Sealcoating project Maps Appendix A.PDF
PDF 606 KB Posted
- Attached to
- Parking Lot Pavement Repair
- Solicitation number
- RFQ-RB-2025-06-18
- Issued by
- Albany County, New York
About this file
Appendix A is a detailed mapping document for a sealcoating project located at 445-447 Delaware Avenue, associated with the Bethlehem Town Hall parking lot in New York. The document provides specific instructions for parking lot markings, including detailed specifications for police-only parking spaces, with red lines one foot in width and lettering one foot tall. The map indicates the project will be segmented into two distinct areas - green and purple zones - which can be completed in either order, with clear delineation of parking spot allocation and directional signage requirements.
The project appears to be a pavement maintenance initiative involving sealcoating and parking lot repair, focusing on precise surface and marking improvements. While specific pricing details are not explicitly stated in the document, the appendix suggests a structured approach to site preparation and marking, indicating a professional municipal infrastructure improvement project. The document does not specify exact contract value, funding sources, or bidding timeline, but provides technical guidance for contractors on site-specific requirements for surface treatment and parking space designations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quote Request Parking Lot Sealing.pdf | ||
| Non-Collusion Statement Appendix B.PDF | ||
| Bidder Qualification Form Appendix C.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
445 – 447 Delaware Avenue Parking Lot Sealcoating Project
Below is the list of number of spots based on the area shown:
For solid red line the words “POLICE ONLY” should appear above the line if standing at the yellow arrow indicated and the words “DO NOT
ENTER” should appear below the line the Red line shall be one foot in width and the letters shall be one foot lettering (each) as well.
This map indicates which areas will be done on which days
The green areas will be completed on one day, and the purple area will be completed on another day.
There is no preference on which is done first.
File details come from the government source that posted it. Updated .