This document is a Request for Proposal (RFP) for forest-wide exterior building painting services for the Helena - Lewis and Clark National Forest. The project involves painting 14 base buildings and 2 optional buildings across multiple locations, with a contract value between $25,000 and $100,000. The scope includes exterior surface preparation, one primer coat, and two exterior paint coats for various structures with different siding types (wood, metal, wood shingles, and EFIS). Contractors must use lead-free, cold-climate appropriate paint with a glossy finish, matching existing colors, and complete work within 5 calendar days per building by September 30, 2026. The buildings are located in Augusta, Stanford, Harlowton, Lincoln, and ATB areas, with estimated square footages ranging from 200 to 2,400 square feet per structure.
The RFP specifies detailed requirements for surface preparation, painting techniques, and cleanup. Contractors must clean and scrape surfaces, sand if necessary, prime bare areas, and apply paint within manufacturer-recommended weather conditions. The project mandates careful attention to different surface types, with specific preparation and painting approaches for wood, metal, wood shingles, and EFIS surfaces. All work must be completed in a clean, orderly manner, with all refuse and materials removed from the site upon project completion. The contract requires submission of technical product data, installation instructions, and paint manufacturer recommendations, including specific paint colors for each structure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES
SCHEDULE OF ITEMS
Forest Wide Exterior Building Painting
B- 1 – SCHEDULE OF ITEMS
BASE SCHEDULE
Pay Item Item Description
Estimated Square
Footage*
Method of
Meas.
Estimated Quantity
Pay Unit Unit Price Item Cost
1 Augusta Warehouse/Fire Cache 1400 LS 1 Lump Sum
2 Stanford Ranger Residence 1600 LS 1 Lump Sum
3 Stanford Warehouse Shop 2200 LS 1 Lump Sum
4 Stanford Ranger Garage 800 LS 1 Lump Sum
5 Harlowton Asst Ranger Residence 1600 LS 1 Lump Sum
6 Harlowton Ranger Residence 1900 LS 1 Lump Sum
7 Harlowton Asst Ranger Garage 700 LS 1 Lump Sum
8 Harlowton Asst Ranger Storage Shed 200 LS 1 Lump Sum
9 WSS Warehouse 2200 LS 1 Lump Sum
10 Lincoln Forester Dwelling 1800 LS 1 Lump Sum
11 Lincoln Forester Dwelling Garage 900 LS 1 Lump Sum
12 Lincoln Fire Cache/Radio Shop 1300 LS 1 Lump Sum
13 Lincoln Compound Pumphouse 700 LS 1 Lump Sum
14 Lincoln Oil Storage Building 500 LS 1 Lump Sum
BASE
TOTAL:
OPTIONAL ITEMS
Pay Item Item Description
Estimated Square
Footage*
Method of
Meas.
Estimated Quantity
Pay Unit Unit Price Item Cost
1 ATB Office
LS 1 Lump
2 ATB Warehouse
LS 1 Lump
OPTION
TOTAL:
TOTAL
BASE +
OPTIONS:
*Square footages are approximate for estimating purposes only. Contractor to verify.
ABBREVIATIONS:
LS = Lump Sum
SPECIAL NOTES:
1. Must quote all items. Round to the nearest cent.
2. In the event of an error in extending the quoted prices, unit prices will govern unless otherwise determined by the
Contracting Officer in accordance with applicable regulations.
3. Offers for quantities less than those listed in the numbered items may be rejected.
SECTION C
DESCRIPTION & SPECIFICATIONS
C-1 PROJECT DESCRIPTION AND LOCATION
a) Scope of Contract. This project is to paint the exterior of the buildings listed in the schedule. Work includes exterior surface preparation, one primer coat, and two exterior paint coats.
Contractor is to provide all labor, materials, and tools to complete the work and dispose of all refuse off of FS property in accordance with all federal, state, and local laws.
b) Project Location.
Various locations on the Helena – Lewis and Clark National Forest. See drawings.
c) Magnitude of Construction: Between $25,000 and $100,000.
d) Period of Performance: Contractor will be allowed 5 calendar days per building. All work shall be completed by September 30, 2026.
CI-2 SPECIFICATIONS
PART 1 – GENERAL
1.1 DESCRIPTION OF WORK
A. SURFACE PREPARATION: Power wash or sand and scrape exterior paint surfaces in preparation to receive new exterior paint.
B. PRIMER: Apply one coat of primer over all exposed siding surfaces to include trim, soffits, fascia, etc.
C. EXTERIOR PAINT: Apply two coats of exterior paint over all siding surfaces to include trim, soffits, fascia, etc.
Match the exterior finish color for all siding, trim, soffits, fascia, etc to the existing colors as close as possible.
1.2 QUALITY ASSURANCE
A. Provide labeled materials and paints which are lead free and appropriate for cold climates.
1.3 SUBMITTALS
A. Submit technical product data, installation instructions and recommendations from paint manufacturer, including paint colors for each structure.
PART 2 – PRODUCTS
2.2 PRIMER & PAINT
A. Oil or water based exterior products acceptable for both primer and paint. Paint is to be of “glossy” finish type. Paint must be labeled as appropriate for cold climate exterior use. Match existing paint colors.
PART 3 – EXECUTION
3.1 PAINTING
A. Clean and scrape surfaces to create a consistently smooth surface. Sand if necessary to improve adhesion with primer and paint.
B. Prime all bare siding, including bare spots and fasteners on previously painted surfaces.
C. Paint each structure including siding and trims. Apply paint within weather conditions prescribed by paint manufacturers. Use appropriate paint and prep work for the surface to be painted. Surface types for each building are in the following table:
Building Name Siding Type Augusta Warehouse/Fire Cache Wood Stanford Ranger Residence Metal Stanford Warehouse Shop Metal Stanford Ranger Garage Metal Harlowton Asst Ranger Residence Metal Harlowton Ranger Residence Metal Harlowton Asst Ranger Garage Metal Harlowton Asst Ranger Storage Shed Wood WSS Warehouse Metal Lincoln Forester Dwelling Wood Shingles Lincoln Forester Dwelling Garage Wood Shingles Lincoln Fire Cache/Radio Shop Wood Shingles Lincoln Compound Pumphouse Wood Shingles Lincoln Oil Storage Building Wood Shingles ATB Office EFIS ATB Warehouse EFIS
PART 4 – CLEANLINESS AND CLEANUP
4.1 GENERAL
A. Maintain the project work areas in a clean and orderly condition throughout the progress of work under this contract. All refuse, including garbage, rubbish, and solid or liquid wastes from the Contractor's operations shall be stored and collected in a sanitary manner and disposed of off Government property in a legal manner.
B. Upon completing the work, the Contractor shall remove from the site and premises any rubbish, tools, equipment, and materials that are not the property of the Forest Service. Upon completing the work, the Contractor shall leave the work areas in a clean, neat, and orderly condition satisfactory to the Contracting Officer.
END OF SECTION