Amend_0001_SF-30.pdf
PDF 155 KB Posted
- Attached to
- Enterprise-wide Administrative Services Federal contract opportunity
- Solicitation number
- SECHQ114R0015
- Issued by
- Securities and Exchange Commission
About this file
Amendment 0001 SF-30
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0003_SF-30.pdf | ||
| Amend_0002_SF-30.pdf | ||
| Attachment_2_CLIN_Table_Amend_0002.xlsx | XLSX spreadsheet | |
| Qs__As.pdf | ||
| Attachment_1_SOW_Amend_0001.pdf | ||
| Attachment_2_CLIN_Table_Amend_0001.xlsx | XLSX spreadsheet | |
| Attachment_1_SOW.pdf | ||
| Attachment_6_Wage_Determinations.pdf | ||
| Attachment_5E_PerSEC.pdf | ||
| Attachment_5B_NDA_(Contract_Personnel).pdf | ||
| Attachment_5_Contract_Administration-Special_Contract_Requirements.pdf | ||
| Attachment_3_Places_of_Performance.pdf | ||
| Attachment_2_CLIN_Table.xlsx | XLSX spreadsheet | |
| Attachment_5A_NDA_(Contractor_Entity).pdf | ||
| Attachment_4_SF1449.pdf | ||
| Attachment_5D_Credit_Release_v__1_09_2012.pdf | ||
| Attachment_5C_OF306.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
SECHQ114R0015/000001
B. Paragraph (viii), subpagraph 6, is deleted and replaced with: 6. Price and any discount terms in accordance with Attachment 2, CLIN Table
(Note: pricing shall be separate from Vendor's, management approach and capabilities, and past performance).
C. Paragraph (viii), subpagraph 10, is deleted and replaced with: 10. A copy of System for Award
Management (SAM) registration (see https://www.sam.gov/), or indicate that the SAM record is available on-line at https://www.sam.gov, or a copy of System for
Award Management application.
D. Paragraph (viii), subpagraph 12, is deleted and replaced with: 12. A management approach and capabilities description of the services being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may also include product literature, or other documents, if necessary.
E. Paragraph (ix), FAR 52.212-2
Evaluation-Commercial Items (Jan 1999), a), Management Approach and Capabilities, subparagraph A is deleted and replaced with:
A. Key Personnel Resumes with a description of the experience and capability for the personnel proposed and representational resumes for all administrative positions at the SEC's
Headquarters in Washington, D.C. and two (2) regional offices. Descriptions shall address such items as the individual's background, education, work experience and accomplishments.
Each resume should be limited to two (2) pages.
F. Paragraph (ix), FAR 52.212-2
Evaluation-Commercial Items (Jan 1999), Past
Performance, 1st paragraph, is deleted and replaced with: Past Performance: Offerors shall provide a list of no more than three current or past contracts (both Government and Commercial) performed within the past five years for whom the
Offeror has provided the same or similar services
(similar value/number of personnel). Offerors may use a Subcontractor's past performance for one of the three past performance submissions. The contractor shall submit the following information
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
SECHQ114R0015/000001
for each contract:
G. Paragraph (ix), FAR 52.212-2
Evaluation-Commercial Items (Jan 1999), Page
Limitation is deleted and replaced with: Page
Limitation: The technical proposal (management approach and capabilities) shall be limited to twelve (12) one-sided pages, minimum font size of point 12, excluding cover page(s), table of contents, the resumes (2 pages each) and letters of commitment for proposed new hire(s). There is no page limitation for past performance.
H. Paragraph (ix), FAR 52.212-2
Evaluation-Commercial Items (Jan 1999), the header "Volume 2 - Price Proposal" is deleted and replaced with"Price Proposal."
I. Paragraph (ix), FAR 52.212-2
Evaluation-Commercial Items (Jan 1999), Price
Proposal, subparagraph c is deleted and replaced with: c) If applicable, Prime Contractor/ Subcontractor Arrangement or Contractor Team
Arrangement Supporting Documentation.
Furthermore, the prime contractor shall disclose to the Government's Contracting Officer a copy of the subcontract pricing, terms and conditions, or subcontracting agreement. If subcontracting or teaming is proposed, the Government will evaluate the acceptability of any subcontracting or teaming as part of its evaluation of price.
J. Paragraph (ix), FAR 52.212-2
Evaluation-Commercial Items (Jan 1999), Price
Proposal, 6th paragraph entitled Price Proposal, is deleted and replaced with the following: Price
Proposal: The Government expects to receive price competition through the submission of several price proposals. The Offeror's proposed pricing will be evaluated against the Government's estimated level of effort of 1,880 hours per year for each position. Offerors shall propose fixed labor rate prices that are both realistic and reasonable. Options will also be evaluated.
K. Paragraph (xv), third paragraph is deleted and replaced with: The Offeror's proposal shall consist of four (4) electronic files, Microsoft
Word, Adobe PDF, or Microsoft Excel type files:
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
SECHQ114R0015/000001
1. Management Approach and Capabilities
2. Past Performance
3. Pricing*
4. SF-1449 and SF-30 Amendment(s)
*Contractor Team Arrangement or Prime
Contractor/Subcontractor Arrangement Supporting
Documentation shall be submitted in the Pricing file, if applicable.
Representations and Certifications and
System for Award Management (SAM) registration/application shall be submitted in a separate file, only if this documentation is not available on-line.
2. Attachment 1, Statement of Work, is revised as follows (revised Attachment 1, Statement of Work, is attached, with changes highlighted in bold italics):
Page 2, Paragraph 4.2, Project Management, is revised to add the following: The Project
Manager and Alternate Project Manager will be located at the SEC Headquarters Office in
Washington, D.C.
3. Attachment 2, CLIN Table, is revised to delete and reserve the Project Manager SEC Labor Duty
Category from all locations except the SEC
Headquarters (HQ) in Washington, D.C. (revised
Attachment 2, CLIN Table, is attached, with changes highlighted in bold italics).
4. The Government's answers to questions asked are provided in the attached file, Qs & As.
5. All other terms and conditions of the solicitation remain the same.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
| 14-R-0015-amend0001 |
| Draft Amendment 1 SF-30 |
File details come from the government source that posted it. Updated .