SECTION 00 21 00 - Attachment 2 - Specialized Experience - Design Template.docx
DOCX document 13 KB Posted
- Solicitation number
- W9128F-22-R-0004
About this file
This document contains a template for submitting specialized experience on design projects. The template requests information on project type and construction, the respondent's firm name and role in design, estimated or actual construction cost, subcontracting percentage and type of work, design and construction dates, performance evaluation, and termination or liquidated damages details. A reference contact is also requested.
The related federal contract opportunity is a solicitation for design and construction services for a Non-Kinetic Operations facility and Courier Station at Offutt Air Force Base in Nebraska. The solicitation is issued by the Department of the Army Corps of Engineers Omaha District and includes specifications and drawings. The response due date is not provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00 21 00 - ATTACHMENT 2
COMPANY SPECIALIZED EXPERIENCE - DESIGN FIRM OR IN-HOUSE DESIGN CAPABILITY
Provide the following information to show examples of projects your company designed that have subsequently been constructed within the last ten years indicating experience with projects of similar type and scope. Use one form per project.
(a) Type of Facility and Construction Represented ___________________________________________
(b) Your Firm’s Name _________________________________________________________________
(c) Name of Project ___________________________________________________________________
(d) Location of Project _________________________________________________________________
(e) Owner/Customer __________________________________________________________________
(f) General Scope of Construction Project __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
(g) Summary of Your Role in Design of this Project, including “Secure Area” (in accordance with UFC 4-010-05 and ICD/ICS 705) design
(h) Identify Estimated (“E”) or Actual (“A”) Construction Cost
(i) Extent (%) and Type of Work You Subcontracted Out _________________________________________________________________________________________________________________________________________________________________________________________________________________________________
(j) Dates Design: Began__________ Completed __________
(k) Dates Construction: Began__________ Completed __________
(l) Your Performance Evaluation by Owner, if known ______________________________________________________________________________________________________________________________________________________
(m) Were You Terminated or Assessed Liquidated Damages? __________________________________ (If either is “Yes”, attach an Explanation)
(n) Owner’s Point of Contact for Reference (Name and Company) ______________________________________________________________________________________________________________________________________________________
(o) Current Telephone Number & Email of Reference POC _____________________________________
File details come from the government source that posted it. Updated .