This document is Addendum #3 for the District Security Upgrades project for Battle Creek Public Schools (BCPS), issued by AE Tech Design with project number BCPS2501-0101. The addendum, dated 9/18/2025, provides clarifications and revisions to the original bid documents for a comprehensive security system upgrade across multiple school locations, including Fremont ES, Verona ES, Northwestern MS, BCAMSC, W.K. Kellogg HS, and other district facilities. The project involves demolishing and replacing existing security infrastructure, including cameras, access control systems, video intercoms, and introducing concealed weapons detection units. The addendum addresses multiple bidder questions regarding equipment specifications, installation requirements, camera and access control system details, and provides guidance on system integration, licensing, and implementation.

The addendum includes specific technical clarifications such as battery standby duration (4 hours), confirmation of camera and access control equipment quantities, and specifications for various system components. Bidders are instructed to include comprehensive pricing for camera hardware, licensing, installation, and programming, with unit pricing to cover all aspects of procurement. The district will consider bids from contractors with umbrella coverage less than the originally specified $200,000,000 and requires electrical permits for each school building. Voluntary alternates are permitted for certain components like Avigilon camera models, and the project emphasizes minimal system downtime during installation. The evaluation criteria will consider factors such as contractor location, past performance in Southwest Michigan, previous district work experience, and subcontractor usage.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project #BCPS2501-0101 Addendum #3

District Security Upgrades

Battle Creek Public Schools

ADDENDA 009113 - 1

DOCUMENT 009113 – ADDENDUM #3

1.1 PROJECT INFORMATION

A. Project Name: District Security Upgrades

B. Owner: Battle Creek Public Schools

C. Designer: AE Tech Design

D. Designer Project Number: BCPS2501-0101

E. Date of Addendum: 9/18/2025

1.2 NOTICE TO BIDDERS

A. This Addendum is issued to all registered plan holders pursuant to the Instructions to

Bidders and Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued

Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the

Owner/Contractor Agreement.

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.

C. All drawing changes incorporated via addenda are bubbled with a revision cloud and denoted by a diamond containing the addendums number.

D. The date for receipt of bids is unchanged by this Addendum.

ADDENDA 009113 - 2

1.3 QUESTION AND ANSWERS

A. The following is a list of questions that were asked between the posting of bid documents and the release of this addendum:

a. What is the existing door access control system that BCPS is currently utilizing?

i. Please refer to Addendum 1 section 1.3 question “q.”

b. Northwestern shows an ENC enclosure but no PR Proximity Reader. Do we provide the panel and if so, how many PR should we size it for?

i. The card readers at Northwestern were updated during a recent renovation and will not be demolished during this project. To clarify:

i. Existing cabling will be disconnected from existing enclosures & hardware (ENC) and pulled back

ii. Enclosures, and everything in them, will be demolished (left intact) and turned over to owner for first right of refusal.

iii. New enclosures & internal hardware will be installed in the footprint of the old enclosures

iv. Existing cabling will be reconnected to internal hardware

ii. Details have been added to the drawing set to help size equipment based on

Northwestern’s current setup.

c. As per addendum 2 it's noted that AC doors are released by the intercom video station. Is it assumed that doors with an AC Symbol also have an Intercom at that location that will not be demolished?

i. All video intercoms at the sites shown in this project are to be demolished and replaced with the model specified on drawing T401.

ii. Instead of video intercoms, some sites have voice-only intercoms with cameras mounted above. These are also to be demolished and replaced with the model on T401.

d. There are card readers located at Fremont, Verona, Springfield, BCAMSC, W.K.

Kellogg, and Cereal City Science Center, however, an ENC is not indicated on any other floor. Could you please indicate where the access control panel(s) is/are located for these sites?

i. Drawings have been updated to show ENC locations. Please see the included drawings for changes.

ADDENDA 009113 - 3

e. At Valley View, there is a symbol labelled AC, however, it seems like a generic symbol. What is this symbol supposed to be? If it is a card reader, is it new or existing?

i. Please refer to Addendum 2 section 1.3 question “a.” The attached drawings have been updated to provide more clarity.

f. There is a card reader on the second floor of the BC Central Fieldhouse that is not located on the demo plan. Is this a new door or existing door?

i. All doors in this project with card readers are existing. Door 216 outside of

Stair #5 is the only door on the second floor of the fieldhouse that has a card reader. This door also shows on the second floor demo sheet.

g. Are there designated, minimum specification parameters for cameras and video storage (i.e. frames per second, codec, etc.)?

i. Manufacturer default parameters will be used until the system is fully installed and up to date, unless stated otherwise by owner. Final parameters will be adjusted by the contractor with owner and consultant input.

h. Per the bid form within the specifications document, you are requesting Unit

Pricing breakouts for respective equipment. Regarding the camera model unit pricing, specifically, our assumption is that the per unit cost you’re looking for is all encompassing (i.e. Cost of camera hardware, licensing, install, & programming).

Is this a correct assumption?

i. Yes, the unit price should include all aspects of procuring the item (i.e. cost of camera hardware, licensing, installation, and programming).

i. Some camera models may require specific mounting equipment for certain installs, whereas the same camera models may not need said mounting equipment for other installs (i.e. A CM4 camera that is corner-mounted will need more mounting equipment than a surface-mounted CM4 camera). How do we factor this in for the unit pricing breakouts?

i. Bidders should include in their unit pricing any mounting equipment required for complete and functional installation. Where installation requirements may vary (e.g., corner-mounted vs. surface-mounted), bidders should assume the configuration requiring the greater amount of mounting equipment and labor when preparing their unit pricing. This will ensure consistency and accuracy across all bid responses.

ADDENDA 009113 - 4

j. Addendum 2 states, “(19) 24C-H5A-3MH multi-head cameras with (19) H5AMH-

AD-DOME1 surface mount adapters; to be installed as exterior CM4. mounting arms for these cameras to be included in contractor procurement.” Are these cameras called out in the original drawings? If so, do we delete those cameras from our count?

i. All cameras are shown in the original drawings. Cameras, NVRs, and mounting hardware specifically called out and quantified in Addendum 2 are not individually labeled on the drawings but are shown on the floor plans. Quantified equipment should not be included in contractor procurement.

k. Avigilon does not sell a master station for the 3.0C-H4VI-RO1-IR. Instead, it can be programmed via SIP protocol on an IP Phone system, or it may be answered via

Unity 8 Software via a USB or built-in microphone. How would you prefer bidders to proceed?

i. Existing master stations at all sites will be demolished. Contractor will assist and train owner with setting up software-based master stations on existing computers of owner’s choice.

l. In the Access Control Riser documentation, it’s stated that Battle Creek will require

24-Hour Standby, however that does not seem technically possible. Per Altronix specifications, the eFlow4NB – eFlow10NB are only capable of utilizing and charging up to a 65AH battery which will provide over 4 hours stand-by for access control. How would you prefer bidders to proceed?

i. 4 hours stand-by is acceptable, and the drawings have been updated to show this change.

m. Are weapons detection units required to directly integrate with the Avigilon video management system, existing Motorola radios, and/or Avigilon facial recognition technology?

i. Per base bid, weapons detection units are required to directly integrate with

Avigilon/Motorola systems. Alternate bids for weapons detection units are not required to integrate with Avigilon/Motorola as it is currently not possible for third party units to integrate.

ADDENDA 009113 - 5

n. Can you provide detailed performance specifications for the Concealed Weapons

Detection (CWD) units, including required detection accuracy rates, false positive thresholds, supported threat types (firearms, knives, etc.), environmental operating conditions (indoor/outdoor), and any preferred integration protocols with existing access control or video surveillance systems? Additionally, please can you clarify the expected number of fixed versus portable units required and whether students will be required to divest backpacks for separate inspection?

i. Refer to Avigilon’s CWD unit data sheets for specifications.

ii. Units are to be assumed “portable” if they are marked with keyed notes 6-8 on the drawings.

iii. If a backpack is identified as containing a threat, the owner will be called to the side for a separate, physical inspection of their backpack.

o. What are the expected throughput rates for CWD units at each entrance, particularly during peak times such as student arrival and dismissal?

i. Throughput rates are specified and included in Avigilon’s CWD unit documentation.

p. Can you provide current enrollment numbers (students), along with average daily staff and visitor counts for each location in the project? If phased, please also include projected counts for the 2025–2026 school year.

i. Enrollment numbers are public data and can be found at https://www.michigan.gov/cepi

q. For each building, please confirm the number of entrances where CWD units will be installed, including traffic flow patterns, entrance dimensions, and available power sources.

i. Buildings with allocated CWD units have “CWD” symbols next to the entrances at which they are to reside or be transported between.

r. How should the CWD units interface with the new video surveillance and access control systems? Are there specific APIs, software platforms, or cabling standards to be used?

i. CWD units will natively integrate with the Avigilon video and access control systems through their Unity/ACC platforms and servers. Cabling standards are listed in our specifications and in our drawings on TG02 and

T401.

https://www.michigan.gov/cepi

ADDENDA 009113 - 6

s. Can you provide performance specifications for vape sensors, including detection sensitivity, alert mechanisms, and recommended placement guidelines?

i. Refer to manufacturer data sheets for specifications.

t. Are there any phasing requirements for demolition of existing systems and installation of new systems, including any required temporary security measures to avoid downtime during the transition?

i. Yes, camera system and access control system downtimes need to be avoided per building, and across the district as a whole. The owner has expressed recent concerns about having cameras offline during security threats. Work needs to be scheduled and phased as to avoid system downtime. In the event of unavoidable system downtime, an outage window needs to be coordinated with the owner and consultant. Work will be completed during second shift to avoid system downtime.

u. Without disclosing proprietary information, can you indicate approximate budget ranges or relative priorities for CWD versus other components (e.g., surveillance cameras, access control)?

i. No

v. Beyond price and schedule, what weighted evaluation criteria will be applied to proposals (e.g., technology innovation, past performance in education environments)?

i. Weighted criteria includes, but isn’t limited to: contractor’s location relative to the owner, past performance on SW Michigan camera and access control projects, contractor’s previous performance with district, and the use of subcontractors,

w. Will voluntary alternates be accepted, such as AI-enhanced detection or mobile

CWD deployments?

i. Please see Addendum 1 section 1.3 questions “e” and “h.”

x. Are bidders to provide electrical permits for each school building and include the permit cost within our bid response?

i. Yes. Bidders are responsible for providing electrical permits and should include the permit cost in their bid response, if applicable. It is up to each bidder to determine whether a permit is required based on the scope of work being performed and in accordance with applicable state and local requirements.

ADDENDA 009113 - 7

y. Document 004123 - BID FORM, Section 1.9 BID GUARANTEE. This section requires bidders to furnish a bid security equal to 5% of the base bid amount. Would the district consider waiving the bid bond requirement for this proposal?

i. No, the district will not waive the bid bond requirement.

z. Document 002113 - INSTRUCTIONS TO BIDDERS, Page 20, Section 2.6, item

d. The Umbrella Coverage requirement is listed as $200,000,000. Would the district consider accepting bids from contractors with $2,000,000 in umbrella coverage to ensure the most competitive pricing for the district?

i. Yes, the district will consider bids from contractors with umbrella coverage less than $200,000,000.

aa. Can you clarify if Evolv Express units can be used in place of CWD units?

i. Evolv Express units do not integrate into Avigilon’s camera or access control systems. If submitted in a bid, these units would qualify as voluntary alternates.

bb. Can you clarify if alternate Avigilon camera models are permissible in a voluntary alternate proposal, as these could provide cost savings over the designated models in the RFP?

i. Yes, alternate Avigilon camera models can be submitted as a voluntary alternate.

cc. Does extra card stock for smart cards need to be provided? Does a smart card printer need to be provided?

i. District will self-procure card stock, and a printer is not required.

1.4

ATTACHMENTS

A. This Addendum contains the attached Specification Sections:

a. Instructions to Bidders 002113-10, 002113-11 (Re-Issued)

i. Review updated amounts in Sections 2.6.B.4.c, 2.6.B.4.d, and 2.6.B.4.e.

B. This Addendum includes the attached Addendum Drawings:

ADDENDA 009113 - 8

a. T022 – Fremont ES First Floor Technology Demo Plan (Re-Issued)

i. “VP2” was added in Office 118.

ii. “ENC” was added to Passage 131.

iii. “AC” was removed from the exterior door on the west end of Corridor 132.

b. T062 – Verona ES First Floor Technology Demo Plan (Re-Issued)

i. “ENC” and MDF were added to Staff 205.

c. T071 – Northwestern MS First Floor Technology Demo Plan (Re-Issued)

i. “ENC” was added to IT Room 101D.

ii. “ENC” and MDF were added to IT 137S.

iii. VP1 was added to the exterior of Vestibule 100V.

d. T091 – BCAMSC First Floor Technology Demo Plan (Re-Issued)

i. “ENC” was added to Data 126.

e. T0112 – W. K. Kellogg HS First Floor Technology Demo Plan (Re-Issued)

i. “ENC” was added to IT S424.

f. T0181 – Cereal City Science Technology Demo Plan (Re-Issued)

i. “ENC” and MDF added to Print Room.

g. T122 – Fremont ES First Floor Technology Plan (Re-Issued)

i. “VP1” was added to the exterior door on the east end of Corridor 121.

ii. “VP2” was removed from Office 118.

iii. “VP1” was moved from the west side of the exterior door at the south end of Corridor 130 to the east side.

iv. “AC” was removed from the exterior door on the west end of Corridor 132.

h. T162 – Verona ES First Floor Technology Plan (Re-Issued)

i. “ENC” and MDF were added to Staff 205

ADDENDA 009113 - 9

i. T171 – Northwestern MS First Floor Technology Plan (Re-Issued)

i. “ENC” was added to IT 137S.

j. T191 – BCAMSC First Floor Technology Plan (Re-Issued)

i. “ENC” was added to Data 126.

k. T1112 – W. K. Kellogg HS First Floor Technology Plan (Re-Issued)

i. “ENC” was added to IT S424.

l. T1181 – Cereal City Science Technology Plan (Re-Issued)

i. “ENC,” MDF, and CM6 added to Print Room.

ii. “CM2” added to the SW corner of the Distribution Center.

m. T401 – Security Systems General Information (Re-Issued)

i. The “Access Control Legend” was updated.

ii. Detail 6 was updated.

n. T403 – Access Control System Risers (Re-Issued)

i. Riser added for Northwestern Middle School

1.5 TEXT REVISIONS / CLARIFICATIONS

A. This Addendum includes the following clarifications:

a. Keyed note 10 on the new technology floorplans was updated.

b. Prevailing wage rate schedules are to be based off Calhoun county, MI where the project resides, and can be found here: https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage

END OF DOCUMENT 009113

https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage

Project #BCPS2501-0101 Bids Security Upgrades

INSTRUCTIONS TO BIDDERS 002113 - 10

©AE TECH DESIGN, ALL RIGHTS RESERVED

1. The successful Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder.

a. Both a Performance and a Payment Bond will be required, each in an amount equal to 100 percent of the Contract Sum.

2. The cost shall be included in the Bid.

3. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

4. The Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract

Sum.

B. Time of Delivery and Form of Bonds

1. The Bidder shall deliver the required bonds to the Owner no later than the date of Execution of the Contract. If the Work is to commence sooner than the executed contract, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered. Owner may deem the failure of the Bidder to deliver required bonds within the period of time allowed a default.

2. Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond.

3. Bonds shall be executed and be in force on the date of the execution of the Contract.

4. Bonds shall be secured from surety bond companies licensed to underwrite within the State of Michigan, shall be included on the United States Department of Treasury’s most recent Listing of Certified Surety Companies (Circular 570), and shall currently hold a rating of A- or better from the A.M. Best Company. Both form and substance shall be subject to the review and approval of the Owner and Construction Manager. When requested, Bidders shall indicate the name and address of their bonding company and agent.

2.6 CONTRACTOR’S AND SUBCONTRACTOR’S LIABILITY INSURANCE

A. The Contractor shall not commence work until he has obtained such insurance as is required by the Contract Documents, B. The Insurance required shall be:

1. Worker’s Compensation policy including Employer’s Liability.

2. Comprehensive General Liability policy including coverage of liability for:

a. Premises and Operations;

b. Elevators;

c. Independent Contractors;

d. Products;

e. Completed Operations for one year after substantial completion;

f. Broad Form Property Damage coverage on an occurrence basis, including explosion, collapse and underground hazards;

g. Contractual, as applicable to the Contractor’s obligations under the Indemnification

Agreement contained in the Contract; and

h. Personal Injury.

Project #BCPS2501-0101 Bids Security Upgrades

INSTRUCTIONS TO BIDDERS 002113 - 11

©AE TECH DESIGN, ALL RIGHTS RESERVED

3. Comprehensive Automobile Liability policy including coverage for owned, non-owned, leased and hired automobiles, and property damage on an occurrence basis.

4. “The insurance shall be carried with companies authorized to do business in Michigan and acceptable to the Construction Manager and Owner. It shall remain in force for the duration of the contract and shall provide coverage as follows:

a. Commercial general Liability

1, Bodily Injury+ $1,000,000 Each Occurrence Property damage (Incl. Completed Operations – 3 years from final completion.

2. Aggregate $2,000,000 Gen. Agg. (must apply separately to each project) $2,000,000 Products & Completed Operations

Aggregate (Combined Single Limits) $1,000,000 Personal/Advertising Injury

3. Pollution Legal Liability $2,000,000 Per occurrence, if claims made, for 2 Years following final acceptance by Owner, or through warranty period, whichever is longer

b. Comprehensive automobile Liability Bodily Injury & Property Damage $1,000,00 Each Occurrence (Combined Single Limits)

c. Workers Compensation $2,000,000 Employer’s Liability (Each Employee) $4,000,000 Policy Limit

d. Umbrella Coverage $2,000,000 Per Occurrence & Aggregate

e. Professional Liability $2,000,000 Per Occurrence & Aggregate

f. St. Joseph Public Schools and AE Tech Design must be named as additional insureds.

2.7 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

A. The proposed Contract Documents consist of the following documents:

1. Certificate of Liability Insurance

2. Specification sections and drawings issued for bid dated August 11th, 2025 and any subsequent addenda associated with the bidding process

3. Contractor’s bid

4. Post-bid interview meeting minutes

5. Performance and Payment Bonds

2.8 END OF DOCUMENT 002113

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

BOYS

GIRLS

BOYS

GIRLS

TOILET

TOILET

MULTI-PURPOSE

KITCHEN

LOUNGE

OFFICE

OFFICE

STAGE

CORRIDOR

CORRIDOR

CORRIDOR

STORAGE

LIBRARY

STORAGE

CORRIDOR

OFFICE

STORAGE

CORRIDOR

PASSAGE

CORRIDOR

PANTRY

JANITOR

JANITOR

CORRIDOR

CORRIDOR

PASSAGE

TOILET

AC

IDF

IDF

CM

CM

MDF

CM

CM

PR

ENC

VP2

N Fremont ES First Floor Technology Demo Plan 1/8" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T022

Fr em on t E

S Fir st Flo or T ec hn olo gy

D em o P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

DEMO GENERAL NOTES

1. DEMO ALL ABANDONED CABLING BACK TO SOURCE.

2. DEMO ALL EXISTING CAMERAS, ENCLOSURES, AND MOUNTING HARDWARE.

3. CONTRACTOR SHALL SUBMIT AN RFI IF THERE ARE ANY DEMOLITION DISCREPANCIES.

4. DEMO ALL EXISTING ACCESS CONTROL ENCLOSURES, INCLUDING POWER SUPPLIES,

BATTERIES, AND ASSOCIATED HARDWARE. PULL BACK CABLING FOR

REINSTALLATION IN NEW ENCLOSURES.

5. DEMO ALL EXISTING CARD READERS, EXCEPT FOR READERS (HID SINGO) AT

NORTHWESTERN ACADEMY.

6. DEMOED EQUIPMENT, IN WHOLE OR IN PART, SHALL BE PRESENTED TO OWNER FOR

FIRST RIGHT OF REFUSAL BEFORE REMOVAL FROM SITE.

7. DEMO ALL EXISTING ENTRY DOOR INTERCOMS AND ASSOCIATED HARDWARE. IF

EXISTING CABLING CANNOT BE REUSED FOR NEW VIDEO INTERCOM, DEMO TO

SOURCE.

8. USE EXISTING CABLING SURVEY DOCUMENTATION TO IDENTIFY "FAILED" CABLES.

DEMO "FAILED" CABLING TO SOURCE, RE-CABLE, RE-TERMINATE, AND TEST CABLING.

9. TEST ALL PERMANENT NETWORK CABLING. DEMO ALL CABLING THAT DOES NOT

MEET INDUSTRY STANDARDS, RE-CABLE, RE-TERMINATE, AND RETEST CABLING.

10. PATCH, FILL, AND REPAIR ANY UNUSED CEILING OR WALL PENETRATIONS AND

ROUGH-INS. BLANK OFF ROUGH-IN BOXES WHERE APPLICABLE.

DN

SECOND

GRADE

COAT ROOM

201S

CLASSROOM

KINDERGARTEN

TEACHER

ROOM

201A

SECOND

GRADE

BOYS TOILET

200B

TEACHER

ROOM

203A

TEACHER

ROOM

209A

KINDERGARTEN

FIRST/SECOND

GRADE

GIRLS TOILET

200G

COAT ROOM

209S

EARLY

CHILDHOOD

STAFF

JANITOR

200S

STAFF TOILET

205T

CLASSROOM

COAT ROOM

208A

RECEPTION

206A

PRINCIPAL

JAN

200J

CORRIDOR

GYMNASIUM

STAGE

ANTEROOM

114A

ANTEROOM

114B

PASSAGE

KITCHEN

CL

111C

JA

NI

TO

R

1J

ENTRANCE

TOILET

210T

TOILET

209T

TOILET

202T

TOILET

201T

BOILER ROOM

STAIR- CENTER

1ST LEVEL

PASSAGE

200A

ENTRY

200CCM

CM

CM

PR

PR

PR

MDF

ENC

N Verona ES First Floor Technology Demo Plan 1/8" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T062

Ve ro na E

S Fir st Flo or T ec hn olo gy

D em o P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

DEMO GENERAL NOTES

1. DEMO ALL ABANDONED CABLING BACK TO SOURCE.

2. DEMO ALL EXISTING CAMERAS, ENCLOSURES, AND MOUNTING HARDWARE.

3. CONTRACTOR SHALL SUBMIT AN RFI IF THERE ARE ANY DEMOLITION DISCREPANCIES.

4. DEMO ALL EXISTING ACCESS CONTROL ENCLOSURES, INCLUDING POWER SUPPLIES,

BATTERIES, AND ASSOCIATED HARDWARE. PULL BACK CABLING FOR

REINSTALLATION IN NEW ENCLOSURES.

5. DEMO ALL EXISTING CARD READERS, EXCEPT FOR READERS (HID SINGO) AT

NORTHWESTERN ACADEMY.

6. DEMOED EQUIPMENT, IN WHOLE OR IN PART, SHALL BE PRESENTED TO OWNER FOR

FIRST RIGHT OF REFUSAL BEFORE REMOVAL FROM SITE.

7. DEMO ALL EXISTING ENTRY DOOR INTERCOMS AND ASSOCIATED HARDWARE. IF

EXISTING CABLING CANNOT BE REUSED FOR NEW VIDEO INTERCOM, DEMO TO

SOURCE.

8. USE EXISTING CABLING SURVEY DOCUMENTATION TO IDENTIFY "FAILED" CABLES.

DEMO "FAILED" CABLING TO SOURCE, RE-CABLE, RE-TERMINATE, AND TEST CABLING.

9. TEST ALL PERMANENT NETWORK CABLING. DEMO ALL CABLING THAT DOES NOT

MEET INDUSTRY STANDARDS, RE-CABLE, RE-TERMINATE, AND RETEST CABLING.

10. PATCH, FILL, AND REPAIR ANY UNUSED CEILING OR WALL PENETRATIONS AND

ROUGH-INS. BLANK OFF ROUGH-IN BOXES WHERE APPLICABLE.

19 19 19 19 19 3

5 5 5

1244444

5 5 5 5

3 BASS

BN

D/

OR

C

BN

D/

OR

C

CH

RL

PERC

4 CELLO

KINDERGARTEN

CLASSROOM

KINDERGARTEN

CLASSROOM

CONFERENCE

ROOM

104A

DEAN'S OFFICE

104B

ASSISTANT

PRINCIPAL'S

OFFICE

104C

COLLABORATION

CENTER

3RD GRADE

CLASSROOM

3RD GRADE

CLASSROOM

BAND

CHOIR/

ORCHESTRA

TECHNICAL

STUDIES

SPECIAL

EDUCATION

136B

ACTIVITY

ROOM

143A

STORAGE

COUNSELOR'S

OFFICE

102C

RECORDS

154D

STORAGE

154E

INSTRUCTIONAL

COACH

154C

FLEX OFFICE

154B

TECHNICAL

STUDIES

TECHNICAL

STUDIES

6TH GRADE

CLASSROOM

STUDENT

SUCCESS

CENTER

136A

DANCE

1ST GRADE

CLASSROOM

1ST GRADE

CLASSROOM

2ND GRADE

CLASSROOM

4TH GRADE

CLASSROOM

2ND GRADE

CLASSROOM

TOILET

114T

TOILET

115T

TOILET

116T

TOILET

117T

5TH GRADE

CLASSROOM

4TH GRADE

CLASSROOM

TOILET

109T

TOILET

108T

5TH GRADE

CLASSROOM

BOY'S TOILET

110B

GIRL'S TOILET

110G

JANITOR

110J

VESTIBULE

100A

PRINCIPAL'S

OFFICE

104D RECEPTION

105A

OFFICE

105C

IT ROOM

101D

STORAGE

101S

TOILET

103T

EXAM

105D

EXAM

105E

IT ROOM

103A

PA

SS

AG

E

5B

WORK ROOM

WAITING ROOM

102A

BEHAVIOR

INTERVENTIONIST

OFFICE

102B

WELCOME

CENTER

101A

PASSAGE

101C

VE

ST

IB

UL

E

0V

MEN'S TOILET

149M

LOBBY

149L

STAGE

149A

STORAGE/

RECEIVING

151S

OFFICE

151A

PRACTICE

151C

SCENE SHOP

STORAGE

160S

STORAGE

149S

GIRL'S

DRESSING

ROOM

149G

BOY'S

DRESSING

ROOM

149B

TOILET

149BT

TOILET

149GT

LOBBY

100W

JANITOR

160B TICKETS

160C

MECH

160D

CONCESSIONS

160E

PASSAGE

160A

STORAGE

154S

COMMUNITIES

IN SCHOOLS

OFFICE

154F

SPECIAL

EDUCATION

6TH GRADE

CLASSROOM

6TH GRADE

CLASSROOM

ELEMENTARY

ART

STUDENT

SUCCESS

CENTER

ELL

CLASSROOM

7TH GRADE

CLASSROOM

7TH GRADE

CLASSROOM

7TH GRADE

CLASSROOM

PASSAGE

154A

TOILET

161TSTORAGE

161S

PANTRY

161S

GYM

STORAGE

144S

STORAGE

147S

TEAM ROOM

144CLAUNDRY

145C

STORAGE

147R

STORAGE

145S

JANITOR'S

CLOSET

145J

OFFICE

145A

MECHANICAL

145M

MECHANICAL

144M

OFFICE

144A

BOY'S LOCKER

ROOM

SHOWER

144D

STORAGE

144F

GIRL'S LOCKER

ROOM

SHOWER

145ESHOWER

145F

TOILET

145T

POOL

OFFICE

152APRACTICE

152B

PRACTICE

152C

MECH

152M

STORAGE

143R

TOILET

143T

TOILET

143C

STORAGE

143S

CORRIDOR

100R

STORAGE

140S

INSTRUMENT

STORAGE

152S

CORRIDOR

100P

CORRIDOR

100N

GIRL'S TOILET

141G

BOY'S TOILET

141B

MAINTENANCE

STORAGE

141A

TOILET

141T

STORAGE

141R

STORAGE

138S

STORAGE

139S

DIGITAL ARTS

CLASSROOM

STORAGE

134S MIDDLE

SCHOOL ART

CLASSROOM

8TH GRADE

CLASSROOM

8TH GRADE

CLASSROOM

8TH GRADE

CLASSROOM

KILN ROOM

133S

STORAGE

134RPA

SS

AG

E

4PBOY'S TOILET

134B

GIRL'S TOILET

134G

JANITOR'S

CLOSET

134J

SICK ROOM

101B

SPECIAL

EDUCATION

CORRIDOR

100L

CORRIDOR

100C

CORRIDOR

100J

CORRIDOR

100D

CORRIDOR

100E

CORRIDOR

100F

LOBBY

100B

BOILER ROOM

ELECTRICAL

142E

TOILET

144T

SHOWER

144E

TOILET

144H

DRYING ROOM

145B

PASSAGE

145D

PASSAGE

144B

IT

137S

PRACTICE

151B

STORAGE

135S

TOILET

105T

TOILET

101T

WOMEN'S

TOILET

149W

8.1

108.2

STORAGE

108S

108T.1109T.1

109.2

100G.1

100G.2

100G.3

100G.4108S.1

9.1

113.1

113.2

113S.1

114.1

114T.1

115T.1

115.1

0E

.2

0E

.1

6.1

6T

.1

7T

.1

7.1

9.2

9.1

8.2

0H

.4

0H

.3

0H

.2

0H

.1

VESTIBULE

100H

2.1

1.2

1.1

0.2

0.1

110G.1

110J.1

110B.1

100A.4

100A.3

100A.2

100A.1

5A

.1 10 5A

.2

5T

.1

105D.1105C.1

105E.1

5S

.1

104D.1

4D

.2

STORAGE

105S

104C.1

104B.1

101D.1

1S

.1

3T

.1

3A

.1104A.1

101T.1

101B.1

1A

.2

1A

.1

100V.8

100V.7

100V.4

100V.3 100V.1

100V.2

100V.5

100V.6

0.1

1.1

2.1

3.1

4.1

5.1

2U

.5

0D

.1

136B.2

136A.2

154B.1

154C.1

154D.1

154F.1

161A.1 161B.1

9S

.1

4A

.1

139.1

8.1

137.2

0M

.1

8.1

7.1

6.1

9.1

4A

.2

4E

.1

0.2

1.2

2.2

3.2

4.2

5.2

9.2

8.2

7.2

6.2

141A.2

8S

.1

161C.1

154.1

154.3

103.1 103.2

102B.1

102C.1

102A.1

0W

.1

154.2

4S

.1

139S.2

CORRIDOR

100M

100K.2

100K.3

137.1

137S.1

136B.1

136A.1

5S

.1

4S

.2

4S .1

134R.1

4P

.1 13 4.2

100L.1

100L.2

2.2

2S

.1

1.213 1S

.1

0S

.1

0.2

130.1

2.1

134.3

134.4

1A

.3

1B

.1

1T

.2

1T .2

1S

.1

2.1

0S

.1 14 2E

.1

142.2

7.2

7.3

143.3

3S

.2

143S.3

3C

.1

141G.1

STORAGE

141S

7.4

3S

.1

143.2

140.3

CORRIDOR

100S

147S.1

143R.1

0R

.2

147R.1

5E

.1

4M

.1

4C

.1

5F

.1

5M

.1

5C

.1145S.1

5J

.1

146.1

0U

.6

0U

.5

0U

.4

1A

.1

1S

.3

4S

.1

4.1

5A

.1

145A.2

145C.2

1S

.1

151S.2

9.6

100R.1

100Q.1

100Q.2

100Q.3

3T

.1

2S

.2

2A

.1

2B

.1

153.2

152.2

2M

.1

2C

.1

4A

.1

XX

X

1.1

2S

.1

1B

.1

1C

.1

151.3

0E

.1

160C.1

1T

.1

161S.1

X

STORAGE

161B

OFFICE

161A

STORAGE

161C

2T

.1

9A

.1

2S

.1 149GT.1

149BT.1

149B.1

9G

.1

9S

.1

150.2

150.1

9L

.1

149.1

149.2

149L.2

149L.3

149.3

149W.1

149M.1

149.4

9L

.5

9L

.4

9.5

CORRIDOR

100Q

CORRIDOR

100T

VESTIBULE

100U

3.1134.1

VESTIBULE

100G

135.1

VESTIBULE

100K

0K

.1

2T

.2

153.1

115.2

114.2

8.1

2.2

146.2

147.1 151.2

145.1

TEACHER

LOUNGE

138A

AUDITORIUM

CAFETERIA

KITCHEN

143.1

133S.1

STORAGE

113S

STORAGE

114S

STORAGE

115S

STORAGE

112S

STORAGE

116S

STORAGE

117S

138A.1

3.2

139.2

138.2

161.1

161.2

7.211

6.2

STORAGE

144G

110J.2

135.2

141A.1

1R

.1

0U

.3

0U

.2

0U

.1

140.2

152.1

MDF

CM

ENC

CM

CM

CM CM

CM CM CM CM

CM

CM

CM

CM

CM

CM

CM

CM

CM CM

CM

CMCMCM

IDF

CM CM

CM

CM

CM

CM CM CM CM

CMCMCMCM

CM

CM

CMCMCM CM

CM

CM

CM

CM

CM

CM

CM CM CM

CM

CM

CM

CM CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

MDF

CM

A

EN

C

VP

OPEN TO BELOWCONTROL

ROOM

N Northwestern MS First Floor Technology Demo Plan 1/16" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T071

No rth we ste rn M

S Fir st Flo or T ec hn olo gy

D em o P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

Auditorium Balcony Technology Demo Plan 1/8" = 1'-0"

DEMO GENERAL NOTES

1. DEMO ALL ABANDONED CABLING BACK TO SOURCE.

2. DEMO ALL EXISTING CAMERAS, ENCLOSURES, AND MOUNTING HARDWARE.

3. CONTRACTOR SHALL SUBMIT AN RFI IF THERE ARE ANY DEMOLITION DISCREPANCIES.

4. DEMO ALL EXISTING ACCESS CONTROL ENCLOSURES, INCLUDING POWER SUPPLIES,

BATTERIES, AND ASSOCIATED HARDWARE. PULL BACK CABLING FOR

REINSTALLATION IN NEW ENCLOSURES.

5. DEMO ALL EXISTING CARD READERS, EXCEPT FOR READERS (HID SINGO) AT

NORTHWESTERN ACADEMY.

6. DEMOED EQUIPMENT, IN WHOLE OR IN PART, SHALL BE PRESENTED TO OWNER FOR

FIRST RIGHT OF REFUSAL BEFORE REMOVAL FROM SITE.

7. DEMO ALL EXISTING ENTRY DOOR INTERCOMS AND ASSOCIATED HARDWARE. IF

EXISTING CABLING CANNOT BE REUSED FOR NEW VIDEO INTERCOM, DEMO TO

SOURCE.

8. USE EXISTING CABLING SURVEY DOCUMENTATION TO IDENTIFY "FAILED" CABLES.

DEMO "FAILED" CABLING TO SOURCE, RE-CABLE, RE-TERMINATE, AND TEST CABLING.

9. TEST ALL PERMANENT NETWORK CABLING. DEMO ALL CABLING THAT DOES NOT

MEET INDUSTRY STANDARDS, RE-CABLE, RE-TERMINATE, AND RETEST CABLING.

10. PATCH, FILL, AND REPAIR ANY UNUSED CEILING OR WALL PENETRATIONS AND

ROUGH-INS. BLANK OFF ROUGH-IN BOXES WHERE APPLICABLE.

IDF

CM

CM

CMCM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM CM

CM

CM

CM

CM

CM

CM

CM

ENGINEERING

WORK ROOM

STORAGE

OFFICE

OFFICE

STORAGE

122A

T.

120 T.

OFFICE

STAIR 3

CLOSET

111A

CONFERENCE

OFFICE

GENERAL OFFICE

RESOURCE CENTER

ATRIUM

ELEV

ELEV.

EQUIP.

KITCHEN

OUTREACH

TRAINING

COAT CLOSET

105A

COMMONS

OUTREACH

TRAINING

STORAGE

STAIR 1

UTILITY

COMPUTER

LAB

MAINTENANCE

DATA

ELEC.

STAIR 2

ENGINEERING

JAN.

WOMEN'S T.

MEN'S T.

COMMONS

CLASSROOM

GENERATOR

PRVP1

PR

PRVP1

EN

C

N BCAMSC First Floor Technology Demo Plan 1/8" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T091

BC

AM

SC

F irs t F loo r T ec hn olo gy

D em o P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

DEMO GENERAL NOTES

1. DEMO ALL ABANDONED CABLING BACK TO SOURCE.

2. DEMO ALL EXISTING CAMERAS, ENCLOSURES, AND MOUNTING HARDWARE.

3. CONTRACTOR SHALL SUBMIT AN RFI IF THERE ARE ANY DEMOLITION DISCREPANCIES.

4. DEMO ALL EXISTING ACCESS CONTROL ENCLOSURES, INCLUDING POWER SUPPLIES,

BATTERIES, AND ASSOCIATED HARDWARE. PULL BACK CABLING FOR

REINSTALLATION IN NEW ENCLOSURES.

5. DEMO ALL EXISTING CARD READERS, EXCEPT FOR READERS (HID SINGO) AT

NORTHWESTERN ACADEMY.

6. DEMOED EQUIPMENT, IN WHOLE OR IN PART, SHALL BE PRESENTED TO OWNER FOR

FIRST RIGHT OF REFUSAL BEFORE REMOVAL FROM SITE.

7. DEMO ALL EXISTING ENTRY DOOR INTERCOMS AND ASSOCIATED HARDWARE. IF

EXISTING CABLING CANNOT BE REUSED FOR NEW VIDEO INTERCOM, DEMO TO

SOURCE.

8. USE EXISTING CABLING SURVEY DOCUMENTATION TO IDENTIFY "FAILED" CABLES.

DEMO "FAILED" CABLING TO SOURCE, RE-CABLE, RE-TERMINATE, AND TEST CABLING.

9. TEST ALL PERMANENT NETWORK CABLING. DEMO ALL CABLING THAT DOES NOT

MEET INDUSTRY STANDARDS, RE-CABLE, RE-TERMINATE, AND RETEST CABLING.

10. PATCH, FILL, AND REPAIR ANY UNUSED CEILING OR WALL PENETRATIONS AND

ROUGH-INS. BLANK OFF ROUGH-IN BOXES WHERE APPLICABLE.

DN

DN

STORAGE

S377

STAIR #15

S378

STORAGE

S379

OFFICE

S380

RECEPTION

S381

OFFICE

S382

CLASSROOM

S383

PASSAGE

S384

CLASSROOM

S385

CO

RR

ID

OR

S3

CORRIDOR

S387

PASSAGE

S388

CO

RR

ID

OR

S3

LIBRARY

S390

CUSTODIAN

OFFICE

S391

CLASSROOM

S392

CLASSROOM

S393

WOMENS

TOILET

S394

JAN.

S395

STAFF LOUNGE

S396

TOILET

S397

BREAK

S398

TOILET

S399

CHECK ROOM

S406

STORAGE

S407

MAIN LOBBY

S408

WOMENS

RESTROOM

S409

WOMENS

RESTROOM

S410

WOMENS

RESTROOM

S411

MENS

RESTROOM

S412

JANITOR

S413

STAIR #3

S414

STAIR HALL

NO.1

S415

RAMP

S416

STAIR HALL

NO.2

S417

ST

AI

R #4

S4

CLASSROOM

S419

CLASSROOM

S420

MENS TOILET

S421

STAIR #9

S422

VESTIBULE

S423

IT

S424

OFFICE

S425

VESTIBULE

S426

GYMNASIUM

S431

STAIR #13

S432

STAIR #12

S433

ELEV.

S429

STAIR #1

S434

STAIR #2

S435

BOX OFFICE

S436 OFFICE

S437

NATATORIUM

POOL

S438

NATATORIUM

DECK

S439

NA

TA

TO

RI

UM

BA

LC

ON

Y S4

STAIR #6

S442

STAIR #7

S443

STAIR #8

S402

STAGE

S405

STAIR #5

S441

DRESSING

ROOM

S400

TOILET

S401

OFFICE

S403

TOILET

S404

AUDITORIUM

VESTIBULE

S444

SOUND BOOTH

S447

AUDIO BOOTH

S448

OFFICE

S449

STORAGE

S450

CONCESSIONS

S445

STORAGE

S446

STAIR #10

S451

STORAGE

S452

VESTIBULE

S453

IDF

IDF

PR

PR

CM

CM

CM

CM

CM CM

CM CM CM CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

EN

C

N W. K. Kellogg HS First Floor Technology Demo Plan 3/32" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T0112

W . K

. K ell og g H

S Fir st Flo or T ec hn olo gy

D em o P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

DEMO GENERAL NOTES

1. DEMO ALL ABANDONED CABLING BACK TO SOURCE.

2. DEMO ALL EXISTING CAMERAS, ENCLOSURES, AND MOUNTING HARDWARE.

3. CONTRACTOR SHALL SUBMIT AN RFI IF THERE ARE ANY DEMOLITION DISCREPANCIES.

4. DEMO ALL EXISTING ACCESS CONTROL ENCLOSURES, INCLUDING POWER SUPPLIES,

BATTERIES, AND ASSOCIATED HARDWARE. PULL BACK CABLING FOR

REINSTALLATION IN NEW ENCLOSURES.

5. DEMO ALL EXISTING CARD READERS, EXCEPT FOR READERS (HID SINGO) AT

NORTHWESTERN ACADEMY.

6. DEMOED EQUIPMENT, IN WHOLE OR IN PART, SHALL BE PRESENTED TO OWNER FOR

FIRST RIGHT OF REFUSAL BEFORE REMOVAL FROM SITE.

7. DEMO ALL EXISTING ENTRY DOOR INTERCOMS AND ASSOCIATED HARDWARE. IF

EXISTING CABLING CANNOT BE REUSED FOR NEW VIDEO INTERCOM, DEMO TO

SOURCE.

8. USE EXISTING CABLING SURVEY DOCUMENTATION TO IDENTIFY "FAILED" CABLES.

DEMO "FAILED" CABLING TO SOURCE, RE-CABLE, RE-TERMINATE, AND TEST CABLING.

9. TEST ALL PERMANENT NETWORK CABLING. DEMO ALL CABLING THAT DOES NOT

MEET INDUSTRY STANDARDS, RE-CABLE, RE-TERMINATE, AND RETEST CABLING.

10. PATCH, FILL, AND REPAIR ANY UNUSED CEILING OR WALL PENETRATIONS AND

ROUGH-INS. BLANK OFF ROUGH-IN BOXES WHERE APPLICABLE.

DISTRIBUTION

CENTER

OUTREACH

STORAGE

OFFICE

OFFICE

OFFICE

VESTIBULE

VOLUNTEER BREAK

ROOM

MEN'S

TOILET WOMEN'S

TOILET

MECHANICAL

PRINT

ROOM

GARAGE

RECEIVING

CM

CM

CM

CM

CM

CM

PR

PR

PR

PR

MDF

ENC

N Cereal City Science Technology Demo Plan 1/8" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T0181

Ce re al Ci ty Sc ien ce

T ec hn olo gy D em o P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

DEMO GENERAL NOTES

1. DEMO ALL ABANDONED CABLING BACK TO SOURCE.

2. DEMO ALL EXISTING CAMERAS, ENCLOSURES, AND MOUNTING HARDWARE.

3. CONTRACTOR SHALL SUBMIT AN RFI IF THERE ARE ANY DEMOLITION DISCREPANCIES.

4. DEMO ALL EXISTING ACCESS CONTROL ENCLOSURES, INCLUDING POWER SUPPLIES,

BATTERIES, AND ASSOCIATED HARDWARE. PULL BACK CABLING FOR

REINSTALLATION IN NEW ENCLOSURES.

5. DEMO ALL EXISTING CARD READERS, EXCEPT FOR READERS (HID SINGO) AT

NORTHWESTERN ACADEMY.

6. DEMOED EQUIPMENT, IN WHOLE OR IN PART, SHALL BE PRESENTED TO OWNER FOR

FIRST RIGHT OF REFUSAL BEFORE REMOVAL FROM SITE.

7. DEMO ALL EXISTING ENTRY DOOR INTERCOMS AND ASSOCIATED HARDWARE. IF

EXISTING CABLING CANNOT BE REUSED FOR NEW VIDEO INTERCOM, DEMO TO

SOURCE.

8. USE EXISTING CABLING SURVEY DOCUMENTATION TO IDENTIFY "FAILED" CABLES.

DEMO "FAILED" CABLING TO SOURCE, RE-CABLE, RE-TERMINATE, AND TEST CABLING.

9. TEST ALL PERMANENT NETWORK CABLING. DEMO ALL CABLING THAT DOES NOT

MEET INDUSTRY STANDARDS, RE-CABLE, RE-TERMINATE, AND RETEST CABLING.

10. PATCH, FILL, AND REPAIR ANY UNUSED CEILING OR WALL PENETRATIONS AND

ROUGH-INS. BLANK OFF ROUGH-IN BOXES WHERE APPLICABLE.

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

BOYS

GIRLS

BOYS

GIRLS

TOILET

TOILET

MULTI-PURPOSE

KITCHEN

LOUNGE

OFFICE

OFFICE

STAGE

CORRIDOR

CORRIDOR

CORRIDOR

STORAGE

LIBRARY

STORAGE

CORRIDOR

OFFICE

STORAGE

CORRIDOR

PASSAGE

CORRIDOR

PANTRY

JANITOR

JANITOR

CORRIDOR

CORRIDOR

PASSAGE

TOILET

AC

IDF

IDF

MDF

ENC

CM6 CM6 CM6CM6

CM6

CM6

CM6

CM6

CM6

CM6 CM6

CM2

CM2

CM6

CM6

CM6

CM6

CM2CM3

CM3

CM

CM4

CM4

CM4

CM4

CM

CM

CM2

CM2

CM6

CM2

PR VP

VP1

N Fremont ES First Floor Technology Plan 1/8" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T122

Fr em on t E

S Fir st Flo or T ec hn olo gy

P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

QUANTITY OF CAMERAS FOR AWAY BLEACHERS SUBJECT TO CHANGE BASED ON

ARCHITECTURAL RENOVATION. UNIT PRICING WILL BE USED TO ADD OR REMOVE

CAMERAS AS NEEDED.

MOUNT ON EXISTING TELEPHONE POLE FOR MONITORING DIESEL PUMP IN BUS

LOT TO THE WEST.

POINT AT GAS PUMP TO THE SOUTHWEST.

CARD PROX. READER LOCATED ON RECEPTION DESK.

LOCATED UP IN STORAGE MEZZANINE.

UNIT TO BE USED AT MAIN ENTRY AND AUDITORIUM ENTRANCE.

UNIT TO BE SHARED BETWEEN STADIUM AND FIELDHOUSE.

SHARED UNIT LOCATION.

REFER TO FIELDHOUSE FOR UNIT.

EXISTING DOORS WITH ELECTRIFIED HARDWARE. DOORS DO NOT HAVE CARD

READERS, AND ARE CONTROLLED BY VIDEO PHONE BASE STATION OR DOOR

RELEASE BUTTON IN THE OFFICE.

KEYED NOTES

GENERAL NOTES

1. CONFIRM FINAL CAMERA VIEW AND LOCATION WITH OWNER PRIOR TO INSTALLATION.

2. CONFIRM FINAL DATA LOCATION FOR CONCEALED WEAPON DETECTION SYSTEM

WITH OWNER BEFORE INSTALLATION.

3. REUSE EXISTING CABLING WHERE POSSIBLE. PROVIDE 15FT MINIMUM PATCH CORD

TO RELOCATE CAMERAS AS NEEDED.

4. REUSE EXISTING PENETRATIONS, PATHWAY, AND ROUGH-INS WHERE POSSIBLE.

5. DISCONNECT ALL EXISTING ACCESS CONTROL DEVICES FROM EXISTING CONTROL

BOARDS AND RECONNECT TO CORRESPONDING PORTS ON NEW CONTROL BOARDS.

SECOND

GRADE

COAT ROOM

201S

CLASSROOM

KINDERGARTEN

TEACHER

ROOM

201A

SECOND

GRADE

BOYS TOILET

200B

TEACHER

ROOM

203A

TEACHER

ROOM

209A

KINDERGARTEN

FIRST/SECOND

GRADE

GIRLS TOILET

200G

COAT ROOM

209S

EARLY

CHILDHOOD

STAFF

JANITOR

200S

STAFF TOILET

205T

CLASSROOM

COAT ROOM

208A

RECEPTION

206A

PRINCIPAL

JAN

200J

CORRIDOR

GYMNASIUM

STAGE

ANTEROOM

114A

ANTEROOM

114B

PASSAGE

KITCHEN

CL

111C

JA

NI

TO

R

1J

ENTRANCE

TOILET

210T

TOILET

209T

TOILET

202T

TOILET

201T

BOILER ROOM

STAIR- CENTER

1ST LEVEL

PASSAGE

200A

ENTRY

200C

PR

PR

PR

CM6

CM6

CM6

CM6

CM6

CM6

CM6

CM6

CM6 CM6

CM2

CM

CM2

CM2CM2

CM3

CM3

CM4CM4

CM4 CM4

CM4

CM4 CM4

CM4 CM4

CM2

CM3

CM6

CM6

CM6

CM6

CM6

VP

VP1

MDF

ENC

N Verona ES First Floor Technology Plan 1/8" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T162

Ve ro na E

S Fir st Flo or T ec hn olo gy

P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

QUANTITY OF CAMERAS FOR AWAY BLEACHERS SUBJECT TO CHANGE BASED ON

ARCHITECTURAL RENOVATION. UNIT PRICING WILL BE USED TO ADD OR REMOVE

CAMERAS AS NEEDED.

MOUNT ON EXISTING TELEPHONE POLE FOR MONITORING DIESEL PUMP IN BUS

LOT TO THE WEST.

POINT AT GAS PUMP TO THE SOUTHWEST.

CARD PROX. READER LOCATED ON RECEPTION DESK.

LOCATED UP IN STORAGE MEZZANINE.

UNIT TO BE USED AT MAIN ENTRY AND AUDITORIUM ENTRANCE.

UNIT TO BE SHARED BETWEEN STADIUM AND FIELDHOUSE.

SHARED UNIT LOCATION.

REFER TO FIELDHOUSE FOR UNIT.

EXISTING DOORS WITH ELECTRIFIED HARDWARE. DOORS DO NOT HAVE CARD

READERS, AND ARE CONTROLLED BY VIDEO PHONE BASE STATION OR DOOR

RELEASE BUTTON IN THE OFFICE.

KEYED NOTES

GENERAL NOTES

1. CONFIRM FINAL CAMERA VIEW AND LOCATION WITH OWNER PRIOR TO INSTALLATION.

2. CONFIRM FINAL DATA LOCATION FOR CONCEALED WEAPON DETECTION SYSTEM

WITH OWNER BEFORE INSTALLATION.

3. REUSE EXISTING CABLING WHERE POSSIBLE. PROVIDE 15FT MINIMUM PATCH CORD

TO RELOCATE CAMERAS AS NEEDED.

4. REUSE EXISTING PENETRATIONS, PATHWAY, AND ROUGH-INS WHERE POSSIBLE.

5. DISCONNECT ALL EXISTING ACCESS CONTROL DEVICES FROM EXISTING CONTROL

BOARDS AND RECONNECT TO CORRESPONDING PORTS ON NEW CONTROL BOARDS.

19 19 19 19 19 3

5 5 5

1244444

5 5 5 5

3 BASS

BN

D/

OR

C

BN

D/

OR

C

CH

RL

PERC

4 CELLO

8.1

108.2

108T.1109T.1

109.2

100G.1

100G.2

100G.3

100G.4108S.1

9.1

113.1

113.2

113S.1

114.1

114T.1

115T.1

115.1

0E

.2

0E

.1

6.1

6T

.1

7T

.1

7.1

9.2

9.1

8.2

0H

.4

0H

.3

0H

.2

0H

.1

2.1

1.2

1.1

0.2

0.1

110G.1

110J.1

110B.1

100A.4

100A.3

100A.2

100A.1

5A

.1 10 5A

.2

5T

.1

105D.1105C.1

105E.1

5S

.1

104D.1

4D

.2

104C.1

104B.1

101D.1

1S

.1

3T

.1

3A

.1104A.1

101T.1

101B.1

1A

.2

1A

.1

100V.8

100V.7

100V.4

100V.3 100V.1

100V.2

100V.5

100V.6

0.1

1.1

2.1

3.1

4.1

5.1

2U

.5

0D

.1

136B.2

136A.2

154B.1

154C.1

154D.1

154F.1

161A.1 161B.1

9S

.1

4A

.1

139.1

8.1

137.2

0M

.1

8.1

7.1

6.1

9.1

4A

.2

4E

.1

0.2

1.2

2.2

3.2

4.2

5.2

9.2

8.2

7.2

6.2

141A.2

8S

.1

161C.1

154.1

154.3

103.1 103.2

102B.1

102C.1

102A.1

0W

.1

154.2

4S

.1

139S.2

100K.2

100K.3

137.1

137S.1

136B.1

136A.1

5S

.1

4S

.2

4S .1

134R.1

4P

.1 13 4.2

100L.1

100L.2

2.2

2S

.1

1.213 1S

.1

0S

.1

0.2

130.1

2.1

134.3

134.4

1A

.3

1B

.1

1T

.2

1T .2

1S

.1

2.1

0S

.1 14 2E

.1

142.2

7.2

7.3

143.3

3S

.2

143S.3

3C

.1

141G.1

7.4

3S

.1

143.2

140.3

147S.1

143R.1

0R

.2

147R.1

5E

.1

4M

.1

4C

.1

5F

.1

5M

.1

5C

.1145S.1

5J

.1

146.1

0U

.6

0U

.5

0U

.4

1A

.1

1S

.3

4S

.1

4.1

5A

.1

145A.2

145C.2

1S

.1

151S.2

9.6

100R.1

100Q.1

100Q.2

100Q.3

3T

.1

2S

.2

2A

.1

2B

.1

153.2

152.2

2M

.1

2C

.1

4A

.1

XX

X

1.1

2S

.1

1B

.1

1C

.1

151.3

0E

.1

160C.1

1T

.1

161S.1

X

2T

.1

9A

.1

2S

.1 149GT.1

149BT.1

149B.1

9G

.1

9S

.1

150.2

150.1

9L

.1

149.1

149.2

149L.2

149L.3

149.3

149W.1

149M.1

149.4

9L

.5

9L

.4

9.5

3.1134.1

135.1

0K

.1

2T

.2

153.1

115.2

114.2

8.1

2.2

146.2

147.1 151.2

145.1

143.1

133S.1

138A.1

3.2

139.2

138.2

161.1

161.2

7.211

6.2

110J.2

135.2

141A.1

1R

.1

0U

.3

0U

.2

0U

.1

140.2

152.1

KINDERGARTEN

CLASSROOM

KINDERGARTEN

CLASSROOM

CONFERENCE

ROOM

104A

DEAN'S OFFICE

104B

ASSISTANT

PRINCIPAL'S

OFFICE

104C

COLLABORATION

CENTER

3RD GRADE

CLASSROOM

3RD GRADE

CLASSROOM

BAND

CHOIR/

ORCHESTRA

TECHNICAL

STUDIES

SPECIAL

EDUCATION

136B

ACTIVITY

ROOM

143A

STORAGE

COUNSELOR'S

OFFICE

102C

RECORDS

154D

STORAGE

154E

INSTRUCTIONAL

COACH

154C

FLEX OFFICE

154B

TECHNICAL

STUDIES

TECHNICAL

STUDIES

6TH GRADE

CLASSROOM

STUDENT

SUCCESS

CENTER

136A

DANCE

1ST GRADE

CLASSROOM

1ST GRADE

CLASSROOM

2ND GRADE

CLASSROOM

4TH GRADE

CLASSROOM

2ND GRADE

CLASSROOM

TOILET

114T

TOILET

115T

TOILET

116T

TOILET

117T

5TH GRADE

CLASSROOM

4TH GRADE

CLASSROOM

TOILET

109T

TOILET

108T

5TH GRADE

CLASSROOM

BOY'S TOILET

110B

GIRL'S TOILET

110G

JANITOR

110J

VESTIBULE

100A

PRINCIPAL'S

OFFICE

104D RECEPTION

105A

OFFICE

105C

IT ROOM

101D

STORAGE

101S

TOILET

103T

EXAM

105D

EXAM

105E

IT ROOM

103A

PA

SS

AG

E

5B

WORK ROOM

WAITING ROOM

102A

BEHAVIOR

INTERVENTIONIST

OFFICE

102B

WELCOME

CENTER

101A

PASSAGE

101C

VE

ST

IB

UL

E

0V

MEN'S TOILET

149M

LOBBY

149L

STAGE

149A

STORAGE/

RECEIVING

151S

OFFICE

151A

PRACTICE

151C

SCENE SHOP

STORAGE

160S

STORAGE

149S

GIRL'S

DRESSING

ROOM

149G

BOY'S

DRESSING

ROOM

149B

TOILET

149BT

TOILET

149GT

LOBBY

100W

JANITOR

160B TICKETS

160C

MECH

160D

CONCESSIONS

160E

PASSAGE

160A

STORAGE

154S

COMMUNITIES

IN SCHOOLS

OFFICE

154F

SPECIAL

EDUCATION

6TH GRADE

CLASSROOM

6TH GRADE

CLASSROOM

ELEMENTARY

ART

STUDENT

SUCCESS

CENTER

ELL

CLASSROOM

7TH GRADE

CLASSROOM

7TH GRADE

CLASSROOM

7TH GRADE

CLASSROOM

PASSAGE

154A

TOILET

161TSTORAGE

161S

PANTRY

161S

GYM

STORAGE

144S

STORAGE

147S

TEAM ROOM

144CLAUNDRY

145C

STORAGE

147R

STORAGE

145S

JANITOR'S

CLOSET

145J

OFFICE

145A

MECHANICAL

145M

MECHANICAL

144M

OFFICE

144A

BOY'S LOCKER

ROOM

SHOWER

144D

STORAGE

144F

GIRL'S LOCKER

ROOM

SHOWER

145ESHOWER

145F

TOILET

145T

POOL

OFFICE

152APRACTICE

152B

PRACTICE

152C

MECH

152M

STORAGE

143R

TOILET

143T

TOILET

143C

STORAGE

143S

CORRIDOR

100R

STORAGE

140S

INSTRUMENT

STORAGE

152S

CORRIDOR

100P

CORRIDOR

100N

GIRL'S TOILET

141G

BOY'S TOILET

141B

MAINTENANCE

STORAGE

141A

TOILET

141T

STORAGE

141R

STORAGE

138S

STORAGE

139S

DIGITAL ARTS

CLASSROOM

STORAGE

134S MIDDLE

SCHOOL ART

CLASSROOM

8TH GRADE

CLASSROOM

8TH GRADE

CLASSROOM

8TH GRADE

CLASSROOM

KILN ROOM

133S

STORAGE

134RPA

SS

AG

E

4PBOY'S TOILET

134B

GIRL'S TOILET

134G

JANITOR'S

CLOSET

134J

SICK ROOM

101B

SPECIAL

EDUCATION

CORRIDOR

100L

CORRIDOR

100C

CORRIDOR

100J

CORRIDOR

100D

CORRIDOR

100E

CORRIDOR

100F

LOBBY

100B

BOILER ROOM

ELECTRICAL

142E

TOILET

144T

SHOWER

144E

TOILET

144H

DRYING ROOM

145B

PASSAGE

145D

PASSAGE

144B

IT

137S

PRACTICE

151B

STORAGE

135S

TOILET

105T

TOILET

101T

WOMEN'S

TOILET

149W

STORAGE

108S

VESTIBULE

100H

STORAGE

105S

CORRIDOR

100M

STORAGE

141S

CORRIDOR

100S

STORAGE

161B

OFFICE

161A

STORAGE

161C

CORRIDOR

100Q

CORRIDOR

100T

VESTIBULE

100U

VESTIBULE

100G

VESTIBULE

100K

TEACHER

LOUNGE

138A

AUDITORIUM

CAFETERIA

KITCHEN

STORAGE

113S

STORAGE

114S

STORAGE

115S

STORAGE

112S

STORAGE

116S

STORAGE

117S

STORAGE

144G

MDF

IDF

MDF

A CM6

CM6

CM6

CM2

CM6

CM4

CM2

CM6 CM6 CM6

CM6

CM6

CM6

CM6

CM6

CM6

CM6

CM6 CM6 CM6

CM6CM6CM6CM6CM6

CM6

CM6 CM6 CM6 CM6

CM6

CM6

CM6

CM6

CM6CM6CM6CM6

CM6CM6

CM6

CM6

CM6

CM6 CM6

CM4CM4

CM4

CM4

CM4

CM4

CM4

CM4

CM4 CM4

CM4

CM4 CM4

CM4

CM4

CM4

CM4CM

CM6

CM2

CM2

CM2

CM2CM

CM6 CM6

CM6

CM5

CM4

CM2

CM2

CM4CM4

CM

CM

CM2

CM2

CM6

CM4

CM6

CM6

CM6

CM4

CM4

CM6

CM6

CM6 CM6

CM6

CM6 CM6

CM6

CM2

VS

VS

VSVS

CM2

CM2

VS

VS

CM6

CM2

CM6

CM6

CM6

CM6

CM6

CM2

CM6

CM6

CM6

CM6

VS

VS

CM6

CM6CWD

CWD

CWD

VP

VP

EN

C

ENC

OPEN TO BELOWCONTROL

ROOM

CM6

CM

CM

N Northwestern MS First Floor Technology Plan 1/16" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T171

No rth we ste rn M

S Fir st Flo or T ec hn olo gy

P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

Auditorium Balcony Technology Plan 1/8" = 1'-0"

QUANTITY OF CAMERAS FOR AWAY BLEACHERS SUBJECT TO CHANGE BASED ON

ARCHITECTURAL RENOVATION. UNIT PRICING WILL BE USED TO ADD OR REMOVE

CAMERAS AS NEEDED.

MOUNT ON EXISTING TELEPHONE POLE FOR MONITORING DIESEL PUMP IN BUS

LOT TO THE WEST.

POINT AT GAS PUMP TO THE SOUTHWEST.

CARD PROX. READER LOCATED ON RECEPTION DESK.

LOCATED UP IN STORAGE MEZZANINE.

UNIT TO BE USED AT MAIN ENTRY AND AUDITORIUM ENTRANCE.

UNIT TO BE SHARED BETWEEN STADIUM AND FIELDHOUSE.

SHARED UNIT LOCATION.

REFER TO FIELDHOUSE FOR UNIT.

EXISTING DOORS WITH ELECTRIFIED HARDWARE. DOORS DO NOT HAVE CARD

READERS, AND ARE CONTROLLED BY VIDEO PHONE BASE STATION OR DOOR

RELEASE BUTTON IN THE OFFICE.

KEYED NOTES

GENERAL NOTES

1. CONFIRM FINAL CAMERA VIEW AND LOCATION WITH OWNER PRIOR TO INSTALLATION.

2. CONFIRM FINAL DATA LOCATION FOR CONCEALED WEAPON DETECTION SYSTEM

WITH OWNER BEFORE INSTALLATION.

3. REUSE EXISTING CABLING WHERE POSSIBLE. PROVIDE 15FT MINIMUM PATCH CORD

TO RELOCATE CAMERAS AS NEEDED.

4. REUSE EXISTING PENETRATIONS, PATHWAY, AND ROUGH-INS WHERE POSSIBLE.

5. DISCONNECT ALL EXISTING ACCESS CONTROL DEVICES FROM EXISTING CONTROL

BOARDS AND RECONNECT TO CORRESPONDING PORTS ON NEW CONTROL BOARDS.

IDF

ENGINEERING

WORK ROOM

STORAGE

OFFICE

OFFICE

STORAGE

122A

T.

120 T.

OFFICE

STAIR 3

CLOSET

111A

CONFERENCE

OFFICE

GENERAL OFFICE

RESOURCE CENTER

ATRIUM

ELEV

ELEV.

EQUIP.

KITCHEN

OUTREACH

TRAINING

COAT CLOSET

105A

COMMONS

OUTREACH

TRAINING

STORAGE

STAIR 1

UTILITY

COMPUTER

LAB

MAINTENANCE

DATA

ELEC.

STAIR 2

ENGINEERING

JAN.

WOMEN'S T.

MEN'S T.

COMMONS

PR

PR

CLASSROOM

GENERATOR

CM6

CM

CM5

CM6

CM6

CM6

CM

CM2

CM2

CM

2 CM4

CM4

CM4

CM4

CM4

CM3

CM6

CM6

CM6

CM6

CM6

CM6

CM6

CM6

CM2

CM6

CM2

VS

VS

CM6

CM3

VP1

CM2

PRVP1

CWD

EN

C

N BCAMSC First Floor Technology Plan 1/8" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T191

BC

AM

SC

F irs t F loo r T ec hn olo gy

P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

QUANTITY OF CAMERAS FOR AWAY BLEACHERS SUBJECT TO CHANGE BASED ON

ARCHITECTURAL RENOVATION. UNIT PRICING WILL BE USED TO ADD OR REMOVE

CAMERAS AS NEEDED.

MOUNT ON EXISTING TELEPHONE POLE FOR MONITORING DIESEL PUMP IN BUS

LOT TO THE WEST.

POINT AT GAS PUMP TO THE SOUTHWEST.

CARD PROX. READER LOCATED ON RECEPTION DESK.

LOCATED UP IN STORAGE MEZZANINE.

UNIT TO BE USED AT MAIN ENTRY AND AUDITORIUM ENTRANCE.

UNIT TO BE SHARED BETWEEN STADIUM AND FIELDHOUSE.

SHARED UNIT LOCATION.

REFER TO FIELDHOUSE FOR UNIT.

EXISTING DOORS WITH ELECTRIFIED HARDWARE. DOORS DO NOT HAVE CARD

READERS, AND ARE CONTROLLED BY VIDEO PHONE BASE STATION OR DOOR

RELEASE BUTTON IN THE OFFICE.

KEYED NOTES

GENERAL NOTES

1. CONFIRM FINAL CAMERA VIEW AND LOCATION WITH OWNER PRIOR TO INSTALLATION.

2. CONFIRM FINAL DATA LOCATION FOR CONCEALED WEAPON DETECTION SYSTEM

WITH OWNER BEFORE INSTALLATION.

3. REUSE EXISTING CABLING WHERE POSSIBLE. PROVIDE 15FT MINIMUM PATCH CORD

TO RELOCATE CAMERAS AS NEEDED.

4. REUSE EXISTING PENETRATIONS, PATHWAY, AND ROUGH-INS WHERE POSSIBLE.

5. DISCONNECT ALL EXISTING ACCESS CONTROL DEVICES FROM EXISTING CONTROL

BOARDS AND RECONNECT TO CORRESPONDING PORTS ON NEW CONTROL BOARDS.

DN

DN

STORAGE

S377

STAIR #15

S378

STORAGE

S379

OFFICE

S380

RECEPTION

S381

OFFICE

S382

CLASSROOM

S383

PASSAGE

S384

CLASSROOM

S385

CO

RR

ID

OR

S3

CORRIDOR

S387

PASSAGE

S388

CO

RR

ID

OR

S3

LIBRARY

S390

CUSTODIAN

OFFICE

S391

CLASSROOM

S392

CLASSROOM

S393

WOMENS

TOILET

S394

JAN.

S395

STAFF LOUNGE

S396

TOILET

S397

BREAK

S398

TOILET

S399

CHECK ROOM

S406

STORAGE

S407

MAIN LOBBY

S408

WOMENS

RESTROOM

S409

WOMENS

RESTROOM

S410

WOMENS

RESTROOM

S411

MENS

RESTROOM

S412

JANITOR

S413

STAIR #3

S414

STAIR HALL

NO.1

S415

RAMP

S416

STAIR HALL

NO.2

S417

ST

AI

R #4

S4

CLASSROOM

S419

CLASSROOM

S420

MENS TOILET

S421

STAIR #9

S422

VESTIBULE

S423

IT

S424

OFFICE

S425

VESTIBULE

S426

GYMNASIUM

S431

STAIR #13

S432

STAIR #12

S433

ELEV.

S429

STAIR #1

S434

STAIR #2

S435

BOX OFFICE

S436 OFFICE

S437

NATATORIUM

POOL

S438

NATATORIUM

DECK

S439

NA

TA

TO

RI

UM

BA

LC

ON

Y S4

STAIR #6

S442

STAIR #7

S443

STAIR #8

S402

STAGE

S405

STAIR #5

S441

DRESSING

ROOM

S400

TOILET

S401

OFFICE

S403

TOILET

S404

AUDITORIUM

VESTIBULE

S444

SOUND BOOTH

S447

AUDIO BOOTH

S448

OFFICE

S449

STORAGE

S450

CONCESSIONS

S445

STORAGE

S446

STAIR #10

S451

STORAGE

S452

VESTIBULE

S453

VP

PR

IDF

IDF

CM

CM3

CM4

CM

CM

PR

CM2CM2

CM2

CM4

CM2

CM4

CM4

CM2

CM6

CM6

EN

C

N W. K. Kellogg HS First Floor Technology Plan 3/32" = 1'-0"

SHEET NO.

ISSUE / DATE

DRAWN BY

PROJECT NO.

© 2023 AETD, ALL RIGHTS RESERVED.

N

EW

PO

RT

R

OA

D, S

UI

TE

5, PO

RT

AG

E, M I 4

· 2

-2

-2

4 · A

ET

EC

H.

DE

SI

GN

2025-09-18 ADDENDUM 3

2025-09-12 ADDENDUM 2

2025-08-22 ADDENDUM 1

2025-08-11 BIDS

CDB

T1112

W . K

. K ell og g H

S Fir st Flo or T ec hn olo gy

P lan

BCPS2501-0101

BA

TT

LE

C

RE

EK

, M I

DI

ST

RI

CT

S

EC

UR

IT

Y

UP

GR

AD

ES

BA

TT

LE

C

RE

EK

P

UB

LIC

S

CH

OO

LS

QUANTITY OF CAMERAS FOR AWAY BLEACHERS SUBJECT TO CHANGE BASED ON

ARCHITECTURAL RENOVATION. UNIT PRICING WILL BE USED TO ADD OR REMOVE

CAMERAS AS NEEDED.

MOUNT ON EXISTING TELEPHONE POLE FOR MONITORING DIESEL PUMP IN BUS

LOT TO THE WEST.

POINT AT GAS PUMP TO THE SOUTHWEST.

CARD PROX. READER LOCATED ON RECEPTION DESK.

LOCATED UP IN STORAGE MEZZANINE.

UNIT TO BE USED AT MAIN ENTRY AND AUDITORIUM ENTRANCE.

UNIT TO BE SHARED BETWEEN STADIUM AND FIELDHOUSE.

SHARED UNIT LOCATION.

REFER TO FIELDHOUSE FOR UNIT.

EXISTING DOORS WITH ELECTRIFIED HARDWARE. DOORS DO NOT HAVE CARD

READERS, AND ARE CONTROLLED BY VIDEO PHONE BASE STATION OR DOOR

RELEASE BUTTON IN THE OFFICE.

KEYED NOTES

GENERAL NOTES

1. CONFIRM FINAL CAMERA VIEW AND LOCATION WITH OWNER PRIOR…