Seal_Cove_Landslide_Surficial_Surveying_and_Monitoring_Services.pdf

PDF 279 KB Posted

Attached to
Seal Cove Landslide Surficial Surveying and Monitoring Services
Solicitation number
2026-RFP-00559
Issued by
San Mateo County, California

About this file

This is a Scope of Work document from the County of San Mateo, California, for establishing and maintaining a long-term surficial monitoring program for the Seal Cove landslide complex and Bluff Retreat. The County seeks qualified engineering, geological, and land surveying firms to provide comprehensive ground deformation monitoring services across the residential neighborhood within the landslide complex, expanding upon existing monitoring efforts centered around the Moss Beach Distillery. The project encompasses the design and implementation of a surficial monitoring network that will track landslide movement and bluff retreat over an extended period. The scope requires establishment of survey control points, installation of monitoring instrumentation, and execution of periodic surveys to detect and measure ground displacement. The monitoring program is intended to provide critical data for understanding the spatial and temporal patterns of ground deformation to inform risk assessment, mitigation planning, and ongoing hazard management in the affected area.

The contract represents a long-term engagement requiring firms to maintain continuous monitoring capabilities and provide regular reporting throughout the contract period. Selected contractors will be responsible for initial baseline surveys, ongoing periodic monitoring at specified intervals, data analysis and interpretation, and delivery of comprehensive monitoring reports. The project funding is provided by the County of San Mateo, with the contract term structured to support sustained monitoring activities over multiple years, ensuring continuity of data collection and analysis for this critical public safety infrastructure project.

View the file

Other files

File Type Posted
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

County of San Mateo

Request for Proposals (RFP) for Seal Cove Landslide

Surficial Surveying and Monitoring Services

Planning and Building

RFP No. 2026-RFP-00559

RFP Contact: Amy Tang xtang@smcgov.org

1. Introduction and Schedule

The County of San Mateo (the “County” or “SMC”) covers most of the San Francisco Peninsula. The region covers 744 mi and is home to nearly 800,000 residents and 20 incorporated cities. The County provides for the health and welfare of all people within its borders and serves as the local government for the unincorporated areas. Innovation thrives here in industries including bioscience, computer software, green technology, hospitality, financial management, health care, education and transportation. The

County prides itself on how that prosperity fosters its commitment to protecting and enhancing the health, safety, welfare and natural resources of the community.

1.1. Summary

The County of San Mateo (County) is seeking proposals from qualified engineering, geological, and land surveying firms to establish and maintain a long-term surficial monitoring program for the Seal Cove landslide complex and Bluff Retreat. This project aims to expand upon existing monitoring efforts currently centered around the Moss Beach Distillery to provide a comprehensive understanding of ground deformation across the broader residential neighborhood within the landslide complex.

1.2. Background

The Seal Cove neighborhood, located in the unincorporated Moss Beach area, is subject to three primary geologic hazards including active faulting, rapid erosion of coastal bluffs, and most notably deep-seated landslide movement across a large portion of the neighborhood. These hazards are documented in the

“Seal Cove Geologic Study” commissioned by the County and published on December 15, 2025 in response to increased land movement observed in early Spring 2025. The Study concluded that the active deep-seated landslide complex had both expanded landward in the southerly portion of the complex and had increased rate of displacement in recent years. This rate of displacement, however, has only been historically measured in the northerly portion of the landslide complex, meaning that we have no data on displacement monitoring in the southerly portion of the slide. A map of the slide and neighborhood can be found in the “Seal Cove Geologic Study” which is publicly available on the County of San Mateo website. This project aims to expand upon the County’s existing monitoring network at the Moss Beach

Distillery to provide a comprehensive understanding of ground deformation across the entire landslide complexes residential roadways and coastal bluffs to inform public safety and infrastructure planning.

1.3. Contact Information

Project Contact:

Quinn Todzo Geotechnical Engineer Email: qtodzo@smcgov.org Phone: (628) 222-3035

Procurement Contact:

Amy Tang Administrative Services Manager Email: xtang@smcgov.org Phone: (650) 363-4053

Department:

Planning and Building mailto:qtodzo@smcgov.org tel:(628)222-3035 mailto:xtang@smcgov.org tel:(650)363-4053

Page 3 of 17 Release date of June 12, 2026

Department Head:

Steve Monowitz Director

1.4. Timeline

RFP Released June 12, 2026

Deadline for Questions and Comments June 29, 2026, 5:00pm

Proposal Due Date and Time July 13, 2026, 5:00pm

Anticipated Contract Award Date July 28, 2026

2. Scope of Work

The selected Contractor will be responsible for the initialization of a new monitoring network and the execution of ongoing biannual surveys. The scope of work includes:

2.1. Expansion of Ground Survey Monuments

The Contractor shall implement a ground survey monitoring program using a total station based survey.

The Contractor shall be responsible for the following:

• Installation of Monuments: Establish 20 new in-ground survey monuments located within

County roadways at locations and in a manner approved by the County. All points must be installed in protected inground monument boxes (traffic-rated) rather than surface pins to prevent loss due to road maintenance or vehicle traffic. The Contractor shall include in their proposal their recommended placement of the survey network. The network must include a combination of

Control Points (stable ground) and Landslide Movement Points (active slide area).

• Baseline Readings: The Contractor shall take baseline readings within a week or two of installing the monitoring points, which should occur within one month of contract approval. The readings shall be taken with a high precision Total Station. Details of the Contractor’s survey equipment shall be included in the proposal

• Continued Readings: The Contractor shall take readings quarterly (four times per year in evenly spread out intervals) of each monitoring point.

2.2. GPS Monitoring

The Contractor shall implement GPS based survey monitoring for difficult terrain, terrain with heavy movement where a normal total station-based survey would be impractical, and other hard to reach areas as well as a secondary backup for total station monitoring to verify accuracy. The Contractor shall be responsible for the following:

Page 4 of 17 Release date of June 12, 2026

• Establish Target Areas: The Contractor shall propose areas and points where they will conduct

GPS monitoring. Areas such as the closed portion of Ocean Blvd. and Terrace Ave. may be included as well as areas like San Lucas Ave. where the depressions are difficult to shoot with a total station.

• Perform Monitoring: The Contractor shall plan to take roughly 150 GPS data points to cover areas not well documented by the total station. Features such as scarps, depressions, grabens, and cracks shall be monitored using this technique. They shall also take readings of the total station points to serve as a secondary backup for total station monitoring to verify accuracy.

2.3. Unmanned Aerial Vehicle (UAV/Drone) Monitoring

The Contractor shall utilize drone technology to provide a holistic view of the complex and provide rates of coastal erosion. The following shall be accomplished by this task, which shall occur concurrently with other bi-annual monitoring tasks:

• Coastal Erosion Rate: Capture high-resolution data (accuracy down to at least 6-inches) to measure sea-cliff recession and bluff retreat

• Mapping: Provide a topographic and visual analysis of the landslide complex to supplement discrete ground-based data points.

2.4. Technical Reporting and Data Visualization

Following each quarterly survey event, the Contractor shall deliver a Comprehensive Monitoring Report to the County. The report must be professional in appearance and include, at a minimum:

• Executive Summary: A concise narrative summarizing the findings, including any identified acceleration of movement or new areas of instability. • Data Tables: Well-produced, easy-to-read tables displaying current coordinates, elevation changes, and cumulative displacement for every monument in the network.

• Graphic Analysis: High-quality charts showing movement trends over time for key monitoring points.

o Vector Maps: Overlays showing the direction and magnitude of ground movement across the Seal Cove neighborhood.

o Drone Orthomosaics: High-resolution imagery with topographical contours highlighting changeover-time.

• Recommendations: Identify any recommended changes to the monitoring program, based on observations and data analysis, that could enhance the effectiveness of the monitoring program.

It should be noted that all data and work products, once paid, shall belong to the County.

Page 5 of 17 Release date of June 12, 2026

2.5. Period of Performance and Reporting

The anticipated contract term is 2 years for the purposes of this proposal and may be extended in the future. The phases of work shall include the following:

• Installation Plan: Submittal of a detailed plan and maps identifying the precise locations, specifications, and installation methods for all monitoring equipment and reference points shall occur within 14 days of contract approval. Responses to County comments on the plan shall be submitted within 14 days of issuance of the County’s comments.

• Initialization: Installation of monuments and baseline survey shall occur within 30 days of the

County’s approval of the Installation Plan and issuance of any required encroachment permits.

• Quarterly Readings: Surveying and reporting to be conducted quarterly.

• Comprehensive Monitoring Reports: To be submitted within 10 days of each quarterly monitoring event.

3. Submission Requirements

3.1. Submission Deadline

Proposals must be electronically received by 5:00 pm, on Monday, July 13, 2026 via eProcurement system.

Allow sufficient time for the upload to complete by the Due Date and Time. Partial uploads will automatically terminate, and proposals will be rejected. The eProcurement system submission time will be the official submission time. The County will not be responsible for and may not accept proposals that are late due to slow internet connections or for any other failure of the eProcurement system.

NOTE: The County does not maintain the eProcurement system and is not liable for site failures or technical problems. To resolve technical issues, contact OpenGov Technical Support by using the real time chat located in the lower right hand corner of the screen, or via email at procurement-support@opengov.com https://procurement.opengov.com/portal/smcgov

3.2. Pre-submission Registration

Organizations or individuals interested in responding to this solicitation must register online with the

County of San Mateo at:

• https://procurement.opengov.com/portal/smcgov

It is recommended that organizations complete this registration as soon as possible. The County will not be responsible for and may not accept proposals that are late due to a failure to register in the eProcurement system.

3.3. Submission via eProcurement Portal

Required Documents mailto:procurement-support@opengov.com mailto:procurement-support@opengov.com https://procurement.opengov.com/portal/smcgov https://procurement.opengov.com/portal/smcgov

Page 6 of 17 Release date of June 12, 2026

Please refer to the Technical Proposal section for submittal documents and requirements.

Electronic Submissions

Include the proposer name and the RFP title and number in each filename. Submit proposals via the eProcurement website, allowing sufficient time for the upload to complete by the Due Date and Time. As noted above, the eProcurement portal submission time will be the official submission time, and partial uploads will automatically terminate, and proposals will be rejected. Contact eProcurement Portal with technical questions regarding this site.

Conflicts between Certain Requirements

Prior to the submission deadlines and solely relating to a determination of the timeliness of questions, comments, and proposal submissions, information displayed on the eProcurement portal site will take precedence in the event of a discrepancy between that information and the information within the solicitation documents. For all other discrepancies, the information in the solicitation documents will take precedence.

Format

Documents should be created in the following format:

• Text should be Times New Roman (12-point minimum font size) and unjustified (i.e., with a ragged-right margin)

• Pages should have margins of at least one inch on all sides (excluding headers and footers)

• If the proposal is lengthy, a Table of Contents should be included.

• PDF format is preferred.

Errors in Proposals

The County will not be liable for any errors in proposals. Proposals may be rejected as unresponsive if they are late, incomplete, missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any remaining RFP requirements.

3.4. Procurement Preference for Local Businesses and Local Non-Profits

The County of San Mateo has adopted a Procurement Preference for Local Businesses Ordinance (County

Ord. Code Ch. 2.89.) The purpose of this Ordinance is to promote a strong local economy by giving preference to local businesses, local non-profits, local small and micro businesses, and local small and micro non-profits in County procurements, to the extent consistent with the law and interests of the public. The County’s process for applying local preferences to competitive procurements is set forth in

County Ordinance Code Section 2.89.030. The Ordinance and exemptions (e.g. the ordinance will be exempt when all bids or proposals received are from Non-Profit Organizations) can be reviewed here:

Chapter 2.89 - PROCUREMENT PREFERENCE FOR LOCAL BUSINESSES | Code of Ordinances |

San Mateo County, CA | Municode Library https://procurement.opengov.com/portal/smcgov/projects/273843/document?section=2640476 https://library.municode.com/ca/san_mateo_county/codes/code_of_ordinances?nodeId=TIT2AD_ART2.8INFIPRCOCO_CH2.89PRPRLOBU https://library.municode.com/ca/san_mateo_county/codes/code_of_ordinances?nodeId=TIT2AD_ART2.8INFIPRCOCO_CH2.89PRPRLOBU

Page 7 of 17 Release date of June 12, 2026

The requirements for bidders to establish eligibility for a local preference for this solicitation are detailed below in Section III (Submission Requirements) The Ordinance does not apply if a procurement is determined to be exempt (County Ord. Code sec. 2.89.050), and the County reserves the right to waive application of the Ordinance to this procurement if determined to be in the best interests of the County

(County Ord. Code sec. 2.89.060).

4. Minimum Qualifications

Proposers must meet the following requirements:

• Minimum of five (5) years of experience in landslide monitoring.

• Project Lead must be a Licensed Civil Engineer in California.

• Demonstrated capability in total station-based surveying, GPS surveying, and UAV-based mapping.

4.1. Minimum Qualifications

4.1.1. Has Proposer has been providing similar services for a minimum of five (5) years in landslide monitoring?*

☐ Yes

☐ No

*Response required

4.1.2. Does the Project Lead possess an active Civil Engineer license in California?*

☐ Yes

☐ No

*Response required

4.1.3. Please confirm your firm is registered with System for Award Management (SAM)*

SAM.gov

☐ Please confirm

*Response required

4.1.4. What is the registered Business Name and Unique Entity ID (UEI) No.?*

• UEI number can be obtained by registering your business through SAM.GOV

• Should you be in the process of obtaining your UEI number, please enter the digits ‘123’ temporarily for your response below in order to proceed with proposal. This temporary number should be replaced with the correct registration number for submission of the proposal.

*Response required

4.2. Procurement Preference for Local Businesses and Local Non-Profits

4.2.1. Is the Proposer a "Local Business"?

https://sam.gov/content/home

Page 8 of 17 Release date of June 12, 2026

As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code, a “Local Business” means any for-profit business which has its principal place of business, or is headquartered, in San Mateo

County. If this designation applies to the proposer, a self-attestation form must be completed and provided with this response.

Please download the below documents, complete, and upload. If this designation is not applicable, please leave blank.

• SMC_LocalBusiness_self-atte...

4.2.2. Is the Proposer a Non-Profit?*

A Non-Profit is defined as a tax-exempt public charity organization (within the meaning of section

501(c)(3) of the Internal Revenue Code) that is formed for purposes other than making a profit, is exempt from paying federal income taxes on the income generated for their exempt purposes.

☐ Yes

☐ No

*Response required

When equals "Yes"

4.2.3. Is the Proposer a "Local Non-Profit"

As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code, a “Local Non-Profit" means a tax-exempt public charity organization (within the meaning of section 501(c)(3) of the

Internal Revenue Code) that is formed for purposes other than making a profit, is exempt from paying federal income taxes on the income generated for their exempt purposes, and has its principal place of business, or is headquartered, in San Mateo County. If this designation applies to the proposer, a self-attestation form must be completed and provided with this response.

Please download the below documents, complete, and upload. If this designation is not applicable, please leave blank.

• SMC_LocalBusiness_self-atte...

4.2.4. Is the Proposer a Local "Small" or "Micro" Business?

As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code:

“Small Business” means any business which holds a Small Business Certification awarded by the

California Office of Small Business and Disabled Veteran Business Enterprise Services (OSDS).

“Micro Business” means any Small Business certified by the OSDS which is automatically designated by the OSDS as a Micro Business due to gross annual receipts falling below the OSDS-designated dollar amount.

If the above designations apply, please provide the OSDS provided Certification ID.

If this designation is not applicable, please leave blank.

4.2.5. Is the Proposer a Local "Small" or "Micro" Non-Profit?

As Defined by Chapter 2.89.020 of the San Mateo County Ordinance Code:

https://government-project.s3.us-west-2.amazonaws.com/153456/a16ffdc0-a0ee-44ca-b6de-1fddd010042f_SMC_LocalBusiness_self-attestation_form_120424.pdf https://government-project.s3.us-west-2.amazonaws.com/153456/80d29c2f-acda-4b87-837e-cb4ead1fb303_SMC_LocalBusiness_self-attestation_form_120424.pdf

Page 9 of 17 Release date of June 12, 2026

“Small Non-Profit" means a Local Non-Profit with an annual revenue of $1,000,000 to $2,500,000 according to its most recently filed IRS Form 990.

“Micro Non-Profit" means a Local Non-Profit with an annual revenue of less than $1,000,000, according to its most recently filed IRS Form 990.

If the above designations apply, please provide your latest filed IRS form 990. A filing from the last two calendar years is acceptable.

If this designation is not applicable, please leave blank.

4.3. Technical Proposal

4.3.1. Introduction and Executive Summary *

Submit a letter of introduction and executive summary of the proposal. The letter must contain:

• Name, title and contact information (email, phone, and address) for representative of proposer that is responsible for communication related to this RFP.

• Name, title, contact information, and signature of person authorized to obligate firm to perform the commitment contained in the proposal.

Submission of the letter will constitute a representation by proposer that it is willing and able to perform the commitments contained in the proposal and has not violated the terms of this RFP.

*Response required

4.3.2. Statement of Minimum Qualifications *

Describe how the proposer meets the minimum qualifications as set forth in Minimum Qualifications of this RFP.

Submission of the Minimum Qualifications checklist is not a substitute for providing a detailed written response.

*Response required

4.3.3. Project Approach*

This section should correlate to the Scope of Work . Proposer should provide a detailed work plan for monument installation and reporting. Details on the survey equipment shall be provided in the proposal.

Maximum response length: 5000 characters

*Response required

4.3.4. Proposed schedule *

Attach proposed schedule reference ability to complete the project within the County's required time frame

*Response required

4.3.5. Innovations*

Refence any notable innovations or improvements that you expect to provide (with respect to, for example, efficiency, technology, sustainability)

Page 10 of 17 Release date of June 12, 2026

*Response required

4.3.6. Performance Measures*

Describe a plan for achieving performance measures

*Response required

4.3.7. Firm Qualifications *

Attach information regarding background and qualifications, including the following:

• An example of a monitoring technical document from a prior project.

• A description of not more than three (3) projects similar in size and scope conducted by the proposer, including the client, reference and telephone numbers, primary staff members involved, budget, schedule, and project summary. Descriptions should be limited to one (1) page for each project.

• If subcontractors are anticipated, identify them (if known) and provide information on how they will be used.

*Response required

4.3.8. Team Qualifications*

Provide a chart identifying:

▪ Project team and reporting structure

▪ Lead project manager

▪ Role each person will play in the project

Provide a brief description of the experience and qualifications of the project team members, including short resumes if desired.

Written assurance that the key individuals listed and identified will be performing the work and will not be substituted or reassigned without the County’s prior approval

*Response required

4.3.9. References*

Provide 2 references for each of the following, including the name, address, and telephone number of recent clients (preferably other public agencies):

*Response required

4.3.10. Fee Proposal*

The Fee Proposal should be submitted as a separate PDF file in the following manner:

• Phase I (Initialization): Lump sum installation and baseline readings.

• Phase II (Ongoing): Fixed Fee per quarterly reading/reporting event.

Page 11 of 17 Release date of June 12, 2026

• Additional Ad-Hoc Monitoring: Fee for additional reporting if data and reporting suggest that additional readings are required.

The County reserves the right to accept other than the lowest priced offer and to reject any proposals that are not responsive to this request.

*Response required

5. Evaluation and Selection Criteria

The proposals will be evaluated by a selection committee with relevant expertise. The County intends to evaluate the proposals generally in accordance with the criteria itemized below. Proposers with the highest scoring proposals may be interviewed by the committee to make the final selection.

No. Evaluation Criteria Scoring Method Weight (Points)

1. Project Approach Points Based 30 (27.3% of Total)

2. Firm Qualifications Points Based 25 (22.7% of Total)

3. Team Qualifications Points Based 20 (18.2% of Total)

4. Price Points Based 25 (22.7% of Total)

5. Preferential Points

Where price is not the sole evaluation factor for a solicitation (e.g., in the case of a "best-value" solicitation), five percent (5%) of the total evaluation points otherwise awardable will be added to the proposal score for each Local

Business or Local Non-Profit score for evaluation purposes. In the event of a tie between a Local Business or Local Non-Profit and another bidder, the Local Business or Non-

Profit shall be awarded the Contract, assuming agreement on other contract terms.

An additional three percent (3%) preference shall be given to a Local Business or Local

Non-profit (for a total of eight percent (8%) of total points otherwise awardable) if the proposer is a Small Business or Small Non-

Profit, or an additional 5 percent preference (for a total of ten percent (10%) of total points otherwise awardable) if the proposer is a Micro

Business or Micro Non-Profit.

Points Based 10 (9.1% of Total)

Page 12 of 17 Release date of June 12, 2026

6. Instructions to Proposers

6.1. Instructions

There will be no pre-proposal conference or site visit for this project.

6.2. Communications

A. As of the issuance date of this RFP and continuing until it is canceled or an award is made, no proposer or person acting on behalf of a prospective proposer may discuss any matter relating to the RFP with any officer, agent, or employee of the County, other than through eProcurement portal, to the Authorized Contact Person, or as outlined in the evaluation or protest procedures.

B. Proposers (including any agent, owner, employee, board members, or other such affiliates) shall not offer any gift, favor, or other personal benefit to any County officer or employee during the procurement process for this agreement, including during the solicitation period and contract negotiations.

Violation of the foregoing prohibitions may result in a proposer being found non-responsible and barred from participating in this or future procurements.

6.3. Contract Award

A. Award Procedure

Contract negotiations are neither an offer nor guarantee that a contract will be executed. A contract award, if any is made, will be to the responsive, responsible proposer offering the overall best value to the County for the services and goods described in this solicitation, or as applicable, for a specific portion of the services and goods described. Any agreement reached will be memorialized in a formal agreement using the attached template, executed by the appropriate authority.

B. Notice of Intent to Award

If a decision is made to take steps to enter into an agreement with one or more proposers, the

County will post a Notice of Intent to Award or otherwise notify proposers the remaining proposers of their non-selection. Notice may instead be provided by including approval of the agreement as an item on an agenda for a meeting of the Board of Supervisors.

C. Commencement of Performance

After all parties have signed the agreement, the County will notify the contractor and performance may proceed. Prior to execution of the agreement by the County, no County employee may authorize work under the agreement. Any work performed prior to the full execution of the Agreement may not be compensated.

D. Levine Act DisclosureThe Levine Act (California Government Code Section 84308) imposes certain requirements on parties contracting with the County of San Mateo related to campaign contributions to County “officers,” including elected County officers and candidates seeking elective office, who may participate in making a decision on certain County contracts. Elected

Page 13 of 17 Release date of June 12, 2026

County officers in San Mateo County include: the San Mateo County Board of Supervisors, Assessor-County Clerk-Recorder, County Controller, Coroner, District Attorney, Sheriff, and Tax

Collector-Treasurer.Generally, under current County policy, approval by the Board of

Supervisors is required for any agreement for services above $200,000, and agreements for services below that threshold may be approved by Department heads.If your proposal is selected, you will be required to certify compliance with the Levine Act.As part of this process, you will need to certify and warrant that you have fully complied, and will remain in full compliance, with all applicable requirements of the Levine Act in connection with the

Agreement, including making any required disclosures of campaign contributions to County

Officers, which includes but may not be limited to elected County Officers. Elected County

Officers include members of the San Mateo County Board of Supervisors, as well as the

Assessor-County Clerk-Recorder, Controller, Coroner, District Attorney, Sheriff, and Tax

Collector-Treasurer. Any campaign contribution required to be disclosed under the Levine Act in connection with this Agreement shall be disclosed on the County of San Mateo Levine Act

Disclosure Form, a copy of which is available from the County upon request.Parties are solely responsible for accurate certification and disclosure. The Levine Act is complex, and this brief description is not legal advice. For example, certain contributions must be aggregated when determining whether contributions have exceeded the $500 threshold. If your proposal is selected, you are urged to review the Levine Act and consider consulting an attorney.

6.4. Term

Planning and Buildingis issuing Request for Proposal (RFP) No. 2026-RFP-00559 for Seal Cove

Landslide Surficial Surveying and Monitoring Services.

The agreement shall have a term of Three (3) year. In addition, the County shall have one (1) option to extend the term for an additional period not to exceed two years, which the County may exercise in its sole, absolute discretion. To exercise this option, the County shall provide written notice to the Contractor at least thirty days before the end of the agreement’s term.

The County’s standard contract template has been included with this solicitation. The awarded contractor will be expected to sign an agreement prepared by the County using this template. Please ensure that your firm has completed legal review of these contract terms. If your firm wishes to request exceptions to these standard terms, submit a Contract Exceptions Request by the Deadline for Questions, Comments and

Contract Exceptions listed in the Solicitation Schedule below. The County will consider Contract

Exceptions Requests but reserves the right to reject requested modifications to its standard terms.

7. Terms and Conditions for Receipt of Proposals

7.1. Errors, Omissions and Inquiries regarding the RFP

Proposers are responsible for reviewing all portions of this RFP. Proposers are to notify the department, in eProcurement portal, if the proposer discovers any ambiguity, discrepancy, omission, or apparent error in the RFP. Such notification should be made promptly after discovery, but in no event later than five business days prior to the deadline for receipt of proposals. Modifications and clarifications will be made by addenda as provided below.

Page 14 of 17 Release date of June 12, 2026

Inquiries regarding the RFP should be lodged in eProcurement portal.

7.2. Objections to RFP Terms

Should a proposer object on any ground to any provision or legal requirement set forth in this RFP, the proposer must, not more than ten calendar days after the RFP is issued, provide written notice to the department, via eProcurement portal, setting forth with specific grounds for the objection.

7.3. Addenda

The County may cancel, revise, or reissue this RFP, in whole or in part, for any reason. Revisions will be posted as Addenda on eProcurement portal. No other revision of this RFP is valid. Proposers shall be responsible for ensuring that their proposals reflects any and all Addenda issued by the County prior to the proposal due date regardless of when a proposal is submitted. Therefore, the County recommends that proposers consult eProcurement portal frequently, including shortly before the proposal due date, to confirm that all Addenda have been downloaded.

7.4. Term of Proposal

Submission of a proposal signifies that the proposed services and prices are valid for the duration of the proposed agreement term and that the quoted prices are genuine and not the result of collusion or any other anti-competitive activity.

7.5. Revision or Withdrawal of Proposal

A proposer may revise a proposal on the proposer’s own initiative at any time before the deadline for submission of proposals. The proposer must submit the revised proposal in the same manner as the original on or before the proposal due date.

A proposer may withdraw a proposal at any time before the deadline for submission of proposals. After that time, whether or not a new RFP is issued for the same subject matter, withdrawal of a proposal may preclude the proposer from participating in the procurement as a proposer or subcontractor, except that an original equipment manufacturer may participate indirectly through a reseller.

7.6. Errors and Omissions in Proposal

The County will not be liable for any errors in proposals. Proposals may be rejected as unresponsive if they are incomplete, are missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any of the remaining RFP requirements.

7.7. No Commitment

Neither submission of a proposal nor the County’s receipt of proposal materials confers any right to the proposer nor any obligation on the County. This RFP does not commit the County to award a contract.

7.8. Financial Responsibility

The County shall have no financial responsibility for any costs incurred by a firm in responding to this

RFP or participating in any presentations or negotiations.

Page 15 of 17 Release date of June 12, 2026

7.9. Estimated Quantity

If the RFP results in an indefinite quantity or a requirements agreement, the goods and services actually requested by the County may be less than the maximum value of the agreement and there is no guarantee, either expressed or implied, as to the actual quantity of goods and services that will be authorized under the agreement.

7.10. Public Record

A. General

1. All proposals, protests, and information submitted in response to this solicitation will become the property of the County and will be considered public records. As such, they may be subject to public review.

2. Any contract arising from this RFP will be a public record.

3. The County is not seeking proprietary information and will not assert any privileges that may exist on behalf of the proposer.

4. Submission of any materials in response to this RFP constitutes:

▪ Consent to the County’s release of such materials under the Public Records Act without notice to the person or entity submitting the materials; and

▪ Waiver of all claims against the County and/or its officers, agents, or employees that the

County has violated a proposer's right to privacy, disclosed trade secrets, or caused any damage by allowing the proposal or materials to be inspected; and

▪ Agreement to indemnify and hold harmless the County for release of such information under the Public Records Act; and

▪ Acknowledgement that the County will not assert any privileges that may exist on behalf of the person or entity submitting the materials.

7.11. Reservations of Rights by the County

The issuance of this RFP does not constitute an agreement by the County that any contract will actually be entered into by the County. The County expressly reserves the right at any time to:

• Waive or correct any defect or informality in any response, proposal, or proposal procedure;

• Reject any or all proposals;

• Reissue an RFP;

• Prior to submission deadline for proposals, modify all or any portion of the selection procedures, including deadlines for accepting responses, the specifications or requirements for any materials, equipment or services to be provided under this RFP, or the requirements for contents or format of the proposals;

Page 16 of 17 Release date of June 12, 2026

• Procure any materials, equipment or services specified in this RFP by any other means; or

• Determine that no project will be pursued.

7.12. No Waiver

No waiver by the County of any provision of this RFP shall be implied from any failure by the County to recognize or take action on account of any failure by a proposer to observe any provision of this RFP.

7.13. Cooperative Agreement (Piggyback)

This competitive solicitation is being conducted as a Cooperative Procurement. The services, terms and conditions of any agreement resulting from this solicitation may be used by other organizations as a

Cooperative Agreement.

This provision in no way commits any affiliate to procure services from any awarded contractor, nor does it guarantee that any additional orders will result. At their discretion, and subject to their own procurement policies, interested organizations may make use of this competitive procurement and contract directly from the awarded contractor.

8. Protest Procedures

8.1. Protest of Non-Responsiveness Determination

Within five (5) working days of the County's issuance of a notice of non-responsiveness, any firm that has submitted a proposal and believes that the County has incorrectly determined that its proposal is non-responsive may submit a written notice of protest. Such notice of protest must be received by the County on or before the fifth working day following the County's issuance of the notice of non-responsiveness. The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest.

8.2. Protest of Contract Award

Within five (5) working days of the County's issuance of a notice of intent to award the contract, any firm that has submitted a responsive proposal and believes that the County has incorrectly selected another proposer for award may submit a written notice of protest. Such notice of protest must be received by the

County on or before the fifth working day after the County's issuance of the notice of intent to award.

The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest.

Page 17 of 17 Release date of June 12, 2026

8.3. Delivery of Protests

All protests must be received by the due date. If a protest is mailed, the protestor bears the risk of non-delivery within the deadlines specified herein. Protests should be transmitted by a means that will objectively establish the date the County received the protest. Protests or notice of protests made orally

(e.g., by telephone) will not be considered. Protests must be delivered to:

Protests@smcgov.org

Subject: Seal Cove Landslide Surficial Surveying and Monitoring Services, 2026-RFP-00559

1. Introduction and Schedule
1.1. Summary
1.2. Background
1.3. Contact Information
1.4. Timeline
2. Scope of Work
2.1. Expansion of Ground Survey Monuments
2.2. GPS Monitoring
2.3. Unmanned Aerial Vehicle (UAV/Drone) Monitoring
2.4. Technical Reporting and Data Visualization
2.5. Period of Performance and Reporting
3. Submission Requirements
3.1. Submission Deadline
3.2. Pre-submission Registration
3.3. Submission via eProcurement Portal
3.4. Procurement Preference for Local Businesses and Local Non-Profits
4. Minimum Qualifications
4.1. Minimum Qualifications
4.1.1. Has Proposer has been providing similar services for a minimum of five (5) years in landslide monitoring?*
4.1.2. Does the Project Lead possess an active Civil Engineer license in California?*
4.1.3. Please confirm your firm is registered with System for Award Management (SAM)*
4.1.4. What is the registered Business Name and Unique Entity ID (UEI) No.?*
4.2. Procurement Preference for Local Businesses and Local Non-Profits
4.2.1. Is the Proposer a "Local Business"?
4.2.2. Is the Proposer a Non-Profit?*
4.2.3. Is the Proposer a "Local Non-Profit"
4.2.4. Is the Proposer a Local "Small" or "Micro" Business?
4.2.5. Is the Proposer a Local "Small" or "Micro" Non-Profit?
4.3. Technical Proposal
4.3.1. Introduction and Executive Summary *
4.3.2. Statement of Minimum Qualifications *
4.3.3. Project Approach*
4.3.4. Proposed schedule *
4.3.5. Innovations*
4.3.6. Performance Measures*
4.3.7. Firm Qualifications *
4.3.8. Team Qualifications*
4.3.9. References*
4.3.10. Fee Proposal*
5. Evaluation and Selection Criteria
6. Instructions to Proposers
6.1. Instructions
6.2. Communications
6.3. Contract Award
6.4. Term
7. Terms and Conditions for Receipt of Proposals
7.1. Errors, Omissions and Inquiries regarding the RFP
7.2. Objections to RFP Terms
7.3. Addenda
7.4. Term of Proposal
7.5. Revision or Withdrawal of Proposal
7.6. Errors and Omissions in Proposal
7.7. No Commitment
7.8. Financial Responsibility
7.9. Estimated Quantity
7.10. Public Record
7.11. Reservations of Rights by the County
7.12. No Waiver
7.13. Cooperative Agreement (Piggyback)