- REPLACE VFD AND SYSTEM COMPONENTS 840 Federal contract opportunity
- Solicitation number
- 140P8625Q0081
About this file
This document is a Request for Quote (RFQ) from the Golden Gate National Recreation Area (GGNRA) seeking a contractor to replace Variable Frequency Drive (VFD) motor controls at Pump Station 840 in the Marin Headlands. The project requires removing old VFD components and installing two new 100hp VFD motor controls with Soft Start options for Pump #1 and Pump #2, ensuring full functionality and connection to the existing SCADA system. The contractor must provide a one-year warranty, maintain specific technical requirements such as UL-listed panel, above-ground controls, and alarm input protections, and ensure compatibility with existing Myers 100hp – 480 volt – 3-phase sewage pump infrastructure.
As an optional line item, the National Park Service is seeking a contractor to supply and install a new interface control screen to replace the current Allen Bradley Panel View 600. Work must be completed during normal business hours (8 a.m. to 5 p.m., Monday through Friday), with a strict requirement that the complete system not be shut down for longer than 4 hours. If a longer shutdown is required, the contractor must provide sewage truck transport to maintain uninterrupted services. The base bid includes replacing VFDs and associated components, with Option 1 being the HMI (Human-Machine Interface) installation. The current system serves the Marin Headlands, which has 134 NPS staff members and receives over 4 million visitors annually.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Section_J_-_Att_No__005_Technical_Information_Form.docx | DOCX document | |
| Sol_140P8625Q0081.pdf | ||
| Section_J_-_Att_No__008_Invoice_Payment_Request.pdf | ||
| Section_J_-_Att_No__002_Location_Map.pdf | ||
| Section_J_-_Att_No__004_WD_CA20250007_Marin_County.pdf | ||
| Section_J_-_Att_No__006_Transmittal_form_CM16.pdf | ||
| Section_J_-_Att_No__003_Quote_Sheet.xlsx | XLSX spreadsheet | |
| Section_J_-_Att_No__007_DI_137_Release_of_Claims_.pdf | ||
| Section_J_-_Att_No__009_Payment_Bond_SF25A-23a.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Marin Headlands
Replace 100hp VFD Sewage Pump Motor Controls
Golden Gate National Recreation Area
Objective
Golden Gate National Recreation Area (GGNRA) desires to solicit a request for quote to qualified vendors to overhaul and upgrade VFD control components in lift station 840 Bunker Road, Sausalito CA
Background The Marin Headlands has a robust community of park visitors, non-profits, park partners, residences, and housing for 134 NPS staff members and interns. Over 4 million visitors per year visit the Marin Headlands. Sewage from the
Marin Headlands is pumped via forced main through the Baker Barry tunnel to the Sausalito Sewer District. Pump
Station 840 is the last station in the Marin Headlands, and it must pump all the Marin Headland’s sewage. VFDs and related controls for the pump station are approximate thirty years old. The VFD for pump 2 is no longer operational and the pump must run in-hand.
Project Description
The contractor will be responsible for removal of old VFD components and installation of two (2) new 100hp
VFD motor controls with Soft Start options. Contractor to provide all tools, materials, and equipment to replace old VFD and install new VFD with Soft Start options on both Pump #1 and Pump #2.
New controls and components shall be installed to full functionality and connected to the existing SCADA system (Mission Control) alarm set point. The contractor will interconnect as needed with existing circuitry and test operation of all the equipment.
The Contractor shall furnish and install a VFD suitable for the horsepower and voltage specified for the lift station.
• The electrical components, switches, relays, timers, and other circuitry shall be located inside the control panel.
• The panel shall be UL listed.
• Terminal boards for connection of power, pumps, alarms and level sensors shall be provided.
• All controls shall be located above ground.
• Maintain "Over temp" and "Moisture" Alarm input protection.
• Contractor to ensure all controls are compatible to existing Myers 100hp – 480 volt – 3-phase pumps
• The contractor shall furnish park a one-year warranty of parts and labor upon acceptance.
• Additional parts to include but not limited to:
There are two (2) Myers pumps approximately 15 feet below grade. Each of these pumps are 100HP and are not to be replaced with this contract.
As an OPTION, Contractor to supply and install new interface control screen to replace current Allen Bradley
Panel View 600. This is an option that may be executed if in the best interest of the new system. National Park
Service is aware that current Allen Bradley touch screen may not be compatible with new VFD / Soft Starts.
Complete system shall not be shut down for longer than 4 hours. VFD replacement shall occur on one (1) pump control at a time allowing the other pump to maintain flow. Current status: Pump #1 operational & Pump
#2 has failed VFD. Pump #2 VFD shall be replaced first and test ran before moving onto Pump #1 VFD. If the contractor requires longer than a four-hour shutdown to perform the work, the contractor shall provide sewage truck pumping/transport to Fort Baker LS 659 to maintain uninterrupted services to the sewage line during the ongoing repair activities.
Contractor will be responsible for removal and proper disposal of all old equipment. Any gaskets, adhesives, lubricants, or incidental parts will be furnished by the contractor.
List of Contract Line Items
Base Bid
• Contract Line Item 1 o Replace VFDs and Associated Components
Options
• Option 1 o Install new HMI
ON-SITE WORK HOURS: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated. No holiday will be allowed.