Amend_0001_SF-30.pdf

PDF 155 KB Posted

Attached to
Enterprise-wide Administrative Services Federal contract opportunity
Solicitation number
SECHQ114R0015
Issued by
Securities and Exchange Commission

About this file

Amendment 0001 SF-30

View the file

Other files for this federal contract opportunity

Other files attached to Enterprise-wide Administrative Services, newest first.
File Type Posted
Amend_0003_SF-30.pdf PDF
Amend_0002_SF-30.pdf PDF
Attachment_2_CLIN_Table_Amend_0002.xlsx XLSX spreadsheet
Qs__As.pdf PDF
Attachment_1_SOW_Amend_0001.pdf PDF
Attachment_2_CLIN_Table_Amend_0001.xlsx XLSX spreadsheet
Attachment_1_SOW.pdf PDF
Attachment_6_Wage_Determinations.pdf PDF
Attachment_5E_PerSEC.pdf PDF
Attachment_5B_NDA_(Contract_Personnel).pdf PDF
Attachment_5_Contract_Administration-Special_Contract_Requirements.pdf PDF
Attachment_3_Places_of_Performance.pdf PDF
Attachment_2_CLIN_Table.xlsx XLSX spreadsheet
Attachment_5A_NDA_(Contractor_Entity).pdf PDF
Attachment_4_SF1449.pdf PDF
Attachment_5D_Credit_Release_v__1_09_2012.pdf PDF
Attachment_5C_OF306.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

SECHQ114R0015/000001

B. Paragraph (viii), subpagraph 6, is deleted and replaced with: 6. Price and any discount terms in accordance with Attachment 2, CLIN Table

(Note: pricing shall be separate from Vendor's, management approach and capabilities, and past performance).

C. Paragraph (viii), subpagraph 10, is deleted and replaced with: 10. A copy of System for Award

Management (SAM) registration (see https://www.sam.gov/), or indicate that the SAM record is available on-line at https://www.sam.gov, or a copy of System for

Award Management application.

D. Paragraph (viii), subpagraph 12, is deleted and replaced with: 12. A management approach and capabilities description of the services being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may also include product literature, or other documents, if necessary.

E. Paragraph (ix), FAR 52.212-2

Evaluation-Commercial Items (Jan 1999), a), Management Approach and Capabilities, subparagraph A is deleted and replaced with:

A. Key Personnel Resumes with a description of the experience and capability for the personnel proposed and representational resumes for all administrative positions at the SEC's

Headquarters in Washington, D.C. and two (2) regional offices. Descriptions shall address such items as the individual's background, education, work experience and accomplishments.

Each resume should be limited to two (2) pages.

F. Paragraph (ix), FAR 52.212-2

Evaluation-Commercial Items (Jan 1999), Past

Performance, 1st paragraph, is deleted and replaced with: Past Performance: Offerors shall provide a list of no more than three current or past contracts (both Government and Commercial) performed within the past five years for whom the

Offeror has provided the same or similar services

(similar value/number of personnel). Offerors may use a Subcontractor's past performance for one of the three past performance submissions. The contractor shall submit the following information

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

SECHQ114R0015/000001

for each contract:

G. Paragraph (ix), FAR 52.212-2

Evaluation-Commercial Items (Jan 1999), Page

Limitation is deleted and replaced with: Page

Limitation: The technical proposal (management approach and capabilities) shall be limited to twelve (12) one-sided pages, minimum font size of point 12, excluding cover page(s), table of contents, the resumes (2 pages each) and letters of commitment for proposed new hire(s). There is no page limitation for past performance.

H. Paragraph (ix), FAR 52.212-2

Evaluation-Commercial Items (Jan 1999), the header "Volume 2 - Price Proposal" is deleted and replaced with"Price Proposal."

I. Paragraph (ix), FAR 52.212-2

Evaluation-Commercial Items (Jan 1999), Price

Proposal, subparagraph c is deleted and replaced with: c) If applicable, Prime Contractor/ Subcontractor Arrangement or Contractor Team

Arrangement Supporting Documentation.

Furthermore, the prime contractor shall disclose to the Government's Contracting Officer a copy of the subcontract pricing, terms and conditions, or subcontracting agreement. If subcontracting or teaming is proposed, the Government will evaluate the acceptability of any subcontracting or teaming as part of its evaluation of price.

J. Paragraph (ix), FAR 52.212-2

Evaluation-Commercial Items (Jan 1999), Price

Proposal, 6th paragraph entitled Price Proposal, is deleted and replaced with the following: Price

Proposal: The Government expects to receive price competition through the submission of several price proposals. The Offeror's proposed pricing will be evaluated against the Government's estimated level of effort of 1,880 hours per year for each position. Offerors shall propose fixed labor rate prices that are both realistic and reasonable. Options will also be evaluated.

K. Paragraph (xv), third paragraph is deleted and replaced with: The Offeror's proposal shall consist of four (4) electronic files, Microsoft

Word, Adobe PDF, or Microsoft Excel type files:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

SECHQ114R0015/000001

1. Management Approach and Capabilities

2. Past Performance

3. Pricing*

4. SF-1449 and SF-30 Amendment(s)

*Contractor Team Arrangement or Prime

Contractor/Subcontractor Arrangement Supporting

Documentation shall be submitted in the Pricing file, if applicable.

Representations and Certifications and

System for Award Management (SAM) registration/application shall be submitted in a separate file, only if this documentation is not available on-line.

2. Attachment 1, Statement of Work, is revised as follows (revised Attachment 1, Statement of Work, is attached, with changes highlighted in bold italics):

Page 2, Paragraph 4.2, Project Management, is revised to add the following: The Project

Manager and Alternate Project Manager will be located at the SEC Headquarters Office in

Washington, D.C.

3. Attachment 2, CLIN Table, is revised to delete and reserve the Project Manager SEC Labor Duty

Category from all locations except the SEC

Headquarters (HQ) in Washington, D.C. (revised

Attachment 2, CLIN Table, is attached, with changes highlighted in bold italics).

4. The Government's answers to questions asked are provided in the attached file, Qs & As.

5. All other terms and conditions of the solicitation remain the same.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

14-R-0015-amend0001
Draft Amendment 1 SF-30

File details come from the government source that posted it. Updated .