SCS Anderson High 2018 Roofing Replacement Project
This document is a comprehensive project manual and front-end bid solicitation issued by Southgate Community Schools (Michigan) in partnership with StructureTec Corporation (consultant) for single-ply roof replacement work at Anderson High School. The project involves roofing system replacement across multiple roof areas using EPDM and Durolast membranes with polyisocyanurate insulation on steel and metal decking. The base bid encompasses Areas A through G at Anderson High School, with an included 10' x 10' deck repair allowance, installation of six new access ladders, and flashing provisions for four new exhaust hoods. Five alternates are specified for roof replacement in Areas H, I, J, K, and L. Sealed bids were due November 7, 2017, at 2:00 p.m., with a pre-bid meeting scheduled for October 26, 2017. Contract award was required by January 11, 2018. Substantial completion is specified for August 18, 2018, with final completion by August 31, 2018. Request for information submissions closed October 31, 2017.
The contract is based on a stipulated sum (lump-sum) basis with unit pricing provisions for potential additional work including deck repairs, drain installation, wood blocking replacement, and asbestos-containing roofing material (ACRM) removal and disposal. Bid security of five percent of the base bid is required, along with 100 percent performance and payment bonds. Prevailing wage rates apply per Michigan Act No. 166 for Wayne County, with current rates effective October 2017. The contractor is solely responsible for identifying and removing ACRM without additional compensation to the owner. Progress payments are made monthly at 90 percent until final completion; 10 percent retainage applies until substantial completion, reducing to 5 percent thereafter. Liquidated damages are set at $500 per day during the base construction period and $250 per day post-substantial completion. The contract includes comprehensive insurance requirements, a 20-year manufacturer's NDL roof warranty, and a 5-year contractor guarantee commencing upon final punch list verification. Financing is through Southgate Community Schools' bond program as referenced in the school building bond issue.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL FRONT END
SOUTHGATE COMMUNITY SCHOOLS
SOUTHGATE, MI
FOR
MS. THERESA MCLACHLAN
2018 ROOFING PROGRAM
PROJECT NO. T16015.RFG3
OCTOBER 2017
DATE OF ISSUANCE – 10-19-2017
Total Building Envelope Management SolutionSM
(800) 745-STEC (7832) • www.structuretec.com
All rights reserved. This written material or any part thereof must not be reproduced in any form without the written permission of StructureTec Corporation, Kalamazoo, Michigan
A
Southgate Community Schools - 2018 Roofing Bond Program
T16015.RFG3
00010 - 1
TABLE OF CONTENTS
October 2017
TABLE OF CONTENTS
DIVISION 0 – DOCUMENTS
SECTION 00100 – BID SOLICITATION
SECTION 00200 – INSTRUCTIONS TO BIDDERS
SECTION 00210 – SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
SECTION 00300 – INFORMATION TO BIDDERS
SECTION 00401 – BID FORM FOR ROOFING
SECTION 00500 – AGREEMENT
SECTION 00600 – BONDS AND CERTIFICATES
SECTION 00700 – GENERAL CONDITIONS
SECTION 00800 – SUPPLEMENTARY CONDITIONS (AIA 2007)
SECTION 00900 – PROJECT FORMS
DIVISION 1 – GENERAL REQUIREMENTS
SECTION 01230 – ALTERNATES
SECTION 01270 – UNIT PRICES
SECTION 01290 – PAYMENT PROCEDURES
SECTION 01310 – PROJECT MEETINGS
SECTION 01330 – SUBMITTAL PROCEDURES
SECTION 01430 – QUALITY ASSURANCE
SECTION 01500 – TEMPORARY FACILITIES AND CONTROLS
SECTION 01630 – PRODUCT SUBSTITUTION PROCEDURES
SECTION 01660 – PRODUCT STORAGE AND HANDLING REQUIREMENTS
SECTION 01780 – PROJECT CLOSEOUT AND WARRANTIES
00100 - 1
BID SOLICITATION
SECTION 00100
A. The Owner will receive sealed bids for: Southgate Community Schools - 2018 Roofing Bond Program
B. The Owner is:
Southgate Community Schools 14600 Dix-Toledo Road Southgate, Michigan 48195
C. The Consultant is:
StructureTec Corporation 34119 W. Twelve Mile Road, Suite 270 Farmington Hills, MI 48331
D. The Project consists of Single-ply Roof Replacement work at Anderson High School as shown and/or specified in the Procurement Documents.
E. Bids should be sent, on the Board's behalf, to the office of and attention of:
Theresa M. McLachlan, C.P.A Director of Business & Finance Administrative Offices Southgate Community School District 14600 Dix-Toledo Road Southgate, MI 48195 up until 2:00pm on Tuesday, November 7th, 2017 at which time and place bids will be publicly opened. An abstract of the amounts of the base bid and major alternates may be made available, at the discretion of the Owner, to bidders after opening of bids.
F. The Owner will not consider or accept a bid received after the date and time specified for the bid submission.
G. The Project Manual will be available for viewing and download from StructureTec eProcurement website at the following address www.ebidexchange.com/structuretec.
Documents will be available for viewing by Thursday, October 19th, 2017.
H. The Owner reserves the right to reject any or all bids and to waive any informality or irregularity in the bidding.
I. Bid security in the amount of five percent of the base bid must accompany each bid in accordance with AIA Document A701-1997, “Instructions to Bidders”.
00100 - 2
J. Performance and Payment Bonds covering 100% of the cost of the project will be required.
K. Contractor is required to submit the Familiar Disclosure and Iran Sanctions Act paperwork when submitting a bid.
L. Request for information to Kody Tolliver (kody.tolliver@structuretec.com) is required no later than Tuesday, October 31st by 5:00pm (Eastern standard time).
M. A pre-bid meeting will be held on:
Thursday, October 26th 2017 1:00pm local time Anderson High School - Athletics Entrance (SE Side of Building) 15475 Leroy Street Southgate, MI 48195
END OF SECTION 00100
00200 - 1
INSTRUCTIONS TO BIDDERS
SECTION 00200
INSTRUCTIONS TO BIDDERS
PART 1 - GENERAL
1.01 BIDDING INFORMATION
A. AIA Document A701-1997, "Instructions to Bidders", Articles 1 through 8, inclusive, is hereby made a part of the Contract Documents, hereinafter referred to as the “Instruction to Bidders”.
B. The Supplementary Instructions to Bidders, Section 00210, shall modify, change, delete from or add to the Instruction to Bidders. Where any article of the Instructions to Bidders is modified or any paragraph, subparagraph or clause thereof is modified or deleted by these supplements, the unaltered provisions of the article, paragraph, subparagraph or clause shall remain in effect.
C. Prevailing Wage: The current prevailing wage rates for Wayne County shall apply for this project. For reference, appended to the end of this section are the current wage rates as of October, 2017.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 00200
State of Michigan WHPWRequest@michigan.gov Official Request #: 1208 Requestor: Southgate Community School District Project Description: To Be Determined Project Number: To Be Determined Wayne County Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/13/2017 Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Asbestos & Lead Abatement Laborer
MLDC 9/7/2017
Asbestos & Lead Abatement Laborer $41.30 $55.23 $69.16 H H H X X X X D Y Apprentice Rates:
Trainee 600 hours + 1 calendar year $30.22 $33.28 $41.73 comment 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days Asbestos, Lead and Mold Abatement, Hazardous Material Handler
AS207 3/27/2017
Asbestos, Lead and Mold Abatement, Hazardous Material Handler $40.75 $54.25 $67.75 H H H X X X X D Y comment Four ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days Boilermaker
BO169 2/17/2015
Boilermaker $54.70 $81.08 $107.45 H H H H H H H D Y Apprentice Rates:
1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $48.63 $72.50 $96.36 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
County: Wayne
Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/13/2017 Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Bricklayer
BR1 10/15/2014
Bricklayer, stone mason, pointer, cleaner, caulker $52.43 $78.65 $104.86 H H D H D D D D Y Apprentice Rates:
First 6 months $31.87 $47.81 $63.74 2nd 6 months $33.72 $50.60 $67.44 3rd 6 months $35.57 $53.37 $71.14 4th 6 months $37.42 $56.14 $74.84 5th 6 months $39.27 $58.92 $78.54 6th 6 months $41.12 $61.70 $82.24 7th 6 months $42.97 $64.46 $85.94 8th 6 months $44.82 $67.24 $89.64 comment make up day allowed Saturday for 5 day 8 hour week Friday for 4 day 10 hour week Four 10 hour days allowed M-TH Carpenter
CA 687 D 7/5/2017
Diver $67.26 $87.51 $107.76 X X H X X H H D Y comment make up day allowed Saturday, Four 10s allowed M-Sat; double time due when over 12 hours worked per day
CA 687 DT 7/5/2017
Diver Tender $57.74 $73.67 $89.60 X X H X X H H D Y comment make up day allowed Saturday
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
CA1045 7/5/2017
Carpet and Resilient Floor Layer, (does not include installation of $51.94 $73.28 $94.62 X X H X X X X D Y prefabricated formica & parquet flooring which is to be paid carpenter rate) Apprentice Rates:
1st 6 months $25.87 $34.92 $43.98 2nd 6 months $29.86 $40.92 $51.96 3rd 6 months $32.07 $44.23 $56.38 4th 6 months $34.27 $47.52 $60.78 5th 6 months $36.47 $50.83 $65.18 6th 6 months $38.69 $54.16 $69.62 7th 6 months $40.90 $57.48 $74.04 8th 6 months $43.10 $60.77 $78.44
CA687Z1 7/5/2017
Carpenter $58.62 $74.55 $90.48 X X H X X H H D Y Apprentice Rates:
1st year $35.89 $44.65 $53.41 3rd 6 months $38.43 $47.99 $57.55 4th 6 months $40.94 $51.29 $61.65 5th 6 months $43.47 $54.62 $65.77 6th 6 months $46.01 $57.96 $69.91 7th 6 months $48.52 $61.27 $74.01 8th 6 months $51.04 $64.58 $78.12 comment make up day allowed Saturdays, four 10s allowed Mon-Sat; double time due when over 12 hours worked per day
CA687Z1P 7/5/2017
Piledriver $58.62 $74.55 $90.48 X X H X X H H D Y comment make up day allowed Saturday, Four 10s allowed Monday-Saturday; double time due when over 12 hours worked per day
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Cement Mason br1cm 10/15/2014 Cement Mason $50.05 $71.17 $92.28 X X H H H H H D N Apprentice Rates:
1st 6 months $29.13 $39.45 $49.77 2nd 6 months $31.20 $42.54 $53.87 3rd 6 months $35.31 $48.67 $62.01 4th 6 months $39.46 $54.85 $70.23 5th 6 months $41.52 $57.91 $74.30 6th 6 months $45.67 $64.10 $82.52
CE514 8/17/2016
Cement Mason $48.55 $68.40 $88.24 H H D H H H H D N Apprentice Rates:
1st 6 months $28.17 $38.03 $47.88 2nd 6 months $30.14 $40.98 $51.82 3rd 6 months $34.09 $46.91 $59.72 4th 6 months $38.03 $52.82 $67.60 5th 6 months $39.99 $55.75 $71.52 6th 6 months $43.94 $61.68 $79.42
Drywall
PT-22-D 8/25/2016
Drywall Taper $45.91 $59.74 $73.56 H H D H D D D D Y Apprentice Rates:
First 3 months $32.08 $38.99 $45.90 Second 3 months $34.85 $43.14 $51.44 Second 6 months $37.62 $47.30 $56.98 Third 6 months $40.38 $51.44 $62.50 4th 6 months $41.76 $53.51 $65.26 comment make up day allowed Four 10s allowed Monday-Thursday, Friday make-up day for bad weather or holidays
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Electrician
EC-58-IW 7/5/2017
Journeyman Electrician - Inside Wireman $64.02 $84.47 $104.91 H H H H H H H D N Apprentice Rates:
0-1000 hours $42.08 $51.55 $61.03 1000-2000 hours $44.07 $54.54 $65.01 2000-3500 hours $46.07 $57.54 $69.01 3500-5000 hours $48.07 $60.54 $73.00 5000-6500 hours $50.06 $63.52 $76.98 6500-8000 hours $54.05 $69.52 $84.97
EC-58-SC 7/5/2017
Sound and Communication Installer $40.35 $54.45 $68.55 H H H H H H H D N Apprentice Rates:
Period 1 $26.75 $34.05 $41.35 Period 2 $28.11 $36.09 $44.07 Period 3 $29.47 $38.13 $46.79 Period 4 $30.83 $40.17 $49.51 Period 5 $32.19 $42.21 $52.23 Period 6 $33.55 $44.25 $54.95
Elevator Constructor
EL 36 8/7/2007
Elevator Constructor Mechanic $56.46 $94.99 D D D D D D D D Y Apprentice Rates:
1st Year Apprentice $37.74 $58.93 2nd Year Apprentice $41.90 $66.94 3rd Year Apprentice $43.98 $70.95 4th Year Apprentice $48.14 $78.96 make up day allowed
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Glazier
GL-357 8/24/2016
Glazier $49.50 $65.23 $80.95 H H H H H H H D Y Apprentice Rates:
1st 6 months $33.77 $41.63 $49.49 2nd 6 months $35.35 $44.00 $52.65 3rd 6 months $38.49 $48.71 $58.93 4th 6 months $40.06 $51.07 $62.07 5th 6 months $41.64 $53.43 $65.23 6th 6 months $43.21 $55.79 $68.37 7th 6 months $44.78 $58.15 $71.51 8th 6 months $47.93 $62.87 $77.81 comment If a four 10 hour day workweek is scheduled, four 10s must be consecutive, M-F.
Heat and Frost Insulator
AS25S 3/31/2017
Spray Insulation - Qualified Senior Sprayer, application of all products $29.04 $42.35 X X X H H H H H N
Heat and Frost Insulator and Asbestos Worker
AS25 6/3/2016
Heat and Frost Insulators and Asbestos Workers $62.65 $78.41 $94.16 H H H H H H H D Y Apprentice Rates:
1st Year $46.90 $54.78 $62.66 2nd Year $50.05 $59.50 $68.96 3rd Year $53.20 $64.23 $75.26 4th Year $56.35 $68.96 $81.56 comment Four 10s must be worked for a minimum of 2 consecutive weeks. OVERTIME is different on a four 10 week. OT is 2x for hours beyond 10. All hours on fifth day, M-F require time and one half. Sat first 8 hours, 1.5, all hours after 8 require double time.
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Ironworker
IR-25-F1 2/1/2017
Fence, Sound Barrier & Guardrail erection/installation and Exterior $35.95 $48.05 $60.15 X X H X X X H D Y Signage work Apprentice Rates:
60% Level $25.39 $32.65 $39.91 65% Level $26.71 $34.58 $42.44 70% Level $28.03 $36.51 $44.98 75% Level $29.35 $38.42 $47.50 80% Level $30.67 $40.35 $50.03 85% Level $31.99 $42.28 $52.56 comment Four ten hour work days may be worked during Monday-Saturday.
IR-25-GZ2 7/5/2017
Siding, Glazing, Curtain Wall $48.13 $59.92 $71.70 X X H H H H D D Y Apprentice Rates:
Level 1 $31.20 $37.93 $44.65 Level 2 $33.31 $40.67 $48.02 Level 3 $35.42 $43.41 $51.39 Level 4 $37.54 $46.16 $54.77 Level 5 $39.66 $48.92 $58.17 Level 6 $41.78 $51.67 $61.55 comment make up day allowed Friday, 4 tens may be worked Monday thru Thursday @ straight time.
IR-25-PE-Z1 3/31/2017
Pre-engineered Metal Work $48.09 $58.86 $69.63 X X H X X X X D Y Apprentice Rates:
Probation 1st Year $26.83 $32.03 $37.23 1st Level $28.96 $34.92 $40.88 2nd Level $28.96 $34.92 $40.88 3rd Level $31.08 $37.79 $44.50 4th Level $33.21 $40.68 $48.15 5th Level $35.33 $43.55 $51.77 6th Level $37.46 $46.43 $55.41 comment make up day allowed 4 tens allowed M-Th with Saturday make up day
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
IR-25-RF 7/5/2017
Reinforced Iron Work $57.30 $85.66 $114.02 H H D H D D D D N Apprentice Rates:
Level 1 $40.32 $59.89 $79.46 Level 2 $42.68 $63.43 $84.18 Level 3 $45.22 $67.24 $89.26 Level 4 $47.75 $71.04 $94.32 Level 5 $50.29 $74.84 $99.40 Level 6 $50.29 $74.84 $99.40 make up day allowed
IR-25-RIG 7/5/2017
Rigging Work $63.51 $95.00 $126.49 H H H H H H H D N Apprentice Rates:
Level 1& 2 $38.22 $56.16 $74.85 Level 3 $41.05 $61.54 $82.01 Level 4 $43.87 $65.76 $87.65 Level 5 $46.70 $70.01 $93.31 Level 6 $49.53 $74.25 $98.97
IR-25-SD 7/5/2017
Decking $55.47 $82.87 $110.26 X X H H H H D D Y comment make up day allowed 4 tens may be worked Monday thru Thursday @ straight time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.
IR-25-STR 7/5/2017
Structural, ornamental, welder and pre-cast $63.64 $95.12 $126.60 H H H H H H D D Y Apprentice Rates:
Levels 1 & 2 $38.22 $56.99 $75.75 Level 3 $41.05 $61.24 $81.41 Level 4 $43.87 $65.46 $87.05 Level 5 $46.70 $69.71 $92.71 Level 6 $49.53 $73.95 $98.37 Level 7 $52.35 $78.18 $104.01 Level 8 $55.18 $82.43 $109.67
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision comment make up day allowed 4 tens may be worked Monday thru Thursday @ straight time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.
IR-25-STR-D 7/5/2017
Industrial Door erection & construction $43.74 $65.27 $86.80 H H H H H H D D Y comment make up day allowed Friday for bad weather when 4 tens scheduled for M-Th. If holiday celebrated on M, 4 tens may be worked T-F. Work in excess of 12 hours per day must be paid @ double time.
Laborer
L33401-A-CC 5/31/2017
Construction laborer, demolition laborer, mason tender, carpenter $44.76 $63.69 $82.61 H H H H H H H D Y tender, drywall handler, concrete laborer, cement finisher tender, concrete chute, and concrete bucket handler, wall and ceiling material handler, plasterer tender, mortar mixer and plastering machine operator Apprentice Rates:
0-1,000 work hours $38.67 $54.55 $70.43 1,001 - 2,000 work hours $39.89 $56.38 $72.87 2,001 - 3,000 work hours $41.11 $58.21 $75.31 3,001 - 4,000 work hours $43.54 $61.86 $80.17 comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.
L33401-B-SB 5/31/2017
Signal Man (on sewer & caisson work), Air, Electric or Gasoline Tool $45.04 $64.11 $83.17 H H H H H H H D Y Operator, Concrete Vibrator Operator, Acetylene Torch & Air Hammer Operator; Scaffold Builder, Caisson Worker comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.
L33401-D-HH 5/31/2017
Furnace Battery Heater Tender, Burning Bar & Oxy-Acetylene Gun $45.28 $64.47 $83.65 H H H H H H H D Y
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.
L33401-E-EX 5/31/2017
Expediter Man, Top Man and/or Bottom Man (Blast Furnace Work or $46.07 $65.65 $85.23 H H H H H H H D Y Battery Work) comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.
L33401-F-CL 5/31/2017
Cleaner/sweeper laborer, furniture laborer - unloading of furniture to the $39.31 $55.51 $71.71 H H H H H H H D Y point of installation, the setting in place or relocation of furniture.
comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.
L334C 5/31/2017 Lansing Burner, Blaster & Powder Man; Air, Electric or Gasoline Tool $45.55 $64.87 $84.19 X X H X H H H D Y Operator (Blast Furance Work or Battery Work) comment make up day allowed Saturday
LPT-1 6/17/2016
Plasterer Tender, Plastering Machine Operator $44.35 $63.10 $81.85 H H H H H H H D Y Apprentice Rates:
1,001 - 2,000 hours $39.53 $55.87 $72.21 2,001 - 3,000 hours $40.73 $57.67 $74.61 3,001 - 4,000 hours $43.15 $61.30 $79.45 comment make up day allowed f conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Laborer - Hazardous
LHAZ-Z1-A 11/7/2014
Class A performing work in conjunction with site preparation and other $43.54 $61.94 $80.33 H H H H H H H D Y preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations; or a laborer performing work in conjunction with the removal, handling, or containment of hazardous waste substances when use of personal protective equipment level "D" is required.
Apprentice Rates:
0-1,000 work hours $37.60 $53.03 $68.45 1,001-2,000 work hours $38.79 $54.81 $70.83 2,001-3,000 work hours $39.98 $56.60 $73.21 3,001-4,000 work hours $42.35 $60.15 $77.95 comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday
LHAZ-Z1-B 11/7/2014
Class B performing work in conjunction with the removal, handling, or $44.54 $63.44 $82.33 H H H H H H H D Y containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.
Apprentice Rates:
0-1,000 work hours $38.36 $54.17 $69.97 1,001-2,000 work hours $39.59 $56.01 $72.43 2,001-3,000 work hours $40.83 $57.87 $74.91 3,001-4,000 work hours $43.30 $61.58 $79.85 comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Laborer Underground - Open Cut, Class I
LAUC-Z1-1 9/7/2017
Construction Laborer $38.92 $49.96 $60.99 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $34.04 $42.64 $51.23 1,001-2,000 work hours $35.02 $44.11 $53.19 2,001-3,000 work hours $35.99 $45.56 $55.13 3,001-4,000 work hours $37.94 $48.49 $59.03
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Laborer Underground - Open Cut, Class II
LAUC-Z1-2 9/7/2017
Mortar and material mixer, concrete form man, signal man, well point $39.03 $50.12 $61.21 X X X X X X X D Y man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.
Apprentice Rates:
0-1,000 work hours $34.12 $42.76 $51.39 1,001-2,000 work hours $35.10 $44.23 $53.35 2,001-3,000 work hours $36.09 $45.72 $55.33 3,001-4,000 work hours $38.05 $48.66 $59.25
Laborer Underground - Open Cut, Class III
LAUC-Z1-3 9/7/2017
Air, gasoline and electric tool operator, vibrator operator, drillers, pump $39.08 $50.20 $61.31 X X X X X X X D Y man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger man, and directional boring man.
Apprentice Rates:
0-1,000 work hours $34.16 $42.82 $51.47 1,001-2,000 work hours $35.14 $44.29 $53.43 2,001-3,000 work hours $36.13 $45.78 $55.41 3,001-4,000 work hours $38.10 $48.73 $59.35
Laborer Underground - Open Cut, Class IV
LAUC-Z1-4 9/7/2017
Trench or excavating grade man. $39.16 $50.32 $61.47 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $34.22 $42.91 $51.59 1,001-2,000 work hours $35.21 $44.40 $53.57 2,001-3,000 work hours $36.20 $45.88 $55.55 3,001-4,000 work hours $38.17 $48.84 $59.49
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Laborer Underground - Open Cut, Class V
LAUC-Z1-5 9/7/2017
Pipe Layer $39.22 $50.41 $61.59 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $34.26 $42.97 $51.67 1,001-2,000 work hours $35.26 $44.47 $53.67 2,001-3,000 work hours $36.25 $45.96 $55.65 3,001-4,000 work hours $38.23 $48.92 $59.61
Laborer Underground - Open Cut, Class VI
LAUC-Z1-6 9/7/2017
Grouting man, top man assistant, audio visual television operations and $36.67 $46.59 $56.49 X X X X X X X D Y all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work and the installation and repair of water service pipe and appurtenances.
Apprentice Rates:
0-1,000 work hours $32.35 $40.10 $47.85 1,001-2,000 work hours $33.22 $41.41 $49.59 2,001-3,000 work hours $34.08 $42.70 $51.31 3,001-4,000 work hours $35.81 $45.30 $54.77
Laborer Underground - Open Cut, Class VII
LAUC-Z1-7 9/7/2017
Restoration laborer, seeding, sodding, planting, cutting, mulching and $33.29 $41.52 $49.73 X X X X X X X D Y topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.
Apprentice Rates:
0-1,000 work hours $29.82 $36.31 $42.79 1,001-2,000 work hours $30.51 $37.34 $44.17 2,001-3,000 work hours $31.21 $38.40 $45.57 3,001-4,000 work hours $32.60 $40.48 $48.35
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Laborer Underground - Tunnel, Shaft & Caisson
LAUCT-Z1-1 9/7/2017
Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, $39.07 $50.19 $61.29 X X X X X X X D Y hog house tender, testing man (on gas), and watchman.
Apprentice Rates:
0-1,000 work hours $34.15 $42.80 $51.45 1,001-2,000 work hours $35.14 $44.29 $53.43 2,001-3,000 work hours $36.12 $45.76 $55.39 3,001-4,000 work hours $38.09 $48.72 $59.33
LAUCT-Z1-2 9/7/2017
Class II - Manhole, headwall, catch basin builder, bricklayer tender, $39.18 $50.35 $61.51 X X X X X X X D Y mortar man, material mixer, fence erector, and guard rail builder.
Apprentice Rates:
0-1,000 work hours $34.24 $42.94 $51.63 1,001-2,000 work hours $35.22 $44.41 $53.59 2,001-3,000 work hours $36.21 $45.90 $55.57 3,001-4,000 work hours $38.19 $48.86 $59.53
LAUCT-Z1-3 9/7/2017
Class III - Air tool operator (jack hammer man, bush hammer man and $39.24 $50.44 $61.63 X X X X X X X D Y grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, concrete shoveler, conveyor man, floor man, gasoline and electric tool operator, gunnite man, grout operator, welder, heading dinky man, inside lock tender, pea gravel operator, pump man, outside lock tender, scaffold man, top signal man, switch man, track man, tugger man, utility man, vibrator man, winch operator, pipe jacking man, wagon drill and air track operator and concrete saw operator (under 40 h.p.).
Apprentice Rates:
0-1,000 work hours $34.28 $43.00 $51.71 1,001-2,000 work hours $35.27 $44.48 $53.69 2,001-3,000 work hours $36.26 $45.97 $55.67 3,001-4,000 work hours $38.25 $48.96 $59.65
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
LAUCT-Z1-4 9/7/2017
Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate $39.42 $50.71 $61.99 X X X X X X X D Y man, long haul dinky driver and well point man.
Apprentice Rates:
0-1,000 work hours $34.42 $43.21 $51.99 1,001-2,000 work hours $35.42 $44.71 $53.99 2,001-3,000 work hours $36.42 $46.21 $55.99 3,001-4,000 work hours $38.42 $49.21 $59.99
LAUCT-Z1-5 9/7/2017
Class V - Tunnel, shaft and caisson miner, drill runner, keyboard $39.67 $51.08 $62.49 X X X X X X X D Y operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars) Apprentice Rates:
0-1,000 work hours $34.60 $43.48 $52.35 1,001-2,000 work hours $35.62 $45.01 $54.39 2,001-3,000 work hours $36.63 $46.52 $56.41 3,001-4,000 work hours $38.66 $49.57 $60.47
LAUCT-Z1-6 9/7/2017
Class VI - Dynamite man and powder man. $40.00 $51.58 $63.15 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $34.85 $43.86 $52.85 1,001-2,000 work hours $35.88 $45.40 $54.91 2,001-3,000 work hours $36.91 $46.94 $56.97 3,001-4,000 work hours $38.97 $50.04 $61.09
LAUCT-Z1-7 9/7/2017
Class VII - Restoration laborer, seeding, sodding, planting, cutting, $33.28 $41.50 $49.71 X X X X X X X D Y mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.
Apprentice Rates:
0-1,000 work hours $29.81 $36.30 $42.77 1,001-2,000 work hours $30.50 $37.33 $44.15 2,001-3,000 work hours $31.20 $38.38 $45.55 3,001-4,000 work hours $32.59 $40.46 $48.33
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Landscape Laborer
LLAN-Z1-A 10/13/2015
Landscape Specialist: includes air, gas, and diesel equipment operator, $28.98 $40.04 $51.09 X X H X X X H D Y skidsteer (or equivalent), lawn sprinkler installer on landscaping work where seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintenance of landscape projects occurs.
comment Sundays paid at time & one half. Holidays paid at double time.
LLAN-Z1-B 10/13/2015
Skilled Landscape Laborer: small power tool operator, lawn sprinkler $24.76 $33.71 $42.65 X X H X X X H D Y installers' tender, material mover, truck driver when seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintaining of landscape projects occurs comment Sundays paid at time & one half. Holidays paid at double time.
Marble Finisher
BR1-MF 10/20/2014
Marble Finisher $43.48 $54.29 $65.10 H H D H D D D D Y Apprentice Rates:
Level 1 $19.04 $25.12 $31.20 Level 2 $20.24 $26.92 $33.60 Level 3 $27.01 $33.96 $40.90 Level 4 $28.47 $36.14 $43.82 Level 5 $29.99 $37.84 $45.70 Level 6 $31.61 $39.86 $48.10 Level 7 $33.30 $41.59 $49.87 Level 8 $34.79 $43.48 $52.17 comment A four ten workweek may be worked Monday thru Thursday or Tuesday thru Friday.
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Marble Mason
BR1-MM 10/17/2014
Marble Mason $50.29 $64.51 $78.72 H H D H D D D D Y Apprentice Rates:
Level 1 $25.14 $32.65 $40.15 Level 2 $28.20 $36.49 $44.78 Level 3 $33.41 $41.97 $50.53 Level 4 $36.15 $45.66 $55.17 Level 5 $38.42 $48.17 $57.92 Level 6 $42.07 $53.56 $65.05 Level 7 $42.74 $54.38 $66.02 Level 8 $43.67 $55.78 $67.88 comment A four ten workweek may be worked Monday thru Thursday or Tuesday thru Friday.
Operating Engineer
EN-324-A120 6/7/2017
Crane with boom & jib or leads 120' or longer $59.36 $77.25 $95.13 X X H H D D D D Y comment Double time after 12 hours M-F
EN-324-A140 6/7/2017
Crane with boom & jib or leads 140' or longer $60.18 $78.48 $96.77 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time.
EN-324-A220 6/7/2017
Crane with boom & jib or leads 220' or longer $60.48 $78.93 $97.37 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time.
EN-324-A300 6/7/2017
Crane with boom & jib or leads 300' or longer $61.98 $81.18 $100.37 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time.
EN-324-A400 6/7/2017
Crane with boom & jib or leads 400' or longer $63.48 $83.43 $103.37 X X H H D D D D Y
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision comment Work in excess of 12 hours per day M-F shall be paid at double time.
EN-324-CW 6/7/2017
Compressor or welding machine $48.51 $60.97 $73.43 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time.
EN-324-FL 6/7/2017
Forklift, lull, extend-a-boom forklift $55.82 $71.94 $88.05 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time.
EN-324-FO 6/7/2017
Fireman or oiler $47.48 $59.43 $71.37 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time.
EN-324-RC 6/7/2017
Regular crane, job mechanic, concrete pump with boom $58.50 $75.96 $93.41 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time.
EN-324-RE 6/7/2017
Regular engineer, hydro-excavator, remote controlled concrete breaker $57.53 $74.50 $91.47 X X H H D D D D Y Apprentice Rates:
0-999 hours $46.53 $58.76 $70.97 1,000-1,999 hours $48.28 $61.38 $74.47 2,000-2,999 hours $50.02 $63.99 $77.95 3,000-3,999 hours $51.77 $66.62 $81.45 4,000-4,999 hours $53.51 $69.22 $84.93 5,000-5,999 hours $55.26 $71.85 $88.43 comment Work in excess of 12 hours per day M-F shall be paid at double time.
Operating Engineer - Marine Construction
GLF D 4/2/2014
Diver/Wet Tender/Tender/Rov Pilot/Rov Tender $52.80 $79.20 $105.60 H H H H H H H D N
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
County: Statewide
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
GLF-1 1/23/2017
Diver/Wet Tender, Engineer (hydraulic dredge) $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters
GLF-2 1/23/2017
Crane/Backhoe Operator, 70 ton or over Tug Operator, $70.82 $91.57 $112.32 X X H H H H H D Y Mechanic/Welder, Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters
GLF-2B 1/23/2017
Friction, Lattice Boom or Crane License Certification $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters
GLF-3 1/23/2017
Deck Equipment Operator, Machineryman, Maintenance of Crane (over $66.27 $84.75 $103.22 X X H H H H H D Y 50 ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters
GLF-4 1/23/2017
Deck Equipment Operator, (Machineryman/Fireman), (4 equipment $60.07 $75.45 $90.82 X X H H H H H D Y units or more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters Operating Engineer Steel Work EN-324-ef 6/8/2017 Forklift, 1 Drum Hoist $60.41 $79.00 $97.58 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW120 6/7/2017
Crane w/ 120' boom or longer $63.11 $83.05 $102.98 H H D H H H D D Y
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW120-O 6/7/2017
Crane w/ 120' boom or longer w/ Oiler $64.11 $84.55 $104.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW140 6/7/2017
Crane w/ 140' boom or longer $64.29 $84.82 $105.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW140-O 6/7/2017
Crane w/ 140' boom or longer W/ Oiler $65.29 $86.32 $107.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW220 6/7/2017
Boom & Jib 220' or longer $64.56 $85.22 $105.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW220-O 6/7/2017
Crane w/ 220' boom or longer w/ Oiler $65.56 $86.72 $107.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW300 6/7/2017
Boom & Jib 300' or longer $66.06 $87.47 $108.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW300-O 6/7/2017
Crane w/ 300' boom or longer w/ Oiler $67.06 $88.97 $110.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SW400 6/7/2017
Boom & Jib 400' or longer $67.56 $89.72 $111.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
EN-324-SW400-O 6/7/2017
Crane w/ 400' boom or longer w/ Oiler $68.56 $91.22 $113.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWCO 6/7/2017
Crane Operator, Job Mechanic, 3 Drum Hoist & Excavator $62.75 $82.51 $102.26 H H D H H H D D Y Apprentice Rates:
0-999 hours $49.40 $63.26 $77.11 1,000-1,999 hours $51.38 $66.23 $81.07 2,000-2,999 hours $53.35 $69.19 $85.01 3,000-3,999 hours $55.33 $72.16 $88.97 4,000-4,999 hours $57.30 $75.11 $92.91 5,000 hours $59.28 $78.08 $96.87 comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWCO-O 6/7/2017
Crane Operator w/ Oiler $63.75 $84.01 $104.26 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWCW 6/7/2017
Compressor or Welder Operator $55.30 $71.33 $87.36 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWHO 6/7/2017
Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe $62.11 $81.55 $100.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWO 6/7/2017
Oiler $53.89 $69.22 $84.54 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
EN-324-SWTD50 6/7/2017
Tower Crane & Derrick where work is 50' or more $63.84 $84.14 $104.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
EN-324-SWTD50-O 6/7/2017
Tower Crane & Derrick 50' or more w/ Oiler $64.84 $85.64 $106.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather Operating Engineer Underground
EN-324A1-UC1 9/7/2017
Class I Equipment $55.54 $71.56 $87.57 H H H H H H H D Y Apprentice Rates:
0-999 hours $44.09 $55.30 $66.52 1,000-1,999 hours $45.68 $57.70 $69.70 2,000-2,999 hours $47.28 $60.09 $72.90 3,000-3,999 hours $48.88 $62.49 $76.10 4,000-4,999 hours $50.49 $64.91 $79.32 5,000-5,999 hours $52.09 $67.30 $82.52
EN-324A1-UC2 9/7/2017
Class II Equipment $50.81 $64.46 $78.11 H H H H H H H D Y
EN-324A1-UC3 9/7/2017
Class III Equipment $50.08 $63.37 $76.65 H H H H H H H D Y
EN-324A1-UC4 9/7/2017
Class IV Equipment $49.51 $62.52 $75.51 H H H H H H H D Y
EN-324A1-UMM 9/7/2017
Master Mechanic $55.79 $71.93 $88.07 H H H H H H H D Y
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Painter
PT-22-P 10/3/2017
Painter $44.32 $57.60 $70.88 H H D H D D D D Y Apprentice Rates:
Year 1 $31.04 $37.68 $44.32 Year 2 $33.70 $41.67 $49.64 Year 3 $36.35 $45.64 $54.94 Year 4 $40.34 $51.63 $62.92 comment make up day allowed Four 10s allowed Monday-Thursday with Friday makeup day if job down due to weather, holiday or other conditions beyond the control of the employer, 8 hours of repaint work performed on Sunday shall be paid time & one half rate Pipe and Manhole Rehab
TM247 4/17/2015
General Laborer for rehab work or normal cleaning and cctv work-top $28.20 $38.20 H H H H H H H H N man, scaffold man, CCTV assistant, jetter-vac assistant
TM247-2 4/17/2015
Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and $32.70 $44.95 H H H H H H H H N operator of CCTV; grouting equipment and tap cutting equipment
TM247-3 4/17/2015
CCTV Technician/Combo Unit Operator: unit driver and operator of $31.45 $43.07 H H H H H H H H N cctv unit or combo unit in connection with normal cleaning and
TM247-4 4/17/2015
Boiler Operator: unit driver and operator of steam/water heater units $33.20 $45.70 H H H H H H H H N and all ancillary equipment associated
TM247-5 4/17/2015
Combo Unit driver & Jetter-Vac Operator $33.20 $45.70 H H H H H H H H N
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
County: Statewide
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
TM247-6 4/17/2015
Pipe Bursting & Slip-lining Equipment Operator $34.20 $47.20 H H H H H H H H N
Pipefitter
PF-636 7/12/2016
Pipefitter, Steamfitter, Refrigeration & Air Conditioning Service $69.83 $91.03 $108.23 H H D H D D D D Y Apprentice Rates:
1st & 2nd periods $29.93 $38.28 $45.28 3rd period $31.93 $41.28 $49.28 4th period $33.18 $43.16 $51.78 5th period $34.43 $45.03 $54.28 6th period $35.68 $46.90 $56.78 7th period $36.93 $48.78 $59.28 8th period $37.93 $50.28 $61.28 9th period $38.93 $51.78 $63.28 10th period $40.36 $53.92 $66.14 comment Four 10s allowed during the week preceding, following and/or the week of a holiday.
Plasterer
BR1P 11/1/2012
Plasterer $45.04 $67.56 $90.08 H H H H H H H D N Apprentice Rates:
1st 6 months $32.11 $48.17 $64.22 2nd 6 months $33.40 $50.10 $66.80 3rd 6 months $34.69 $52.04 $69.38 4th 6 months $37.28 $55.92 $74.56 5th 6 months $39.87 $59.81 $79.74 6th 6 months $42.45 $63.68 $84.90 comment make up day allowed Saturday
Official Request #: 1208 Official Rate Schedule Requestor: Southgate Community School District Every contractor and subcontractor shall keep posted Project Description: To Be Determined on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: To Be Determined prescribed in a contract.
Contract must be awarded by: 1/11/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
PL67 9/8/2010
Plasterer $44.72 $60.11 $75.50 H H H X D D D D N Apprentice Rates:
1st 6 months $29.33 $37.02 $44.72 2nd 6 months $30.87 $39.34 $47.80 3rd 6 months $32.41 $41.64 $50.88 4th 6 months $35.49 $46.26 $57.04 5th 6 months $38.56 $51.16 $63.76 6th 6 months $41.64 $55.49 $69.34
Plumber
PL-98 7/18/2013
Plumber $64.45 $84.87 $101.29 H H D H D D D D Y Apprentice Rates:
Period 1 $19.93 $26.43 $32.93 Period 2 $23.90 $31.40 $38.90 Period 3 $30.60 $39.19 $47.77 Period 4 $31.23 $40.13 $49.03 Period 5 $32.39 $41.87 $51.35 Period 6 $33.54 $43.59 $53.65 Period 7 $34.69 $45.32 $55.95 Period 8 $35.86 $47.07…