This is an Engineering Manual specification document issued by the Escambia County Utility Authority (ECUA) for gravity sewer collection systems, applicable to the CDBG-DR Oakfield-Palafox Stormwater Upgrades project (HS005) in Escambia County, Florida. The specification establishes comprehensive standards for the furnishing and installation of sewer pipe, fittings, structures, and accessories for sanitary sewer construction. Key requirements include compliance with multiple ASTM standards (ASTM C478, D1784, D2321, D2564, D3212, F1336, F477, D3034, D3753, F2763, F2764, F2947, and F3202); use of PVC pipe as the standard material for gravity sewer applications unless otherwise specified; installation of precast reinforced concrete or polymer concrete manholes with minimum 48-inch internal diameter; and proper handling and storage protocols to prevent material damage. The specification encompasses pipe installation procedures including trench preparation, jointing methods, separation requirements from potable water lines (minimum 10 feet horizontal separation or alternative conditions), service lateral connections with cleanouts at the right-of-way line, and manhole installation on prepared stone foundations.
Acceptance criteria include infiltration testing (maximum 25 gallons per day per inch of pipe diameter per mile for pipe sections and 1 gallon per vertical foot per 24 hours for manholes), air testing for newly constructed sanitary sewer lines with specified pressure and time requirements based on pipe diameter, exfiltration testing with allowable leakage limits, vacuum testing for manholes, and Closed Circuit Television (CCTV) inspection of all sewer mains and laterals per Section 2651. Deflection testing using GO-NO-GO mandrels is required for flexible pipe if CCTV inspection reveals potential unacceptable deflection, with testing performed no sooner than 30 days after installation. Contractors must provide all testing facilities, equipment, and labor at no additional cost to ECUA, with all tests witnessed by ECUA inspectors. Payment is calculated as unit price per linear foot for sewer pipe, unit price per manhole for standard/drop/shallow manholes, and unit price per connection for service lateral connections, with costs for all acceptance tests and inspections included in the contractor's unit pricing unless otherwise indicated.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering Manual
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 1 of 17
Section 2570
Gravity Sewer Collection Systems
PART 1: General
1.1 General Description of Work – Furnish and install all sewer pipe, fittings, structures, and accessories required for sanitary sewer construction as indicated.
1.2 Product Delivery, Storage, and Handling Guidelines –
1.2.1 Store materials to prevent physical damage.
1.2.2 Protect materials during transportation and installation to avoid physical damage.
1.3 Quality Assurance –
1.3.1 Compliance – Comply with latest published editions of American Society of Testing and Materials (ASTM) Standards:
ASTM C478 Precast Reinforced Concrete Manhole Sections
ASTM D1784
Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl
Chloride) (CPVC) Compounds
ASTM D2321
Practice for Underground Installation of Flexible Thermoplastic Sewers and
Other Gravity-Flow Applications
ASTM D2564 Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Piping Systems
ASTM D3212 Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals
ASTM F1336 Poly (Vinyl Chloride) (PVC) Gasketed Sewer Fittings
ASTM F477 Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM D3034 Type PSM – Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings
ASTM D3753
Fiberglass (Glass-Fiber-Reinforced Thermosetting-Resin) Manholes and
Wetwells
ASTM F2763
12 to 60 in. Dual and Triple Profile-Wall Polyethylene (PE) Pipe and Fittings for
Sanitary Sewer Applications
ASTM F2764
6 to 60 in. Polypropylene (PP) Corrugated Double and Triple Wall Pipe and
Fittings for Non-Pressure Sanitary Sewer Applications
ASTM F2947
6 to 60 in. Annular Corrugated Profile-Wall Polyethylene (PE) Pipe and Fittings for Sanitary Sewer Applications
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 2 of 17
ASTM F3202
Solid Wall Poly (Vinyl Chloride) PVC Fittings for Joining Corrugated Wall High
Density Polyethylene (PE) and Polypropylene (PP) Piping
PART 2: Materials and Equipment
2.1 General Requirements –
2.1.1 Pipe Material – Pipe shall meet the designations of the “ECUA Pipe Material Chart”, with standard pipe material for gravity sewer applications being that of PVC unless shown otherwise on plans or bid forms. For new material requests see Procedure 8 New Product Review and Approval.
2.1.2 Pipe Markings – All pipes shall be marked in accordance with applicable standard specification under which pipe is manufactured unless otherwise specified.
2.2 Delivery, Storage, and Handling – Certificates of Compliance with the Specifications shall be required for all materials used on the Project. All materials shall be protected during transportation, storage, handling, and installation to avoid physical deterioration due to sun and weather. The ECUA reserves the right to reject material, which in any way does not meet the requirements of these Specifications.
2.3 Sewer Mains –
2.3.1 Polyvinyl Chloride Pipe (PVC) –
2.3.1.1 See “ECUA Pipe Material Chart” for pipe requirements.
2.3.1.2 Use single elastomeric gasket push-on joints complying with ASTM D3212.
2.4 Structures and Pipe Accessories –
2.4.1 Fittings –
2.4.1.1 Fittings shall be allowed only on service laterals and drop manholes.
2.4.1.2 Fittings shall equal or exceed quality and strength of pipe. See “ECUA Pipe Material Chart” for pipe requirements.
Approved Manufacturers
Manufacturer Type
Tigre-ADS USA, Inc. SDR 26 Gasketed
Others as approved by ECUA in writing.
2.4.2 Precast Manholes & Sections –
2.4.2.1 Construction shall be precast reinforced concrete capable of sustaining an H-20 loading.
2.4.2.2 Manholes shall be constructed in accordance with ASTM C-478, using Type II or Type III Portland Cement with waterproofing additive (Xypex, MasterLife 300L or
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 3 of 17 approved equivalent) and anti-microbial additive (ConBlock MIC or approved equal) per manufacturer specifications and mix rate.
2.4.2.3 Manholes shall have a minimum I.D. of 48 inches, unless otherwise noted on plans.
2.4.2.4 Base section shall be manufactured in accordance with ASTM C-478 and be monolithic to a point 6 inches above the crown of the incoming pipe with minimum 6-inch thick bottom section and 5-inch or 6-inch thick wall section for 4-foot diameter and 5-foot diameter manholes, respectively . Doghouse manholes shall be used only with prior written approval of ECUA.
2.4.2.5 Influent holes shall be properly located and either cast in place with appropriate boot or required shape, or core drilled after concrete has set. Minor field adjustments may be made with approval of ECUA. The invert of the lowest influent pipe shall be a minimum of 4 inches above the inside floor of the base section. The manhole base section shall include a preformed invert channel conforming to the shape and radius of the sewer pipe. The depth of the invert channel shall be no less than 2/3 of the pipe diameter.
2.4.2.6 Cone (top) sections shall be eccentric narrowing from 48 inches to 24 inches I.D., unless otherwise noted on plans.
2.4.2.7 Flat top sections shall be used in place of cone sections for manholes less than 5 feet deep. The access hole shall be offset to allow easy access and shall be reinforced to support an H-20 loading.
2.4.2.8 The joints between sections shall be one of the following:
2.4.2.8.1 Lap joint design with the upper lip inside and suitably shaped to accommodate a bitumastic joint sealer, (“Ram-Neck”, ConSeal CS-102, or approved equivalent).
2.4.2.8.2 Rubber "O" ring gasket.
2.4.2.9 Completed joints shall be sealed inside and out with cement grout. Grout shall have both waterproofing and antimicrobial additives that are the same used for the manufacturing of the manhole and mixed in accordance with manufacturer’s recommendations.
2.4.2.10 All joints shall be covered with a thermo-adhesive wrap as manufactured by
Wrapid Seal or approved equal. See section 2.4.3.2 for sealing of the manhole chimney.
2.4.2.11 Pipe to manhole seals shall be made utilizing one of the following or approved equivalent:
2.4.2.11.1 Kore-N-Seal or Lock-Joint, with stainless steel bands and screws.
2.4.2.11.2 A-LOK.
2.4.2.12 Brick manholes shall not be allowed.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 4 of 17
2.4.3 Polymer Concrete Manholes
2.4.3.1 Products
2.4.3.1.1 Provide polymer concrete manhole sections, monolithic base sections and related components referencing to ASTM C 478. ASTM C 478 material and manufacturing is allowed compositional and dimensional differences required by a polymer concrete product.
2.4.3.1.2 Provide base riser section with monolithic floors, unless shown otherwise.
2.4.3.1.3 Provide riser sections joined with bell and spigot / ship-lap design seamed with butyl mastic and/or rubber gaskets (ASTM C 990) so that on assembly, manhole base, riser and top section make a continuous and uniform manhole structure.
2.4.3.1.4 Construct riser sections for polymer concrete manholes from standard polymer concrete manhole sections of the diameter indicated on drawings.
Use various lengths of polymer concrete manhole sections in combination to provide correct eight with the fewest joints.
2.4.3.1.5 Design wall sections for depth and loading conditions with wall thickness as designed by polymer concrete manufacturer.
2.4.3.1.6 Provide tops to support AASHTO HS-20 or HL-93 or vehicle loading or loads as required and receiving cast iron frame covers or hatches, as indicated on drawings.
2.4.3.2 DESIGN CRITERIA:
2.4.3.2.1 Polymer Concrete Manhole risers, cones, flat lids, grade rings and manhole base sections shall be designed by manufacturer to meet the intent of ASTM C 478 with allowable compositional and sizing differences as designed by the polymer concrete manufacturer.
2.4.3.2.2 AASHTO HS-20 or HL-93 design or as required loading applied to manhole cover and transition and base slabs
2.4.3.2.3 Polymer manholes will be designed based upon live and dead load criteria in ASTM C 857 and ACI 350-06
2.4.3.2.4 Unit soil weight of 120 pcf located above portions of manhole, including base slab projections.
2.4.3.2.5 Internal liquid pressure based on unit weight of 63 pcf
2.4.3.2.6 Dead load of manhole sections fully supported by polymer concrete manhole base
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 5 of 17
2.4.3.3 DESIGN:
Polymer Concrete Manhole risers, cones, flat lids, grade rings and manhole base sections shall be designed by manufacturer to meet loading requirements of ASTM C 478, ASTM C 857 and ACI 350-06 as modified for polymer concrete manhole design as follows:
2.4.3.3.1 Polymer Concrete Mix Design shall consist of thermosetting resin, sand, and aggregate. No Portland cement shall be allowed as part of the mix design matrix. All sand and aggregate shall be inert in an acidic environment.
2.4.3.3.2 Reinforcement – Shall use acid resistant reinforcement (FRP Bar) in accordance with ACI 440.1R-06 as applicable for polymer concrete design.
2.4.3.3.3 The wall thickness of polymer concrete structures shall not be less than that prescribed by the manufacturer’s design by less than 95% of stated design thickness.
2.4.3.3.4 Each polymer concrete manhole component shall be free of all defects, including indentations, cracks, and foreign inclusions that, due to their nature and degree or extent, detrimentally affect the strength and serviceability of the component part. Cosmetic defect shall not be cause for rejection. The nominal internal diameter of manhole components shall not vary more than 2%.
2.4.3.3.5 Marking and Identification - Each manhole shall be marked with the following information - Manufacturer’s name or trademark, Manufacturer’s location and Production Date
2.4.3.3.6 Manhole joints shall be assembled with a bell/spigot or shiplap butyl mastic and/or gasketed joint so that on assembly, manhole base, riser and top section make a continuous and uniform manhole. Joint sealing surfaces shall be free of dents, gouges and other surface irregularities that would affect joint integrity
2.4.3.3.7 Minimum clearance between wall penetrations and joints shall be per manufacturer’s design
2.4.3.3.8 Construct invert channels to provide smooth flow transition with minimal disruption of flow at pipe-manhole connections. Invert slope through manhole is as indicated on drawings. All precast base sections to be cast monolithically. Polymer bench and channel are to be constructed with all polymer concrete material, monolithically. Extended ballast slab requirements for buoyancy concerns can be addressed with cementitious concrete material.
2.4.3.3.9 Provide resilient connectors conforming to requirements of ASTM C 923 or other options as available. All connectors are to be water tight. Install approved resilient connectors at each pipe entering and exiting manholes in accordance with manufacturer’s instructions.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 6 of 17
2.4.3.4 GROUTING
2.4.3.4.1 All materials needed for grouting and patching will be a polyester mortar compound provided by the manufacturer or an approved equal by the manufacturer.
2.4.4 Manhole Accessories –
2.4.4.1 Manhole Lid and Cover – Refer to the following guidelines regarding manhole lid and cover:
2.4.4.1.1 Gray cast iron, with nominal opening of twenty-four (24) inches for standard four-foot diameter manholes. Manholes larger than four-foot diameter shall have a nominal opening no less than thirty-two (32) inches.
2.4.4.1.2 Cover shall be embossed with ECUA logo and marked "SANITARY SEWER" as shown on detail drawings.
2.4.4.1.3 The lifting holes shall not extend through cover.
2.4.4.1.4 Inflow protecting inserts as manufactured by Rainstopper or an approved equal shall be installed in all manholes access covers. Manhole insert shall be manufactured of 304 stainless steel with a thickness of not less than 18 gauge. The insert shall have a straight side design to allow a loose fit into ring for easy removal. An approved gasketed manhole cover is an alternative.
2.4.4.1.5 In difficult to reach non-traffic areas alternative gasketed manhole lid and cover may be used as approved by ECUA.
2.4.4.1.6 Reinforced polymer concrete manholes shall require a composite, locking ring and cover with gasket.
2.4.4.2 Chimney Sealing – Refer to the following guidelines regarding covers:
2.4.4.2.1 The chimney of the manhole shall be constructed using concrete grade rings and shall be internally “wiped” using non-shrink grout. See also Section 3.3.3.4 Joint Wrapping for additional requirements.
2.5 Approved Rings and Covers –
2.5.1 Covers – Refer to the following guidelines regarding covers:
Standard Non-Bolting Covers
Within FDOT Right-Of-Way* Outside FDOT Right-Of-Way
U. S. Foundry 170 Bj (200# Cover) U.S Foundry 170 E (130 # Cover)
EJ
Neenah R-1470-E
Approved Equivalent Approved Equivalent
* Any cover for use within the FDOT right-of-way shall meet FDOT weight requirements (Min 195#).
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 7 of 17
Note: For non-standard applications requiring bolted covers or applications in flood prone areas, submit proposed ring and cover for review and approval by ECUA prior to installation.
2.6 Manhole Coating – If required per ECUA design standard Section 570, manholes shall be coated in accordance with ECUA Technical Specification Section 2573. Steps in Manholes – Manholes shall not be constructed with steps. Manholes with steps will be rejected and shall be removed from the construction site at no cost to ECUA.
2.7 Flexible Transition Couplings – All flexible transition couplings shall be Strongback RC series couplings as manufactured by Fernco, Alpha coupling as manufactured by ROMAC, or ECUA approved equal.
PART 3: Execution
3.1 General – Provide all labor, equipment, and materials and install all pipe, fitting, specials, and appurtenances as indicated or specified.
3.2 Pipe Installation –
3.2.1 Handling – Handle and store pipe in a manner to insure installation in sound and undamaged condition, and in accordance with pipe Manufacturer’s requirements.
3.2.1.1 Do not drop, bump, roll or drag.
3.2.1.2 Use slings, lifting lugs, hooks and other devices designed to protect pipe, joint elements, and coatings.
3.2.1.3 Ship, move, and store with provisions to prevent movement or shock contact with adjacent units.
3.2.1.4 Handle with equipment capable of work with adequate factor of safety against overturning or other unsafe procedures.
3.2.2 Installation – Utilize equipment, methods, and materials insuring installation to lines and grades as indicated.
3.2.2.1 Do not lay on blocks unless pipe is to receive total concrete encasement.
3.2.2.2 Use calibrated laser for control of line and grade.
3.2.2.3 Install pipe of size, material, strength class, and joint type with embedment shown for plan location.
3.2.2.4 Insofar as possible, commence laying at downstream end of line and install pipe with bell ends in direction of laying (upstream). Sewer pipe shall have spigot ends in direction of flow. Obtain approval for deviations there from.
3.2.2.5 Clean interior of all pipe, fittings, and joints prior to installation. Exclude entrance of foreign matter during discontinuance of installation.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 8 of 17
3.2.2.5.1 Close open ends of pipe with watertight plugs at the end of each work day.
3.2.2.5.2 Do not let water enter trench. Pipe shall be laid in a dry trench. Include provisions to prevent pipe flotation and displacement should water control measures prove inadequate.
3.2.2.5.3 Remove water, sand, mud and other undesirable materials from trench before removal of end cap or plugs.
3.2.2.6 Inspect pipe prior to installation to determine if any pipe defects are present.
3.2.2.7 Brace or anchor as required to prevent displacement after establishing final position.
3.2.2.8 Perform only when weather and trench conditions are suitable.
3.2.2.9 Observe extra precaution when hazardous atmospheres might be encountered, especially when connecting to existing, active sanitary sewers.
3.2.2.10 Separation of sanitary sewer lines and potable water lines. See Detail D-64
3.2.2.10.1 Except as provided in paragraph 3.2.2.10.5, sewers and force mains shall be laid at least ten feet (outside to outside) horizontally from water mains.
Provided the applicant demonstrates there is no reasonable alternative, the ECUA may approve smaller horizontal separation distances for sewers if one of the following conditions is met:
3.2.2.10.1.1 The top of the sewer is installed at least 18 inches below the bottom of the potable water line.
3.2.2.10.1.2 The sewer is encased in watertight carrier pipe.
3.2.2.10.1.3 Both the sewer and the water main are constructed of slip-on or mechanical joint pipe complying with public water supply design standards and pressure tested to 150 psi to assure water tightness.
3.2.2.10.1.4 The applicant provides documentation accompanying the permit application showing that another alternative will result in an equivalent level of reliability and public health protection.
3.2.2.10.2 Except as provided in paragraph 3.2.2.10.5, sewers and force mains shall be laid at least three feet (outside to outside) horizontally from any existing or proposed reclaimed water line. Smaller horizontal distances shall be approved in accordance with subsection 62-610.469(7), F.A.C.
3.2.2.10.3 Except as provided in paragraph 3.2.2.10.5, sewer pipes and force mains shall cross under water mains, unless there is no alternative. Sewers and force mains crossing water mains or reclaimed water lines shall be laid to provide a minimum vertical distance of 18 inches between the invert of the upper pipe and the crown of the lower pipe. The minimum vertical separation shall be maintained whether the water main is above or below the sewer. For sewer crossings, the crossing shall be arranged so that the sewer pipe joints are equidistant and as far as possible from the water
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 9 of 17 main joints. Adequate structural support shall be provided for the sewer or force main to maintain line and grade. For sewers, provided the applicant demonstrates there is no reasonable alternative, the ECUA may approve smaller vertical separation distances if one of the following conditions is met:
3.2.2.10.3.1 The sewer is encased in a watertight carrier pipe.
3.2.2.10.3.2 The sewer is designed and constructed equal to water pipe and pressure tested to 150 psi to assure water tightness.
3.2.2.10.3.3 The applicant provides documentation accompanying the permit application showing that another alternative will result in an equivalent level of reliability and public health protection.
3.2.2.10.4 The provisions of paragraphs 3.2.2.10 (1-3) above are applicable to in-ground crossings. No vertical or horizontal separation distances are required for aboveground crossings.
3.2.2.10.5 If there are conflicts in the separation requirements between collection systems and drinking water facilities established in this subsection and those established in Section 556-“Water Distribution Systems” design standards, then the requirements in Section 556-“Water Distribution Systems”, shall apply.
3.2.2.11 Auger or jack casing in place where shown on plans.
3.2.2.12 Maintain minimum of 36 inches of cover unless directed by Engineer.
3.2.2.13 Encase sewer pipe in steel, PVC, or HDPE casing or use ductile iron pipe when crossing under pipe, conduit, or structure of 24 inches in diameter or greater when a 6-inch separation distance cannot be maintained. This protection shall extend a minimum of 10 feet beyond crossed structure.
3.2.3 Jointing –
3.2.3.1 Perform in accordance with Manufacturer's recommendations.
3.2.3.2 Clean and lubricate all joint and gasket surfaces with lubricant recommended.
3.2.3.3 Utilize methods and equipment capable of fully homing/seating or making up joints without damage, per manufacturer recommendations.
3.2.3.4 Check joint opening and deflection for specification limits.
3.2.4 Closure Pieces –
3.2.4.1 Connect two segments of pipelines or a pipeline segment and existing structure with short sections of pipe fabricated for the purpose.
3.2.4.2 Observe specifications regarding location of joints, type of joints and pipe materials and strength classifications.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 10 of 17
3.2.5 Temporary Plugs –
3.2.5.1 Furnish, install, and secure watertight temporary plugs at each end of work for removal by others when completed ahead of adjacent contract or where indicated.
3.2.5.2 Remove from pipe laid under separate or prior contract in order to complete pipe connection when work by other contractor is finished prior to work at connection point under this Contract.
3.2.6 Permanent Plugs –
3.2.6.1 Use test plugs as manufactured by pipe supplier, or
3.2.6.2 Fabricate by Contractor of substantially same construction.
3.2.6.3 Must be watertight against heads up to 20 feet of water.
3.2.6.4 Secure in place in a manner to facilitate removal when required to connect pipe.
3.3 Manhole Installation –
3.3.1 Precast Bases –
3.3.1.1 Prepared Foundation
3.3.1.1.1 Manholes shall only be placed in a dry trench.
3.3.1.1.2 Unless otherwise specified, Contractor shall place manhole on No. 57 virgin stone (or FDOT certified No. 57 stone/recycled concrete) wrapped in a 8 oz/sy non-woven geotextile fabric resulting in a minimum compacted depth of 12-inches, or greater, as needed to achieve a firm and unyielding foundation for the manhole.
3.3.1.1.2.1 A third-party geotechnical engineer or Engineer of Record shall verify via written record that the stone foundation is adequate and appropriate for the soils encountered. This verification shall be provided to the ECUA inspector prior to setting the manhole.
3.3.1.1.2.2 Stone shall be compacted in lifts no greater than 6-inches using a vibratory compactor.
3.3.1.1.3 Prior to placement of stone for manhole foundation, the soil types shall be confirmed by the Engineer of Record or a third-party Geotechnical Engineer.
3.3.1.1.4 If silts, clay, or highly organic soils (fine grained soils including soil groups ML, CL, OL, MH, CH, OH AND PT) are encountered, a Florida Licensed Engineer shall provide a manhole foundation design.
3.3.1.1.5 As an alternative to a stone foundation for manholes, the Contractor may provide foundation alternatives using select fill as part of the manhole submittal process for review and approval by ECUA and the Engineer of
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 11 of 17
Record. If this alternative is utilized, Contractor shall employ an independent testing laboratory at his own expense to ensure that compaction/foundation type of all fill material meets specifications.
3.3.1.2 Base shall be leveled prior to installation of manhole sections.
3.3.1.3 Manhole bases and channel inverts shall be cast integrally.
3.3.2 Manhole Sections –
3.3.2.1 Use precast sections unless cast-in-place manholes approved by Engineer.
3.3.2.2 Precast sections may be installed after base concrete has attained 75 percent of design strength.
3.3.2.3 Full circumference seals between manhole sections shall use one of the following or approved equivalent.
3.3.2.3.1 Bitumastic Seal (ConSeal CS-102, Kent No. 2, or RamNek)
3.3.2.3.2 Rubber "O" ring gasket
3.3.2.4 Joint Wrapping –
3.3.2.4.1 A thermo-adhesive wrap shall be used on all manhole wall joints and manhole chimney sections.
3.3.2.4.2 The thermo-adhesive wrap shall be the WrapidSeal™ manhole encapsulation system as manufactured by CANUSA, The Woodlands, Texas, or approved equal as determined by ECUA.
3.3.3 Invert Channels –
3.3.3.1 Form invert channel as indicated. Invert channel shall conform to the shape and radius of the pipe. The depth of the invert channel shall be no less than 2/3 of the pipe diameter. Invert must be formed by manhole manufacturer prior to structure arrival on the jobsite unless approved by ECUA as stated below.
3.3.3.2 Alternate invert and shelf may be constructed of mortar over concrete fill with approval of Engineer and ECUA project representative.
3.3.3.3 Make changes in direction of flow with smooth curves of as large a radius as size of manhole permits.
3.3.3.4 Make changes in size and grade smoothly and uniformly.
3.3.3.5 Slope shelf of manhole adjacent to channels, toward the channels, and rough broom finish to provide a non-slip surface.
3.3.3.6 Finish channel bottom smoothly without roughness, irregularity, or pockets.
Irregularities greater than 1/8-inch shall not be allowed.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 12 of 17
3.3.3.7 On straight through single pipe manholes, half sections of same pipe may be used with mortar and concrete with approval of Engineer.
3.3.3.8 Invert channels shall allow passage of closed circuit television (CCTV) inspection equipment as utilized by ECUA.
3.3.4 Field Coatings – Field applied coatings shall be applied after Engineer's approval of structure.
3.4 Wastewater Services –
3.4.1 See ECUA Pipe Material Summary Chart for acceptable materials.
3.4.2 Laterals – Service laterals shall be located in accordance with requirements in Section 570 and applicable details D-1, D-2 and/or D-3. Install service laterals to each residential lot or individual business lot or property, or as directed by Engineer. Each service lateral to include a cleanout near the property line and within the right of way or easement for ease of cleaning and maintenance. Laterals shall be connected to the sewer mains between the 10 and 11 o’clock or the 1 and 2 o’clock position of the sewer mains, unless otherwise approved by ECUA.
3.4.3 Services Wyes – Install wyes, 4-inch branch diameter unless shown otherwise on plans.
See ECUA standard detail, D-1 "Typical Service Connection".
3.4.4 Cleanouts – Install cleanouts at the right-of-way line with cleanout cap located 1 foot below ground surface, unless shown otherwise on plans. See ECUA standard detail, D-1
"Typical Service Connection" and D-2. Cleanouts within concrete or hardscaping shall be placed within a traffic rated steel box.
3.4.5 Risers – Risers may be used with wyes for service connections where invert of sewer is 7 feet or more below ground surface or where shown on plans. Where risers are used, the minimum available depth of sewer shall be four feet. Terminate each connection as shown on plans or as directed by Engineer. See ECUA Detail D-1 for more information.
3.4.6 General –
3.4.6.1 Glue cap on end of stub out.
3.4.6.2 Backfill trench only after recording exact location and depth of service connection.
3.4.6.3 Street crossings shall have a minimum of 2 feet of cover to subgrade unless approved by Engineer.
3.4.6.4 Drive a ½-inch metal rebar adjacent to each service lateral cleanout, with top of post 1 foot below ground surface. As-built drawings shall reflect horizontal location and depth of lateral at property line.
3.4.6.5 Install a cleanout location marker on top of cleanout as shown in the ECUA standard detail, D-1 "Typical Service Connection".
3.5 Connection of Service Laterals and Sewer System Facilities –
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 13 of 17
3.5.1 Existing Service Laterals and New Sewer Main – When a new sewer main is installed to replace an existing sewer main, extend new sewer laterals to property line. Connect new service lateral to existing sewer lateral at the property line.
3.5.2 New Service Lateral Connections to Existing Manholes –
3.5.2.1 Unless otherwise directed by ECUA, insert new sewer lateral six (6) inches inside of manhole. Ensure that new pipe does not obstruct flow path in existing invert channel. Where possible, orient new service line consistently with direction of flow.
3.5.2.2 Connect new laterals to existing manholes using Kor-N-Seal I106 -406 series connector. Seal new lateral in place with grout with Xypex waterproofing additive mixed in accordance with manufacturer’s recommendations.
3.5.2.3 Reconstruct manhole channel and shelf to suit new connection.
3.5.2.4 All debris shall be removed.
3.5.3 Connections to Existing Sewer –
3.5.3.1 Doghouse type manholes shall not be permitted unless approved by ECUA in writing for each specific application.
3.5.3.2 Cut out existing sewer inside of manhole and construct channel and shelf to suit new connection.
3.5.3.3 New connection shall be made in such a manner to facilitate access with sewer main CCTV systems.
3.5.3.4 If an existing sewer service is potentially available, the sewer service shall be inspected via push camera by the contractor. Only ECUA staff shall approve the connection to an existing sewer service lateral upon review of the video inspection footage.
PART 4: Acceptance
4.1 Acceptance Tests for Sewer Pipelines and Manholes – If any acceptance test fails within the contract warranty period, the Contractor, at no additional cost to ECUA shall correct all deficiencies in a manner acceptable to ECUA and the Engineer. COSTS FOR ALL
ACCEPTANCE TESTS AND INSPECTIONS (INCLUDING CCTV OF SEWER MAINS AND
LATERALS) SHALL BE INCLUDED WITH THE CONTRACTOR’S UNIT PRICE OF THE
INSTALLED SEWER MAINS AND LATERALS, UNLESS OTHERWISE INDICATED.
4.1.1 Infiltration Testing –
4.1.1.1 General – Refer to the following general guidelines for infiltration testing:
4.1.1.1.1 Maximum infiltration for each section of sewer pipe shall not exceed 25 gpd/inch of pipe diameter/mile. However, if the CCTV inspection reveals significant leaks, those leaks shall be repaired prior to Final Acceptance by
ECUA.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 14 of 17
4.1.1.1.2 Manhole vacuum test.
4.1.1.1.3 Acceptance of air test or exfiltration results will not preclude rejection of work if infiltration is measured and exceeds limitation.
4.1.1.1.4 Maximum infiltration for each manhole shall not exceed 1 gallon per vertical foot per 24 hours.
4.1.1.1.5 All tests to be witnessed by ECUA.
4.1.2 Air Test (Pipelines) – On all newly constructed sanitary sewer lines, the Contractor shall conduct a line acceptance test using low pressure air. The air test shall be conducted after the pipe has been backfilled and the cost of air testing shall be included in other items of
Work. The Contractor shall perform a pre-test in advance of requesting an Engineer or inspector to witness the test. The Engineer shall be advised at least 48 hours before tests are conducted. These tests shall be conducted at all times in the presence of the
Engineer. Should a line which has been previously tested indicate any infiltration, or otherwise appear suspect to the Engineer, the Contractor shall conduct confirmation air tests on the line at no additional cost. The Contractor shall provide, as required, the proper plugs, weirs, public notification, and other equipment required to perform all tests.
Testing of each section of sewer installed shall include the portions of service connections that are to be installed under the contract.
4.1.2.1 Furnish all facilities required including:
4.1.2.1.1 Necessary piping connections.
4.1.2.1.2 Test pumping equipment.
4.1.2.1.3 Pressure gauges or manometers.
4.1.2.1.4 Bulkheads.
4.1.2.1.5 All miscellaneous items required.
4.1.2.1.6 Obtain approval from Engineer of equipment and methods proposed for use.
4.1.2.1.7 Plug ends of line and cap or plug all connections to withstand internal test pressures.
4.1.2.1.8 Introduce low-pressure air until internal air pressure is 4.0 psi greater than the average back pressure of ground water above the pipe. (Add 0.43 psi for each vertical foot of ground water over the top of pipe.)
4.1.2.1.9 Allow two minutes for air pressure to stabilize.
4.1.2.1.10 Time required for pressure to decrease from 3.5 to 2.5 psi greater than average back pressure of any ground water above pipe shall not be less than time in following table for given diameters.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 15 of 17
Air Testing Chart
Pipe Diameter (Inches) Minutes
6 3.0
8 4.0
10 5.0
12 5.5
15 7.5
18 8.5
21 10.0
24 11.5
30 14.0
36 17.0
4.1.2.1.11 Repeat test as necessary after all leaks and defects have been repaired.
4.1.3 Exfiltration Test (Pipelines) –
4.1.3.1 Furnish all facilities required to plug pipe sections and fill with water to attain a minimum elevation of water in upstream manhole two feet higher than top of pipe in line being tested, or two feet above existing ground water in trench, whichever is higher elevation.
4.1.3.2 Maintain water level in manhole at start of test period for one hour.
4.1.3.3 Water added to maintain level (water lost) shall not exceed the following amounts:
Exfiltration Testing Chart
Pipe Diameter (Inches) Gallons/100 feet
8 0.63
10 0.79
12 0.95
15 1.19
18 1.42
21 1.66
24 1.90
Allowable leakage may be increased by 5 percent for each foot of head above water elevation indicated above.
4.1.4 Infiltration Test (Pipelines) –
4.1.4.1 May be used in lieu of air test or exfiltration test if Contractor can prove that ground water conditions are such that crown of pipe is covered with not less than two feet of water at highest point in section being tested. The test head shall be maintained for not less than 24 hours before a weir measurement is made.
4.1.4.2 Infiltration shall be measured with weir at manhole and shall not exceed amounts stated in paragraph 4.1.3 of this section, Exfiltration Test.
4.1.4.3 Engineer will require exfiltration or air test if Contractor cannot prove to satisfaction of Engineer that ground water conditions are satisfactory.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 16 of 17
4.1.5 Vacuum Testing (Manholes) – The vacuum test may be performed on manholes, completely constructed, with inlet and outlet pipes in place. Test shall be coordinated with the Engineer and ECUA inspector. Plug pinholes and horizontal seams with a non-shrinking mortar.
4.1.5.1 Brace the inlet and outlet pipes/plugs to prevent movement during the test. Use air inflated plugs in good condition.
4.1.5.2 The vacuum test shall be performed using equipment approved by the Engineer.
The equipment shall be in good operating condition. No gauges are to have any broken glass or other visible abnormalities. The test shall be performed by trained personnel familiar with the equipment and the test.
4.1.5.3 The vacuum shall be pumped down to 10 inches (250 mm) of mercury on an approved gauge, and held. At the time the removal of air is stopped, the test time shall begin. The test shall be successful if the vacuum remains at 9 inches of mercury or greater according to the following table:
Manhole Diameter and Depth1 Minimum Time
48-inch and 60-inch diameter (5-12 feet in depth) 45 seconds
48-inch and 60-inch diameter (12-20 feet) 65 seconds 1- Vacuum testing for diameters or depths not shown shall be as directed by Engineer and witnessed by ECUA.
4.1.6 Deflection and Low Point (Belly) Testing–
4.1.6.1 All sewer mains and service laterals shall be inspected using CCTV in accordance with Section 2651 – Television Inspection. Sewer mains and laterals shall be cleaned and adequately partially flooded prior to the CCTV inspection to provide ECUA inspector and camera operator with a gauge for low point (belly) severity and limits.
4.1.6.2 Sufficient water must be placed in the line for proper inspection and to identify any sags in the sewer main. Observations shall be documented in accordance with PACP (version 7.0 or later) coding standards.
4.1.6.3 Maximum tolerance of sags is ¾-inch feet for 12-inch and smaller diameter pipe and 1.5-inches for 15-inch and larger diameter pipe. Any defects in the pipe or construction methods revealed shall be corrected by the Contractor at no additional cost to ECUA.
4.1.6.4 Deflection Test for Flexible Pipe: If the CCTV inspection reveals deflection that may be deemed unacceptable by the Engineer or ECUA representative, a properly sized "GO-NO-GO" mandrel, sewer ball or deflectometer shall be utilized to verify acceptability. See Detail D-14 for maximum allowable pipe deflection .
4.1.6.5 The deflection test shall be performed no sooner than thirty (30) days after installation.
4.1.6.6 If a deflection is identified that requires a repair, the Contractor shall complete the repair in a manner acceptable to the ECUA engineer and re-perform exfiltration/infiltration tests of the entire length of sewer main (manhole to manhole) once all repairs have been completed at no additional cost to ECUA.
2025 Edition Section 2570 – Gravity Sewer Collection Systems Page 17 of 17
PART 5: Measurement and Payment
5.1 Sewer Pipe –
5.1.1 Measure in lineal feet by specified pipe size along centerline of pipe with no deduction for manholes, wye connections, or riser connections.
5.1.2 Includes furnishing, handling, laying pipe materials and specified bedding materials;
trench excavation, backfill and compaction; dewatering; sheeting, shoring and bracing;
testing; CCTV inspection; utilities repair and relocation; providing all labor, tools, equipment and miscellaneous associated work necessary to complete item.
5.1.3 Payment: Unit price per linear foot.
5.2 (Standard) (Drop) (Shallow) Manholes –
5.2.1 Includes furnishing and placing all precast and cast in place materials; excavation, backfill and compaction; frame and lid; stub pipes; providing all labor, equipment, tools and miscellaneous associated work needed to complete item.
5.2.2 Payment: Unit price per each manhole.
5.3 Service Lateral Connections –
5.3.1 Lump sum price for long or short service lateral as indicated.
5.3.2 Includes furnishing, handling, laying pipe materials; trench excavation, backfill and compaction; dewatering; testing; cleaning, CCTV inspection; utilities repair; providing all labor, equipment and miscellaneous associated work needed to complete item.
5.3.3 Payment: Unit price per each.