Section I_Century Bog Restoration Construction Drawings.pdf
PDF 27 MB Posted
- Attached to
- DFW-2026-059 Century Bog Restoration Project
- Solicitation number
- BD-26-1046-DFW-FW104-125752
- Issued by
- Plymouth County, Massachusetts
About this file
This file comprises construction drawings for the Century Bog Restoration project prepared for MassWildlife by Inter-Fluve, a wetland engineering firm based in Cambridge, Massachusetts. The project is located at Century Bog in the towns of Plymouth and Wareham, Massachusetts, at the confluence of Red Brook and Buttermilk Bay. The restoration work involves excavating and regrading approximately 2.6 miles of stream channel, removing existing berms and irrigation infrastructure, filling perimeter and lateral ditches, installing large wood structures and fish exclusion features, and constructing riffles with fabric-encapsulated soil (FES) lifts. The drawings specify excavation of approximately 18,600 cubic yards of fill discharge within existing ordinary high water (OHW), 90 cubic yards of dredging within OHW, and 37,050 cubic yards of excavation within wetlands, with 17,410 cubic yards of fill discharge within wetlands. The project includes installation of 413 logs, 576 logs with rootwads, and 656 cubic yards of slash for habitat enhancement across multiple bog cells, along with planting of Atlantic White Cedar clusters, transitional seed application on disturbed slopes, and sandplain grassland seeding on upland areas.
The construction drawings were issued for construction in February 2026 following a revision in July 2025 for reduced limits of disturbance. The project proposes permanent alterations to resource areas including reduction of 750 linear feet of bank, addition of 36,700 square feet of bordering vegetated wetland, reduction of 95,500 square feet of land under waterways and OHW, and reduction of 487,500 square feet of riverfront area. Proposed replacements include 24,600 linear feet of bank and 3,024,100 square feet of bordering vegetated wetland. The construction plans provide detailed specifications for channel design with typical 5-foot bottom widths, 2H:1V bank slopes, and multiple riffles at varying locations. Temporary access drives, staging areas, erosion control measures including silt fencing and turbidity curtains, and turtle protection protocols are incorporated throughout the design to minimize environmental impacts during construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Red_Brook_Addendum1_260320_Final.pdf | ||
| DFW-2026-059_Century Bog Restoration Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
NOT TO SCALE
SITE MAP
NOT TO SCALE
COORDINATES:
LATITUDE: 41° 47' 57"
LONGITUDE: 70° 37' 33"
WATERBODY: RED BROOK
TRIBUTARY OF: BUTTERMILK BAY
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
COVER, LOCATION & SHEET LIST 1 22
PROJECT
LOCATION
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
FEBRUARY 2026
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
LOCATION MAP
STATE OF MASSACHUSETTS
Boston
Boston
Pittsfield Boston
Worcester
Lawrence
Wellfleet
Barnstable
Plymouth
Martha's Vineyard
Nantucket
North Adams
Woods Hole
Greenfield
Northampton
NOT TO SCALE
I-90
25 25
SANDWICHWAREHAM
BOURNE
BARKER RD
PL
YM
O
UT
H
AV
E
GLEN CHARLIE
POND
WHITE ISLAND POND
WHITE ISLAND
POND
EZEKIEL
POND
BARTLETT
POND
RED BROOK
RED BROOK
SHEET LIST
1 COVER, LOCATION & SHEET LIST
2 EXISTING CONDITIONS AND SURVEY CONTROL PLAN
3 STAGING AND ACCESS PLAN
4 INDEX AND PROPOSED CONDITIONS OVERVIEW
5 PROPOSED CONDITIONS PLAN
6 PROPOSED SECTIONS
7 PROPOSED CONDITIONS PLAN
8 PROPOSED SECTIONS
9 PROPOSED CONDITIONS PLAN
10 PROPOSED SECTIONS
11 PROPOSED CONDITIONS PLAN
12 PROPOSED SECTIONS
13 PLANTING PLAN
14 PLANTING PLAN
15 PLANTING PLAN
16 PLANTING PLAN
17 TREATMENT DETAILS
18 TREATMENT DETAILS
19 EROSION CONTROL DETAILS
20 FES LIFT DETAILS
21 EXISTING RESOURCE AREAS PLAN
22 PROPOSED RESOURCE AREAS PLAN
FIRE ROAD, TYP
TOWN OF PLYMOUTH
W
AR
EH
AM
PL
YM
OU
TH
CELL D
CELL C
CELL B
CELL 4
CELL A
CELL 1
OH
O H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH OH
OH OH
O H
O H
BARKER RD
CELL 7
CELL 5
CELL 6
CELL 3
CELL 2
TOWN OF WAREHAM
COMMONWEALTH
OF MASSACHUSETTS
COMMONWEALTH
OF MASSACHUSETTS
COMMONWEALTH
OF MASSACHUSETTS
COMMONWEALTH
OF MASSACHUSETTS
TO
W
N
OF
P
LY
M
OU
TH
TO
W N
O F
PL
YM
O U
TH
TOWN OF
PLYMOUTH
COMMONWEALTH
OF MASSACHUSETTS
COMMONWEALTH
OF MASSACHUSETTS
CONTROL POINTS
POINT #
DESCRIPTION
CAPPED REBAR
CAPPED REBAR
CAPPED REBAR
CAPPED REBAR
CAPPED REBAR
ELEVATION
48.36
48.21
46.58
45.10
47.39
NORTHING
2754226.6220
2753032.4680
2752346.3010
2751282.1120
2753297.3490
EASTING
895570.1470
895874.7520
893733.3160
892692.9150
894411.6510
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
EXISTING CONDITIONS AND
SURVEY CONTROL PLAN 2 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
WHITE ISLAND POND
WHITE ISLAND POND
BARTLETT POND
EZEKIEL POND
RED BROOK
MAIN BOG CHANNEL
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
OH OH OVERHEAD LINE
EXISTING BUILDING
EXISTING WETLAND PER
MASSACHUSETTS DEP
EXISTING VEHICLE/PEDESTRIAN
PATH
EXISTING FIRE ROAD
EXISTING STREAM CHANNEL BANKS
SCALE IN FEET
0 500250
WHITE ISLAND
POND DAM
FLOW CONTROL
STRUCTURE
BERM
CONCRETE BOX
CULVERT, 2 BAYS
INVERT IN 43.0
INVERT OUT 42.8
CONCRETE BOX
CULVERT, 2 BAYS
INVERT IN 39.5
INVERT OUT 39.5
CULVERT
INVERT IN 41.0
INVERT OUT 41.5
CONCRETE
CULVERT, 2 PIPES
INVERT IN 40.9
INVERT OUT 41.6
CONCRETE OUTLET
STRUCTURE, 2 BAYS
INVERT IN 38.2
INVERT OUT 38.1
TRIPLE BARREL
CMP CULVERT
INVERT IN 38.9
INVERT OUT 38.6
CONCRETE OUTLET
STRUCTURE
INVERT IN 38.6
INVERT OUT 38.4
CULVERT
INVERT UNKNOWN
BERM
BERM
GATE
GATE
GATE
GATE
GATE
CONTROL POINTPOINT #
EXISTING GATE
1. TOPOGRAPHIC DATA OF BOGS AND SURROUNDING
AREA ARE FROM U.S. GEOLOGICAL SURVEY
TOPOGRAPHIC LIDAR, LIDAR FOR CENTRAL-EASTERN
MASS. DATA SET, FLOWN IN SPRING 2021,
RETRIEVED FROM MASSGIS.
2. BATHYMETRIC DATA OF RED BROOK BASED UPON
SURVEY COLLECTED BY INTER-FLUVE ON MAY 30,
2024.
3. SUPPLEMENTAL TOPOGRAPHIC DATA BASED UPON
SURVEY COLLECTED BY INTER-FLUVE ON MAY 30,
2024, AND SURVEY COLLECTED BY GREEN SEAL
ENVIRONMENTAL, INC. DURING JULY 2012 AND
DECEMBER 2013.
4. INFRASTRUCTURE LOCATION DATA IS APPROXIMATE.
5. OVERHEAD LINE APPROXIMATED FROM AERIAL
IMAGERY. THIS INFRASTRUCTURE SHALL BE
CONFIRMED BY THE CONTRACTOR PRIOR TO
CONSTRUCTION AND SHALL REMAIN AND BE
PROTECTED IN PLACE UNLESS STATED OTHERWISE.
6. PARCEL DATA WAS OBTAINED FROM MASSGIS
PUBLICLY AVAILABLE DATA. THE BOUNDARIES
SHOULD BE CONSIDERED APPROXIMATE.
7. HORIZONTAL COORDINATES ARE REFERENCED TO
NAD83, MASSACHUSETTS STATE PLANE, MAINLAND
ZONE, US FEET.
8. VERTICAL DATUM IS NAVD88, US FEET.
9. CELL BOUNDARIES ARE DEFINED BY WETLAND
BOUNDARIES FROM MASSGIS.
LIMIT OF DISTURBANCE
NOTES:
TEMPORARY HERRING
CHANNEL/RED BROOK
36" CONCRETE PIPE
STEEL PIPE
STEEL PIPE
EXISTING ROADS
FL
OW
FLOW
BERM
BERM
DITCH, TYP
DAM FISH LADDER
IRRIGATION POND
IRRIGATION POND
IRRIGATION POND
SAND BORROW PIT
PARKING AREA
FIRE ROAD, TYP
FL
OW
SAND BORROW PIT
AR
EH
AM
PL
YM
OU
TH
CELL D
CELL C
CELL B
CELL 4
CELL A
CELL 1
OH
O H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH OH
OH OH
O H
O H
BARKER RD
CELL 7
CELL 5
CELL 6
CELL 3
CELL 2
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
STAGING AND ACCESS PLAN 3 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
WHITE ISLAND POND
WHITE ISLAND POND
BARTLETT POND
EZEKIEL POND
RED BROOK
SCALE IN FEET
0 500250
MAIN BOG CHANNEL
APPROXIMATE TEMPORARY
STAGING AREAAPPROXIMATE LOCATION OF
TEMPORARY STAGING AREA
CONSTRUCTION ACCESS
APPROXIMATE LOCATION OF
TEMPORARY STAGING AREA
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
OH OH OVERHEAD LINE
EXISTING BUILDING
EXISTING WETLAND PER
MASSACHUSETTS DEP
TEMPORARY ACCESS DRIVE TO
REMAIN
EXISTING FIRE ROAD
EXISTING STREAM CHANNEL BANKS
EXISTING GATE
LIMIT OF DISTURBANCE
TEMPORARY ACCESS DRIVE TO BE
REMOVED
1. THE CONTRACTOR SHALL USE TEMPORARY ACCESS
DRIVES FOR SITE ACCESS AS FEASIBLE.
TEMPORARY ACCESS DRIVES INDICATED FOR
REMOVAL MAY BE USED FOR ACCESS UNTIL THEIR
REMOVAL.
2. CONTRACTOR MAY USE EXISTING FIRE ROADS FOR
CONSTRUCTION ACCESS
3. THE CONTRACTOR SHALL PROVIDE A TEMPORARY
STABILIZED CONSTRUCTION ENTRANCE AT EACH
EXIT AND ENTRANCE, SEE DETAIL 3 ON SHEET 17.
4. TEMPORARY AVOIDANCE FENCES SHALL BE
PLACED WITH MINIMUM CLEARANCE OF 6" FROM
THE GROUND SURFACE. ALL TEMPORARY FENCING
IS TO BE REMOVED AFTER CONSTRUCTION.
NOTES:
CONSTRUCTION ACCESS
EXISTING ROADS
FLOW
FL
OW
CONSTRUCTION ACCESS4
REMOVE EXISTING BERM
IRRIGATION POND
EXISTING GATE
STEEL PIPE
DITCH, TYP.
SAND BORROW PIT
GATE
EXISTING GATE
EXISTING GATE
36" CONCRETE PIPE
TEMPORARY HERRING
CHANNEL/RED BROOK
STEEL PIPE
IRRIGATION POND
REMOVE
EXISTING
BERMS
EXISTING GATE
BERM
REMOVE
EXISTING BERM
IRRIGATION POND
REMOVE EXISTING BERM
FLOW CONTROL STRUCTURE
WHITE ISLAND
POND DAM
DAM FISH LADDER
TEMPORARY AVOIDANCE FENCES
FL
OW
PROPOSED GATE 3
PROPOSED GATE
PROPOSED GATE3
CONTRACTOR SHALL SET ASIDE ENOUGH
SAND TO SPREAD 12" OF SAND ON TOP OF
THE FINAL SURFACE AFTER REGRADING
CONCRETE BOX
CULVERT, 2 BAYS
INVERT IN 43.0
INVERT OUT 42.8
CONCRETE BOX
CULVERT, 2 BAYS
INVERT IN 39.5
INVERT OUT 39.5
CONCRETE
CULVERT, 2 PIPES
INVERT IN 40.9
INVERT OUT 41.6
CONCRETE OUTLET
STRUCTURE, 2 BAYS
INVERT IN 38.2
INVERT OUT 38.1
TRIPLE BARREL
CMP CULVERT
INVERT IN 38.9
INVERT OUT 38.6
CONCRETE OUTLET
STRUCTURE
INVERT IN 38.6
INVERT OUT 38.4
CULVERT
INVERT UNKNOWN
CULVERT
INVERT IN 41.0
INVERT OUT 41.5
PROPOSED GATE 3
AR
EH
AM
PL
YM
OU
TH
7+36 1+00
CELL D
CELL C
CELL B
CELL 4
CELL A
CELL 1
BARKER RD
CELL 7
CELL 5
CELL 6
CELL 3
CELL 2
97+88
1+00
10+00
+0
+0
40+00
50+00
60+00
+0
80+00
+0
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
INDEX AND PROPOSED
CONDITIONS OVERVIEW 4 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
RED BROOK
SHEET 5 AND 13
SHEET 7 AND 14
SHEET 9 AND 15
SHEET 11 AND 16
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
EXISTING BUILDING
EXISTING WETLAND PER
MASSACHUSETTS DEP
EXISTING FIRE ROAD
PROPOSED CONTOUR (1')
PROPOSED STREAM
CHANNEL ALIGNMENT
SCALE IN FEET
0 500250
RED BROOK
BARTLETT POND
WHITE ISLAND POND
WHITE ISLAND POND
EZEKIEL POND
10+00
EXISTING GATE
PROPOSED STREAM CHANNEL BANKS
LIMIT OF DISTURBANCE
TEMPORARY ACCESS DRIVE TO
REMAIN
TEMPORARY ACCESS DRIVE TO BE
REMOVED
NOTES:
1. PROVIDE TOPOGRAPHIC COMPLEXITY IN CELLS 3, 4, 5, 6, 7, AND
B. SEE DETAIL 1 ON SHEET 17.
2. PERIMETER AND LATERAL DITCHES SHALL BE FILLED AND
COMPACTED TO FINAL SURROUNDING ELEVATIONS AND
SUBJECT TO THE INDICATED TOPOGRAPHIC COMPLEXITY
UNLESS NOTED OTHERWISE. PACK DITCHES WITH A MIXTURE
OF SLASH AND EXCAVATED MATERIAL.
3. ABANDONED IRRIGATION PIPES EXPOSED DURING
CONSTRUCTION SHALL BE REMOVED AND DISPOSED OF
OFFSITE TO THE EXTENT PRACTICAL. REMAINING BURIED
SECTIONS OF PIPE SHALL BE CUT AND CAPPED OR ENDS
BURIED.
4. ALL SIDE SLOPES SHALL BE GRADED TO A SLOPE OF
APPROXIMATELY 5H:1V OR MORE GRADUAL, SEEDED WITH
NATIVE TRANSITIONAL SEED MIXTURE.
5. LARGE WOOD SHALL BE INSTALLED IN AND ADJACENT TO THE
CHANNEL PER THE TREATMENT DETAILS AND IN
COORDINATION WITH THE ENGINEER. LARGE WOOD AND
POOLS ARE NOT DEPICTED IN PLAN OR PROFILE VIEW FOR
CLARITY, SEE TREATMENT DETAILS.
6. CLEAR AND SALVAGE EXISTING TREES AND SHRUBS
DESIGNATED BY THE ENGINEER PRIOR TO SURFACE
ROUGHENING AND GRADING. REUSE SALVAGED MATERIAL AS
SLASH FOR INSTALLATION IN LARGE WOOD STRUCTURES AND
FOR PLACEMENT OVER WETLAND AREAS. DO NOT REUSE
INVASIVE PLANTS DESIGNATED BY THE ENGINEER, WHICH
SHOULD BE REMOVED AND DISPOSED OF APPROPRIATELY IN
ACCORDANCE WITH SPECIFICATIONS.
7. RESTORE/GRADE MINOR SAND PILES/EXCAVATION PITS AND
OTHER IRREGULARITIES ASSOCIATED WITH FORMER
AGRICULTURAL ACTIVITIES AS IDENTIFIED BY THE ENGINEER.
8. EXCAVATED ORGANIC SOILS SHALL BE PRIORITIZED TO FILL IN
WETLAND DITCHES AND CHANNELS. SANDY SOILS SHALL BE
USED TO FILL REMAINING AREAS DESIGNATED FOR FILL, WITH
EXCESS SPOILED IN REUSE AREAS.
9. POTENTIAL SAND DISPOSAL AREAS MAY RECEIVE EXCESS SAND
SPOILS TO LIMIT HAULING WITHIN SITE. POTENTIAL SAND
DISPOSAL AREAS ARE NOT DEPICTED ON THE SECTIONS. SAND
DISPOSAL AREAS ARE SUBJECT TO FIELD ADJUSTMENT AND
SHALL BE GRADED TO A MAXIMUM SLOPE OF 5H:1V AND TIE
INTO EXISTING UPLAND GRADES.
10. THE ESTIMATED BOTTOM OF PEAT SURFACE WAS OBTAINED
FROM A GROUND PENETRATING RADAR (GPR) SURVEY
PERFORMED BY NRCS IN 2022 AND 2013. THIS INFORMATION IS
PROVIDED FOR THE SOLE CONVENIENCE OF THE CONTRACTOR.
THE GPR DATA ACCURACY IS HIGHLY VARIABLE. THE NATURE
AND EXTENT OF SUCH VARIATIONS MAY NOT BECOME EVIDENT
UNTIL DURING OR AFTER CONSTRUCTION.
11. THE PROPOSED STREAM PROFILE IS THE AVERAGE SLOPE.
POOLS WITHIN THE STREAM, NOT DEPICTED ON PROFILES OR
SECTIONS, SHALL BE PROVIDED ALONG THE OUTSIDE OF
MEANDER BENDS. SEE CONSTRUCTION DETAILS.
12. INVASIVE PLANT SPECIES TO BE REMOVED AND/OR TREATED
AS PART OF CONSTRUCTION. FOLLOW-UP SPOT TREATMENT
TO BE CONDUCTED AS NEEDED POST-CONSTRUCTION BY THE
CONTRACTOR PER THE CONTRACT DOCUMENTS. SEE
SPECIFICATIONS.
EXISTING ROADS
FLOW
PROPOSED GATE
TURTLE PROTECTION PLAN NOTES:
1. THE CONTRACTOR IS ADVISED THAT TURTLES MAY BE PRESENT ON A VARIETY OF HABITATS
ONSITE RANGING FROM SHALLOW VEGETATED WETLANDS WITHIN THE PERIMETER DITCHES AND
IRRIGATION PONDS, BASKING ON THE BANK EDGES, OR LAYING EGGS IN SAND BORROW PITS. IF TURTLES ARE ENCOUNTERED DURING CONSTRUCTION, THEY SHALL BE CAREFULLY MOVED OUT OF
HARM'S WAY, THE SPECIES AND LOCATION OF THE TURTLE NOTED, AND THE OWNER'S
REPRESENTATIVE SHALL BE NOTIFIED. TURTLES ENCOUNTERED IN AN ACTIVE WORK ZONE SHALL BE TEMPORARILY PLACED INTO A LARGE TUB, KEPT COOL, AND PLACED OUT OF THE SUN UNTIL
THEY CAN BE RELOCATED TO A TURTLE SAFE ZONE WITHIN THE SAME WORK DAY.
2. MINOR ADJUSTMENTS TO EARTHWORK MAY BE DIRECTED BY THE PROJECT ENGINEER IN THE
FIELD TO PRESERVE OR ENHANCE TURTLE HABITATS, OR TO PRESERVE EXISTING PATCHES OF
HIGH-QUALITY VEGETATION. AREAS TO BE PRESERVED WILL BE FLAGGED FOR THE CONTRACTOR
BY THE OWNER'S REPRESENTATIVE.
3. TO THE GREATEST EXTENT PRACTICABLE, SOIL STOCKPILES THAT COULD SERVE AS POTENTIAL NESTING SITES SHALL BE ENCLOSED WITH A TURTLE BARRIER BETWEEN MAY 15 AND JULY 1 TO
PREVENT ACCESS BY NESTING FEMALES.
4. THE TURTLE PROTECTION PLAN MAY BE FIELD ADAPTED IN COORDINATION WITH THE OWNER
AND/OR THE OWNER'S REPRESENTATIVE.
SUGGESTED TURTLE PROTECTION MEASURE:
COMPLETE PROPOSED WORK IN CELL A FIRST TO CREATE A
"TURTLE SAFE ZONE", DELINEATED BY A SILT FENCE BETWEEN
CELL 3 AND CELL A ALONG THE EXISTING BERM TO BE
REMOVED. TURTLES COULD BE TEMPORARILY RELOCATED TO
CELL A, AND CONTAINED WITH THE AID OF THE SILT FENCE,
UNTIL CONSTRUCTION IS COMPLETED.
1+00
2+00
3+00 4+00
5+00
6+00
7+00 7+36
CELL D
CELL C
CELL 7
2+00
3+
4+0
5+
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00 14+00
15+00
16+00
17+00
+0
19+00
+0
21+00
22+00
23+00
24+00
+0
OH
OH
OH OH OH OH OH OH OH
OH
OH
OH
OH
.0
42.0
.0
42.0
.0
.0
.0
.0
.0
45.0
43.0 44.0
40.0
39.0
.0
45.0
42.0
43.0
44.0
45.0
43.0
44.0
A
B
D
C
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
0.00%
0.50%
0.01%
0.70% 0.01%
0.70%0.70%
0.01%
GRADE BREAK STA = 2+33
ELEV = 38.15
GRADE BREAK STA = 2+60
ELEV = 38.15
GRADE BREAK STA = 3+10
ELEV = 38.40
GRADE BREAK STA = 22+50
ELEV = 38.60
GRADE BREAK STA = 23+80
ELEV = 39.09
GRADE BREAK STA = 24+30
ELEV = 39.09
GRADE BREAK STA = 24+60
ELEV = 39.30
GRADE BREAK STA = 22+80
ELEV = 38.80
GRADE BREAK STA = 23+40
ELEV = 38.81
STA: 27+00
ELEV: 39.31
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PROPOSED CONDITIONS PLAN 5 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
M
AT
CH
LI
N E
- S
HE
ET
PROPOSED CHANNEL ALIGNMENT
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
EXISTING BUILDING
EXISTING FIRE ROAD
PROPOSED CONTOUR (1')
PROPOSED STREAM CHANNEL ALIGNMENT
SCALE IN FEET
0 16080
10+00
EXISTING GATE
EXISTING OUTLET STRUCTURE TO REMAIN, PROPOSED
CHANNEL SHALL CONFORM TO EXISTING INVERT. BOTTOM
OF CHANNEL WIDTH SHALL MATCH CULVERT WIDTH.
REMOVE AND DISPOSE OF EXISTING
TRIPLE BARREL CULVERT.
FILL EXISTING TEMPORARY
HERRING CHANNEL
EXPAND EXISTING POND INTO PROPOSED BOG SURFACE,
NO GRADING BELOW EXISTING LOW WATER SURFACE.
REMOVE CONTROL STRUCTURES AT IRRIGATION POND.
PROPOSED SAND SURFACE AREA. ESTABLISH UNIFORM GRADE TO GRADUALLY
MEET SURROUNDING GROUND SURFACES. GRADE SHALL NOT BE STEEPER
THAN 5H:1V. GRADING SHALL BE FIELD FIT. FINISHED SURFACE SHALL CONSIST
OF MINIMUM 1 FT THICK POORLY GRADED, MEDIUM GRAINED SAND
SOURCED FROM ONSITE. SURFACE SAND SHALL BE SEGREGATED TO LIMIT
INCLUSION OF ORGANIC MATERIALS. SURFACE SAND SHALL CONTAIN LESS
THAN 15% ORGANIC MATERIALS BY ESTIMATED BULK VOLUME .
50 FT RIFFLE WITH FES
BANKS, STA 2+60 TO 3+10
REMOVE EXISTING BERM TO CONNECT
CELL C TO BARTLETT POND
30 FT RIFFLE WITH FES
BANKS, STA 22+50 TO 22+80
LIMIT OF DISTURBANCEPOTENTIAL SAND DISPOSAL AREA. LOCATION
AND ORIENTATION SHALL BE APPROVED BY
THE ENGINEER PRIOR TO USE.
100'
10x VERTICAL
EXAGGERATION
FILL EXISTING CULVERT BENEATH THE
ACCESS DRIVE WITH FLOWABLE FILL
PROPOSED RIFFLE
MAINTAIN EXISTING ACCESS ROAD
PROPOSED STREAM CHANNEL BANKS
1 FT SAND REMOVAL
SURFACE TREATMENT WITHIN CELLS C AND D SHALL CONSIST OF
FIELD DIRECTED SCARIFICATION AFTER INITIAL IRRIGATION PIPE
REMOVAL AND GRUBBING TO PENETRATE THE SAND LAYER.
GRADING FEATURE EXTENT
TEMPORARY ACCESS DRIVE TO
REMAIN
TEMPORARY ACCESS DRIVE TO BE
REMOVED
REMOVE EXISTING BERM
EXISTING IRRIGATION POND
FIELD FIT GRADING OF STEEP
HILLS SURROUNDING BORROW
PIT IN COORDINATION WITH THE
ENGINEER. SALVAGE TREES
UNDER 3" DBH FOR REUSE.FILL ALL LATERAL
DITCHES (TYP.)
CONTRACTOR SHALL BE AWARE OF INVASIVE
VEGETATION MANAGEMENT AROUND
PERIMETER OF BARTLETT POND ON
MASSWILDLIFE PROPERTY. WORK SHALL BE
PERFORMED BY OTHERS AS NEEDED USING
MANUAL/LOW GROUND DISTURBANCE
TECHNIQUES, IN PERPETUITY. COORDINATION
BY CONTRACTOR MAY BE REQUIRED.
PROPOSED CHANNEL SHALL CONFORM TO
EXISTING INVERT. BOTTOM OF CHANNEL
WIDTH SHALL MATCH CULVERT WIDTH.
PROVIDE TIMBER STOP LOGS TO CREST ELEVATION
42.24 FT AND LOCKING DEVICE TO RETROFIT EXISTING
STRUCTURE. PROTECT EXISTING STRUCTURE.
STONE WEIR, FISH
EXCLUSION FEATURE,
CREST ELEVATION = 42.2
BARTLETT POND
REMOVE AND DISPOSE
OF OUTLET STRUCTURE
40 FT RIFFLE WITH FES
BANKS, STA 23+40 TO 23+80
30 FT RIFFLE WITH FES
BANKS, STA 24+30 TO 24+60
MAINTAIN EXISTING GATE
MAINTAIN EXISTING GATE
INSTALL SWING GATE
PROPOSED GATE
MAINTAIN EXISTING GATE
MAINTAIN EXISTING GATE
RECLAIM BRICK AND CONCRETE DEBRIS
FOR USE AS BACKFILL IN STAGING AREA
NOTES:
1. PROVIDE TOPOGRAPHIC COMPLEXITY IN CELLS 3, 4, 5, 6, 7, AND B. SEE
DETAIL 1 ON SHEET 17.
2. PERIMETER AND LATERAL DITCHES SHALL BE FILLED AND COMPACTED TO
FINAL SURROUNDING ELEVATIONS AND SUBJECT TO THE INDICATED
TOPOGRAPHIC COMPLEXITY UNLESS NOTED OTHERWISE. PACK DITCHES
WITH A MIXTURE OF SLASH AND EXCAVATED MATERIAL.
3. ABANDONED IRRIGATION PIPES EXPOSED DURING CONSTRUCTION SHALL BE
REMOVED AND DISPOSED OF OFFSITE TO THE EXTENT PRACTICAL.
REMAINING BURIED SECTIONS OF PIPE SHALL BE CUT AND CAPPED OR ENDS
BURIED.
4. ALL SIDE SLOPES SHALL BE GRADED TO A SLOPE OF APPROXIMATELY 5H:1V
OR MORE GRADUAL, SEEDED WITH NATIVE TRANSITIONAL SEED MIXTURE.
5. LARGE WOOD SHALL BE INSTALLED IN AND ADJACENT TO THE CHANNEL PER
THE TREATMENT DETAILS AND IN COORDINATION WITH THE ENGINEER.
LARGE WOOD AND POOLS ARE NOT DEPICTED IN PLAN OR PROFILE VIEW
FOR CLARITY, SEE TREATMENT DETAILS.
6. CLEAR AND SALVAGE EXISTING TREES AND SHRUBS DESIGNATED BY THE
ENGINEER PRIOR TO SURFACE ROUGHENING AND GRADING. REUSE
SALVAGED MATERIAL AS SLASH FOR INSTALLATION IN LARGE WOOD
STRUCTURES AND FOR PLACEMENT OVER WETLAND AREAS. DO NOT REUSE
INVASIVE PLANTS DESIGNATED BY THE ENGINEER, WHICH SHOULD BE
REMOVED AND DISPOSED OF APPROPRIATELY IN ACCORDANCE WITH
SPECIFICATIONS.
7. RESTORE/GRADE MINOR SAND PILES/EXCAVATION PITS AND OTHER
IRREGULARITIES ASSOCIATED WITH FORMER AGRICULTURAL ACTIVITIES AS
IDENTIFIED BY THE ENGINEER.
8. EXCAVATED ORGANIC SOILS SHALL BE PRIORITIZED TO FILL IN WETLAND
DITCHES AND CHANNELS. SANDY SOILS SHALL BE USED TO FILL REMAINING
AREAS DESIGNATED FOR FILL, WITH EXCESS SPOILED IN REUSE AREAS.
9. POTENTIAL SAND DISPOSAL AREAS MAY RECEIVE EXCESS SAND SPOILS TO
LIMIT HAULING WITHIN SITE. POTENTIAL SAND DISPOSAL AREAS ARE NOT
DEPICTED ON THE SECTIONS. SAND DISPOSAL AREAS ARE SUBJECT TO FIELD
ADJUSTMENT AND SHALL BE GRADED TO A MAXIMUM SLOPE OF 5H:1V AND
TIE INTO EXISTING UPLAND GRADES.
10. THE ESTIMATED BOTTOM OF PEAT SURFACE WAS OBTAINED FROM A
GROUND PENETRATING RADAR (GPR) SURVEY PERFORMED BY NRCS IN 2022
AND 2013. THIS INFORMATION IS PROVIDED FOR THE SOLE CONVENIENCE
OF THE CONTRACTOR. THE GPR DATA ACCURACY IS HIGHLY VARIABLE. THE
NATURE AND EXTENT OF SUCH VARIATIONS MAY NOT BECOME EVIDENT
UNTIL DURING OR AFTER CONSTRUCTION.
11. THE PROPOSED STREAM PROFILE IS THE AVERAGE SLOPE. POOLS WITHIN
THE STREAM, NOT DEPICTED ON PROFILES OR SECTIONS, SHALL BE
PROVIDED ALONG THE OUTSIDE OF MEANDER BENDS. SEE CONSTRUCTION
DETAILS.
12. INVASIVE PLANT SPECIES TO BE REMOVED AND/OR TREATED AS PART OF
CONSTRUCTION. FOLLOW-UP SPOT TREATMENT TO BE CONDUCTED AS
NEEDED POST-CONSTRUCTION BY THE CONTRACTOR PER THE CONTRACT
DOCUMENTS. SEE SPECIFICATIONS.
EXISTING GROUND, TYP
APPROXIMATE BOTTOM OF PEAT LAYER, TYP
AVERAGE PROPOSED GRADE, TYP
SEE NOTE 11
EXISTING SAND PIT TO BE FILLED WITH EXCESS SAND.
REFER TO SAND SURFACE TREATMENT NOTES FOR
REGION BETWEEN CELL C, CELL D, AND CELL 7.
1+00 2+00 3+00 4+00 5+00 5+25
6:1 9:1
STA: 1+75
ELEV: 47.72
STA: 2+10
ELEV: 43.78
STA: 4+08
ELEV: 42.95
STA: 4+29
ELEV: 42.93
STA: 4+16
ELEV: 39.09
STA: 4+21
ELEV: 39.09
STA: 4+52
ELEV: 43.01
STA: 4+73
ELEV: 46.51
PROPOSED OHW: 41.37
EXISTING OHW: 41.42
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00
5:1
5:1
STA: 1+38
ELEV: 50.42
STA: 1+79
ELEV: 42.18 STA: 4+77
ELEV: 41.49
STA: 4+83
ELEV: 38.51
STA: 4+88
ELEV: 38.51
STA: 4+94
ELEV: 41.58
STA: 7+07
ELEV: 42.90
STA: 7+23
ELEV: 45.51
EXISTING OHW: 41.22
PROPOSED OHW: 41.18
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 11+25
6:1 5:1 5:1
STA: 1+08
ELEV: 48.55
STA: 1+39
ELEV: 42.36 STA: 2+30
ELEV: 42.05
STA: 2+37
ELEV: 38.43
STA: 2+42
ELEV: 38.43
STA: 2+49
ELEV: 42.05
STA: 6+56
ELEV: 42.47
STA: 6+80
ELEV: 46.42 STA: 6+96
ELEV: 45.79
STA: 7+17
ELEV: 41.46
STA: 10+84
ELEV: 45.38
STA: 10+63
ELEV: 41.35
EXISTING OHW: 41.21
PROPOSED OHW: 40.85
5:1
1+00 2+00 3+00 3+50
5:1
STA: 2+97
ELEV: 45.63
STA: 2+75
ELEV: 41.44STA: 2+44
ELEV: 41.35STA: 1+39
ELEV: 38.08
EXISTING OHW: 38.89
PROPOSED OHW: 42.25
1+00 2+00 3+00 4+00 5+00 6+00 6+50
STA: 1+60
ELEV: 40.44
STA: 2+68
ELEV: 43.32 STA: 5+14
ELEV: 43.33
STA: 5+23
ELEV: 39.32
STA: 5+28
ELEV: 39.32
STA: 5+37
ELEV: 43.48
STA: 6+23
ELEV: 43.80
STA: 6+38
ELEV: 45.92
PROPOSED OHW: 41.57EXISTING OHW: 41.50
7:1
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PROPOSED SECTIONS 6 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
40'
8'
5x VERTICAL
EXAGGERATION
1" = 40'5
C BOG GRADING
1" = 40'5
D BERM REMOVAL
1" = 40'5
B BOG GRADING
EXISTING GROUND
LEGEND
AVERAGE PROPOSED GRADE
APPROXIMATE BOTTOM OF PEAT LAYER
1" = 40'5
A BOG GRADING
1 FT SAND REMOVAL
1. SECTIONS ARE ORIENTED TO FACE DOWNSTREAM.
2. TYPICAL CHANNEL DIMENSIONS:
BOTTOM WIDTH = 5 FT
BANK HEIGHT APPROXIMATELY 3 FT TO 4 FT
BANK SLOPE = 2H:1V.
3. CHANNEL BOTTOM SHALL BE CONSTRUCTED TO THE GRADES DEPICTED IN
PROFILE AND SECTIONS.
4. POOLS, NOT DEPICTED IN THE SECTIONS HEREIN SHALL BE PROVIDED ALONG
THE OUTSIDE OF MEANDER BENDS. SEE CONSTRUCTION DETAILS.
5. GENERAL CHANNEL BANK SLOPES ARE SHOWN. INSTALLED BANK SLOPES MAY
VARY FROM VERTICAL IN LARGE WOOD AREAS TO 3H:1V AS DIRECTED BY THE
ENGINEER IN THE FIELD.
NOTES:
1" = 40'7
E BERM REMOVAL
2.6
2.
4%
CELL 6
CELL B
CELL 5
CELL 4
+0
26+00 27+00
+0
+0
+0
31+00
32+00
33+00
34+00 35+00 36+00
37+00
38+00 39+00 40+00
+0
42+00
+0
+0
45+00
+0
47+00
48+00
+0
50+00 51+00
+0
53+00 54+00
55+00 56+00
OH OH OH OH OH
OH
OH OH
OH
OH
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
OH
42.0
43.0
43.043.0
41.0
.0
42.0
42.0
43.0
43.0
43.0
.0
46.0
45.0
41.0 42.0
43.0
44.0
I
H
G
F
E
26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00
0.00%
STA: 57+00
ELEV: 39.46
STA: 26+00
ELEV: 39.31
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PROPOSED CONDITIONS PLAN 7 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
M
AT
CH
LI
N E
- S
HE
ET
M
AT
CH
LI
N E
- S
HE
ET
PROPOSED CHANNEL ALIGNMENT
SCALE IN FEET
0 16080
SAND DISPOSAL AREA, FIELD ADJUST
GRADES TO JOIN EXISTING UPLAND AREAS
EXPAND EXISTING POND INTO PROPOSED BOG SURFACE,
NO GRADING BELOW EXISTING LOW WATER SURFACE.
REMOVE CONTROL STRUCTURES AT IRRIGATION POND.
EXPAND EXISTING POND INTO PROPOSED BOG SURFACE,
NO GRADING BELOW EXISTING LOW WATER SURFACE.
REMOVE CONTROL STRUCTURES AT IRRIGATION POND. UP TO 1 FT OF SAND REMOVAL
(ALTERNATE BID ITEM 1)
POTENTIAL SAND DISPOSAL AREA.
LOCATION AND ORIENTATION SHALL BE
APPROVED BY THE ENGINEER PRIOR TO USE.
POTENTIAL SAND DISPOSAL AREA. LOCATION
AND ORIENTATION SHALL BE APPROVED BY
THE ENGINEER PRIOR TO USE.
100'
10x VERTICAL
EXAGGERATION
REMOVE EXISTING BERM
REMOVE EXISTING BERM
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
EXISTING BUILDING
EXISTING FIRE ROAD
PROPOSED CONTOUR (1')
PROPOSED STREAM CHANNEL ALIGNMENT
10+00
EXISTING GATE
LIMIT OF DISTURBANCE
PROPOSED RIFFLE
PROPOSED STREAM CHANNEL BANKS
GRADING FEATURE EXTENT
TEMPORARY ACCESS DRIVE TO
REMAIN
TEMPORARY ACCESS DRIVE TO BE
REMOVED
GRADUALLY GRADE TO
2 FT OF SAND REMOVAL 0.5 FT OF SAND REMOVAL TO
GRADUALLY CONFORM TO
EXISTING BOG SURFACE
EXISTING IRRIGATION POND
EXISTING IRRIGATION POND
FILL ALL LATERAL
DITCHES (TYP.)
REMOVE AND DISPOSE
OF OUTLET STRUCTURE
APPROXIMATE BOTTOM OF PEAT LAYER, TYP
EXISTING GROUND, TYP
AVERAGE PROPOSED GRADE, TYP
SEE NOTE 11
NOTES:
1. PROVIDE TOPOGRAPHIC COMPLEXITY IN CELLS 3, 4, 5, 6, 7, AND B. SEE DETAIL
1 ON SHEET 17.
2. PERIMETER AND LATERAL DITCHES SHALL BE FILLED AND COMPACTED TO
FINAL SURROUNDING ELEVATIONS AND SUBJECT TO THE INDICATED
TOPOGRAPHIC COMPLEXITY UNLESS NOTED OTHERWISE. PACK DITCHES WITH
A MIXTURE OF SLASH AND EXCAVATED MATERIAL.
3. ABANDONED IRRIGATION PIPES EXPOSED DURING CONSTRUCTION SHALL BE
REMOVED AND DISPOSED OF OFFSITE TO THE EXTENT PRACTICAL. REMAINING
BURIED SECTIONS OF PIPE SHALL BE CUT AND CAPPED OR ENDS BURIED.
4. ALL SIDE SLOPES SHALL BE GRADED TO A SLOPE OF APPROXIMATELY 5H:1V OR
MORE GRADUAL, SEEDED WITH NATIVE TRANSITIONAL SEED MIXTURE.
5. LARGE WOOD SHALL BE INSTALLED IN AND ADJACENT TO THE CHANNEL PER
THE TREATMENT DETAILS AND IN COORDINATION WITH THE ENGINEER.
LARGE WOOD AND POOLS ARE NOT DEPICTED IN PLAN OR PROFILE VIEW FOR
CLARITY, SEE TREATMENT DETAILS.
6. CLEAR AND SALVAGE EXISTING TREES AND SHRUBS DESIGNATED BY THE
ENGINEER PRIOR TO SURFACE ROUGHENING AND GRADING. REUSE SALVAGED
MATERIAL AS SLASH FOR INSTALLATION IN LARGE WOOD STRUCTURES AND
FOR PLACEMENT OVER WETLAND AREAS. DO NOT REUSE INVASIVE PLANTS
DESIGNATED BY THE ENGINEER, WHICH SHOULD BE REMOVED AND DISPOSED
OF APPROPRIATELY IN ACCORDANCE WITH SPECIFICATIONS.
7. RESTORE/GRADE MINOR SAND PILES/EXCAVATION PITS AND OTHER
IRREGULARITIES ASSOCIATED WITH FORMER AGRICULTURAL ACTIVITIES AS
IDENTIFIED BY THE ENGINEER.
8. EXCAVATED ORGANIC SOILS SHALL BE PRIORITIZED TO FILL IN WETLAND
DITCHES AND CHANNELS. SANDY SOILS SHALL BE USED TO FILL REMAINING
AREAS DESIGNATED FOR FILL, WITH EXCESS SPOILED IN REUSE AREAS.
9. POTENTIAL SAND DISPOSAL AREAS MAY RECEIVE EXCESS SAND SPOILS TO
LIMIT HAULING WITHIN SITE. POTENTIAL SAND DISPOSAL AREAS ARE NOT
DEPICTED ON THE SECTIONS. SAND DISPOSAL AREAS ARE SUBJECT TO FIELD
ADJUSTMENT AND SHALL BE GRADED TO A MAXIMUM SLOPE OF 5H:1V AND
TIE INTO EXISTING UPLAND GRADES.
10. THE ESTIMATED BOTTOM OF PEAT SURFACE WAS OBTAINED FROM A
GROUND PENETRATING RADAR (GPR) SURVEY PERFORMED BY NRCS IN 2022
AND 2013. THIS INFORMATION IS PROVIDED FOR THE SOLE CONVENIENCE OF
THE CONTRACTOR. THE GPR DATA ACCURACY IS HIGHLY VARIABLE. THE
NATURE AND EXTENT OF SUCH VARIATIONS MAY NOT BECOME EVIDENT
UNTIL DURING OR AFTER CONSTRUCTION.
11. THE PROPOSED STREAM PROFILE IS THE AVERAGE SLOPE. POOLS WITHIN THE
STREAM, NOT DEPICTED ON PROFILES OR SECTIONS, SHALL BE PROVIDED
ALONG THE OUTSIDE OF MEANDER BENDS. SEE CONSTRUCTION DETAILS.
12. INVASIVE PLANT SPECIES TO BE REMOVED AND/OR TREATED AS PART OF
CONSTRUCTION. FOLLOW-UP SPOT TREATMENT TO BE CONDUCTED AS
NEEDED POST-CONSTRUCTION BY THE CONTRACTOR PER THE CONTRACT
DOCUMENTS. SEE SPECIFICATIONS.
58 58
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+50
7:1 7:1
STA: 8+66
ELEV: 44.18
STA: 7+72
ELEV: 43.23
STA: 7+93
ELEV: 43.30
STA: 7+85
ELEV: 39.44
STA: 7+79
ELEV: 39.44
STA: 1+86
ELEV: 49.09
STA: 2+19
ELEV: 44.68
STA: 8+87
ELEV: 47.15STA: 6+72
ELEV: 42.94
STA: 6+71
ELEV: 41.94
STA: 2+41
ELEV: 44.02
STA: 2+42
ELEV: 43.00
PROPOSED OHW: 42.19
EXISTING OHW: 43.31
58 58
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+25
11:1 6:1
STA: 7+93
ELEV: 44.00
STA: 8+02
ELEV: 39.39
STA: 8+07
ELEV: 39.39
STA: 8+47
ELEV: 44.38
STA: 1+70
ELEV: 48.56
STA: 2+01
ELEV: 43.48
STA: 8+17
ELEV: 44.02
STA: 8+68
ELEV: 46.31
PROPOSED OHW: 41.99
EXISTING OHW: 42.90
62 62
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 9+50
6:113:1
STA: 7+86
ELEV: 39.36
STA: 7+93
ELEV: 39.36
STA: 8+90
ELEV: 43.92
STA: 1+81
ELEV: 46.33
STA: 7+71
ELEV: 43.62
STA: 8+04
ELEV: 43.74
STA: 9+08
ELEV: 46.93
STA: 2+17
ELEV: 43.51
PROPOSED OHW: 41.72
EXISTING OHW: 42.68
1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 12+50
6:1 10:1 7:16:1
STA: 10+26
ELEV: 39.33
STA: 10+31
ELEV: 39.33
STA: 1+61
ELEV: 46.80
STA: 1+92
ELEV: 43.73
STA: 5+25
ELEV: 43.83
STA: 5+43
ELEV: 46.85
STA: 7+26
ELEV: 45.56
STA: 7+38
ELEV: 43.79
STA: 10+19
ELEV: 42.85
STA: 10+37
ELEV: 42.71
STA: 12+05
ELEV: 43.68
STA: 12+18
ELEV: 45.90
PROPOSED OHW: 41.61EXISTING OHW: 42.63
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PROPOSED SECTIONS 8 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
1" = 40'7
I BERM REMOVAL
1" = 40'7
G BOG GRADING
1" = 40'7
H BERM REMOVAL
1" = 40'7
F BOG GRADING
8'
40'
5x VERTICAL
EXAGGERATION
EXISTING GROUND
LEGEND
AVERAGE PROPOSED GRADE
APPROXIMATE BOTTOM
OF PEAT LAYER
1. SECTIONS ARE ORIENTED TO FACE DOWNSTREAM.
2. TYPICAL CHANNEL DIMENSIONS:
BOTTOM WIDTH = 5 FT
BANK HEIGHT APPROXIMATELY 3 FT TO 4 FT
BANK SLOPE = 2H:1V.
3. CHANNEL BOTTOM SHALL BE CONSTRUCTED TO
THE GRADES DEPICTED IN PROFILE AND SECTIONS.
4. POOLS, NOT DEPICTED IN THE SECTIONS HEREIN
SHALL BE PROVIDED ALONG THE OUTSIDE OF
MEANDER BENDS. SEE CONSTRUCTION DETAILS.
5. GENERAL CHANNEL BANK SLOPES ARE SHOWN.
INSTALLED BANK SLOPES MAY VARY FROM
VERTICAL IN LARGE WOOD AREAS TO 3H:1V AS
DIRECTED BY THE ENGINEER IN THE FIELD.
NOTES:
UP TO 1 FT SAND REMOVAL
(ALTERNATE BID ITEM 1)
CELL 3
CELL 2
CELL 1
56+00
57+00
58+00 59+00
+0
+0
62+00
63+00
64+00
+0
66+00
+0
+0
69+00
70+00
71+00
+0
73+00
+0
75+00
+0
77+00
78+00
79+00 80+00
81+00
82+00
+0
84+00
85+00
+0
87+00 88+00
89+00 90+00
91+00 92+00
93+00 94+00
95+00 96+00
97+00 97+88
O H
O H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH OH
OH
OH
OH
OH
OH
OH
.0
46.046.046.0
L
M
J 9 K
52 52
56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00
0.94%
0.02%
0.02% 0.94%0.94% 0.02% 0.94%0.005%
STA: 72+00
ELEV: 41.93STA: 56+00
ELEV: 39.46
GRADE BREAK STA = 66+45
ELEV = 39.84
GRADE BREAK STA = 66+10
ELEV = 39.51
GRADE BREAK STA = 66+75
ELEV = 39.84
GRADE BREAK STA = 69+74
ELEV = 40.73
GRADE BREAK STA = 70+99
ELEV = 41.90
GRADE BREAK STA = 67+05
ELEV = 40.13
GRADE BREAK STA = 68+00
ELEV = 40.15
GRADE BREAK STA = 68+60
ELEV = 40.71
52 52
72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00
GRADE BREAK STA = 78+93
ELEV = 43.02GRADE BREAK STA = 77+93
ELEV = 42.07
GRADE BREAK STA = 85+62
ELEV = 43.17
GRADE BREAK STA = 85+67
ELEV = 42.66
0.95%0.02% 0.02%
STA: 72+00
ELEV: 41.95
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PROPOSED CONDITIONS PLAN 9 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
MATCHLINE - SHEET 11
M
AT
CH
LI
N E
- S
HE
ET
TIE IN TO EXISTING CHANNEL
REMOVE EXISTING BERM
EXISTING BERM AND FLOW CONTROL STRUCTURE TO REMAIN
BOTTOM OF CHANNEL WIDTH SHALL MATCH THE CULVERT
WIDTH, CHANNEL INVERT SHALL CONFORM TO CULVERT INVERT.
PROPOSED CHANNEL ALIGNMENT
SCALE IN FEET
0 16080
EXISTING FLOW
CONTROL TO REMAIN
WHITE ISLAND POND DAM AND
FISH LADDER NOT INCLUDED IN
THE PROJECT AREA
VISIBLE IRRIGATION PIPES AND TUBING SHALL BE
REMOVED TO THE EXTENT PRACTICAL THROUGH
PULLING OF PIPE. NO FIELD SCARIFICATION AFTER
IRRIGATION PIPE REMOVAL IN CELL 1.
CONTRACTOR SHALL COORDINATE WITH OWNER AND
ENGINEER TO SELECTIVELY PLACE SALVAGED WOOD IN
AND AROUND EXISTING CHANNEL, WITH EXCAVATION
AS NECESSARY TO INSTALL WOOD BALLAST
REMOVE EXISTING BERM TO
CONNECT OFF-BOG WETLAND AT
APPROXIMATELY ELEVATION 45.9'
REMOVE EXISTING
BERM TO CONNECT
OFF-BOG WETLAND
60 FT RIFFLE WITH FES
BANKS, STA 68+00 TO 68+60
100 FT RIFFLE WITH FES
BANKS, STA 76+80 TO 77+80
100'
10x VERTICAL
EXAGGERATION
REMOVE AND DISPOSE
OF TIMBER STRUCTURE
SURFACE TREATMENT WITHIN CELL 2 SHALL CONSIST OF
FIELD SCARIFICATION AFTER INITIAL IRRIGATION PIPE
REMOVAL AND GRUBBING TO PENETRATE THE SAND LAYER
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
EXISTING BUILDING
EXISTING FIRE ROAD
PROPOSED CONTOUR (1')
PROPOSED STREAM CHANNEL ALIGNMENT
10+00
EXISTING GATE
LIMIT OF DISTURBANCE
PROPOSED RIFFLE
PROPOSED STREAM CHANNEL BANKS
GRADING FEATURE EXTENT
TIE INTO EXISTING CHANNEL
POTENTIAL SAND DISPOSAL AREA. LOCATION
AND ORIENTATION SHALL BE APPROVED BY
THE ENGINEER PRIOR TO USE.
TEMPORARY ACCESS DRIVE TO
REMAIN
TEMPORARY ACCESS DRIVE TO BE
REMOVED
PROPOSED CHANNEL ALIGNMENT
GRADUALLY GRADE TO
2 FT OF SAND REMOVAL
0.5 FT OF SAND REMOVAL
TO GRADUALLY CONFORM
TO EXISTING BOG SURFACE
EXISTING
IRRIGATION POND
FILL ALL LATERAL DITCHES (TYP.)
TEMPORARY AVOIDANCE FENCES
FILL ALL LATERAL AND PERIMETER DITCHES
125 FT RIFFLE WITH FES
BANKS, STA 69+85 TO 71+10
PROPOSED GATE
MAINTAIN EXISTING GATE
INSTALL SWING GATE 3
MAINTAIN
EXISTING GATE
NOTES:
1. PROVIDE TOPOGRAPHIC COMPLEXITY IN CELLS 3, 4, 5, 6, 7, AND B. SEE
DETAIL 1 ON SHEET 17.
2. PERIMETER AND LATERAL DITCHES SHALL BE FILLED AND COMPACTED
TO FINAL SURROUNDING ELEVATIONS AND SUBJECT TO THE INDICATED
TOPOGRAPHIC COMPLEXITY UNLESS NOTED OTHERWISE. PACK
DITCHES WITH A MIXTURE OF SLASH AND EXCAVATED MATERIAL.
3. ABANDONED IRRIGATION PIPES EXPOSED DURING CONSTRUCTION
SHALL BE REMOVED AND DISPOSED OF OFFSITE TO THE EXTENT
PRACTICAL. REMAINING BURIED SECTIONS OF PIPE SHALL BE CUT AND
CAPPED OR ENDS BURIED.
4. ALL SIDE SLOPES SHALL BE GRADED TO A SLOPE OF APPROXIMATELY
5H:1V OR MORE GRADUAL, SEEDED WITH NATIVE TRANSITIONAL SEED
MIXTURE.
5. LARGE WOOD SHALL BE INSTALLED IN AND ADJACENT TO THE
CHANNEL PER THE TREATMENT DETAILS AND IN COORDINATION WITH
THE ENGINEER. LARGE WOOD AND POOLS ARE NOT DEPICTED IN PLAN
OR PROFILE VIEW FOR CLARITY, SEE TREATMENT DETAILS.
6. CLEAR AND SALVAGE EXISTING TREES AND SHRUBS DESIGNATED BY
THE ENGINEER PRIOR TO SURFACE ROUGHENING AND GRADING.
REUSE SALVAGED MATERIAL AS SLASH FOR INSTALLATION IN LARGE
WOOD STRUCTURES AND FOR PLACEMENT OVER WETLAND AREAS. DO
NOT REUSE INVASIVE PLANTS DESIGNATED BY THE ENGINEER, WHICH
SHOULD BE REMOVED AND DISPOSED OF APPROPRIATELY IN
ACCORDANCE WITH SPECIFICATIONS.
7. RESTORE/GRADE MINOR SAND PILES/EXCAVATION PITS AND OTHER
IRREGULARITIES ASSOCIATED WITH FORMER AGRICULTURAL
ACTIVITIES AS IDENTIFIED BY THE ENGINEER.
8. EXCAVATED ORGANIC SOILS SHALL BE PRIORITIZED TO FILL IN
WETLAND DITCHES AND CHANNELS. SANDY SOILS SHALL BE USED TO
FILL REMAINING AREAS DESIGNATED FOR FILL, WITH EXCESS SPOILED
IN REUSE AREAS.
9. POTENTIAL SAND DISPOSAL AREAS MAY RECEIVE EXCESS SAND SPOILS
TO LIMIT HAULING WITHIN SITE. POTENTIAL SAND DISPOSAL AREAS
ARE NOT DEPICTED ON THE SECTIONS. SAND DISPOSAL AREAS ARE
SUBJECT TO FIELD ADJUSTMENT AND SHALL BE GRADED TO A
MAXIMUM SLOPE OF 5H:1V AND TIE INTO EXISTING UPLAND GRADES.
10. THE ESTIMATED BOTTOM OF PEAT SURFACE WAS OBTAINED FROM A
GROUND PENETRATING RADAR (GPR) SURVEY PERFORMED BY NRCS IN
2022 AND 2013. THIS INFORMATION IS PROVIDED FOR THE SOLE
CONVENIENCE OF THE CONTRACTOR. THE GPR DATA ACCURACY IS
HIGHLY VARIABLE. THE NATURE AND EXTENT OF SUCH VARIATIONS
MAY NOT BECOME EVIDENT UNTIL DURING OR AFTER CONSTRUCTION.
11. THE PROPOSED STREAM PROFILE IS THE AVERAGE SLOPE. POOLS
WITHIN THE STREAM, NOT DEPICTED ON PROFILES OR SECTIONS,
SHALL BE PROVIDED ALONG THE OUTSIDE OF MEANDER BENDS. SEE
CONSTRUCTION DETAILS.
12. INVASIVE PLANT SPECIES TO BE REMOVED AND/OR TREATED AS PART
OF CONSTRUCTION. FOLLOW-UP SPOT TREATMENT TO BE CONDUCTED
AS NEEDED POST-CONSTRUCTION BY THE CONTRACTOR PER THE
CONTRACT DOCUMENTS. SEE SPECIFICATIONS.
APPROXIMATE BOTTOM OF PEAT LAYER, TYP
EXISTING GROUND, TYP
AVERAGE PROPOSED GRADE, TYP
SEE NOTE 11
35 FT RIFFLE WITH
FES BANKS, STA
66+10 TO 66+45
30 FT RIFFLE WITH
FES BANKS, STA
66+75 TO 67+05
1+00 2+00 3+00 4+00 5+00 6+00
10:19:1
STA: 2+42
ELEV: 46.17
STA: 2+18
ELEV: 48.97
STA: 5+45
ELEV: 48.79
STA: 5+21
ELEV: 46.31
STA: 3+84
ELEV: 45.70
STA: 4+03
ELEV: 45.76
STA: 3+96
ELEV: 42.43
STA: 3+91
ELEV: 42.45
PROPOSED OHW: 44.10
1+00 2+00 3+00 4+00 5+00 6+00 6+50
5:15:1
STA: 1+47
ELEV: 48.36
STA: 1+64
ELEV: 45.32
STA: 5+65
ELEV: 48.97
STA: 5+47
ELEV: 45.42
STA: 4+47
ELEV: 45.41
STA: 4+66
ELEV: 45.50
STA: 4+54
ELEV: 41.99
STA: 4+59
ELEV: 41.99
PROPOSED OHW: 43.81 EXISTING OHW: 43.80
1+00 2+00 3+00 4+00 5+00 6+00 6+50
10:1 5:1
STA: 1+67
ELEV: 47.88
STA: 1+91
ELEV: 45.53
STA: 3+36
ELEV: 44.76
STA: 3+46
ELEV: 40.14
STA: 3+51
ELEV: 40.14
STA: 3+63
ELEV: 45.02
STA: 5+37
ELEV: 45.32
STA: 5+72
ELEV: 51.78PROPOSED OHW: 42.49
EXISTING OHW: 43.75
1+00 2+00 3+00 4+00 5+00 6+00 7+00
7:1 7:1
STA: 1+98
ELEV: 48.97
STA: 2+14
ELEV: 46.79
STA: 4+75
ELEV: 46.66
STA: 4+94
ELEV: 46.60
STA: 4+87
ELEV: 43.10
STA: 4+82
ELEV: 43.10
STA: 6+01
ELEV: 46.29
STA: 6+18
ELEV: 48.94
PROPOSED OHW: 44.77 EXISTING OHW: 44.05
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PROPOSED SECTIONS 10 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
1" = 40'9
L BERM REMOVAL
1" = 40'9
J BOG GRADING
1" = 40'9
M BOG GRADING
1" = 40'9
K BOG GRADING
8'
40'
5x VERTICAL
EXAGGERATION
EXISTING GROUND
LEGEND
AVERAGE PROPOSED GRADE
APPROXIMATE BOTTOM OF PEAT LAYER
1. SECTIONS ARE ORIENTED TO FACE DOWNSTREAM.
2. TYPICAL CHANNEL DIMENSIONS:
BOTTOM WIDTH = 5 FT
BANK HEIGHT APPROXIMATELY 3 FT TO 4 FT
BANK SLOPE = 2H:1V.
3. CHANNEL BOTTOM SHALL BE CONSTRUCTED TO THE GRADES DEPICTED
IN PROFILE AND SECTIONS.
4. POOLS, NOT DEPICTED IN THE SECTIONS HEREIN SHALL BE PROVIDED
ALONG THE OUTSIDE OF MEANDER BENDS. SEE CONSTRUCTION DETAILS.
5. GENERAL CHANNEL BANK SLOPES ARE SHOWN. INSTALLED BANK SLOPES
MAY VARY FROM VERTICAL IN LARGE WOOD AREAS TO 3H:1V AS
DIRECTED BY THE ENGINEER IN THE FIELD.
NOTES:
CELL A
45.0
45.0
45.0
P
N
O
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PROPOSED CONDITIONS PLAN 11 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
MATCHLINE - SHEET 9
SCALE IN FEET
0 16080
NO DISTURBANCE
WITHIN EXISTING
OPEN WATER AREA DECOMMISSION
EXISTING ACCESS DRIVE
SURFACE TREATMENT SHALL CONSIST OF
FIELD SCARIFICATION AFTER INITIAL
IRRIGATION PIPE REMOVAL AND GRUBBING
TO PENETRATE THE SAND LAYER.
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
EXISTING BUILDING
EXISTING FIRE ROAD
PROPOSED CONTOUR (1')
EXISTING GATE
LIMIT OF DISTURBANCE
PROPOSED RIFFLE
GRADING FEATURE EXTENT
POTENTIAL SAND DISPOSAL AREA. LOCATION
AND ORIENTATION SHALL BE APPROVED BY
THE ENGINEER PRIOR TO USE.
TEMPORARY ACCESS DRIVE TO
REMAIN
TEMPORARY ACCESS DRIVE TO BE
REMOVEDEXISTING BERM TO BE REMOVED
FILL ALL LATERAL
DITCHES (TYP)
INSTALL SWING GATE3
PROPOSED GATE
NOTES:
1. PROVIDE TOPOGRAPHIC COMPLEXITY IN CELLS 3, 4, 5, 6, 7, AND B. SEE
DETAIL 1 ON SHEET 17.
2. PERIMETER AND LATERAL DITCHES SHALL BE FILLED AND COMPACTED
TO FINAL SURROUNDING ELEVATIONS AND SUBJECT TO THE INDICATED
TOPOGRAPHIC COMPLEXITY UNLESS NOTED OTHERWISE. PACK
DITCHES WITH A MIXTURE OF SLASH AND EXCAVATED MATERIAL.
3. ABANDONED IRRIGATION PIPES EXPOSED DURING CONSTRUCTION
SHALL BE REMOVED AND DISPOSED OF OFFSITE TO THE EXTENT
PRACTICAL. REMAINING BURIED SECTIONS OF PIPE SHALL BE CUT AND
CAPPED OR ENDS BURIED.
4. ALL SIDE SLOPES SHALL BE GRADED TO A SLOPE OF APPROXIMATELY
5H:1V OR MORE GRADUAL, SEEDED WITH NATIVE TRANSITIONAL SEED
MIXTURE.
5. LARGE WOOD SHALL BE INSTALLED IN AND ADJACENT TO THE
CHANNEL PER THE TREATMENT DETAILS AND IN COORDINATION WITH
THE ENGINEER. LARGE WOOD AND POOLS ARE NOT DEPICTED IN PLAN
OR PROFILE VIEW FOR CLARITY, SEE TREATMENT DETAILS.
6. CLEAR AND SALVAGE EXISTING TREES AND SHRUBS DESIGNATED BY
THE ENGINEER PRIOR TO SURFACE ROUGHENING AND GRADING.
REUSE SALVAGED MATERIAL AS SLASH FOR INSTALLATION IN LARGE
WOOD STRUCTURES AND FOR PLACEMENT OVER WETLAND AREAS. DO
NOT REUSE INVASIVE PLANTS DESIGNATED BY THE ENGINEER, WHICH
SHOULD BE REMOVED AND DISPOSED OF APPROPRIATELY IN
ACCORDANCE WITH SPECIFICATIONS.
7. RESTORE/GRADE MINOR SAND PILES/EXCAVATION PITS AND OTHER
IRREGULARITIES ASSOCIATED WITH FORMER AGRICULTURAL
ACTIVITIES AS IDENTIFIED BY THE ENGINEER.
8. EXCAVATED ORGANIC SOILS SHALL BE PRIORITIZED TO FILL IN
WETLAND DITCHES AND CHANNELS. SANDY SOILS SHALL BE USED TO
FILL REMAINING AREAS DESIGNATED FOR FILL, WITH EXCESS SPOILED
IN REUSE AREAS.
9. POTENTIAL SAND DISPOSAL AREAS MAY RECEIVE EXCESS SAND SPOILS
TO LIMIT HAULING WITHIN SITE. POTENTIAL SAND DISPOSAL AREAS
ARE NOT DEPICTED ON THE SECTIONS. SAND DISPOSAL AREAS ARE
SUBJECT TO FIELD ADJUSTMENT AND SHALL BE GRADED TO A
MAXIMUM SLOPE OF 5H:1V AND TIE INTO EXISTING UPLAND GRADES.
10. THE ESTIMATED BOTTOM OF PEAT SURFACE WAS OBTAINED FROM A
GROUND PENETRATING RADAR (GPR) SURVEY PERFORMED BY NRCS IN
2022 AND 2013. THIS INFORMATION IS PROVIDED FOR THE SOLE
CONVENIENCE OF THE CONTRACTOR. THE GPR DATA ACCURACY IS
HIGHLY VARIABLE. THE NATURE AND EXTENT OF SUCH VARIATIONS
MAY NOT BECOME EVIDENT UNTIL DURING OR AFTER CONSTRUCTION.
11. THE PROPOSED STREAM PROFILE IS THE AVERAGE SLOPE. POOLS
WITHIN THE STREAM, NOT DEPICTED ON PROFILES OR SECTIONS,
SHALL BE PROVIDED ALONG THE OUTSIDE OF MEANDER BENDS. SEE
CONSTRUCTION DETAILS.
12. INVASIVE PLANT SPECIES TO BE REMOVED AND/OR TREATED AS PART
OF CONSTRUCTION. FOLLOW-UP SPOT TREATMENT TO BE CONDUCTED
AS NEEDED POST-CONSTRUCTION BY THE CONTRACTOR PER THE
CONTRACT DOCUMENTS. SEE SPECIFICATIONS.
SUGGESTED TURTLE PROTECTION MEASURE:
COMPLETE PROPOSED WORK IN CELL A FIRST TO CREATE A "TURTLE SAFE ZONE", DELINEATED BY A SILT FENCE BETWEEN CELL 3 AND CELL A ALONG THE EXISTING BERM TO BE REMOVED. TURTLES
COULD BE TEMPORARILY RELOCATED TO CELL A, AND CONTAINED WITH THE AID OF THE SILT
FENCE, UNTIL CONSTRUCTION IS COMPLETED. SEE SHEET 4 FOR TURTLE PROTECTION PLAN.
1+00 2+00 3+00 4+00 5+00 5+50
7:1 8:1
STA: 1+63
ELEV: 48.89
STA: 1+86
ELEV: 45.72
STA: 4+77
ELEV: 45.51
STA: 4+99
ELEV: 48.41
1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+50
6:1 6:1
STA: 1+63
ELEV: 48.64
STA: 1+86
ELEV: 44.61
STA: 6+84
ELEV: 45.31
STA: 7+04
ELEV: 48.97
1+00 2+00 3+00 4+00 4+50
7:110:1
STA: 1+65
ELEV: 47.86
STA: 1+89
ELEV: 45.50
STA: 3+84
ELEV: 45.83
STA: 4+07
ELEV: 49.19
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PROPOSED SECTIONS 12 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
1" = 40'11
N BERM REMOVAL
1" = 40'11
O BOG GRADING
1" = 40'11
P BOG GRADING
8'
40'
5x VERTICAL
EXAGGERATION
EXISTING GROUND
LEGEND
AVERAGE PROPOSED GRADE
APPROXIMATE BOTTOM OF PEAT LAYER
CELL D
CELL C
CELL 7
OH
OH
OH OH OH OH OH OH OH
OH
OH
OH
OH
OH OH
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PLANTING PLAN 13 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
M
AT
CH
LI
N E
- S
HE
ET
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
ATLANTIC WHITE CEDAR WETLAND
SCALE IN FEET
0 16080
COASTAL PLAIN PONDSHORE
SHRUB/FEN WETLAND
SANDPLAIN GRASSLAND
RED MAPLE WETLAND
EXISTING BUILDING
EXISTING GATE
LIMIT OF DISTURBANCE
SANDPLAIN GRASSLAND SHALL
BE FIELD FIT OVER THE EXTENT
OF DISTURBED GROUND
TRANSITIONAL
NOTES:
1. PLANT ATLANTIC WHITE CEDAR (AWC) IN DENSE
CLUSTERS WITHIN AREAS APPROVED BY THE
INTER-FLUVE ECOLOGIST AND OWNER BASED ON
FAVORABLE HYDROLOGIC CONDITIONS. EACH
CLUSTER SHALL CONTAIN 30–40 TREES, SPACED
10–12 FT ON CENTER. SPACE CLUSTERS
APPROXIMATELY 175–200 FT ON CENTER. SALVAGED
SPHAGNUM SHALL BE PLACED ON THE GROUND
SURFACE OF AWC ZONES AS DIRECTED BY THE
OWNER'S REPRESENTATIVE.
2. TRANSITIONAL SEED SHALL BE APPLIED ON ALL
DISTURBED SIDE SLOPES WITHIN AND AROUND THE
PERIMETER OF THE BOG.
3. SANDPLAIN GRASSLAND SEED SHALL BE APPLIED ON
ALL DISTURBED UPLAND AREAS.
4. FIELD ADJUSTED SAND DISPOSAL AREAS ALONG THE
BOG PERIMETER SHALL, AS SHOWN ON THE
PROPOSED CONDITIONS PLAN, BE VEGETATED WITH
SANDPLAIN GRASSLAND SEED AT THE CREST OF THE
DISPOSAL AREA.
POND
POND
PROPOSED GATE
FORESTED/SHRUB WETLAND WITH
DENSE CLUSTERS OF ATLANTIC
WHITE CEDARS, SEE NOTE 1
EXACT PLANTING ZONE BOUNDARIES TO
BE FIELD FIT AT THE TIME OF PLANTING
0.3 ACRES OF GRASS/FORB MIX. FINAL SEEDING LOCATION
TO BE FIELD FIT IN COORDINATION WITH THE ECOLOGIST.
REFER TO SAND SURFACING NOTES ON SHEET 5.
0.7 ACRES OF GRASS/FORB MIX. FINAL
SEEDING LOCATION TO BE FIELD FIT IN
COORDINATION WITH THE ECOLOGIST. REFER
TO SAND SURFACING NOTES ON SHEET 5.
GRASS/FORB MIX
CELL 6
CELL B
CELL 5
CELL 4
OH OH OH OH OH
OH
OH OH
OH
OH
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
OH
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PLANTING PLAN 14 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
M
AT
CH
LI
N E
- S
HE
ET
M
AT
CH
LI
N E
- S
HE
ET
SCALE IN FEET
0 16080
TRANSPLANT SPHAGNUM
MOSS ALONG EDGE
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
ATLANTIC WHITE CEDAR WETLAND
COASTAL PLAIN PONDSHORE
SHRUB/FEN WETLAND
SANDPLAIN GRASSLAND
RED MAPLE WETLAND
EXISTING BUILDING
EXISTING GATE
LIMIT OF DISTURBANCE
TRANSITIONAL
NOTES:
1. PLANT ATLANTIC WHITE CEDAR (AWC) IN DENSE
CLUSTERS WITHIN AREAS APPROVED BY THE
INTER-FLUVE ECOLOGIST AND OWNER BASED ON
FAVORABLE HYDROLOGIC CONDITIONS. EACH
CLUSTER SHALL CONTAIN 30–40 TREES, SPACED
10–12 FT ON CENTER. SPACE CLUSTERS
APPROXIMATELY 175–200 FT ON CENTER. SALVAGED
SPHAGNUM SHALL BE PLACED ON THE GROUND
SURFACE OF AWC ZONES AS DIRECTED BY THE
OWNER'S REPRESENTATIVE.
2. TRANSITIONAL SEED SHALL BE APPLIED ON ALL
DISTURBED SIDE SLOPES WITHIN AND AROUND THE
PERIMETER OF THE BOG.
3. SANDPLAIN GRASSLAND SEED SHALL BE APPLIED ON
ALL DISTURBED UPLAND AREAS.
POND
POND
POND
FORESTED/SHRUB WETLAND WITH DENSE CLUSTERS
OF ATLANTIC WHITE CEDARS, SEE NOTE 1
PROPOSED GATE
CELL 3
CELL 2
CELL 1
O H
O H
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH OH
OH
OH
OH
OH
OH
OH
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PLANTING PLAN 15 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
MATCHLINE - SHEET 16
M
AT
CH
LI
N E
- S
HE
ET
SCALE IN FEET
0 16080
TRANSPLANT SPHAGNUM
MOSS ALONG EDGE
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
ATLANTIC WHITE CEDAR WETLAND
COASTAL PLAIN PONDSHORE
SHRUB/FEN WETLAND
SANDPLAIN GRASSLAND
RED MAPLE WETLAND
EXISTING BUILDING
EXISTING GATE
LIMIT OF DISTURBANCE
TRANSITIONAL
NOTES:
1. PLANT ATLANTIC WHITE CEDAR (AWC) IN DENSE
CLUSTERS WITHIN AREAS APPROVED BY THE
INTER-FLUVE ECOLOGIST AND OWNER BASED ON
FAVORABLE HYDROLOGIC CONDITIONS. EACH
CLUSTER SHALL CONTAIN 30–40 TREES, SPACED
10–12 FT ON CENTER. SPACE CLUSTERS
APPROXIMATELY 175–200 FT ON CENTER. SALVAGED
SPHAGNUM SHALL BE PLACED ON THE GROUND
SURFACE OF AWC ZONES AS DIRECTED BY THE
OWNER'S REPRESENTATIVE.
2. TRANSITIONAL SEED SHALL BE APPLIED ON ALL
DISTURBED SIDE SLOPES WITHIN AND AROUND THE
PERIMETER OF THE BOG.
3. SANDPLAIN GRASSLAND SEED SHALL BE APPLIED ON
ALL DISTURBED UPLAND AREAS.
POND
FORESTED/SHRUB WETLAND WITH DENSE CLUSTERS
OF ATLANTIC WHITE CEDARS, SEE NOTE 1
CELL A
220 Concord Avenue, 2nd Floor Cambridge, MA 02138
617.714.5537 www.interfluve.com
OF
N :\P ro je ct Fi le s_
Ac tiv e\ R ed Br oo k_
C en tu ry
Bo g_
M A\
D ra w in gs \C en tu ry Bo g.
dw g
- e sc hu lz
2/
/2
EYS, LP
AJ
AJ, NN
2/18/2026
NN, MM
24-05-11
MASSWILDLIFE
CENTURY BOG RESTORATION
CONSTRUCTION PLANS
PLANTING PLAN 16 22
SHEET
REVISION DESCRIPTION PROJECT
CHECKED
APPROVED
DRAWN
DATE
DESIGNED
DATEBYNO.
0 LP 6/16/2025 ISSUED FOR NOTICE OF INTENT
1 LP 7/1/2025 LOD REDUCED
2 EYS 2/18/2026 ISSUED FOR CONSTRUCTION
MATCHLINE - SHEET 15
SCALE IN FEET
0 16080
TAX PARCEL BOUNDARY
LEGEND
EXISTING CONTOUR (1')
ATLANTIC WHITE CEDAR WETLAND
COASTAL PLAIN PONDSHORE
SHRUB/FEN WETLAND
SANDPLAIN GRASSLAND
RED MAPLE WETLAND
EXISTING BUILDING
EXISTING GATE
LIMIT OF DISTURBANCE
TRANSITIONAL
NOTES:
1. PLANT ATLANTIC WHITE CEDAR (AWC) IN DENSE
CLUSTERS WITHIN AREAS APPROVED BY THE
INTER-FLUVE ECOLOGIST AND OWNER BASED ON
FAVORABLE HYDROLOGIC CONDITIONS. EACH
CLUSTER SHALL CONTAIN 30–40 TREES, SPACED
10–12 FT ON CENTER. SPACE CLUSTERS
APPROXIMATELY 175–200 FT ON CENTER. SALVAGED
SPHAGNUM SHALL BE PLACED ON THE GROUND
SURFACE OF AWC ZONES AS DIRECTED BY THE
OWNER'S REPRESENTATIVE.
2. TRANSITIONAL SEED SHALL BE APPLIED ON ALL
DISTURBED SIDE SLOPES WITHIN AND AROUND THE
PERIMETER OF THE BOG.
3. SANDPLAIN GRASSLAND SEED SHALL BE APPLIED ON
ALL DISTURBED UPLAND AREAS.
FORESTED/SHRUB WETLAND WITH
DENSE CLUSTERS OF ATLANTIC
WHITE CEDARS, SEE NOTE 1
NOTES:
1. TOPOGRAPHIC COMPLEXITY SHALL BE IMPLEMENTED IN
CELLS 3, 4, 5, 6, 7, AND B.
2. CONFIGURATION OF MOUNDS AND DEPRESSIONS WILL
VARY DEPENDING ON EXISTING VEGETATION AND ACCESS
CONSIDERATIONS.
3. TOPOGRAPHIC MOUNDS AND DEPRESSIONS ARE INTENDED
TO MIMIC NATURAL…