SCOPEOFWORKHOTWATERTANK.docx
DOCX document 22 KB Posted
- Attached to
- 711-MLG-HOTTANKTANK/FAGAN
- Solicitation number
- SRC0000027222
- Issued by
- Trumbull County, Ohio
About this file
This Scope of Work document outlines the requirements for replacing a hot water tank/boiler at Trumbull Correctional Institution's B-6 mechanical room. The project involves removing an existing Bradford White (Magnum Series) hot water tank/boiler and installing a new Bradford White (Magnum Series) Model#: D80T7253NA with 80-gallon capacity and 725,000 BTU output. The work includes draining and removing the existing unit, installing the new unit, verifying and potentially modifying exhaust flues, connecting gas lines, electrical components, and control wiring, followed by startup testing to ensure proper operation.
The project includes all necessary rigging and comes with a one-year warranty on all parts in conjunction with the manufacturer's warranty. The installation is to be performed during normal working hours, and pricing assumes existing shut-off valves are in working order. No specific pricing terms or funding sources are mentioned in the document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work to Replace one (1) existing hot water tank/boiler in B-6 mechanical room at Trumbull Correctional Institution
1. Drain and prep existing Bradford White (Magnum Series) hot water tank/boiler for removal.
2. Remove and dispose of existing hot water tank/boiler.
3. Set one (1) new Bradford White (Magnum Series) Model#: D80T7253NA, 80 gallon capacity, and 725,000 BTU’s in B-6 mechanical room in the same position as the existing.
4. Check too be sure that existing exhaust flues are the correct size for the tank/boiler per the manufacture’s recommendations, clear, and venting properly to have safe operation of new boiler. If not correct size for the tank/boiler per the manufacture’s recommendations, clear or venting properly redo to ensure that flue is clear and venting properly to have safe operation of new hot water tank/boiler.
5. Connect existing gas lines to new hot water tank/boiler.
6. Connect existing electric to new hot water tank/boiler.
7. Connect existing control wiring to hot water tank/boiler.
8. Start up and check new water tank/boiler to insure proper operation.
9. Price is based on existing shut off valves working properly.
10. Includes all rigging.
11. 1 – year warranty on all parts, in conjunction with the manufacturer’s warranty.
12. Installed during normal working hours.