SDA T1TL Industry Day Agenda with Links.pdf
PDF 96 KB Posted
- Attached to
- SDA Tranche 1 Transport Layer
- Solicitation number
- HQ085021R0002
- Issued by
-
Space Development Agency
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Distribution A: Approved for public release. Distribution unlimited
Distribution A: Approved for public release. Distribution unlimited
Welcome to the SDA T1TL Virtual Industry Day, below is the agenda with hyperlinks to the video presentations.
You can view or download the videos, please try and limit the number of downloads and post/share across your companies internally. If you get errors please try a non-corporate computer since your firewall or company browser settings may be blocking the site.
As you can see each segment is about 25 minutes length and averages approximatily 240MB per file for a total run time of 2 hours 9 minutes.
Enjoy the presentations from the SDA Team.
Semper Citius!!
PRESENTATION TOPIC (VIDEO LENGTH AND FILE SIZE) PRESENTER PRESENTER ROLE
OPENING REMARKS AND KEYNOTE (25 MIN/240MB)
ADMINISTRATIVE REMARKS JENN ELZEA CHIEF, SDA STRATEGIC ENGAGEMENT
WELCOME DEREK TOURNEAR, PHD DIRECTOR, SDA
KEYNOTE GEN THOMPSON, USSF VICE CHIEF OF SPACE OPERATIONS
TRANCHE 1 AND CONTRACTS OVERVIEW (26 MIN/244MB)
TRANCHE 1 NATIONAL DEFENSE SPACE ARCHITECTURE BILLY PALERMO PROGRAM DIRECTOR, SDA TRANCHE 1 REQUEST FOR PROPOSALS AND CONTRACTING MECHANICS CHRIS GLISTA CHIEF, SDA CONTRACTS
EVALUATION CRITERIA AND CONOPS (28 MIN/262MB)
PROPOSAL INSTRUCTIONS AND EVALUATION CRITERIA BILLY PALERMO PROGRAM DIRECTOR, SDA TRANCHE 1 CONCEPT OF OPERATIONS OVERVIEW MATT RICH SENIOR ANALYST (CONTRACTOR), SDA TRANCHE 1
CONSTELLATION, SV AND MISSION PAYLOADS (29 MIN/276MB)
CONSTELLATION AND SPACE VEHICLES OVERVIEW MATT RICH SENIOR ANALYST (CONTRACTOR), SDA TRANCHE 1 MISSION PAYLOADS AND CAPABILITIES OVERVIEW TIM BOUDREAUX CHIEF, SDA TRANSPORT CELL
INTEROPERABILITY LAUNCH AND GROUND (21 MIN/196MB)
VERIFICATION AND INTEROPERABILITY TESTING OVERVIEW TIM BOUDREAUX CHIEF, SDA TRANSPORT CELL LAUNCH INTEGRATION OVERVIEW COL KALLI LANDRY, USSF CHIEF, SDA SUPPORT AND MISSION OPERATIONS CELLS GROUND SEGMENT OVERVIEW COL KALLI LANDRY, USSF CHIEF, SDA SUPPORT AND MISSION OPERATIONS CELLS https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_01-02+Opening+Remarks+and+Keynote.mp4 https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_03-04+Tranche+1+and+Contracts+Oveview.mp4 https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_05-06+Evaluation+Criteria+and+CONOPS.mp4 https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_07-08+Constellation+SV+and+Mission+Payloads.mp4 https://sdat1tlindustryday.s3.us-east-2.amazonaws.com/Industry+Day_09-10+Interoperability+Launch+and+Ground.mp4
File details come from the government source that posted it. Updated .