DNR Eldon Hazlet - Replace Above Ground Fuel Tanks
Solicitation number
21-422DNR-REALT-B-20753
Issued by
St. Clair County, Illinois

About this file

This document is a Scope of Work for a small purchase procurement issued by the Illinois Department of Natural Resources for the replacement of aboveground fuel storage tanks at Eldon Hazlet State Park. The project involves installing two new 1,500 gallon double-walled steel fuel storage tanks, one for diesel and one for gasohol, along with associated piping, pumps, meters, and other required hardware. The contractor must obtain the necessary permits and approvals from the Office of the State Fire Marshal prior to installation. The work must be completed by September 30, 2021. Bids may be submitted electronically through BidBuy or emailed directly. Interested bidders must be registered as a small business and comply with prevailing wage, certified payroll, and apprenticeship requirements. The contract will be awarded to the lowest responsible qualified bidder, with the Department of Natural Resources reserving the right to reject any or all bids.

View the file

Other files

File Type Posted
Standard CertificationsV.18.1~49.doc DOC document
Standard Specifications for Road and Bridge Construction 2016~10.pdf PDF
1SMALL CONSTRUCTION BID FORM~19.docx DOCX document
Pictures~1.docx DOCX document
Standard Terms and Conditions1~94.pdf PDF
335613_spec_aboveground fuel storage tanks_final~1.docx DOCX document
Forms B 1~24.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ILLINOIS DEPARTMENT OF NATURAL RESOURCES

SMALL PURCHASE PROCUREMENT

SCOPE OF WORK & PROJECT REQUIREMENTS

Date: March 3, 2021 File # 4-20-049

LOCATION: Eldon Hazlet State Park

PROJECT TITLE: Replace Above Ground Fuel Storage Tanks

PROJECT NARRATIVE:

This project will consist of replacing the two (2) existing double walled fuel storage tanks due to the inner tank walls are leaking into the interstitial space. The tanks are located at the Eldon Hazlet State Park main office area.

The project will include installing two (2) steel, double walled vented fuel storage tanks: 1 – 1500 gallon diesel tank and 1 – 1500 gallon gasohol tank and all pertinent piping, pumps, meters and hardware. The fuel storage system must be installed per the National Electric Code (NEC) and the Office of the State Fire Marshal (OSFM) “Rules for Aboveground Fuel Dispensing Storage Tanks”, 41 Ill. Adm. Code 180. The existing fuel tanks, fuel and appurtenant systems are to be removed and disposed of offsite.

SCOPE OF WORK:

The contractor will provide all labor, equipment and materials needed to install a new fuel storage system in accordance with 41 Ill. Adm. Code 180 Rules for Aboveground Fuel Dispensing Storage Tanks. The Contractor is required to file a permit application with the OSFM prior to installation and have the tanks inspected by the OSFM prior to filling. Copies of all sign-offs and approvals by the OSFM should be provided for DNR’s files.

The following items shall be addressed:

1)The existing two (2) – 2000 gallon tanks will need to be emptied, dismantled and properly disposed of per the Office of the State Fire Marshal Code and per EPA. The existing tanks and all associated existing equipment is required to be disposed of at an offsite approved disposal site per code.
2)The new tanks will be installed on the existing reinforced concrete pad where the existing tanks are located. The Contractor shall provide the proper and required equipment to lift from above and vertically remove and install the new tanks. A crane or high lift boom equipment will be required.
3)Provide one (1) single compartment double walled steel aboveground storage tank (AST) that meets all requirements per Section 180.20 of the State Fire Marshal Code and referenced sections that may apply to fuel storage and dispensing of 1,500 gallons of diesel fuel. The pump for this tank shall have vanes specifically designed for the use with diesel fuel.
4)Provide one (1) single compartment double walled steel above ground storage tank (AST) that meets all requirements per Section 180.20 of the State Fire Marshal Code and referenced sections that may apply to fuel storage and dispensing of 1,500 gallons of gasohol fuel.
5)All associated metering devices, pumps, dispenser, safety equipment and on/off devices should be installed as new equipment. These devices should be calibrated by the installer for the individual fuel types. All appurtenant devices shall be installed per manufactures recommendations.
6)The existing electrical service and safety switch for emergency shut-off should be evaluated to determine if it meets current NEC and State Fire Marshal Code requirements for conduit, wire size, and connections from the existing shop to the new fuel storage system. If the existing system does not meet current code requirements, it will be the responsibility of the Contractor to include upgrades in the base bid.
7)All electrical connections must have seal-offs per Fire Marshal Code requirements.
8)Provide all new emergency shut-off signage. Sign shall say “EMERGENCY DISCONNECT SWITCHFUEL PUMPS”. Letters on sign shall be 2” high and meet State Fire Marshal requirements.
9)Vent pipe size & height, top-fill with lockable enclosures, labeling size & color, off-set distance from other buildings, anti-siphoning devices, dispensing hoses & handles, break-away connections, and all pertinent components of the fueling systems must all meet the State Fire Marshal Codes and requirements for this installation.
10)Ladders shall be provided on the exterior of the fuel pumps for safe access to the fill location, pump maintenance and meter readings.
11)Provide one new 20 lb. Tri-Class dry chemical fire extinguisher and system on/off indicator light.
12)Vapor lock preventers shall be installed per manufacture’s recommendations

PROJECT OVERVIEW:

ATTACHMENTS:

The following documents are included:

1) Specification Section 33 56 13 Aboveground Storage Tank Installation

PROJECT SPECIFICATIONS & REQUIREMENTS:

A.Project Specifications:
1) Contractor is responsible to verify all measurements and access.

2) Contractor is responsible for locating and verifying the location of all utilities.

3) The Contractor is responsible for completing and filing for an AST Dispensing Application with the Office of the Illinois State Fire Marshal. The application can be found on the State Fire Marshal’s website.

4) The new tanks and all hardware must be installed and calibrated per OSFM Code.

5) Tanks must be inspected and approved by the OFSM upon completion of installation and prior to the tanks being filled and dispensing fuel.

B. Project Instructions and Notes:

1) Work Completed by Prime Contractor A minimum of fifty percent (50%) of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources.

2)Coordination of Work Activities:
All work activities and entry to the site must be coordinated with the Site Superintendent.

3) Deliverables and Staff Training:

Two (2) sets of operating and maintenance manual and start-up procedures shall be provided to DNR. DNR staff shall receive proper training and instruction on the operation and maintenance of all new equipment.

4)Independent Testing:
The Contractor shall pay to have the pumps calibrated prior to closing out the project; resultsmust be provided to the Site Superintendent.

5) Contractor’s Licensing and/or Certifications:

Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency. This includes, but is not limited to:

a. AST Storage Tanks - Office of the State Fire Marshal

b. Licensed Electrician - for installation

6) Product Data:

Submit for the approval of the DNR Project Engineer and Site Superintendent product data for the following items prior to starting work: tanks, piping, hoses, vents, break-aways, top-fill equipment, disconnects, ladders, liquid level gauge, fill ports, leak detector, ground rod, emergency fuel shut-off switch and explosion proof seal-off.

7) Warranty:

The tanks, equipment, installation and miscellaneous equipment will have a minimum one-year warranty, unless otherwise specified by the manufacturers.

C. Project Requirements:

1)Project Meeting
PROJECT MEETING TO BE HELD: NO
MANDATORY ATTENDANCE: NO
2)Duration
Bids shall be good for ninety (90) calendar days after the Bid Opening Date.
3)Prevailing Wage Rates
This contract [or agreement] calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current “prevailing rate of wages” (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor (IDOL) publishes the prevailing wage rates on its website at https://www2.illinois.gov/idol/laws-rules/conmed/pages/rates.aspx. IDOL revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the IDOL’s web site for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to IDOL’s website. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage requirements and notice and record keeping duties.
4)Certified Payroll
State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state construction projects to submit certified payroll records to the Department of Natural Resources. The payroll records must include all workers employed by contractors on the project.

In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.

No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.

5) Employment of Public Workers on Public Works:

In a period of excessive unemployment rates, State contractors (1) constructing or building any public works or (2) cleaning-up and disposing on-site of hazardous waste, and that clean-up or on-site disposal is funded or financed in whole or in part with State funds or funds administered by the State, are required to employ at least 90% Illinois laborers on such project. For projects involving clean-up and on-site disposal of hazardous waste, emergency response or immediate removal activities are excluded. This requirement applies to all labor whether skilled, semi-skilled or unskilled, whether manual or non- manual.

A period of excessive unemployment rates is defined as any month immediately following two consecutive calendar months during which the level of unemployment in the State of Illinois has exceeded 5% as measured by the United States Bureau of Labor Statistics in its monthly publication of employment and unemployment figures.

Any public works project financed in whole or in part by federal funds administered by the State of Illinois is covered under the provisions of this requirement, to the extent permitted by any applicable federal law or regulation. 30 ILCS 570.

Contractors may receive an exception from this requirement by submitting a request and supporting documents certifying that Illinois laborers are either not available or are incapable of performing the particular type of work involved. The certification must: (a) be submitted to the agency within the first quarter of the Contract Term; (b) provide sufficient support that demonstrates the exception is met; (c) be signed by an authorized signatory of the contractor; and (d) be approved by the agency.

6) Small Business Set-Aside The Contractor awarded the project must be registered as a small business, as required by the Small Business Set-Aside Program. (For complete requirements, to become registered, or to certify your business is in the Small Business Set-Aside Program, visit the Illinois Procurement Gateway (IPG) at https://ipg.vendorreg.com/ or call (217) 782-1270.

7) Apprenticeship-in-Training When applicable, the contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .

8) Illinois Office The bidder must certify that the bidder will maintain an Illinois office as the primary place of employment for persons employed in the construction authorized by the contract.

9)Subcontractors
The Contractor shall identify the names of all subcontractors to be utilized by them in the
performance of this contract, together with the anticipated amount of money that each
subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois
Procurement Code (30 ILCS 500/1-15.108), a person or entity is not a “subcontractor” if that
person only provides goods or supplies that are incidental to the performance of a contract by
a person who has a contract subject to the Code.

10) Insurance Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims.

11) Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.

12) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.

13) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.

14) Utilities Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.

15) Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.

16) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.

17)Steel Products
Any and all steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/).

18) Specified Materials Bids shall be based on providing all products exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.

19) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.

20) Warranties The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date. See Section B. Project Instructions and Notes, for any extended warranties that may apply.

21) Change Orders Change order shall be defined as a change in a contract term, other than as specifically provided for in the contract, which authorizes or necessitates any increase or decrease in the cost of the contract or the time for completion. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed. Change orders that increase or decrease the cost of a contract or an estimated contract by a total of $10,000 or more or the time of completion by more than 30 days shall be published on the Illinois Procurement Bulletin, pursuant to Section 15-25 of the Code and documented pursuant to Section 33E-9 of the Criminal Code of 2012, in advance of execution of the change order.

22) Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.

23) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.

24)Contract Award
Contract award will be made to the lowest, responsible, qualified bidder. The Department of Natural Resources reserves the right to reject any or all bids.
25)Term of Contract
All work shall be completed by September 30, 2021.

26) Bid Submittal Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form to Frederick.Murphy@illinois.gov

27)Bid Submittal Date and Time
Refer to the BIDBUY solicitation for the bid date and time.

28) Questions

ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST

BE DIRECTED TO Frederick.Murphy@illinois.gov . ALL QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN THREE (3) BUSINESS DAYS BEFORE THE BID DATE.