SDA T1TL Industry Day Agenda with Links.pdf

PDF 96 KB Posted

Attached to
SDA Tranche 1 Transport Layer
Solicitation number
HQ085021R0002
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Distribution A: Approved for public release. Distribution unlimited

Distribution A: Approved for public release. Distribution unlimited

Welcome to the SDA T1TL Virtual Industry Day, below is the agenda with hyperlinks to the video presentations.

You can view or download the videos, please try and limit the number of downloads and post/share across your companies internally. If you get errors please try a non-corporate computer since your firewall or company browser settings may be blocking the site.

As you can see each segment is about 25 minutes length and averages approximatily 240MB per file for a total run time of 2 hours 9 minutes.

Enjoy the presentations from the SDA Team.

Semper Citius!!

PRESENTATION TOPIC (VIDEO LENGTH AND FILE SIZE) PRESENTER PRESENTER ROLE

OPENING REMARKS AND KEYNOTE (25 MIN/240MB)

ADMINISTRATIVE REMARKS JENN ELZEA CHIEF, SDA STRATEGIC ENGAGEMENT

WELCOME DEREK TOURNEAR, PHD DIRECTOR, SDA

KEYNOTE GEN THOMPSON, USSF VICE CHIEF OF SPACE OPERATIONS

TRANCHE 1 AND CONTRACTS OVERVIEW (26 MIN/244MB)

TRANCHE 1 NATIONAL DEFENSE SPACE ARCHITECTURE BILLY PALERMO PROGRAM DIRECTOR, SDA TRANCHE 1 REQUEST FOR PROPOSALS AND CONTRACTING MECHANICS CHRIS GLISTA CHIEF, SDA CONTRACTS

EVALUATION CRITERIA AND CONOPS (28 MIN/262MB)

PROPOSAL INSTRUCTIONS AND EVALUATION CRITERIA BILLY PALERMO PROGRAM DIRECTOR, SDA TRANCHE 1 CONCEPT OF OPERATIONS OVERVIEW MATT RICH SENIOR ANALYST (CONTRACTOR), SDA TRANCHE 1

CONSTELLATION, SV AND MISSION PAYLOADS (29 MIN/276MB)

CONSTELLATION AND SPACE VEHICLES OVERVIEW MATT RICH SENIOR ANALYST (CONTRACTOR), SDA TRANCHE 1 MISSION PAYLOADS AND CAPABILITIES OVERVIEW TIM BOUDREAUX CHIEF, SDA TRANSPORT CELL

INTEROPERABILITY LAUNCH AND GROUND (21 MIN/196MB)

VERIFICATION AND INTEROPERABILITY TESTING OVERVIEW TIM BOUDREAUX CHIEF, SDA TRANSPORT CELL LAUNCH INTEGRATION OVERVIEW COL KALLI LANDRY, USSF CHIEF, SDA SUPPORT AND MISSION OPERATIONS CELLS GROUND SEGMENT OVERVIEW COL KALLI LANDRY, USSF CHIEF, SDA SUPPORT AND MISSION OPERATIONS CELLS https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_01-02+Opening+Remarks+and+Keynote.mp4 https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_03-04+Tranche+1+and+Contracts+Oveview.mp4 https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_05-06+Evaluation+Criteria+and+CONOPS.mp4 https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_07-08+Constellation+SV+and+Mission+Payloads.mp4 https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_09-10+Interoperability+Launch+and+Ground.mp4

File details come from the government source that posted it. Updated .