Section 01300 - Submittals 2 of 2.pdf

PDF 304 KB Posted

Attached to
Pipe and Steel conduit liner for Willow Creek Dam, Steamboat
Solicitation number
IFB1 PMAA 2017000160 2
Issued by
Clear Creek County, Denver City, Colorado

About this file

This is a submittal requirements document (Section 01300, Part 2 of 2) that outlines the procedures and standards for submitting bids and project documentation in response to a state or local construction contract opportunity. The document establishes comprehensive guidelines for how bidders must prepare and deliver their submittals, including specifications for format, content, organization, and timing. Key requirements include mandatory submission of shop drawings, product data, samples, and certified documentation to demonstrate compliance with contract specifications. Bidders are required to submit materials according to a detailed schedule, with specified quantities and formats for each submittal category. The document emphasizes the need for quality control, coordination between trades, and verification that all submitted materials align with the approved design and project requirements. Submittals must be clearly labeled, indexed, and cross-referenced to contract documents to facilitate review and approval by the project engineer or architect.

The submittal process includes specific procedures for review cycles, resubmission requirements, and approval timelines. Bidders must ensure that all submittals contain manufacturer certifications, test reports, and compliance documentation as required by the specifications. The document outlines consequences for non-compliance, including rejection of submittals and potential delays in project schedule. Contractors are responsible for maintaining copies of all submittals and tracking approvals throughout the project duration. The document also addresses the coordination of submittals across multiple trade contractors and establishes clear communication protocols between the contractor, subcontractors, and project administration. These requirements ensure standardized documentation and facilitate efficient project execution and quality assurance throughout the contract term.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .