Industry Day Slides Final 1 April 0800 Rel to Industry.pdf
PDF 4 MB Posted
- Attached to
- SDA Space Transport Layer Tranche 0 DRAFT RFP
- Solicitation number
- SDA-SN-20-0008
- Issued by
-
Space Development Agency
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Distribution A: Approved for public release. Distribution unlimited
This Photo by Unknown Author is licensed under CC BY-NC http://streathambrixtonchess.blogspot.com/2012/01/quiet-time.html https://creativecommons.org/licenses/by-nc/3.0/
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Timothy Boudreaux
Transport Tranche 0 Overview
INDUSTRY DAY - AGENDA
• Architecture & CONOPS
• SDA Experimentation and Demonstration Schedule
• SDA, FNC3, JADC2 Alignment
• Statement of Work
• Transport Draft RFP
• Background
• Spiral Development
• Objectives
• Schedule
• Draft RFP Specific Tasks
• Risk Areas
• IBS
• Link-16
INDUSTRY DAY – AGENDA (CONT)
• DRFP Specific Tasks (Cont)
• Crosslinks (OISL/RF)
• Networking
• Spectrum Management
• GPS
• Alternative Position, Navigation and Timing (APNT)
• BMC3
• Cyber
• Encryption
• Hardware In the Loop
• Ground Support/Operations
• Launch
• Intermission (15 minutes)
INDUSTRY DAY – AGENDA (CONT)
• Intermission (15 minutes)
• Interoperability
• Custody
• Supply Chain
• SWaP (Size, Weight and Power)
• Bid and Proposal
• Evaluation Criteria
• Tranche 0 CAPSTONE
• Closing Comments
• Break (15 Minutes)
• Question and Answer Session
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Architecture & CONOPS 04/02/2020
Distribution A: Approved for public release. Distribution unlimitedDISTRIBUTION STATEMENT F. Further dissemination only as directed by Director, SDA (November 2019) or higher DoD authority.
PHYSICAL
NETWORKING
APPLICATION
DATA &
ADDRESS
OPTIMAL
ROUTE
PHYSICAL
NETWORKING
APPLICATION
OISL x2-4OPIR
PHYSICAL
NETWORKING
APPLICATION1550nm
TLM MSN SENSOR
LEO 600-1200 km
OISL x2
MOA in work
Placeholder
Placeholder
Placeholder
TRANSPORT
(NAVIGATION) CUSTODYTRACKING
SUPPORT (GROUND) SUPPORT (USER)
BATTLE
MGMT
Sensing – High Altitude
Sensing – Low Altitude
Data Transport
Persistent Regional 100-200 sats
Persistent Global 300-500 sats
TLM
MISSION DATA
RANGING
TIME XFER
SENSING LAYER
ALGORITHMS ON
BMC3
TT&C, Mission Data (IBS)
Link 16 Variant
Only
Direct Tactical Data Bulk Data Relay
1200 km 1800 km
2400 km
OptL
Payload on contract Bus DRFP released
MSN
SWIR
MWIR
Phenomenology Experiment
Transport Crosslink Demo
VERSION: v0.9
HITL/SITL
SATOPS
MOA signed with NRL
MIDS/JTIDS
(LINK 16)
IBS
On Contract LEO 1000 km
Ka
ARCHITECTURE OVERVIEW
TRANSPORT LAYER – LOW LATENCY DATA
LEO 1000km
Low Latency (<X ms)
SUPPORT (GROUND)
Data Transport
Bulk Data Relay N links
OISL x4
TRANSPORT
(NAVIGATION)
PHYSICAL
NETWORKING
APPLICATION
Ka
MISSION DATA
RANGING
TIME XFER
TT&CMSN
(LINK 16)
Opt
DATA
BACKHAUL
L KaTransport Demo
VERSION: v0.8.6
HITL/SITL
SATOPS
High Throughput (> XGbps)
TRANSPORT LAYER – IBS
LEO 1000km
Low Latency (<X ms)
SUPPORT (GROUND) SUPPORT (USER)
Data Transport
Bulk Data Relay N links
OISL x4
TRANSPORT
(NAVIGATION)
PHYSICAL
NETWORKING
APPLICATION
Ka
MISSION DATA
RANGING
TIME XFER
TT&CMSN
(LINK 16)
Opt
DATA
BACKHAUL
L KaTransport Demo
VERSION: v0.8.6
HITL/SITL
SATOPS
MIDS/JTIDS
(LINK 16)
High Throughput (> XGbps)
Direct Tactical Data
IBS
IBS
TRANSPORT LAYER – LINK-16
LEO 1000km
Low Latency (<X ms)
SUPPORT (GROUND) SUPPORT (USER)
Data Transport
Bulk Data Relay N links
OISL x4
TRANSPORT
(NAVIGATION)
PHYSICAL
NETWORKING
APPLICATION
Ka
MISSION DATA
RANGING
TIME XFER
TT&CMSN
(LINK 16)
Opt
DATA
BACKHAUL
L KaTransport Demo
VERSION: v0.8.6
HITL/SITL
SATOPS
MIDS/JTIDS
(LINK 16)
Direct Tactical Data
TRANSPORT + TRACKING
PHYSICAL
NETWORKING
APPLICATION
DATA &
ADDRESS
OPTIMAL
ROUTE
PHYSICAL
NETWORKING
APPLICATION
OISL x4KaOPIR
LEO 600-1200km
TRANSPORT
(NAVIGATION)TRACKING
Low Latency (<X ms)
SUPPORT (GROUND) SUPPORT (USER)
BATTLE
MGMT
Sensing – High Altitude
Data Transport
TLM
Optical Crosslinks
Not Shown: EMERGING CAPABILITIES
MISSION DATA
RANGING
TIME XFER
TT&CMSN
(LINK 16)
Direct Tactical Data Bulk Data Relay
1800 km 2400 km
Opt
DATA
BACKHAUL
L Ka
N links
MSN Transport Demo
VERSION: v0.8.6
HITL/SITL
SATOPS
MIDS/JTIDS
(LINK 16)
TRANSPORT + TRACKING + CUSTODY
PHYSICAL
NETWORKING
APPLICATION
DATA &
ADDRESS
OPTIMAL
ROUTE
PHYSICAL
NETWORKING
APPLICATION
OISL x4KaOPIR
PHYSICAL
NETWORKING
APPLICATION1550nm
TLM MSN SENSOR
LEO 600-1200km
OISL x2 US Army – EO/IR
TRANSPORT
(NAVIGATION) CUSTODYTRACKING
Low Latency (<X ms)
SUPPORT (GROUND) SUPPORT (USER)
BATTLE
MGMT
Sensing – High Altitude
Sensing – Low Altitude
Data Transport
TLM
Optical Crosslinks
Not Shown: EMERGING CAPABILITIES
MISSION DATA
RANGING
TIME XFER
SENSING LAYER
ALGORITHMS ON
BMC3
TT&CMSN
(LINK 16)
Direct Tactical Data Bulk Data Relay
1200 km 1800 km
2400 km
Opt
DATA
BACKHAUL
L Ka
N links
MSN
SWIR
MWIR
Phenomenology Experiment
Transport Demo
VERSION: v0.8.6
HITL/SITL
SATOPS
MIDS/JTIDS
(LINK 16)
Reference Transport T0 Constellation
Parameter Group A Group B Number of Planes 2 SVs per Plane 7 3 Altitude 1000 km Inclination 80-100 degrees Node Separation 31.64 degrees Mean Anomaly Separation 51.43 deg 36 deg Interplane Phasing 25.71 deg 18 deg OISLs per SV 4 2 In-Plane
Mission Payload(s) IBS Link 16
IBS
TT&C Downlink Ka Ka Navigation GPS GPS
• Tranche 0 constellation consists of two planes of SVs in near-polar orbits
• Two types of SVs
• Group A provides in- and out-of-plane crosslinks, as well as support of non-transport SVs and optical links to the ground
• Group B provides Link-16 capability and crosslinks in-plane to the Group A SVs
• Each include IBS
• Each plane includes both types of SVs
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
SDA Experimentation and Demonstration Schedule
TRANSPORT EXPERIMENTATION/DEMO
LEO <= 1000km
SUPPORT (GROUND)
VERSION: v0.8.6
Experiment Launch 1 December 2020
Experiment Launch 2 March 2021 Manufacturer TBD
Same Provider OISL Demonstration Risk Reduction for MANNA JCTD
Tranche 0 Launch September 2022 Verified OISL Interoperability Manufacturers TBD
Second Source OISL Demonstration
Optical Ground Station Development
OISL
TRANSPORT
EXPERIMENT LAUNCH 1
PROVIDER 1
COMMODITIZED
BUS OISL x4
TRANSPORT
(NAVIGATION)
PHYSICAL
NETWORKING
APPLICATION
Ka
MISSION DATA
RANGING
TIME XFER
TT&CMSN
(LINK 16)
Opt
DATA
BACKHAUL
L KaTransport Demo
OISL
TRANSPORT
EXPERIMENT LAUNCH 2
PROVIDER 2
COMMODITIZED
BUS
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
SDA, FNC3, ABMS, JADC2 Alignment
FNC3
Emerging & Developing
Technologies
ABMS
Conceive, Build, Test
New Technologies
JADC2
Connects Distributed
Sensors, Shooters and Data (all Domains)
Sensing
SDA
Enterprise
Data Transport
Data Fusion
C2
Custody/Tracking
Transport
BMC3
SDA, FNC3, JADC2 Interoperability
Custody/Tracking/BMC3
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Tranche Spiral Development
TRANSPORT LAYER TRANCHE SPIRAL
DEVELOPMENT APPROACH
FY20-21 Experiment:
OISLs in LEO
FY22: Tranche 0 Periodic regional access Low latency data transport High throughput Mission Payloads (IBS and Link-16) Tens of Transport Layer space vehicles in two orbital planes
FY24: Tranche 1 Persistent regional access Integration with Tracking and Custody Layer Hundreds of Transport Layer space vehicles in many orbital planes Potentially other mission payloads
Review and Analysis
FY23: Tranche 0 Capstone
Rapid integration and delivery of cutting edge warfighting capabilities
Assessment of warfighter needs Incorporation of new technologies
FY25: Tranche 1 Capstone Transition Operations to USSF
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Objectives
TRANSPORT TRANCHE 0 GOALS
• Low Latency Data
• Transmit/Receive Wideband Data
• Demonstrate Limited BMC3
• Transport Bulk IBS Data
• Link-16 Messages
• Common Relative Time Reference
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Schedule
TENTATIVE SCHEDULE
RFP Release ATP
PDR CDR TRR
Launch Demo Ops from BPTF
SRR
5/1/20 7/24/20 8/8/20
SOLICITATION, SOURCE SELECTION, AND KICKOFF
10/15/20 3/1/21 6/8/21
DESIGN & DEVELOPMENT
INTEGRATION & TEST
FRR
8/1/22
9/30/22
SHIP, LAUNCH, AND OPS
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Specific Tasks
General Information
Background Information
High Level Objectives and/or Technology Areas
Correlation Between Technology and Requirements
Technical Requirements
Higher Fidelity Information and Requirements on Transport Layer System
Technical Objectives
Specific Requirements Offeror is Required to Perform Compliance, Certifications and/or Implementation
DRFP SOW Development
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
SOW 4.1 Risk Areas
TECHNOLOGY RISK AREAS
OISL SWaP Antenna Supply Chain Networking
Antenna image from: https://en.wikipedia.org/wiki/AN/APG-81#/media/File:AN-APG-81_Antenna,_2005_-_National_Electronics_Museum_-_DSC00393.JPG https://en.wikipedia.org/wiki/AN/APG-81#/media/File:AN-APG-81_Antenna,_2005_-_National_Electronics_Museum_-_DSC00393.JPG
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.2 Integrated Broadcast System
SDA – IBS Integration/Utilization
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.3 Link-16
E-2
SATCOM
Link 16
Link 16
SDA Transport Layer
Link 16
Link 16
Link 16 Integration
Link 16
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.4 Optical Intersatellite Links &
Radio Frequency Crosslinks
Technical Challenge Area – Optical Inter-Satellite Links
OISL TECHNICAL CHALLENGES
• Close links as required in preconfigured OISL topology
• Demonstrate OISL Profile sufficient for vendor interoperability
• Close OISL links meeting threshold data transfer
• Assess and demonstrate latencies as described in Tranche 0 OISL Profile
• Demonstrate full-duplex link negotiation (A/B switchable)
• Assess the reduced total throughput with encrypted data
• Assess and demonstrate the flexibility of SDA for modulation, etc.
• Cross-plane link “up-time” as a percent of entire orbit
• Assess platform vibration on optical beam jitter
OISL Tranche 0 Profile
OISL Key Performance Parameters
• SWAP-C
• Interoperability
• Latency
• Efficiency
• Persistence
• Reliability
• Aperture & Beam Divergence
• Pointing Accuracy
• Pointing Stability (Jitter)
• Maximum Angular Tracking Rate
• Field of Regard (FOR)
• Time Accuracy (absolute)
• Time Synchronization (relative)
• Acquisition & Tracking
Parameters
• Optical Power Conversion
Efficiency
• Optical Link Efficiency
• Irradiance Stability (variance)
• Bit Error Rate (BER)
RF Crosslinks as Risk Reduction
OISLs Higher performance, Higher Risk
V-band Crosslinks
CDR Final Design
SDA Transport Demos
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.5 Networking
Networking
Out-of-plane Routing
In-Plane Routing
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.6 Spectrum Management
2-Year Process
*Specific SMO TBD, most likely AFSMO
90 day Process
9-month to 7-year Process†
†ITU process was just modified at WRC-19; a milestone approach is now in effect.
• Graphic does not include pre-coordination activities.
• Timelines assume average coordination issues encountered, but can increase.
• Detailed step-by-step process breakdown is available.
SMO: Spectrum Management Office NTIA: National Telecommunications and Information Administration IRAC: Interdepartmental Radio Advisory Committee SPS: IRAC Spectrum Planning Subcommittee FAS: IRAC Frequency Assignment Subcommittee SSS: IRAC Space Systems Subcommittee BR: ITU Radio Bureau
The National and International Processes are separate timelines, some overlap exists. No faster than 4 years combined.
Spectrum Management
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.7 Global Positioning System
Integration
GPS Provides SDA Satellite Navigation and Timing Reference
20200 km
750 km
Schriever
AFB
GPS Monitor Antenna
GPS MCS
SDA
LEO Platforms
(DGS)
GPS GPS
(Kiana Point)
Kwajalein
Ascension
Cape Canaveral
SDA TTC
SDA TTC
Each SDA Satellite will carry GPS
SDA Cross-Links
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.8 Alternative Position Navigation
And Timing
Ground Terminal calibrated to WGS84, UTC
Alternate Position, Navigation and Timing
(APNT)
Tranche Zero Demonstration o GPS primary source of PNT for
SDA satellite o Tranche 0 demonstrate cross-link ranging/timing accuracy relative to GPS truth o Ground processing of raw GPS and cross-link ranging/timing measurement
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.9 BMC3
• Functions slated to migrate onboard in later tranches can be tested on the ground
• OISL data rates inform simulations of compute & communication resources
• Performance of Tracking sensors inform allocation of BMC3 compute resources
• Reliability data from COTS hardware inform HW design for future BMC3 modules
• Test connectivity between the Support layer & hosted payloads to the onboard processing HW
• Develop procedures to uplink software changes to multiple Transport satellites
• Operate massless payloads onboard Transport satellites
• Downlink the output of massless payloads from Transport satellites
• Uplink input data for massless payloads
• Downlink output data from massless payloads
• Uplink software updates to onboard BMC3 hardware
• Demonstration of maximum onboard processing capability within SWaP
• Massless payload demo
• Accommodate on-orbit SW updates
• Alternate landing zone for hosted payload communications
Ground Interface Requirements
BATTLE MANAGEMENT LAYER –
TRANCHE 0 GOALS
Concept of Operations Risk ReductionSpace-based Requirements
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.10 Cyber Security
Cyber Requirements
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.11 Encryption
Crypto Requirements
CDU-200 KI-55
Gryphon
KI-103
Gnome
KI-7700
Commercial Solutions for Classified
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.12 Hardware in the Loop
• Integrate delivered engineering units
• Verify compatibility/interoperability:
o Spacecraft & payloads o Network & routing behavior o Space-to-ground site links (Optical &
Ka) o Space-to-ground/air tactical link (L-band) o Space-to-space links (OISLs or V-band) o Integrated BMC3 applications
• Engineering unit of space vehicle control, telemetry and data handling subsystem/communications subsystem, inclusive of OISLs
• User manual, any Ground Support Equipment and/or Special Test Equipment needed to operate engineering unit
• Unclassified test encryption keys
• Plan for OISL compatibility testing
• Support/labor to integrate HW and SW into test-bed
Requirements
HARDWARE-IN-THE-LOOP
TEST-BED
Concept of Operations
• Located at the Naval Research Laboratory in Washington, DC
• Government owned and operated
• Unclassified
Facility Details
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.13 Ground System and Operations
Ground & Ops Overview Satellite tactical operations and associated ground systems will be provided and hosted through the Naval Research Laboratory’s Blossom Point Tracking Facility
SV mission management, data processing and other requirements will be the SV contractors responsibility – BPTF will assist with operations, management, installation, integration, etc.
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
4.14 Launch
Launch Strategic Overview
SDA will provision launch services for all Transport Tranche 0 satellites using SMC’s OSP-4 contract and Mission Manifest Office rideshare opportunities
Notional Rideshare Process
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Interoperability
Technical Challenge Area – Interoperability
Interface / Interop Testing
EM
SubSystem
Testing
OISL IF - EM
Testing
OISL Compat Testing
OISL
Comm/PNT
Perf Characterizati on
BMC3 - EM
Testing
BMC3 Compat Testing
Custody SW IF Testing
Link16 - EM Testing
Link16 IF Compat Testing
Link16 Link Characterizati on
IBS - EM
Testing
IBS IF Compat Testing
IBS Link Characterizati on
FM
SubSystem
Testing
OISL IF - FM
Testing
OISL Compat Testing
OISL
Comm/PNT
Perf Characterizati on
BMC3 - FM
Testing
BMC3 Compat Testing
Custody SW IF Testing
Link16 - FM Testing
Link16 IF Compat Testing
Link16 Link Characterizati on
IBS - FM
Testing
IBS IF Compat Testing
IBS Link Characterizati on
FM Payload Testing
FM Payload Funct Testing and Characterizati onFM Payload Network &
Link16 Message Handling
FM Payload Custody SW
Funct Testing
FM Vehicle Testing
FM SV Launch Vehicle IF
Compat/Depl oy Test
FM SV IBS IF
Compat Test
FM SV Link16 IF Compat
Test
FM SV BPTF IF
Compat Test
FM Launch Range IF
Compat Test
FM
Mission/Netw ork Mgr IF
Test
• It is an objective of the SDA Transport Layer to ensure interoperability with all required systems prior to launch.
• Simulations, test beds, and flight unit assessments and tests will be performed to verify compatibility/interoperability.
• Contractors shall demonstrate ability to conduct operations through a common ground station, and various space, ground and air terminals.
• The satellites will have data link and network layer interoperability via adopted commercial standards and protocols (with identified modifications e.g., using OISL profile)
• Engineering Model (EM) demonstrations are highly recommended, Flight Model (FM) testing is required.
• Once the constellations are on orbit new terminals will be tested with HWIL/SWIL test beds or other test units to ensure interoperability.
Technical Challenge Area – Interoperability
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Custody
Custody T0 Capability
CONUS
Data Uplink
Regional Command or Intel Center
Fielded Weapon Systems
Transport Custody Space-based
Custody
Data Processing Center
Sensor Partners
SDA Assets
Potential Limited space-based fusion
Custody Ground-based Data Fusion
Target ID Direct DL Targeting
Solution Dissemination of Targeting solution to Warfighter
Bulk Data Transfer
Dissemination of Targeting solution to Warfighter
Bulk Data to
OCONUS
NDSA Layer Tranche 0 Capstone (FY20-21) Tranche 0 Capability (FY22) Tranche 1 Capability (FY24)
Custody Demonstrate multi-phenomenology, sensor fusion on the ground and potential limited space-based fusion
Periodic regional access with multiple sensing types through mission partner contribution
Persistent regional access with multiple sensing types through mission partner contribution
Custody T0 CONOPs
• Threshold: Demonstrate Multi-Int fusion of unclassified commercial-spacecraft collected remote sensing data on the ground using two different sensing phenomenologies
• Objective: Demonstrate Multi-Int fusion of spacecraft-collected remote sensing data using two different sensing phenomenologies on-board a spacecraft assisted by ground processing
Space-based Sensors
Ground-based Custody
In-space Custody
Transport (In-space)
Transport –Custody Interface In-space
Transport –Custody Interface Ground-based
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Supply Chain
Small Satellite Supply Chain
• Focus Primarily on Tier 1 – Tier 4
• U.S. Defense Industrial Base
• Components, Subsystems, Buses
• Specific Focus
• Solar Cells
• Batteries
• Reaction Wheel Assemblies
• Star Trackers
• Rad-Hard/Rad-Tolerant Electronics
SDA Supply Chain – Radhard Electronics
• Small Sat Market
• Rad Hardened – Low Risk, Expensive, Overkill
• COTS Products/Up-Screen – Higher Risk for First Missions
• Rad-Tolerant Strategy – Compromise Between Rad Hardened and Up-Screen
• Small Sats Require Less Stringent Requirements
• Less Harsh Radiation Environment
• Shorter Mission Life – 5 Years
COVID-19 Impacts to Small Satellite Market
• Venture Capital (VC): most smallsat companies are funded by VC
• VCs may watch from the sidelines with “wait and see”
• VCs reserve capital for other portfolio companies
• COVID-19 will force VCs to realign priorities
• COVID-19: Difficult for VCs and Small Sat companies to raise capital
• COVID-19 impacts may impact the supply chain to some companies
• Countries with quarantines impact schedule
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
SWaP
Link 16
OISL
Ka
OISL
GPS
Electric Propulsion
OISL
Ka
OISL
GPS
Electric Propulsion IBS Through Ka/Optical
SWaP
Segment System Name Definition Components OSI Level Unit Pwr (W)
Units Duty Cycle
Power (W)
Comment
Space Payload A 393 Peak power might be as high as 600W
OISLs Optical Inter-Satellite Links
Optical head, elex, modem
1, 2 35 4 100% 140
V-ISLs V-band Inter-Satellite Links
Antenna, radio, modem
1, 2 70 4 0% 0
ODL Optical Down-Link Optical head, elex, modem
1, 2 35 1 25% 9
Ka U/D L
(IBS)
Ka-band Up/Down Link Antenna, radio, modem
1, 2 21 1 25% 5
Link-16 L-band freq with Link- 16 message fmt & protocol
Antenna, radio, modem
1, 2, 3, 4, 115 1 25% 29
Network Control Unit
(NCU)
Router, OISL/antenna control, network config & software
Electronics, SW for PNT, link pointing, network protocols implementation
2, 3, 4 30 1 100% 30
Tactical Comm Unit
(TCU)
Message handling for Link-16 and IBS
Electronics, SW for translation/encap sulation
3,4 50 1 50% 25
Crypto Bulk encrypt/decrypt units, key control
Bulk encrypt/decrypt HW/SW for each link
1, 2 5 11 50% 28
BMC3 Future location for TCU, NCU, and Custody Layer software
TBD 3,4,5,6,7 250 1 10% 25
Data & Power Distro
Communicates with bus and distributes/controls power provided by the bus.
Electronics and
SW
5,6,7 NA NA NA 29 10% of total filtered power used
Heaters Heater power applied for cold conditions e.g., when elex power is turned off and shaded.
Heaters, tstats, SW hosted in bus processor or TBD payload unit
5,6,7 367 1 20% 73 60% of max design power -power used
Notional Power Table
Group B Satellite
Group A Satellite
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Bid and Proposal
TRANCHE 0 CONSTELLATION
LEO 1000km
SUPPORT (GROUND)
HITL/SITL
SATOPS
Parameter Group A Group B
Number of Planes 2
SVs per Plane 7 3
Altitude 1000 km
Inclination 80-100 deg
Node Separation 31.643 deg
Mean Anomaly Separation 51.429 deg 36 deg
Interplane Phasing 25.714 deg 18 deg
OISLs per SV 4 2 (in-plane)
Mission Payload(s) IBS Link-16
IBS
TT&C Downlink Ka Ka
Navigation GPS GPS
OISL
(In Plane)
GROUP A
PHYSICAL
NETWORKING
APPLICATION
Ka
TT&CMSN
(IBS)
Opt
DATA
BACKHAUL
L KaOISL (In Plane)
OISL
(Cross Plane) x2
OISL
(In Plane)
GROUP B
PHYSICAL
NETWORKING
APPLICATION
Ka
TT&CMSN
(IBS) DATA
BACKHAUL
L Ka
MSN
(LINK-16)
LOISL
(In Plane)
Link-16 overlapping coverage areas
Interoperability between different vendors is critical to success
PRICE AND RATIONALE
Overall Pricing Table Group A Group B
NRE NRE
Price: SVs 1-7 Price: SVs 1-3
Unit Price: SV 8-n Unit Price: SV 4-m
Total Price: All SVs
NRE cost for SV design, development, test and demonstration
Total price for the first set of space vehicles
Price per satellite for all satellites after the first set
Total Price includes NRE and Price for first set of satellites for each Group
Project Management
Systems Engineering
Mission Assurance Payload
OISL IBS Link-16 BMC3 Networking
SV – broken down by subsystem
Assembly, Integration, and
Test Ground Support
Mission Operations
Support
Offeror may bid Group A, Group B, or both
Price Breakdown Major tasks by FY by WBS element
Funding Requirements by Month
Funding Requirements by Government FY, Performer FY, and Calendar Year
Price and Percentage of Price by the prime and major subcontractors
Major Risk/Activity
Materials
ODCs
To ta l P ric e
Sample WBS
TECHNICAL DATA AND COMPUTER SOFTWARE
RIGHTS ASSERTIONS
• SDA Assumes:
• No hardware, technical data or computer software will be provided with less than Government Purpose Rights
• The vast majority of information generated will be provided with Unlimited Rights to the Government
• Should the offeror disagree they must clearly identify those elements to be provided with less than Unlimited Rights and identify the rationale for their assertion(s) using the format shown in the following table
Technical Data Computer Software To be Furnished With Restrictions
Summary of Intended Use in the Conduct of the Effort
Basis for Assertion Asserted Rights Category
Name of Person Asserting Restrictions
(LIST) (NARRATIVE) (LIST) (LIST) (LIST)
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Evaluation Criteria
Factors Rating Methodology
Outstanding Good Acceptable Marginal Unacceptable
1 Schedule
2 Technical
Subfactors Combined Technical and Technical Risk Rating
Outstanding Good Acceptable Marginal Unacceptable
1 Overall Technical Solution
2 Data Rights
3 Low Latency Intersatellite Crosslinks
4 Link 16 Tactical Data Link
5 Networking/Routing
3 Past Performance Substantial Confidence
Satisfactory Confidence
Neutral Confidence
Limited Confidence
No Confidence
Outstanding Good Acceptable Marginal Unacceptable
4 Small Business Participation
5 Price Reasonable Not Reasonable
Evaluation Methodology
This is a best value tradeoff source selection. SDA anticipates issuing multiple awards.
Evaluation Definitions
Term Definition
Significant Strength
An aspect of an offeror's proposal that exceeds the specified schedule or capability requirements in a way that will be very advantageous to the Government during contract performance
Strength An aspect of an offeror’s proposal that has merit or exceeds the specified schedule or capability requirements in a way that will be advantageous to the Government during contract performance
Deficiency A material failure of an offeror’s proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level
Weakness A flaw in the offeror’s proposal that increases the risk of unsuccessful contract performance
Significant Weakness
A flaw in the offeror’s proposal that appreciably increases the risk of unsuccessful contract performance
Evaluation Factor 1: Schedule
Color Rating
Adjectival Rating Description
Outstanding Proposal greatly exceeds the required schedule and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal exceeds the required schedule and contains at least one strength, and risk of unacceptable performance is low to moderate.
Acceptable Proposal meets the required schedule and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal may meet the required schedule and risk of unsuccessful performance is high.
Unacceptable Proposal does not meet the required schedule, and thus, contains one or more deficiencies, and risk of unsuccessful performance is unacceptable.
Proposal is not awardable
Evaluation Factor 2: Technical
Color Rating
Adjectival Rating Description
Outstanding 1. Proposal indicates an exceptional approach and understanding of the requirements, and
2. Proposal contains a significant strength or multiple strengths/significant strengths, and
3. Risk of unsuccessful performance is low.
Good 1. Proposal indicates a thorough approach and understanding of the requirements, and either
a. Proposal contains at least one significant strength, or multiple strengths, and risk of unsuccessful performance is moderate, or
2. Proposal contains at least one strength, and risk of unsuccessful performance is low.
Acceptable 1. Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and
2. Risk of unsuccessful performance is no worse than moderate.
Marginal 1. Proposal has not demonstrated an adequate approach and understanding of the requirements, and
2. Risk of unsuccessful performance is high.
Unacceptable 1. Proposal does not meet the requirements of the solicitation and, contains one of more deficiencies, and/or
2. Risk of unsuccessful performance is unacceptable.
3. Proposal is not awardable.
• Technical Subfactors:
1. Overall Technical Solution
2. Data Rights
3. Low-Latency Intersatellite Crosslinks
4. Link 16 Tactical Data
5. Networking/Routing
• Subfactor 1 evaluation will focus on the offeror’s demonstrated understanding of all objectives in the Statement of Work and technical risks in the proposed solution to satisfying those risks
• Subfactor 2-4 evaluation will focus on technical performance, system pedigree, and technology readiness, and test, evaluation, and risk reduction and mitigation plans
Evaluation Factor 3: Past Performance
Adjectival Rating Description
Very Relevant Past or ongoing efforts involve the same scope, magnitude, and complexity required to meet the Attachment 1 Statement of Work
Relevant Past or ongoing efforts involve similar scope, magnitude, and complexity required to meet the Attachment 1 Statement of Work
Somewhat Relevant Past or ongoing efforts involve some of the same scope, magnitude, and complexity required to meet the Attachment 1 Statement of Work
Not Relevant Past or ongoing efforts involve little or none of the scope, magnitude, and complexity required to meet the Attachment 1 Statement of Work
Relevancy Rating
Adjectival Rating Description
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort. Proposal is not awardable.
Past Performance Confidence Rating
Evaluation Factor 4: Small Business Participation
Color Rating
Adjectival Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of small business objectives
Good Proposal indicates a thorough approach and understanding of small business objectives
Acceptable Proposal indicates an adequate approach and understanding of small business objectives
Marginal Proposal has not demonstrated an approach and understanding of small business objectives
Unacceptable Proposal does not meet MQR. Proposal is not awardable
Evaluation Factor 5: Price
• Offeror’s price will be evaluated on a per-SV basis
• Lower prices will be evaluated more favorably
• Pricing will be evaluated for reasonableness. Proposals deemed not reasonable are not awardable
Group A Group B
NRE NRE
Price: SVs 1-7 Price: SVs 1-3
Unit Price: SV 8-n Unit Price: SV 4-m
Total Price: All SVs
Price = Total Price/# of SVs Proposed
Distribution A: Approved for public release. Distribution unlimited 81
Relative Importance of Factors and Subfactors
Factor Prioritization
Technical Subfactor Prioritization
5 Price 2 Technical 3 Past Performance
4 Small Business1 Schedule
Increasing Importance
1 Overall Technical Solution
3 Low Latency Intersatellite
Crosslinks 4 Link-16 5 Networking
/ Routing 2 Data Rights
3 Low Latency Intersatellite
Crosslinks 4 Link-16 5 Networking
/ Routing 2 Data Rights
Overall technical solution is as important than interoperability subfactors
All other technical subfactors are of equal importance
Price is as important as all other factors combined
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
TRANCHE 0 CAPSTONE
TRANCHE 0 OPERATIONAL GOALS
• Operational Goal 1 – Data Transfer
• Threshold: 250Mbps Low Latency Data Transfer
• Goal: 1 Gbps Low Latency Data Transfer
• Operational Goal 2 – Tracking
• Threshold: OSM generated on-board tracking passed to C2BMC via Transport and back through the chain.
• Goal: OSM (or more data) generated on-board tracking passed to Transport, fused for full 3D track, and passed directly to theater
• Operational Goal 3 – BMC3
• Threshold: Sized BMC3 processor accepting SV inputs (satellite only).
• Goal: Sized BMC3 processor, accepting SV inputs, and some uploaded software functionality.
• Operational Goal 4 – Custody
• Threshold: Multi-INT fusion (2 phenomenologies) of Commercial Assets processed on ground
• Goal: Multi-INT fusion of (2 phenomenologies) on-board SV assisted by ground processing
• Operational Goal 5 - IBS
• Threshold: Bulk IBS Data Transfer Ground – SV - Ground
• Goal: Demod IBS Data Transfer to BMC3
• Operational Goal 6 – Link-16
• Threshold: Synchronize/Data Transfer with Link-16
• Goal: Link-16 Data Set SV to Operational Platform
• Operational Goal 7 – APNT
• Threshold: Demonstrate Transport Layer PNT synchronization in the absence of GPS for an extended period, using intersatellite ranging and time transfer
• Goal: Demonstrate an ability to transmit PNT messages over tactical data link (Link 16) to subscribed users
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Closing Comments
CLOSING REMARKS
• Draft RFP posted to betaSAM.gov on 24 Mar:
https://beta.sam.gov/opp/df40604870a34029bfcb2b29282e6bde/view
• Next Steps:
• Post industry day slides to betaSAM.gov
• DRFP open for industry feedback until 17 Apr
• Conducting 1-on-1s with industry the week of 13 Apr
• Q&A posted to betaSAM.gov as completed
• Anticipate releasing Final RFP o/a 1 May
SEMPER CITIUS
https://beta.sam.gov/opp/df40604870a34029bfcb2b29282e6bde/view
Distribution A: Approved for public release. Distribution unlimitedDistribution A: Approved for public release. Distribution unlimited
Thank you
| Slide Number 1 |
| Slide Number 2 |
| Industry Day - Agenda |
| Industry Day – Agenda (Cont) |
| Industry Day – Agenda (Cont) |
| Slide Number 6 |
| Architecture Overview |
| Transport Layer – Low Latency Data |
| Transport Layer – IBS |
| Transport Layer – Link-16 |
| Transport + Tracking |
| Transport + Tracking + Custody |
| Reference Transport T0 Constellation |
| Slide Number 14 |
| Transport experimentation/Demo |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Transport Layer Tranche Spiral Development Approach |
| Slide Number 20 |
| Transport Tranche 0 Goals |
| Slide Number 22 |
| Tentative Schedule |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Technology Risk Areas |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |
| Slide Number 32 |
| Technical Challenge Area – Optical Inter-Satellite Links |
| Slide Number 34 |
| Slide Number 35 |
| Slide Number 36 |
| Slide Number 37 |
| Slide Number 38 |
| Slide Number 39 |
| Slide Number 40 |
| GPS Provides SDA Satellite Navigation and Timing Reference |
| Slide Number 42 |
| Slide Number 43 |
| Slide Number 44 |
| Slide Number 45 |
| Slide Number 46 |
| Cyber Requirements |
| Slide Number 48 |
| Slide Number 49 |
| Slide Number 50 |
| Slide Number 51 |
| Slide Number 52 |
| Slide Number 53 |
| Ground & Ops Overview |
| Slide Number 55 |
| Launch Strategic Overview |
| Slide Number 57 |
| Slide Number 58 |
| Slide Number 59 |
| Slide Number 60 |
| Custody T0 Capability |
| Custody T0 CONOPs |
| Slide Number 63 |
| Small Satellite Supply Chain |
| SDA Supply Chain – Radhard Electronics |
| COVID-19 Impacts to Small Satellite Market |
| Slide Number 67 |
| SWaP |
| Slide Number 69 |
| Tranche 0 Constellation |
| Price and Rationale |
| Technical Data and Computer Software Rights Assertions |
| Slide Number 73 |
| Slide Number 74 |
| Slide Number 75 |
| Slide Number 76 |
| Slide Number 77 |
| Slide Number 78 |
| Slide Number 79 |
| Slide Number 80 |
| Slide Number 81 |
| Slide Number 82 |
| Tranche 0 Operational Goals |
| Slide Number 84 |
| Closing Remarks |
| Slide Number 86 |