEMENTS OR MODIFICATIONS. INFORMATION SHALL INCLUDE HORIZONTAL AND VERTICAL INFORMATION, INCLUDING PIPE, CONDUIT INVERTS, CONDUIT, VAULT, AND PULL BOX
INVERTS, SIZES AND MATERIALS FOR ALL UNDERGROUND UTILITIES.
16. DO NOT SCALE DRAWINGS. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE CONTRACTING OFFICER IMMEDIATELY FOR WRITTEN CLARIFICATION.
17. CONTRACTOR(S) SHALL GUARANTEE THEIR WORK FOR A PERIOD OF NO LESS THAN ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. CONTRACTOR(S) SHALL REPLACE ALL DEFECTIVE PARTS & SUPPLIES
AT THEIR COST.
/5
/2
:2 2:
P
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\G
EN
ER
AL
S
H
EE
TS
_T
EM
PL
AT
E.
D W
G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
3 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C1.1
/5
/2
:2 2:
P
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\G
EN
ER
AL
S
H
EE
TS
_T
EM
PL
AT
E.
D W
G
GENERAL NOTES
CONTINUED
18. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS, AND LABOR REQUIRED TO COMPLETE THE WORK INDICATED. THIS INCLUDES ALL ACCESSORIES, FINISHES, AND SYSTEMS NECESSARY AND APPLICABLE TO
ENSURE A COMPLETE & FUNCTIONAL PROJECT UPON COMPLETION.
19. ANY ITEM SHOWN OR REFERENCED IN ONE INSTANCE SHALL BE AS IF SHOWN IN ALL INSTANCES, UNLESS
OTHERWISE NOTED.
20. CONTRACTOR IS TO REFER TO ALL DRAWINGS, SPECIFICATIONS, AND REQUIREMENTS OF CONTRACT INCLUDED FOR DESCRIPTION OF THE WORK. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL REQUIREMENTS AMONG THE DRAWINGS, SPECIFICATIONS, REQUIREMENTS OF CONTRACT, THE WORK OF ALL THEIR EMPLOYEES, SUB-CONTRACTORS, SUB-SUB-CONTRACTORS, AND ANY PERSON OR TRADE
PARTICIPATING IN ANY ASPECTS OF THE WORK.
21. COORDINATE QUESTIONABLE FIELD CONDITIONS IN WRITING WITH THE CONTRACTING OFFICER THROUGH
RFIS OR AT PROGRESS MEETINGS WITH QUALIFIED PERSONNEL CAPABLE OF ADVISING AND
RECOMMENDING APPROPRIATE SOLUTIONS.
22. FINAL DECISION(S) AFFECTING THE WORK WILL BE DOCUMENTED IN WRITING BY THE CONTRACTING OFFICER. DO NOT PROCEED WITH WORK WITHOUT WRITTEN DOCUMENTATION. FAILURE TO DO SO SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SUBJECT TO REJECTION, REMOVAL, REPAIR, AND REPLACEMENT OF THE WORK AS DIRECTED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST.
23. THE CONTRACTOR SHALL MAINTAIN A CLEAN WORKSITE. EXTREME DILIGENCE MUST BE USED ON THE SITE ENSURING THAT ALL TRASH, INCLUDING SMALL REFUSE, IS CONTAINED. WIND AND OTHER ENVIRONMENTAL CONDITIONS OR WEATHER PATTERNS DO NOT RELIEVE THE CONTRACTOR OF THIS RESPONSIBILITY.
GARBAGE, TRASH, AND OTHER SOLID WASTE ASSOCIATED WITH CONSTRUCTION OPERATIONS WILL BE DISPOSED OF IN BEAR PROOF TRASH BINS AND DISPOSED OF WEEKLY OR SOONER IF WARRANTED, OUTSIDE THE PARK. BEAR PROOF TRASH BINS OR DUMPSTERS MUST REMAIN CLOSED AND LOCKED AT ALL TIMES, INCLUDING DUMPSTERS WITH BARS. ALL FOOD, INCLUDING EMPTY COOLERS, WILL BE STORED IN BEAR-PROOF CONTAINERS, OR COVERED AND PLACED IN LOCKED VEHICLES OUT OF SIGHT TO ENSURE WILDLIFE CANNOT SEE OR OBTAIN IT. SPILLED FOOD WILL BE CLEANED UP IMMEDIATELY. THE PROJECT SITE WILL BE CLEANED UP AT THE END OF EACH DAY THE WORK IS BEING CONDUCTED (I.E., TRASH DISPOSED OF/SECURED APPROPRIATELY, SCRAP MATERIALS PICKED UP) TO MINIMIZE THE LIKELIHOOD OF WILDLIFE VISITING THE SITE. ALL CONTRACTOR PERSONNEL WILL BE TRAINED ON BEAR SAFETY.
24. THE IMPROVEMENTS TO THE DISPOSAL FIELD WILL HAPPEN ONCE THE FIRST PHASE OF THE TREE REMOVAL PROJECT IS COMPLETED. THE NPS WILL BE REMOVING APPROXIMATELY 1,400 DEAD TREES THROUGHOUT THE DISPOSAL FIELD AREA. THE TREE REMOVAL PHASES WILL BE DELINEATED ON THE PLANS ONCE THE NPS HAS DEFINED THE AREAS. ANY DAMAGE DONE TO THE DISPOSAL FIELD WILL BE
INCLUDED INTO THE CONTRACT.
25. THE CONTRACTOR IS REQUIRED TO SUBMIT A CONSTRUCTION PHASING PLAN, TANK TIE-IN PLAN, TANK &
SEWER MAIN BYPASS PLAN,AND SANITARY SEWER OVERFLOW PLAN FOR APPROVAL.
26. CONTINUED OPERATION OF A MIMIMUM OF THREE SPRAY FIELDS, EQUIVALENT TO THE SIZE OF FIELDS J, M, AND N COMBINED) IS REQURED FOR THE SUMMER SEASON, GENERALLY APRIL THROUGH NOVEMBER, DEPENDENT ON WEATHER. SUMMER FLOWS AVERAGE 35,000 GPD WITH MAXIMUM FLOWS OF 85K GPD
OCCURING ON OVER HOLIDAY PERIODS. THESE FLOWS ARE TOO HIGH FOR LEACH FIELD USE.
27. MAXIMUM PERMITED FLOWS WITH ALL FIELDS OPERATIONAL ARE 95K GPD FOR SPRAY FIELDS (SUMMER
USE ONLY) AND 82K GPD FOR LEACH FIELDS (WINTER).
28. OPERATION AND ACCESS TO VALVES CONTROLLING FLOW TO FIELDS IN USE ARE REQUIRED AT ALL TIMES AS CURRENT OPERATION IS MANUAL (THERE IS NO POWER AT THE SITE) AND REQUIRES MANUALLY TURNING VALVES IN THE VAULTS. TRANSFER OF FIELDS REQUIRES ONE WORKING DAY TO COMPLETE AND
REQUIRES A TWO WEEK ADVANCE REQUEST.
29. ANY DISRUPTION IN EFFLUENT DISPOSAL SHALL REQUIRE A TIE-IN PLAN AND CHECKLIST TO INCLUDE EMERGENCY CONTACT INFORMATION, LIST OF PARTS ON HAND AND ONSITE, REQUIRED MEASUREMENTS FOR PIPES, VAULTS, VALVES, ETC., SPARE PARTS ONSITE, WORK SEQUENCE AND DURATIONS. SERVICE DISRUPTION SHALL STRICTLY BE LIMITED TO 8 HRS TOTAL, REGARDLESS OF WHETHER IT BEGINS AT 4PM OR 4AM, THE REPAIR MUST BE MADE WITHIN 8 HRS, IDEALLY WHEN THE CCWWTP IS STAFFED, AS EFFLUENT
STORAGE AT THE WWTP IS LIMITED.
30. THE CONTRACTOR SHALL SUBMIT A SEWER SPILL CONTAINMENT PLAN FOR APPROVAL. ANY EFFLUENT SPILLS SHALL BE TREATED AS A SANITARY SEWER OVERFLOW (SSO) AND REQUIRES REPORTING TO THE
CALIFORNIA STATE WATER CONTROL BOARD.
31. THE SITE AT APPROXIMATELY 6,800 FT ABOVE SEA LEVEL. ROAD ACCESS IS NOT AVAILABLE WHEN THERE IS SNOW AND IS GENERALLY CLOSED FROM NOVEMBER THROUGH APRIL, WITH INTERMITTENT CLOSURES DUE TO WEATHER OCCURRING EARLIER AND LATER. THE CONTRACTOR SHALL MAINTAIN A WEATHER WATCH AND ENSURE NO EQUIPMENT WILL BE STUCK IN THE SNOW AND THE SYSTEM WILL BE FULLY OPERATIONAL AT THE SEASONAL CLOSURE(S). THE PARK DOES NOT PLOW THIS ROAD. WINTER SNOW OF 6 FT IS COMMON.
32. SEQUOIA AND KINGS NATIONAL PARKS IS A HIGH PUBLIC USE FACILITY. CONTRACTOR SHALL PROTECT THE PUBLIC FROM ALL OPERATIONS AND WORK AREAS. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, ALL STAGING AREAS, WORK SITES, MATERIAL HANDLING AREAS AND TEMPORARY SOURCES OF WATER.
33. SEQUOIA AND KINGS NATIONAL PARKS IS HOME TO BEARS AND OTHER WILD ANIMALS THAT WILL FORAGE FOR FOOD. ALL WORK AREAS ARE TO BE KEPT CLEAN OF ATTRACTIVE MATERIALS SUCH AS FOOD, GREASE, GARBAGE, AND DEBRIS.
34. EMERGENCY SERVICES WITHIN THE PARK ARE LIMITED. THE CONTRACTOR SHALL DEVELOP A SAFETY PLAN IN ACCORDANCE WITH THE SPECIFICATIONS. IN ADDITION, THE CONTRACTOR SHALL PROVIDE TRAINING TO ALL EMPLOYEES AND POST THE EMERGENCY CONTACTS, LOCATION OF THE HOSPITAL, AND OTHER
EMERGENCY SERVICES.
35. POLICE, RANGER SERVICES, AND FIRE PROTECTION ARE PROVIDED BY THE NATIONAL PARK SERVICE.
CONTRACTOR SHALL ESTABLISH CONTACTS WITH THESE SERVICES AND KEEP THEM APPRISED OF WORK
SCHEDULES, TRAFFIC CONTROL AND WORK PROGRESS.
36. CONTRACTOR SHALL MAINTAIN A LIST OF COMMONLY ASKED QUESTIONS WITH ANSWERS FOR USE WHEN DISCUSSING THE PROJECT WITH THE PUBLIC. ADDITIONAL PUBLIC INQUIRY NOT ADDRESSED ON THE LIST SHALL BE REFERRED TO THE CONTRACTING OFFICER. THE PROJECT PURPOSE AND ANTICIPATED QUESTIONS/ANSWERS FROM THE GENERAL PUBLIC WILL BE PREPARED BY THE NATIONAL PARK SERVICE
AND WILL BE PROVIDED TO THE CONTRACTOR.
37. CONTRACTOR SHALL MAINTAIN ON-SITE AND IN ALL VEHICLES A COPY OF THE SPILL PREVENTION AND RESPONSE PLAN. ALL PERSONNEL SHALL BE TRAINED IN THE CONDITIONS OF THE PLAN AND SHALL BE
FULLY KNOWLEDGEABLE OF THE REPORTING REQUIREMENTS AND PROCEDURES.
38. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE PROJECT PLANS AND
SPECIFICATIONS UNLESS OTHERWISE NOTED.
39. THE CONTRACTOR SHALL CONFORM TO THE RULES AND REGULATIONS OF THE FEDERAL OSHA
CONSTRUCTION SAFETY ORDINANCE PERTAINING TO EXCAVATIONS AND TRENCHES.
40. ALL WORK SHALL BE SUBJECT TO THE INSPECTION AND APPROVAL OF THE NPS. WORK SHALL NOT BE
COVERED PRIOR TO INSPECTION AND APPROVAL. REJECTED WORK SHALL BE REDONE AT THE
CONTRACTOR'S EXPENSE.
41. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER CONTRACTORS WITHIN THE PARK.
42. THE CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER AND PARK AND SCE (SOUTHER CAL EDISON) OF
PROPOSED LOCATIONS AND TIMES FOR EXCAVATION.
43. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PREVENTING DAMAGE TO EXISTING UTILITIES.
THE GOVERNMENT HAS ATTEMPTED TO SHOW THE APPROXIMATE LOCATION OF MAJOR UTILITIES ON THE DRAWINGS INCLUDING WATER LINES, SEWER LINES, AND PRIMARY ELECTRICAL LINES. SMALL SEWER SERVICES AND WATER LINES, SECONDARY ELECTRICAL AND TELEPHONE LINES HAVE NOT BEEN SHOWN.
THE CONTRACTOR SHALL SWEEP ALL SITES AND ALIGNMENTS AFFECTED BY CONSTRUCTION OPERATIONS WITH SUITABLE DETECTION DEVICES. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT, 800-227-2600 AND THE NATIONAL PARK SERVICE A MINIMUM OF TWO WORK WEEKS PRIOR TO EXCAVATING FOR COORDINATING AND MARKING THE LOCATION OF UNDERGROUND UTILITIES. THE AREAS PLANNED FOR EXCAVATION SHALL BE OUTLINED BY THE CONTRACTOR IN WHITE MARKING PAINT WITH "USA" WRITTEN AT A HIGHLY VISIBLE LOCATION ADJACENT TO THE EXCAVATION AREA. IN AREAS TO BE EXCAVATED, THE LOCATION OF ALL EXISTING DIRECT BURIAL PRIMARY ELECTRICAL CABLE SHALL BE MARKED ON THE GROUND SURFACE OR ON THE PAVEMENT. IN ADDITION, THE LOCATION OF ALL SEWER CROSSINGS OR OTHER UNDERGROUND UTILITIES OR KNOWN OBSTRUCTIONS SHALL ALSO BE CLEARLY MARKED AHEAD OF EXCAVATION FOR CONSTRUCTION. THE CONTRACTOR SHALL REMOVE ALL PAINT MARKINGS AS SOON AS EXCAVATION IS COMPLETED. IF DAMAGE OCCURS, REPAIR OF UTILITY SHALL BE PERFORMED AT NO
ADDITIONAL COST TO THE GOVERNMENT.
44. CONTRACTOR SHALL POTHOLE BY HAND ALL UTILITIES PRIOR TO USE OF EXCAVATORS OR BACKHOES.
CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL DAMAGED CONDUCTORS AT NO ADDITIONAL
COST TO THE GOVERNMENT.
45. EXISTING BURIED UTILITIES ARE INDICATED ON THE DRAWINGS WHERE SUCH UTILITIES ARE KNOWN. THE LOCATION AND EXTENT OF SUCH UTILITIES ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE, PROTECT AND MAINTAIN ALL EXISTING UTILITIES WHETHER OR NOT SHOWN ON THE DRAWINGS. ONLY ACTUAL POTHOLE EXCAVATION WILL REVEAL THE TYPES, EXTENT, SIZES, LOCATIONS AND DEPTHS OF SUCH UNDERGROUND UTILITIES. A REASONABLE EFFORT HAS BEEN MADE TO LOCATE AND DELINEATE ALL KNOWN UNDERGROUND UTILITIES. HOWEVER, THE NPS, THE UTILITY OWNER
AND THE CONTRACTING OFFICER CAN ASSUME NO RESPONSIBILITY FOR THE COMPLETENESS OR
ACCURACY OF THE DELINEATION OF SUCH UNDERGROUND UTILITIES WHICH MAY BE ENCOUNTERED.
46. ANY EXISTING UTILITY STRUCTURE INCLUDING BUT NOT LIMITED TO VALVE BOXES, SEWER AND STORM MANHOLES AND INLETS, ELECTRICAL, WATER, AND GAS BOXES AND VAULTS OCCURRING IN THE LOCATION
OF PROPOSED IMPROVEMENTS SHALL BE PROTECTED AND RESET UNLESS OTHERWISE NOTED.
47. IF THERE ARE ANY DISCREPANCIES BETWEEN DIMENSIONS IN DRAWINGS AND EXISTING CONDITIONS
WHICH WILL AFFECT THE WORK, THE CONTRACTOR SHALL BRING SUCH DISCREPANCIES TO THE
ATTENTION OF THE CONTRACTING OFFICER FOR ADJUSTMENT BEFORE PROCEEDING WITH THE WORK. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER FITTING OF ALL WORK AND FOR THE
COORDINATION OF ALL TRADES, SUBCONTRACTORS AND PERSONS ENGAGED UPON THE CONTRACT.
48. TRUCKS HAULING DIRT AND DEBRIS SHALL BE COVERED TO REDUCE WIND BLOWN DUST AND SPILLS.
49. ON DRY DAYS, DIRT OR DEBRIS SPILLED ONTO PAVED SURFACES SHALL BE SWEPT UP IMMEDIATELY TO REDUCE RESUSPENSION OF PARTICULATE MATTER CAUSED BY VEHICLE MOVEMENT. APPROACH ROUTES TO CONSTRUCTION SITES SHALL BE CLEANED DAILY OF CONSTRUCTION RELATED DIRT IN DRY WEATHER.
50. THE COST OF PROTECTION AND/OR REPAIR OF THE CONTRACTOR'S WORK AS AFFECTED BY STORM WATERS DURING INCLEMENT WEATHER SHALL BE THE CONTRACTOR'S RESPONSIBILITY UNTIL THE IMPROVEMENTS HAVE BEEN ACCEPTED BY THE NPS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO ADJACENT PROPERTIES OR IMPROVEMENTS AS A RESULT OF NOT PROTECTING SUCH AREAS
FROM STORM WATERS FLOWING OUT OF THE WORK AREA.
51. THE COST OF CORRECTIVE WORK REQUIRED FOR COMPLETION AND/OR ACCEPTANCE OF THE WORK
NECESSITATED BECAUSE OF UNSATISFACTORY WORKMANSHIP OR MATERIALS SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
GENERAL NOTES CONTINUED 52. PRIOR TO THE CONCLUSION OF THE WORK, THE CONTRACTOR SHALL REPAIR OR REPLACE IN KIND ALL DAMAGED PROPERTY FOR WHICH THE CONTRACTOR IS RESPONSIBLE (INCLUDING CURBS, GUTTERS, SIDEWALKS, SLABS, PORCHES, STEPS, ROADS, AND PATHS). THE WORK SITE AND ADJACENT AREAS SHALL BE CLEANED UP. THIS REPAIR AND REPLACEMENT, AND CLEAN UP WORK SHALL BE SUBJECT TO THE
APPROVAL AND ACCEPTANCE OF THE NPS.
53. SHOWN LATERAL LOCATIONS ARE APPROXIMATE ONLY. EXACT LOCATIONS SHALL BE DETERMINED BY THE
CONTRACTOR.
54. NOT ALL TOPOGRAPHY OR VEGETATION IS SHOWN. CONTRACTOR SHALL VISIT SITE TO BECOME
ACQUAINTED WITH ACCESS AND VEHICLE RESTRICTIONS.
55. POTHOLE ALL VAULT OR HAND HOLE LOCATIONS TO CONFIRM DEPTHS PRIOR TO ORDERING PRECAST
ELEMENTS.
56. CONTRACTOR SHALL PREPARE ACCURATE AS-BUILT DRAWINGS OF ALL PROJECT WORK. THE AS-BUILT DRAWINGS SHALL INCLUDE ALL LOCATIONS AND ELEVATIONS OF ALL ANGLE POINTS AND FITTINGS OF NEW UTILITIES AND ABANDONED LINES. CONTRACTOR SHALL HAVE A CA LICENSED LAND SURVEYOR LOCATE ALL ELECTRIC FEATURES, INCLUDING UNDERGROUND CONDUIT, HAND HOLES, AND VAULTS, (HORIZONTAL AND
VERTICAL) PRIOR TO TRENCH BACKFILL.
57. CONTRACTOR SHALL RESTORE ALL AREAS TO EXISTING CONDITIONS, UNLESS OTHERWISE NOTED, FOLLOWING CONSTRUCTION.
58. TRENCHES SHALL BE COMPACTED TO 90% FOR UNPAVED AREAS AND 95% FOR PAVED AREAS AND AREAS
BENEATH STRUCTURES.
59. THE CONTRACTOR SHALL COMPLY WITH THE ENVIRONMENTAL MITIGATION REQUIREMENTS PER THE
SPECIFICATIONS AND AS NOTED ON CONTRACT DRAWINGS.
1. DEMOLITION DRAWINGS ARE BASED ON CASUAL FIELD OBSERVATIONS AND EXISTING RECORD DOCUMENTS. REPORT DISCREPANCIES TO ENGINEER OR OWNER PRIOR TO DEMOLITION OF ELECTRICAL
SYSTEMS.
2. ENSURE EXISTING BOXES, WIRING CONNECTIONS AND OTHER INSTALLATIONS TO REMAIN ACTIVE HAVE
ACCESS.
1. ALL ELECTRICAL DISTRIBUTION RELATED WORK SHALL CONFORM TO SCE COMPANY GREENBOOK STANDARDS, WHICH IS THE BASIS FOR ALL SEQUOIA AND KINGS CANYON NATIONAL PARK UTILITY AND
DISTRIBUTION CONSTRUCTION WORK.
2. ALL UNDERGROUND ELECTRICAL AND DATA CONDUIT SHALL BE SCHEDULE 40 PVC. INSTALL MARKING TAPE ABOVE ALL UNDERGROUND CONDUITS AND DUCT BANKS. ALL 90 DEGREE ELBOWS UP TO EQUIPMENT
SHALL BE PVC-COATED GRS CONDUITS.
3. CONTRACTOR SHALL LOCATE ALL UTILITIES BY POT HOLING. EXISTING UTILITIES SHOWN HAVE BEEN GATHERED FROM EXISTING RECORDS, WHICH ARE NOT COMPLETE. CONTRACTOR SHALL POT HOLE PRIOR
TO DIGGING.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ROUTING ALL CONDUITS INCLUDING THOSE SHOWN ON ONE LINES AND ANY HOME RUNS. SEE SPECIFICATIONS FOR CONDUIT INSTALLATION REQUIREMENTS.
CONDUIT ROUTINGS AND STUB-UP LOCATIONS SHOWN ARE APPROXIMATE. EXACT ROUTINGS SHALL BE
INSTALLED AS REQUIRED FOR EQUIPMENT INSTALLATION, FREE OF ANY INTERFERENCES.
5. ALL ABOVE GROUND CONDUIT SHALL BE GRS.
6. LABEL EACH/ALL HAND HOLES (HH) AND/OR PULL BOXES (PB). LABEL CABLES AT EACH HH, PB, AND TERMINATION POINT. LABELS SHALL USE 6 INCH RED VINYL, STENCIL PUNCHED TAGS, ATTACHED WITH UV STABLE WIRE ZIP TIES. INCLUDE DISTANCE AND DIRECTION OF ALL CONDUCTORS AT ALL ACCESS POINTS AS WELL AS NUMBER OF ACCESS POINTS ALONG THE CIRCUIT ROUTE. FOR EXAMPLE: “TO BLDG 3001, 265’ NE VIA 3 PBs".
7. BUNDLE, COLOR CODE, AND LABEL EACH FEEDER CIRCUIT AT ALL HHS AND PBS WHERE MORE THAN ONE
FEEDER IS PRESENT IN THE BOX, AS WELL AS SINGLE FEEDER CIRCUITS IN A BOX.
8. UNDERGROUND ELECTRIC LINES ARE SCHEMATIC IN NATURE AS SHOWN ON THE DRAWINGS. CONTRACTOR SHALL ADJUST ROUTES TO AVOID EXISTING UTILITIES, BOULDERS, AND TREES AS NECESSARY.
9. CONDUITS SHALL BE CLEANED AND MANDRELED TO ENSURE AN INTACT PATHWAY. CONTRACTOR SHALL REMOVE DIRT, MUD AND DEBRIS FROM THE CONDUIT BY SWABBING, FLUSHING AND BLOWING THE CONDUIT
FREE IF REQUIRED. SEE SPECIFICATION 26 05 43.
ELECTRICAL DEMOLITION NOTES
GENERAL ELECTRIC NOTES
ARV
E
E
E
E
T
T
T
T
T POINT TABLES - ORIGINAL
EXPLODED COPIES
EXCEL REFERENCE
E
E
T
E
E
T
/1
2/
:5 0:
A
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\D
IS
PO
SA
L
FI
EL
D R
EP
AI
R S.
D W
G
N
SCALE IN FEET
0 200 400
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
4 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C1.2 EXISTING CONDITIONS
OVERVIEW
WUKSACHI LODGE
GENERALS HWY
SENSITIVE CULTURAL
BOUNDARY
TANK AREA
SEE INSERT, THIS SHEET
DISPOSAL FIELD AREA.
SEE SHEET C2.0 FOR REPAIRS
DIRT TRACK
ACCESS ROAD
CONTROL BUILDING AREA
SEE INSERT, THIS SHEET
GENERAL NOTES:
1. NO TOPOGRAPHIC OR UTILITY LOCATE SURVEY WAS PERFORMED FOR THIS
PROJECT. ALL BASE-MAPPING AND LINE WORK WAS CREATED FROM AVAILABLE
GOVERNMENT RECORDS.
2. CONTRACTOR TO ENSURE GATE IS CLOSED AND LOCKED EACH NIGHT.
3. THE HELIPAD NEEDS ACCESS AT ALL TIME AND SHALL NOT BE USED FOR PARKING,
STORAGE, OR STAGING.
DISPOSAL FIELD LINE
EXISTING VAULT
EXISTING EFFLUENT SPRAY HEAD
EXISTING IN LINE GATE VALVE
EXISTING AIR RELEASE VALVE
ARV
EDGE OF DIRT TRACK
EDGE OF ASPHALT
LEGEND
EXISTING EFFLUENT
TRANSPORT PIPE
TANK AREA
N
SCALE IN FEET
0 50 100
PROPOSED 40' X 40'
STAGING AND LAY
DOWN AREA
EXISTING 250,000 GAL
EFFLUENT STORAGE TANK
EXISTING 6"
EFFLUENT
TRANSPORT PIPE
EXISTING FLOW
CONTROL VAULT
EXISTING 15K GAL
EFFLUENT BY-PASS
STORAGE TANK
EXISTING
ELECTRICAL PULL
BOX
CONTROL BUILDING
AREA
N
SCALE IN FEET
0 20 40
EXISTING
PROPANE
TANK
EXISTING CONTROL
BUILDING
EXISTING
TEG
EXISTING
VALVE VAULT
HELIPAD
ACCESS
GATE
EXISTING FLOW
METER VAULT
EXISTING
DRAIN LINES
SEE SHEET C2.2
EXISTING MONITORING WELL
PARKING, STAGING, AND
STOCKPILING AVAILABLE
AROUND CONTROL
BUILDING. ACCESS MUST
BE MAINTAINED AT ALL
TIMES.
EXISTING FLOW
CONTROL VAULT
SEE ELECTRICAL SHEETS
AREA ABANDONED
/1 2/
:5
0:
A M
G
AL
EN
.R
EA
M
C :\D
JA
-P
W W
O R
K\ D
JA
-P
R O
D \D
M S1
\D
IS
PO
SA
L
FI
EL
D
R
EP
AI
R
S.
D
W G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
5 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C1.3 SYSTEM AS-BUILTS
ARV
E
T
/1
2/
:5 0:
A
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\D
IS
PO
SA
L
FI
EL
D R
EP
AI
R S.
D W
G
N
SCALE IN FEET
0 100 200
EXISTING CONTROL
BUILDING
EXISTING PROPANE
TANK TO BE REMOVED
REPLACE ALL SPRAY HEADS ON SECTIONS OF
PIPE BEING REPLACED
SPRAY ZONE J
39 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE G
172 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE H
299 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE I
915 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE O
SPRAY ZONE P
299 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE Q
111 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE N
80 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE M
LEACH FIELD ZONE # 5
180 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE L
62 LF OF PIPE TO BE
REPAIRED/REPLACED
SPRAY ZONE K
167 LF OF PIPE TO
BE REPAIRED/
REPLACED
LEACH FIELD ZONE # 6
LEACH FIELD ZONE # 9
LEACH FIELD ZONE # 8
LEACH FIELD ZONE # 7
72 LF OF PIPE TO BE
REPAIRED/REPLACED
LEACH FIELD ZONE # 10
LEACH FIELD ZONE # 11
LEACH FIELD ZONE # 12
LEACH FIELD ZONE # 13
LEACH FIELD ZONE # 14
LEACH FIELD ZONE # 15
LEACH FIELD ZONE # 16LEACH FIELD ZONE # 17
89 LF OF PIPE TO BE
REPAIRED/REPLACED
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
6 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C2.0 DISPOSAL FIELD REPAIRS
GENERAL CONSTRUCTION NOTES:
ALL MAIN LINE GATE VALVES TO BE REPLACED
ALL AIR RELEASE VALVE TO BE REPLACED
ALL DEFICIENT SPRAY HEADS TO BE REPLACED. 45 TOTAL
ALL ZONE IDENTIFICATION POSTS TO BE REPLACED WITH NEW
POSTS WITH BRASS NAME TAGS. 24 TOTAL.
ALL MONITORING WELLS TO BE REHABILITATED
ALL SOLENOID VALVES ARE TO BE REPLACED AND NEW PULL
BOXES INSTALLED AT EACH VALVE LOCATION.
4 4
4 4
C C3.0
A C3.1
B C3.1
TREE REMOVAL AREA #2
TREE REMOVAL AREA #1
GENERAL NOTES:
1. ALL REPAIR AREAS WERE PROVIDED BY THE NPS. IF THE CONTRACTOR
ENCOUNTERS ADDITIONAL ITEMS THAT NEED TO BE REPAIRED, IMMEDIATE
COORDINATION WITH THE CO WILL BE REQUIRED.
2. CONTRACTOR TO COORDINATE THE TREE REMOVAL AREAS / PHASES WITH
THE CO PRIOR TO CONSTRUCTION. TREE REMOVAL TO BE DONE BY
OTHERS.
3. THE DISPOSAL FIELD MAIN LINES ARE ASSUMED TO BE 4" PVC FROM NPS
PROVIDED AS-BUILTS. CONTRACTOR TO FIELD VERIFY THE SIZE AND
MATERIAL BEFORE REPAIRS.
4. THE SPRINKLER HEAD LATERAL LINES ARE ASSUMED TO BE 1" - 2 12" FROM
NPS PROVIDED AS-BUILTS. MATERIAL IS UNKNOWN. CONTRACTOR TO
FIELD VERIFY THE SIZE AND MATERIAL BEFORE REPAIRS.
5. ALL SPRAY HEAD LATERAL LINES BEING REPAIRED NEED TO SLOPE BACK
TO DRAIN TO THE VALVE BOX.
6. LEACH FIELDS 1-4 AND SPRAY FIELDS A-F ARE NOT IN USE.
7. THE CONTRACTOR IS REQUIRED TO SUBMIT A CONSTRUCTION PHASING
PLAN, TANK TIE-IN PLAN, TANK& SEWER MAIN BYPASS PLAN, AND
SANITARY SEWER OVERFLOW PLAN FOR APPROVAL.
8. CONTINUED OPERATION OF A MIMIMUM OF THREE SPRAY FIELDS,
EQUIVALENT TO THE SIZE OF FIELDS J, M, AND N COMBINED) IS REQURED
FOR THE SUMMER SEASON, GENERALLY APRIL THROUGH NOVEMBER,
DEPENDENT ON WEATHER. SUMMER FLOWS AVERAGE 35,000 GPD WITH
MAXIMUM FLOWS OF 85K GPD OCCURING ON OVER HOLIDAY PERIODS.
THESE FLOWS ARE TOO HIGH FOR LEACH FIELD USE.
9. MAXIMUM PERMITED FLOWS WITH ALL FIELDS OPERATIONAL ARE 95K GPD
FOR SPRAY FIELDS (SUMMER USE ONLY) AND 82K GPD FOR LEACH FIELDS
(WINTER).
10. OPERATION AND ACCESS TO VALVES CONTROLLING FLOW TO FIELDS IN
USE ARE REQUIRED AT ALL TIMES AS CURRENT OPERATION IS MANUAL
(THERE IS NO POWER AT THE SITE) AND REQUIRES MANUALLY TURNING
VALVES IN THE VAULTS. TRANSFER OF FIELDS REQUIRES ONE WORKING
DAY TO COMPLETE AND REQUIRES A TWO WEEK ADVANCE REQUEST.
11. ANY DISRUPTION IN EFFLUENT DISPOSAL SHALL REQUIRE A TIE-IN PLAN
AND CHECKLIST TO INCLUDE EMERGENCY CONTACT INFORMATION, LIST
OF PARTS ON HAND AND ONSITE, REQUIRED MEASUREMENTS FOR PIPES,
VAULTS, VALVES, ETC., SPARE PARTS ONSITE, WORK SEQUENCE AND
DURATIONS. SERVICE DISRUPTION SHALL STRICTLY BE LIMITED TO 8 HRS
TOTAL, REGARDLESS OF WHETHER IT BEGINS AT 4PM OR 4AM, THE REPAIR
MUST BE MADE WITHIN 8 HRS, IDEALLY WHEN THE CCWWTP IS STAFFED,
AS EFFLUENT STORAGE AT THE WWTP IS LIMITED.
12. THE CONTRACTOR SHALL SUBMIT A SEWER SPILL CONTAINMENT PLAN
FOR APPROVAL. ANY EFFLUENT SPILLS SHALL BE TREATED AS A
SANITARY SEWER OVERFLOW (SSO) AND REQUIRES REPORTING TO THE
CALIFORNIA STATE WATER CONTROL BOARD.
MONITORING WELL #1 MONITORING WELL #2
MONITORING WELL #3 MONITORING WELL #4
MONITORING WELL #6
MONITORING WELL #5
MONITORING WELL #7 MONITORING WELL #8
MONITORING WELL #1
MONITORING WELL #3
MONITORING WELL #2
MONITORING WELL #5
MONITORING WELL #4
MONITORING WELL #6
MONITORING WELL #7
MONITORING WELL #8
C C3.1
E C3.1
DISPOSAL FIELD LINE TO BE REPAIRED
EXISTING VAULT
EXISTING EFFLUENT SPRAY HEAD
EXISTING IN LINE GATE VALVE
EXISTING AIR RELEASE VALVE
ARV
EDGE OF DIRT TRACK
EDGE OF ASPHALT
LEGEND
EXISTING MONITORING WELL
6 D C3.1
E3.8
TYPICAL LEACH FIELD
LINE REPLACEMENT
C C3.2
TYPICAL SPRAY FIELD
LINE REPLACEMENT
A C3.0
DISPOSAL FIELD REPAIR POINTS
OBJECT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
AIR RELEASE VALVE
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
GATE VALVE / PRV VAULT
ID TAG NORTHING
1680140.75
1680273.96
1680268.20
1680414.99
1680515.12
1679758.30
1679948.25
1680005.75
1680043.84
1680518.59
1680764.27
1681135.90
1681167.96
EASTING
7068973.97
7069053.41
7068851.90
7068743.83
7068670.29
7068885.51
7068650.97
7068657.50
7068654.46
7068635.72
7068576.80
7068580.71
7068651.44
DISPOSAL FIELD REPAIR POINTS
OBJECT
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
ID TAG NORTHING
1679708.61
1679773.21
1679762.47
1680094.41
1680154.14
1680042.64
1680065.77
1680281.25
1680506.87
1680432.65
1680492.89
1680565.96
1680620.69
1680601.50
1680862.85
1680888.15
1680822.36
1680896.25
1680802.02
1680754.78
1680834.60
1680794.13
1680700.14
1680817.77
1680881.97
1681027.24
1681083.97
1680896.64
1680958.28
1681012.81
EASTING
7069056.31
7069067.66
7069008.03
7069216.77
7069214.39
7068651.35
7068724.74
7068823.28
7068911.86
7068852.76
7068858.89
7068858.59
7068895.77
7068848.33
7068567.23
7068834.82
7069007.64
7069196.03
7069259.16
7069240.82
7069236.55
7069206.93
7069172.32
7069168.24
7069192.85
7069358.27
7069384.67
7069255.76
7069253.44
7069266.30
DISPOSAL FIELD REPAIR POINTS
OBJECT
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
ID TAG NORTHING
1680009.92
1679984.62
1679925.01
1679896.97
1679922.96
1680505.02
1680491.17
1680480.43
1680464.32
1680438.30
1680258.14
1680189.85
1679754.23
1679724.42
1680117.00
1680300.25
1679547.80
1679713.46
1679896.78
1679948.43
1680009.26
1680054.27
1680102.73
1680157.63
1680268.44
1680310.55
1680379.36
1680621.78
1680603.59
1680585.27
EASTING
7069244.84
7069193.46
7069124.34
7069093.66
7069071.11
7069340.93
7069278.76
7069230.77
7069180.50
7069123.70
7069010.34
7068920.97
7068879.75
7068762.91
7068830.02
7068785.34
7068527.62
7068637.88
7068639.23
7068645.89
7068653.96
7068641.47
7068600.89
7068559.17
7068538.43
7068542.94
7068585.70
7068900.92
7068853.45
7068817.86
DISPOSAL FIELD REPAIR POINTS
OBJECT
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
SOLENOID VALVE
ID TAG NORTHING
1680532.16
1680608.66
1680715.73
1680825.75
1680577.04
1680874.21
1680886.08
1680898.33
1680908.54
1680919.83
1680936.50
1680946.57
1680996.37
1681066.97
1680946.40
1680434.95
EASTING
7068741.50
7069060.84
7068995.60
7069009.17
7068551.72
7069291.40
7069256.22
7069198.12
7069128.66
7069059.76
7068961.17
7068882.47
7068704.56
7068578.58
7068831.70
7068620.32
DISPOSAL FIELD REPAIR POINTS
OBJECT
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
SPRAY HEAD
ID TAG NORTHING
1681069.23
1681115.89
1681053.42
1681115.64
1681043.03
1681094.75
1681051.51
1681100.01
1680989.43
1681010.52
1681076.99
1681110.57
1681060.02
1681102.30
1681138.94
EASTING
7069313.83
7069353.63
7069248.17
7069281.59
7069197.21
7069226.40
7069124.97
7069162.24
7068972.44
7068896.92
7068992.81
7069038.47
7068885.37
7068927.54
7068982.65
DISPOSAL FIELD REPAIR POINTS
OBJECT
MONITORING WELL
MONITORING WELL
MONITORING WELL
MONITORING WELL
MONITORING WELL
MONITORING WELL
MONITORING WELL
MONITORING WELL
ID TAG NORTHING
1679465.67
1679534.51
1679653.91
1680046.33
1680144.56
1680768.74
1680671.23
1681090.00
EASTING
7068605.87
7068771.48
7068839.42
7069358.10
7069055.66
7069360.72
7069080.05
7068802.41
Q477
Q476
Q473
P493
P494
N434
N435
L461
K368
K375
K374
K373
K377
H325
A238
I345
I365
I366
I358
I359
I348
I347
I346
I362
I363
I353
I354
I355
I356
I357
I351
I352
H343
H344
H339
H340
H333
H328
H330
H331
G320
G321
G322
P3
P2
P1
Q2
Q1
O5
O4
O3
O2
O1
L1
N4
N3
N2
N1
M4
M3
M2
M1
J4
K4
K3
K2
MW7
MW8
MW6
MW5
MW4
MW3
MW2
MW1
K1
J2
I2
I1
H4
H3
H2
H1
G3
G1
J1
G2
J3
/1
2/
:5 0:
A
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\D
IS
PO
SA
L
FI
EL
D R
EP
AI
R S.
D W
G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
7 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C2.1 DISPOSAL FIELD REPAIRS
POINT TABLES
NOTES:
1. THESE POINTS WERE COLLECTED USING A SUB-METER TRIMBLE DATA COLLECTOR.
CONTRACTOR TO VERIFY ALL REPLACEMENT APPURTENANCES AND CONFIRM
ASSOCIATED ID TAG IN FIELD WITH FINAL APPROVAL FROM CO.
2. ALL SOLENOID VALVES, GATE VALVES, PRV VAULTS, AND MONITORING WELLS TO
RECEIVE NEW IDENTIFICATION POSTS. 67 TOTAL. SEE DETAIL C/C3.0.
T
/1
2/
:5 0:
A
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\D
IS
PO
SA
L
FI
EL
D R
EP
AI
R S.
D W
G
N
SCALE IN FEET
0 10 20
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
8 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C2.2 TANK AREA PLAN
PROPOSED 40' X 40' STAGING, LAY
DOWN, AND CRANE PAD AREA
(GRADING NOT ALLOWED)
250,000 GAL EFFLUENT STORAGE TANK. SEE
SHEETS S1.0 THROUGH S4.0 FOR STRUCTURAL
IMPROVEMENTS, AND ELECTRICAL SHEETS
FOR CONTROL IMPROVEMENTS
FLOW CONTROL VAULT.
SEE SHEET C3.0
15,000 GAL EFFLUENT BY-PASS
STORAGE TANK.
SEE SHEETS M1.0 AND M2.0
EXISTING 6"
EFFLUENT
TRANSPORT PIPE
EXISTING 6" EFFLUENT
TRANSPORT PIPE TO
TANK
EXISTING 8" TANK
OVERFLOW PIPE TO
DAYLIGHT
EXISTING 6"
EFFLUENT
TRANSPORT PIPE
EXISTING 6" EFFLUENT
TRANSPORT PIPE TO
DISPOSAL AREA
FLOW METER VAULT.
SEE SHEET M1.0
EXISTING EFFLUENT BYPASS LINE
PIPE. CURRENTLY DISCONNECTED
AT CONTROL VAULT
EXISTING 4" VAULT
OVERFLOW PIPE TO DAYLIGHT
EXISTING ELECTRICAL PULL BOX.
SEE ELECTRICAL SHEETS
ELECTRICAL PANELBOARD AND TRANSFORMER.
SEE ELECTRICAL SHEETS
EXISTING UNDERGROUND CONDUIT.
APPROXIMATE LOCATION
ACCESS ROAD
250,000 GALLON EFFLUENT STORAGE TANK
15,000 GALLON EFFLUENT STORAGE TANK
FLOW CONTROL VAULT
PROPOSED STAGING AREA - EXISTING CONDITIONS
PROPOSED ACCESS, PARKING
AND STORAGE AREA
FLOW CONTROL VAULT.
SEE SHEET M1.0
GENERAL NOTES:
1. STAGING AND PARKING IS NOT ALLOWED THE ROAD. ACCESS MUST
BE MAINTAINED AT ALL TIMES.
2. CONTRACTOR IS RESPONSIBLE FOR CLEARING FALLEN TREES IN
THE PROPOSED STAGING AREA WEST OF THE 250K GALLON
EFFLUENT STORAGE TANK.
3. CONTRACTOR TO SUBMIT CRANE PAD PLAN AND SPECIFICATIONS
TO THE CO FOR APPROVAL.
4. THE 250K GALLON TANK AT THE SITE PROVIDES STORAGE DURING
RAIN EVENTS WHEN THE SPRAY FIELDS CANNOT BE USED (PER
PERMIT), AND ENABLES MEASURED FLOW TO THE DISPOSAL
FIELDS.
5. REPAIRS AND CONNECTIONS TO THE 15K GALLON TANK SHALL BE
MADE PRIOR TO TAKING THE 250K GALLON TANK OFFLINE FOR
REPAIRS. ONCE ONLINE, THIS TANK WILL PROVIDE A SMALL
STORAGE BUFFER. THIS REQUIRES ISOLATION OF THE 250K TANK,
RECONNECTING THE PIPING TO THE 15K TANK AND OPENING THE
GATE VALVE TO THE 15K. CONTRACTOR TO SUBMIT A
BYPASS/SEQUENCING AND TIE-IN PLAN FOR APPROVAL SHOWING
HOW FLOW AND TANKS WILL BE CONTROLLED DURING
CONSTRUCTION AND SWITCH OVERS.
6. THE 250K GALLON TANK WILL BE REQUIRED TO BE EMPTIED AND
CLEANED PRIOR TO REPAIR. COORDINATE CLOSELY THE SEKI
FACILITIES. THE TANK DOES NOT DRAIN COMPLETELY. THE
CONTRACTOR IS REQUIRED TO VACUUM OUT THE REMAINING
EFFLUENT AND SLUDGE, USING SQUEEGIES AND VACUUM. THE
SLUDGE MAY BE DISPOSED OF AT THE CLOVER CREEK
WASTEWATER TREATMENT PLANT (CC WWTP).
/1
2/
:5 0:
A
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\D
IS
PO
SA
L
FI
EL
D R
EP
AI
R S.
D W
G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
9 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C3.0 DISPOSAL FIELD REPAIR
DETAILS 1
20' MAX ALLOWABLE
DISTURBANCE LIMITS
EXCAVATOR
TRENCH EXCAVATION
SPOIL PILE
PIPE STAGING/
LAYOUT AREA
B C3.0
TRENCH EXCAVATION DISTURBANCE LIMITS
NTS
NTS
A
C3.0
STANDARD SPRAY FIELD TRENCH
NTS
E
C3.0
TOPSOIL PATCH SECTION
NTS
F
C3.0
GRAVEL PATCH SECTION
4"
6"4"
6"
BACKSLOPE AS SPECIFIED
TO CONFORM TO O.S.H.A.
REGULATIONS
INSTALL 3" WIDE
WARNING TAPE
18" MAX. DEPTH
VERTICAL TRENCH WALLS WITH
SHORING TO CONFORM TO
O.S.H.A. REGULATIONS SUBGRADE OR
GROUND SURFACE
SLOPING, BENCHING AND/OR
SUPPORT SYSTEMS IN THIS
AREA TO CONFORM TO O.S.H.A
REGULATIONS
TRENCH WIDTH=O.D. OF PIPE PLUS 2'
MINIMUM TRENCH WIDE = 2.5'
TYPE 2 PIPE BEDDING WHERE
REQUIRED FOR SOFT OR
UNSTABLE FOUNDATION.
SELECT TYPE 1 BEDDING MATERIAL
PLACED IN 6" LAYERS & COMPACTED
AS SPECIFIED IN SECTION 31 23 33
"TRENCHING, BACKFILLING, AND
COMPACTING FOR UTILITIES"
NON-ORGANIC NATIVE
BACKFILL MATERIAL
(COMPACT AS SPECIFIED)
COMPACTED TRENCH BACKFILL
REPLACE WITH
SALVAGED TOPSOIL - 4"
COMPACTED TRENCH
BACKFILL
CRUSHED BASE MATERIAL,
6" COMPACTED DEPTH
(PLACED & COMPACTED PER
SECTION 32 11 23)
RESTORE SURFACE TO
EXISTING CONDITIONS
EFFLUENT MAIN, CONTRACTOR TO
VERIFY SIZE AND MATERIAL OF PIPE
TYPE 1 PIPE BEDDING
PLACED IN 6" MAX.
LAYERS AND COMPACTED
THOROUGHLY.
#14 COPPER TRACE WIRE
SEE SECTION 31 05 25.
PIPE SPRING LINE
" M
IN
IM
U M
DRIVE POST MINIMUM
OF 24" INTO GROUND
2 3 8" GALVANIZED
STEEL U-CHANNEL
SIGN POST
3'-0"
6" X 4" SPRAY FIELD
ZONE IDENTIFICATION
SIGN WITH 4" TEXT
HEIGHT
FINISH GRADE
C C3.0
DISPOSAL ZONE AND VALVE IDENTIFICATION SIGN
NTS
TRENCH WIDTH=O.D. OF PIPE PLUS 2'
3'-0"
H
REMOVE INFLUENT EXISTING
FLOWMETER & REPLACE
W/ NEW 6" BADGER M200 MAG
METER OR APPROVED EQUAL
REPLACE EXISTING TANK LEVEL SENSOR WITH KELLER
ACCULEVEL SUBMERSIBLE LEVEL TRANSMITTER OR
APPROVED EQUAL, CONNECT TO JUNCTION BOX AND
RUN SIGNAL WIRE TO CONTROL BUILDING,
REMOVE THE TOP 6" OF THE
CONCRETE VAULT DRILL IN ANCHORS
AND POUR THE TOP 6" BACK AND CAST
IN HALLIDAY H-20 RATED ALUMINUM
ACCESS HATCH WITH INTEGRATED
FALL PROTECTION GRATE OR
APPROVED EQUAL
D C3.0
FLOW CONTROL VAULT - 250,000 GAL TANK
NTS
NOTES:
1. NEW POSTS TO BE 2 3 8" GALVANIZED U-CHANNEL STEEL POSTS WITH LABEL CLAMPS.
2. NEW LABELS TO BE BRASS ENGRAVED NAME TAGS WITH ID FROM REPAIR POINT
TABLE.
3. REMOVE ALL EXISTING RED PLASTIC LABEL TAGS ON ALL SPRINKLER HEADS.
LEACH FIELD 12
CONTROL VALVE
4" LETTERS
(TYP)
AIR RELEASE
VALVE
MAIN LINE
VALVE
LATERAL VALVE
B12"
5"
MOUNTING
HOLES
TYPICAL NAMEPLATES
12"
24" MIN
5' -0
5'
-0
7'-0"
EXISTING GRADE
#14 COPPER TRACE WIRE.
TERMINATE IN COILS IN
BOXES FOR MAINTENANCE
AND LOCATING, TYPICAL.
SEE SECTION 31 05 25.
CONCRETE COLLAR
ASPHALT PATCH
6" WIDE X 6" THICK
CONCRETE COLLAR
1' WIDE X 4" THICK ASPHALT
PATCH. MATCH TO EXISTING
2/
:5 0:
A
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\D
IS
PO
SA
L
FI
EL
D R
EP
AI
R S.
D W
G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
10 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C3.1 DISPOSAL FIELD REPAIR
DETAILS 2
M
IN
IM
U
M C
O
VE
R
NEW 6" ADJUSTABLE C.I.
VALVE BOX SET PLUMB
AND CENTER OVER VALVE
OPERATING NUT
NEW C.I. VALVE BOX BELL
NEW PLUG VALVE
NEW CONCRETE GATE
VALVE THRUST BLOCK
FOOTNOTES:
1. CONCRETE THRUST BLOCKS WILL ONLY BE INSTALLED ON VALVES AND
FITTINGS THAT CONNECT TO AN EXISTING EFFLUENT SYSTEM WHERE THE
RESTRAINT CONFIGURATION OF THE EXISTING SYSTEM IS UNKNOWN.
2. IF THE CONTRACTOR FINDS THE EXISTING VALVE BOX TO BE IN GOOD
CONDITION, IT CAN BE REUSED WITH APPROVAL FROM THE CO.
FINISH GROUND
NEW MECHANICAL
JOINT RESTRAINT
BEDDING MATERIAL
UNDISTURBED SOIL
NTS
A
C3.1
PLUG VALVE DETAIL
UNION VALVE
GALV. TEE & PLUG
CURB STOP
BRONZE OR COPPER SCREENED
OPENING 100 MESH MAX.
STREET ELBOW
PIPE
SUPPORT (TYP.)
CORP.
STOP
EXISTING EFFLUENT MAIN.
30" TYPICAL BURY DEPTH
1" SADDLE CONNECTION TO
PVC MAIN. CONTRACTOR TO
VERIFY SIZE AND MATERIAL
BEFORE REPAIR
1" GALV. PIPE, SCH.40
BITUMINOUS COATED
& WRAPPED W/ 2
LAYERS VINYL TAPE
UNION VALVE TO
REMOVE AND SEAL FOR
WINTERIZING
AIR RELEASE VALVE
CURB STOP
BOX LID
DRAIN PIT WITH 8 CU FT
OF 3/8" GRAVEL.
EXTENSION TYPE
BASE CURB BOX
MOUNT RISER TO STEEL
POST WITH STAINLESS
STEEL RIGID PIPE STRAPS
NTS
B
C3.1
AIR RELEASE VALVE DETAIL NTS
C C3.1
EFFLUENT SPRAY HEAD REPLACEMENT DETAIL
EXISTING
SPRINKLER LATERAL
SADDLE TAP
SADDLE TAP
ATTACH 1/2" STAINLESS STEEL
RISER PIPE TO STEEL T-POST
USING GALVANIZED WIRE AT
THE TOP MIDDLE AND BOTTOM
OF T-POST
CONCRETE BLOCK
3/4" STAINLESS STEEL PIPE
EFFLUENT SPRINKLER
HEAD, REPLACE IN
KIND
FINISH GROUND
NTS
D
C3.1
SOLENOID VALVE VAULT REHAB DETAIL
REPLACE EXISTING
SOLENOID VALVES IN KIND
REPLACE ANY BROKEN
OR MISPLACED RIGID
FOAM INSULATION
RE-RUN ALL WIRING TO EACH
SOLENOID VALVE VAULT, SEE
ELECTRICAL SHEETS
PROTECT ALL EXISTING
PLUMBING IN PLACE
STEEL T-POST
THREADED CAP
4" SCH 80 PVC
FEMALE ADAPTER
CONCRETE
SURFACE SEAL
MALE
ADAPTER
4" SLOTTED
SCH 40 PVC
CAP
4" SCH 80 PVC
PEA GRAVEL
EXISTING GROUND
' T
YP
IC
AL
3'
(R
EP
LA
C
E)
3' (R
EP
LA
C E)
1' -6
SLOPE TO DRAIN
NTS
E
C3.1
MONITORING WELL REHAB DETAIL
NOTES:
1. REPLACE ALL MONITORING WELLS DOWN TO A MINIMUM OF 3 FEET BELOW
EXISTING GRADE, OR DEEPER IF BURN DAMAGE IS PRESENT.
2. INSTALL NEW CONCRETE COLLARS ON ALL MONITORING WELLS.
12" I.D.
12" MIN. ALL AROUND
EX
IS
TI
N
G
3/4" STAINLESS STEEL PIPE
2/
:5 0:
A
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\D
IS
PO
SA
L
FI
EL
D R
EP
AI
R S.
D W
G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
11 38
GR
GR
BE
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469C3.2 DISPOSAL FIELD REPAIR
DETAILS 3
LINE NO. 14" PERFORATIONS
IN 47' SECTION
TYPICAL
SPACING, INCHES
LINE 1
LINE 2
LINE 3
LINE 4
LINE 5
' M
IN
(T
YP
2 12" SCH 40 PVC
PERFORATED
8"4"
CAP
4" PVC
CONTROL VALVE
DRILL PRECISE
4" HOLES, SPACING
AS INDICATED IN
TABLE BELOW
SIDE
VIEW
END
VIEW
CAP & THRUST
BLOCK
47' 47'
FIRST 14" HOLE
1.5 X TYPICAL
SPACE FROM
END (TYP) LENGTH OF TRENCH = 100'
DRILL 3 8" HOLE
THRU CAP AT
TOP
TYPICAL END
NTS
A
C3.2
TYPICAL LEACH FIELD LAYOUT
1 3 4 5 6 7 8
2 12"2 12"2 12"2"2"1 12"
1" 1 14 "
LATERAL PIPE SIZE (Unless Noted Otherwise)
NUMBER OF HEADS DOWNSTREAM
NTS
B
C3.2
LATERAL PIPE SIZE
1' 6"
4' -6
1'-6"
GEOTEXTILE
FABRIC
2-1/2" SCH 40 PVC
PERFORATED LATERAL.
1 12"x3 4"
DRAIN ROCK
NATIVE SOIL
NTS
C
C3.2
TYPICAL LEACH FIELD TRENCH
AREA OF PEELING
PAINT & CORROSION
(E) WELD, TYP
INJECT VOIDED AREAS WITH
NON-SHRINK GROUT, TYP
REPLACE GASKETS AT 30"Ø
HINGED ACCESS MH, ENSURE
GASKETS ARE SECURED IN
PLACE AS HATCH IS OPENED
& CLOSED; TYP
(E) STEEL LADDER
& CAGE TO REMAIN
SCALE
250k GALLON STORAGE TANK FLOOR PLAN
A
S1.0
WELD CLOSED
DRILLED HOLE
SANDBLAST UPPER TANK
INTERIOR DOWN TO BARE
METAL & RECOAT. SPOT WIRE
BRUSH FLOOR & LOWER TANK
DOWN TO BARE METAL &
RECOAT; SEE DETAIL 1/S501
REPLACE GASKETS AT
30"Ø HINGED ACCESS
MH, TYP
/1
0/
:4 0:
P
M G
AL
EN
.R
EA
M C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\7
0.
S
EK
I S
TO
R
AG
E
TA
N
K
FO
U N
D
AT
IO
N
.D W
G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
250K GAL STORAGE
TANK FOUNDATION PLAN
195497
12 38
TE
KM
AG
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469S1.0
N 4'2'1'0 8'3'4'
SCALE OF FEET
A
GOVERNING DESIGN CODES:
A.ANSI/AWWA D100-21 WELDED CARBON STEEL TANKS FOR WATER STORAGE
B. CALIFORNIA BUILDING CODE (CBC 2022)
C.AMERICAN INSTITUTE FOR STEEL CONSTRUCTION 15TH EDITION (AISC 360-16)
D.OSHA STANDARD 1910 (FALL PROTECTION)
DESIGN LOAD CRITERIA:
A. ROOF LIVE LOAD
· 20 PSF
B. ROOF SNOW LOAD
· 250 PSF (PER NPS)
C.WIND LOADS
· ULTIMATE DESIGN WIND SPEED (3 SEC GUST), VULT = 95 MPH
· ALLOWABLE DESIGN WIND SPEED (3 SEC GUST), VASD = 74 MPH
· EXPOSURE CATEGORY = C
· SURFACE ROUGHNESS = C
· WIND UPLIFT = 9.3 PSF (ULT)
STRUCTURAL STEEL:
A.ALL STRUCTURAL STEEL SHALL BE DETAILED FABRICATED AND ERECTED IN ACCORDANCE WITH
THE AISC MANUAL OF STEEL CONSTRUCTION AND THE AISC CODE OF STANDARD PRACTICE.
B.MATERIAL REQUIREMENTS:
· WIDE FLANGE SHAPES = ASTM A992, GRADE 50
· ROUND HSS SHAPES = ASTM A500, GRADE C (Fy = 50 KSI)
· ANGLES, CHANNELS, AND PLATES = ASTM A36, GRADE 36
· STRUCTURAL BOLTS, NUTS, & WASHERS = ASTM F3125, GRADE A325 TYPE 1
C.WELDED CONNECTIONS:
· WELDING ELECTRODES = E70
· WELD IN ACCORDANCE WITH AWS D1.1 STRUCTURAL WELDING CODE. A CERTIFIED WELDER IS
REQUIRED.
· MINIMUM FILLET WELD SIZE = 3/16"
D.GROUTING:
· SHALL BE 5000 PSI, NON-SHRINK, NON-METALLIC, AND MEET THE REQUIREMENTS OF ASTM C1107.
REFERENCE SPEC SECTION 03 62 00 FOR GROUTING REQUIREMENTS
E. EXISTING 250k GALLON TANK WORK:
· SANDBLAST EXISTING TANK INTERIOR AND EXTERIOR WALL, AND FLOOR AND APPURTENANCES
TO BARE METAL, CLEAN, DEGREASE, PRIMER, AND RECOAT PER SPEC. SECTION 09 96 00.
SURFACE AREA IS APPROXIMATELY 9,000 SF. ALL PAINT BLASTING WASTE (PAINT PARTICLES, ABRASIVE MEDIA, RUST, METAL, ETC) SHOULD BE COLLECTED AND DISPOSED OF PROPERLY
· REPLACE 30" DIAMETER HINGED ACCESS MANWAY GASKET, NUTS, BOLTS, AND WASHERS
(TYPICAL OF 2)
· INSTALL NEW PRESSURE TRANSMITTER. SEE ELECTRICAL DRAWINGS
· INSTALL NEW NIKESON LIQUILEVEL EBS OR AN APPROVED EQUAL. SEE ELECTRICAL DRAWINGS
· INSTALL NEW INFLUENT 4" DIAMETER FLOAT VALVE ASSEMBLY
F. QUALITY ASSURANCE PLAN:
GENERAL REQUIREMENTS:
· THE OWNER SHALL BE RESPONSIBLE FOR HIRING THE SPECIAL INSPECTOR(S) & MUST INCUR ALL
ASSOCIATED COSTS PER IBC-2021
· THE PERMIT APPLICANT SHALL SUBMIT A STATEMENT OF SPECIAL INSPECTIONS PREPARED BY
THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE PER IBC-2021. THE
STATEMENT OF SPECIAL INSPECTIONS SHALL BE AS SHOWN BELOW
· SPECIAL INSPECTORS SHALL SUBMIT INSPECTION REPORTS TO THE CONTRACTING OFFICER.
THE REPORTS SHALL BE PREPARED IN ACCORDANCE WITH THE REQUIREMENTS CONTAINED IN
THE IBC-2021
· ALL OTHER NORMAL INSPECTIONS & TESTING NOT INCLUDED IN THE SPECIAL INSPECTION (i.e.
SOILS COMPACTION TESTING, CONCRETE SAMPLING & TESTING, PERMIT AGENCY INSPECTION,
ETC) SHALL BE PAID FOR BY THE GENERAL CONTRACTOR. ALL NORMAL TESTING & INSPECTIONS AS WELL AS ALL QUALITY ASSURANCE TESTING & INSPECTIONS (SPECIAL INSPECTIONS) SHALL
BE COORDINATED & SCHEDULED BY THE GENERAL CONTRACTOR TO FIT WITHIN THE WORKFLOW
OF THE PROJECT
STRUCTURAL GENERAL NOTES
INDICATES AREA OF POTENTIAL
VOIDS UNDER TANK
12/12/2025
SCALE
250K GAL TANK ROOF DEMOLITION PLAN
A
S2.0
(E) STEEL LADDER
& CAGE TO REMAIN
DEMO & REMOVE 30"SQ
ROOF ACCESS HATCH
& INTERIOR LADDER
DEMO & REMOVE
GUARDRAIL
30"Ø HINGED
ACCESS MH TO
REMAIN, TYP
8" WSP DOUBLE
ELBOW VENT, TYP
DEMO & REMOVE
ROOF GIRDERS &
SUPPLEMENTARY
STEEL ANGLES
DEMO & REMOVE
CENTER MANHOLE
DEMO & REMOVE
CENTER RING &
BRACES
DEMO & REMOVE
COLUMN CAPITALS
DEMO & REMOVE
ROOF DECK
SANDBLAST TANK
EXTERIOR DOWN TO
BARE METAL & RECOAT
8" OVERFLOW
DRAIN TO REMAIN
6" FE TO REMAIN
/1
0/
2:
:1
PM
K
R
IS
TA
.S
C O
TT
C
:\D
JA
-P W
W O
R K\
D
JA
-P R
O D
\D M
S1
\7
0.
S
EK
I S
TO
R
AG
E
TA
N
K R
O O
F
PL
AN
.D
W G
OF
DESIGNED:
TECH. REVIEW:
DATE:
SUB SHEET NO. TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
250K GAL STORAGE
TANK ROOF FRAMING
DEMOLITION PLAN
195497
13 38
TE
KM
AG
12/12/2025
RED FIR / CLOVER CREEK
SEQUOIA & KINGS CANYON NATIONAL PARK
328469S2.0
4'2'1'0 8'3'4'
SCALE OF FEET
A
N
NOTE: ALL EXISTING APPURTENANCES ON THE ROOF ARE TO BE REPLACED
SCALE
EXISTING 250K…