This document is a section of a bid specification for the Connor Springs SD Main Extension project. It outlines the measurement and payment terms for various components of the project, including bores, connections to existing pipes, grassing, pavement removal and replacement, pipe installation, and solid rock excavation. The section also includes details on how temporary silt fence will be measured and paid for.
The bid items will be paid based on unit prices per linear foot, square foot, and cubic yard, as applicable. The unit prices are intended to cover all labor, equipment, tools, and incidentals necessary to complete the respective work items. There are no specific details provided regarding response dates, bid opening, award, contract term, or renewal options.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
840-1
SECTION 00840
MEASUREMENT AND PAYMENT
1. GENERAL
The unit price or lump sum price bid for each item shall be for furnishing all materials, tools, labor, equipment, skills, tests and certifications, and incidentals necessary to complete the items as shown on the plans, as shown on the details in the plans and as called for in the specifications.
2. BORES
2.1. Measurement: Bores will be measured along the surface of the ground over the center line of the bore successfully completed according to size and the lengths as specified in the plans. The measurement will be in linear feet.
2.2. Payment: Bore of the river will be paid for at the “adder” unit price bid per linear foot of bore successfully completed according to size and the lengths as specified in the plans. This unit price will be full compensation for furnishing all labor, equipment, tools and incidentals necessary to complete the bores at the locations shown in the plans and as called for in the specifications.
This “adder” unit price pertains to the river bore only and the line pipe will be paid for at the price bid per lineal foot of pipe according to size. This unit price does not pertain to convenience directional drills. Convenience directional drills will be paid for at the unit price bid per lineal foot of directional drill according to size and line pipe plus and will NOT be paid as additional footage.
3. CONNECTION TO EXISTING PIPE
3.1. Measurement: Connection to existing pipe will be measured by the actual count of each connection completed according to size and material.
3.2. Payment: Payment for the connections to existing pipe will be included with unit price bid for the installation of the proposed PE gas main and will be full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary for connection at the locations shown in the plans and as called for in the specifications.
4. GRASSING
4.1. Measurement: Measurement will be made by multiplying the width by the length of the area grassed according to type. The measurement will be in square feet. The maximum width, however, shall not exceed 15 feet where the pipeline is adjacent to the roadway. Areas beyond 15 feet in width disturbed by the construction of this project shall be grassed as called for in the specifications at the expense of the Contractor.
4.2. Payment: Payment for grassing will be included with the unit price bid for line pipe. This unit price will be full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary to complete the work as called for in the specifications. Bermuda sod, where required, will be paid for at the unit price bid per square foot.
5. PAVEMENT REMOVED AND REPLACED
5.1. Measurement: Measurement will be made by multiplying the length of paving removed and replaced according to type in feet. The measurement will be in square feet.
5.2. Payment: Pavement removed and replaced will be paid for at the unit price bid per square foot removed and replaced according to type. This payment will be full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary for the removal and replacement of paving as shown on the detail in the plans and as called for in the specifications.
840-2
This unit price will also include steel plating necessary to the flow of traffic until the removal and replacement is complete and acceptable.
6. PIPE
6.1. Measurement: Pipe will be measured along the surface of the ground over the center line of the pipe installed and tested according to size, material and method of installation. The measurements will be in linear feet and no deduction will be made for space occupied by valves or fittings, however, no separate payment will be made for fittings.
6.2. Payment: Pipe will be paid for at the unit price bid per lineal foot of pipe installed and tested according to size, material and method of installation. This unit price will be full compensation for furnishing all labor, equipment, tools, and incidentals, necessary to complete the installation at the locations shown on the plans and as called for in the specifications.
This unit price will also include clearing and grubbing as shown in the plans, as called for in the specifications or as directed by the Engineer. There will be no additional compensation.
7. SOLID ROCK EXCAVATION
7.1. Measurement: Solid rock excavation will be determined by multiplying the average depth of rock excavated in feet, times the length in feet, times the width equal to the nominal diameter of the pipe plus 2 feet and divided by 27. The measurement will be in cubic yards.
7.2. Payment: Solid rock excavation will be paid for at the unit price bid per cubic yard. This unit price will be full compensation for all materials for blasting and all labor, tools, equipment and incidentals necessary to complete the work as called for in the specifications.
This includes the connection to both the existing main and the proposed main.
8. TEMPORARY SILT FENCE
8.1. Measurement: Temporary silt fence will be measured by the actual amount installed according to type. The measurements will be in linear feet.
8.2. Payment: Temporary silt fence will be paid for at the unit price bid per linear foot of fence installed according to type. This unit price will be full compensation for furnishing all materials, fittings, labor, equipment, tools and incidentals necessary to complete the installation as shown on the detail in the plans, at the locations shown on the plans, as called for in the specifications and as directed by the Engineer.
This unit price includes cleanout and removal of temporary silt fence.