SCOPE_OF_WORK_VICK_Cyclic_Replacment_of_Cemetery_Building_Roof.pdf
PDF 2 MB Posted
- Attached to
- RE-ROOF CEMETERY MAINTENANCE BLDG
- Solicitation number
- 140P5225Q0026
About this file
This is a Statement of Work (SOW) for the Vicksburg National Military Park's project to replace the roof on the Cemetery Maintenance Building and potentially two additional housing units. The primary objective is to remove and replace the existing circa 2000 asphalt shingle roof on the approximately 2,562 square foot Cemetery Maintenance Shop, including complete removal of existing roofing components, inspection of roof decking, and installation of new roofing materials.
The scope includes detailed requirements for roof replacement, such as removing and replacing ice and water shield, drip edge flashing, and installing new 16 oz lead-coated copper flashing. Optional tasks include similar roof work for Quarters 2 (estimated 13 squares) and Quarters 4 (estimated 19 squares) housing units. The project is scheduled for early to mid-July 2025, with a 60-day performance period. Strict safety regulations must be followed, including compliance with OSHA standards, and work is restricted from June 1 to July 31 due to potential endangered bat roosting. The contractor must submit detailed material specifications, safety plans, and coordinate work to minimize disruption to park operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICKSBURG NATIONAL MILITARY PARK
VICKSBURG, MISSISSIPPI
STATEMENT OF WORK:
REPLACE CEMETERY MAINTENANCE BUILDING ASPHALT
SHINGLE ROOF
DATED:
April 18, 2025
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
SOUTHEAST REGION
Introduction:
Vicksburg National Military Park (VICK) is comprised of several discontinuous units related to the US Civil War, including:
• The Campaign For Vicksburg: For 18 months Union and Confederate Forces engaged each other all through the region as they positioned for control of Vicksburg.
• The Siege of Vicksburg: For 47 days, the Union General US Grant held the Confederate Army and city of Vicksburg under a hard and brutal siege.
The multiple sites are managed under one administration and are located in and around a 40-mile radius surrounding Vicksburg, Mississippi. Sites related to the Campaign For Vicksburg include the Port Gibson Unit (Shaifer House), Raymond Unit (Battle of Raymond), and Champion Hill (Crossroads and Coker House). The Siege of Vicksburg sites include the main battlefield and National Cemetery within the City of Vicksburg, Pemberton's Headquarters, Louisiana Circle, Navy Circle, and the USS Cairo.
Because of the integrity of the resources, Vicksburg National Military Park, the USS Cairo, and the National Cemetery are listed on the National Register of Historic Places. In addition, the engines and boilers of the USS Cairo are Historic Mechanical Engineering Landmarks, and Pemberton's Headquarters has been designated as a National Historic Landmark.
Cemetery Maintenance Shop The maintenance shop building was constructed in 1931. It is rectangular in form with a two-story central block flanked by single-story wings. The raised painted concrete foundation supports brick exterior walls set in an English bond with headers located every sixth course. The central portion has a front-gable roof while side gable roofs cover the flanking wings. All roofs are covered with asphalt shingles and drain to half-round gutters attached to painted wood fascia and downspouts discharging at grade. Openings have painted lintels and sills. Windows include wood multi-light pivot windows and wood multi-light double-hung windows, typically six-over-six lights. There are several pairs of sliding wood doors located inboard of the exterior wall, as well as paired and single swinging doors.
Objective:
The work of this contract is for the replacement of roofing components on the approx. 2,562 square foot
(sq. ft.) Cemetery Shop Roof. Contractor will remove and dispose of the existing Architectural asphalt shingle (26 square approximately) in its entirety. Once removed, contractor shall inspect roof decking, chimney and wall flashing elements, penetrations, and repair items before installing new roof system.
Half round gutter system and hangers shall be removed, fascia inspected, secured. Flashing shall be replaced with 16 oz lead-coated copper.
Contractor shall furnish all supervision, labor, equipment, tools, fuel, transportation, materials, fall protection measures (See Safety Section #5 below), and oversight necessary for replacing the Cemetery Maintenance Shop circa 2000 asphalt shingle roof and/or roof accessories. Contractor shall utilize this
SOW, pre-bid site observation, field measurements, and approved materials to implement the SOW requirements as stated herein. Use form CM-16 for all submission, highlighted yellow to easily locate, as noted herein before acquiring products or implementing work.
Contractor shall coordinate work so visitation and park programs are not disrupted.
Scope:
Specific Requirements:
● Take all necessary actions and precautions to assure safety of the public, property and the environment and the workers in removing and disposing of any existing paint. This includes compliance with all applicable regulations including, but not limited to, the following:
o OSHA 29 General Industry (29 CFR 1910) o OSHA 29 CFR 1910, Subpart D (Walking, working surface) o OSHA 29 CFR 1910, Subpart F (Powered platforms, man lifts, and vehicle-mounted work platforms) o OSHA 29 CFR 1926, Subpart M (Fall Protection)
● Compliance with all other applicable health, safety and environmental requirements of the government agencies having jurisdiction including, but not limited to:
○ Federal OSHA;
○ Federal Environmental Protection Agency.
● Comply with the requirements of governmental agencies having jurisdiction over this work, including compliance with volatile organic compounds/ volatile organic solvent regulations and abrasive surface preparation.
Cemetery Shop:
• Demo existing asphalt shingle roof and all underlayments, Typical o Remove and replace all ice and water shield at ridge, eaves, walls, and roof penetrations.
• Demo all less than 6-inch-wide L-type drip edge flashing, Typical
• Salvage flashing, if lead-coated copper, field verify, for reinstallation or to leave in place.
o Existing flashing damaged during work activity shall be replaced 16 oz lead-coated copper o Any caulk/sealant being applied will not be accepted by the Contracting Officer Representative (COR) o Do Not Paint flashing
• Correct flashing deficiencies and install new 16 oz lead-coated copper flashing to meet current roofing standards or as stated herein.
o Submit data sheet and sample for approval. Install new 6-inch-wide L-Type lead-coated flashing with kick at eaves (drip edge) Potential sources: Kmsheetmetal.com, basiccopper.com, riversidesheetmetal.net https://www.kmsheetmetal.com/shop/Lead-Coated-Copper-Drip-Edge-with-Kick-p412771056?srsltid=AfmBOoq-4Xdi9q1gUZBDz834RtXJtGeYZWBPO9lTEPy6uK4pWVtGxzWG https://basiccopper.com/copper-roof-flashing.html?gad_source=1&gclid=EAIaIQobChMIouitisTpjAMVrjkGAB04ZCyiEAAYAiAAEgLl6PD_BwE https://www.riversidesheetmetal.net/sheet-metal/lead-coated-copper.html#lead-coated-copper-sheet-metal o Submit data sheet and samples for approval. Install new base and step flashing (in mortar joints) where North and South roofs join at walls
• Install new 30 lb felt paper or synthetic felt
• Install new ice and water shield at eaves, ridges, valleys (surface transition), and walls
• Install 12” x36” 210 lbs. per 100 sqft, stick down type, three (3) tabs per strip with 5-inch exposure asphalt shingles as specified to match the existing roof.
o Submit cut sheet information on mater to include color selection, etc.
• Make sure no material debris is left behind clogging the gutters and downspouts, Typ.
• General cleanup inside the facility shall be required following the roof installation along with site cleanup and restoration, Typ.
o Attic shall be thoroughly cleaned for removal of construction debris due to repair of the decking that required replacing.
o Site shall be restored to pre-construction appearance and condition to satisfaction of the NPS.
Optional tasks for Quarters 2 and 4:
• Perform all demo and new roof work as stated herein for each structure o Valleys shall be formed in-kind with asphalt shingles and be a minimum of 8” wide o Ridges and Hips shall be formed in-kind with asphalt shingles
• Ensure dormers, eaves, and ridges, are weathertight with lumber material prior to installation roof underlayments, flashing, and finish materials.
o Schedule onsite inspection with COR so government verifies condition are meet before reroofing.
• Replace all flashing with 16 oz lead-coated copper.
• Install new continuous flashing beneath window dormers
BACKGROUND INFO – FIELD VERIFY:
The contractor shall be responsible for field verifying the quantities required to complete the work and the info provided can’t be verified by the NPS since there is a discrepancy in the info provided. It is strongly encouraged that the contractor visits the project site to verify conditions and quantities.
The Cemetery Maintenance Shop roof is estimated to be between 2500 to 2600 sqft. Quarters 2, next to the Cemetery Shop, roof is estimated to be approx. 1,300 sqft. Quarters 4 at the cemetery entrance is estimated to be approx. 1,800 to 2,000 sqft.
Contractor shall FIELD VERIFY:
• Cemetery Shop Roof o Center Roof 850 sqft (estimated) o North Roof 775 sqft (estimated) o South Roof 875 sqft (estimated)
• Option 1: Quarters 2 Mansard Roof 13 squares (estimated)
• Option 2: Quarters 4 Mansard Roof 19 squares (estimated)
WOOD TREATMENT:
• Assume 2% to 3% for cost estimating of wood that may require repairs (epoxy, dutchmen, etc.)
or replacement in-kind.
• Material requiring removal for flashing removal/reinstallation shall be carefully removed and reinstalled. Damage cause by work negligence shall be the responsibility and expense of the contractor.
PAINT:
• If it is determined by the contractor in coordination with the NPS, that wood siding or trim boards require replacement then the contractor shall:
o Prime all sides after final placement cuts are made – all surfaces to be coated before installed.
o Apply one coat of paint on all sides before nailing to structure.
o Apply final paint coat after installation of material.
o All primer and paint shall be Sherwin Williams’s product with paint being Exterior
Duration as made by the manufacturer.
NPS will provide paint color formula
DISPOSAL OF MATERIALS:
o All materials eligible for recycle will be collected and disposed of properly at a recycling center according to applicable regulations and a quantity of materials sheet shall be submitted to the COR at the end of the project detailing the amount of material that was recycled from the site.
o All materials that are not recyclable and are deemed unfit for reuse will be disposed of in the proper manner according to all applicable regulations and a quantity of materials sheet shall be submitted to the COR at the end of the project detailing the amount of material disposed of.
Period of Performance:
• Sixty (60) Days after Notice to Proceed. Tentative start date: early to mid JUL 2025. See next page about *Endangered Species Act and possible bats rooting in the shingles (seasonal):
Safety:
All work performed on government property will be accomplished in accordance with OSHA, EPA, Federal, State and local regulations and requirements. Prior to starting work on government property, the contractor will submit to Vicksburg National Military Park (VICK) for approval a copy of their company safety plan pertaining to this particular contract. Although not all inclusive, the safety plan must address at a minimum the following areas:
AWard Inserted Text
TY
1) Equipment List
2) Fall protection from elevated surfaces
3) Heavy equipment operations (if required)
4) Public/visitor safety (barriers/signage, etc.)
5) Traffic safety plan (if required)
6) Personal protective equipment to be used
7) Hazardous materials (HAZMAT) to be used
a. Copies of Safety Data Sheets must be provided to CARI
b. Storage of HAZMAT
8) Emergency response protocols
9) Personnel training requirements
10) OSHA DART rate
a. OSHA 300A Summary for last three years
Contractor shall use “green” products whenever possible. All HAZMAT must be pre-approved for use by the VICK Collateral Duty Safety Coordinator. The contractor shall be responsible for the safety and security of the site to ensure unauthorized personnel (park visitors & employees) do not enter the construction area.
*Endangered Species Act: requires that no work will be performed on this site from June 1 to July 31 to ensure the protection of an endangered bat species that could possibly be roosting in the shingles at that time of year.
Submittals:
● Contractor will submit cut sheets to the COR for material approval prior to use for the following items:
o Actual square footage (sqft) of building(s) roof o Asphalt Shingles o Lead-coated copper flashing (eave/gable, base, and step) o Fasteners (nails, screws, length, coating, diameter, etc.)
o Job Specific Safety Plan o Equipment list
PLACE OF PERFORMANCE:
The project site is located at the Cemetery Maintenance Shop on Cemetery Maintenance Road (380 Trindle Circle) inside the Vicksburg National Cemetery, located on Connecting Avenue, of the Vicksburg National Military Park. Access can be gained from Fort Hill Drive or through the front entrance to the park at 3201 Clay Street Vicksburg MS.
Permitted Work Hours:
Contractor shall only perform this work during normal operating hours (8:00am -4:30pm) Monday through Friday, unless approval is given by the park representative or COR.
Working after hours or weekends shall not be approved to accomplish the work unless prolong delays due to weather only. No work activity occurring on site prior to an alternative workday request will be result in denial of the request. Note: There is no lighting after work hours.
Permitted Access and Limits:
Call the COR in advance to schedule access to the sites Contractor is limited to access, work area, and staging area shown in red on map below or specified by Park.
LOCATION MAP FOR CEMETERY MAINTENANCE SHOP - VICKSBURG NATIONAL CEMETERY
CEMETERY MAINTENANCE BUILDING LOCATION
CEMETERY SHOP FRONT ELEVATION
CEMETERY SHOP ELEVATION – CENTER PORTION OF BUILDING
CEMETERY MAINTENANCE SHOP REAR ELEVATION
(WASHINGTON STREET VIEW)
OPTION 1: QUARTERS 2 HOUSING UNIT
OPTION 2: QUARTERS 4 HOUSING UNIT
Place of Performance: