This document is a Scope of Work issued by the Illinois Department of Natural Resources (IDNR) for a small purchase procurement project to install new energy efficient windows and vinyl siding at the Kickapoo State Park office building and garage. The project requires the contractor to remove thirteen 32" x 39", five 20" x 39", and five 52" x 39" windows and install new energy efficient windows. The contractor will also install approximately 18 squares of vinyl siding on the office building and garage, including new wooden eaves and matching color gutters. The project has a completion date of June 30, 2021.
The acceptable window and siding manufacturers are listed, and the contractor must have 5 years of experience with similar projects. The contract is subject to federal assistance provisions, including requirements related to the Clean Air Act, Clean Water Act, Buy American Act, and other regulations. Prevailing wage rates apply, and the contractor must be registered in the Small Business Set-Aside Program. Payment terms are per the State Prompt Payment Act, and the contract will be awarded to the lowest responsive and responsible bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard Terms and Conditions~25.pdf | ||
| SMALL CONSTRUCTION BID FORM~81.docx | DOCX document | |
| Standard Certifications~17.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SMALL PURCHASE PROCUREMENT
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: August 11, 2020 File # 3-20-022
LOCATION: Kickapoo State Park
PROJECT TITLE: Install New Energy Efficient Office Windows & Place Vinyl Siding on Office Building and Garage
PROJECT NARRATIVE:
The Illinois Department of Natural Resources (IDNR) is seeking a Vendor to install new energy efficient vinyl windows in the office building and new vinyl siding on the office building and garage.
The Kickapoo Park Office needs new energy efficient windows. Several of the windows are not opening completely, the existing windows are not energy efficient and some of the window jambs have deteriorated. The Kickapoo office and garage need new exterior vinyl siding. The Office and Garage wood exterior is over 40 years old and is in dire need of new vinyl siding. In various locations of the garage and office building the wood shows signs of weathering and distress.
WINDOW INSTALLATION SCOPE OF WORK:
| 1. | The contractor shall remove thirteen (13) H: 32” x W: 39”, (5) H: 20” x W: 39” (5) H: 52” x W: 39” windows and frames from the Kickapoo Office Building. |
| 2. | The contractor shall be responsible for accurately measuring and installation of new energy efficient windows. |
| 3. | The contractor shall prep the area and dry fit the new window. |
| 4. | The contractor shall set and level the new window. |
| 5. | The contractor shall pre-drill window holes. |
| 6. | The contractor shall apply caulk and fit the window properly. |
| 7. | The contractor shall use shims if needed and secure the window with screws in the pre-drilled holes. |
| 8. | The contractor shall trim shims if needed, add insulation, paint, and finish. |
| 9. | The contractor shall dispose of all discarded material at a location off site. |
| 10. | The Contractor will provide energy efficient windows that will slide open. |
| 11. | Per the National Glass Association Code Tempered Glass will be provided on all windows that are less than 18” from the floor. |
| 12. | All windows less than 18” from the floor will be fixed windows. |
| 13. | The Contractor will replace existing screen door with same type of screen door. |
SIDING INSTALLATION SCOPE OF WORK:
| 1. | The contractor shall install approximately 18 squares of vinyl siding to the Kickapoo Office Building and Garage using their own chosen method. The color of vinyl siding will be selected by the Kickapoo Site Superintendent. |
| 2. | The Contractor will install new wooden eaves to the house and garage covered with vinyl siding. |
| 3. | The Contractor will install new gutters on both sides of the Office Building, approximately 100 ft., and will match the color of the new siding. |
| 4. | The contractor shall be responsible for accurately measuring and installation of vinyl siding. |
| 5. | The contractor shall haul discarded material off site. |
ATTACHMENTS:
The following documents are included:
N/A
PROJECT SPECIFICATIONS & REQUIREMENTS:
Acceptable Window Manufacturers:
a. Anderson
b. Jeld - Wen
c. Marvin Windows & Doors
d. Masonite
e. Pella Corp
f. Ply Gem
g. Velux USA
h. Atrium
i. Simonton Acceptable Siding Manufactures:
| a. | ABC Supply |
| b. | Cane |
| c. | Alside |
| d. | Variform |
| e. | Royal |
Acceptable Manufacturers:
Manufacturers listed below have been recognized for providing quality products with superior performance by such entities as Underwriters Laboratories (UL), Applied Research Laboratory (ARL), or consumer-based organizations such as Consumer Reports. They are chosen to describe the standard of quality, performance and characteristics desired and is not intended to limit or restrict competition.
“Or Equal” submissions will not be rejected because of minor differences in design, construction or features that do not affect the suitability of the product for its intended use. Burden of proof that the product is equal is on the bidder.
A. Project Specifications:
1. The awarded contractor, or subcontractor, must have 5 years of experience installing windows and siding and be able to provide documentation of completion of at least 5 projects similar in size and scope to this one.
B. Project Instructions and Notes:
1. Work Completed by Prime Contractor A minimum of thirty percent (30%) of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources.
2. Coordination of Work Activities:
All work activities and entry to the site must be coordinated with the site superintendent.
3. Deliverables and Staff Training:
N/A
4. Independent Testing:
The Contractor shall pay all independent laboratory testing, if needed.
5. Contractor’s Licensing and/or Certifications:
Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency. This includes, but is not limited to:
a. Siding – (VIS) Vinyl Siding Installation Certified IL Dept. of Professional Regulation
6. Shop Drawings:
Submit for the approval of the DNR Project Architect/Engineer, shop drawings and product data for the following items prior to Bid Award:
| a. Windows |
| b. Siding |
7. As-Built Markups:
The Contractor shall hand mark one set of drawings with corrections, dimensions, and "As-Built" notes. These Drawings shall be delivered to the DNR Project Architect/Engineer upon construction completion and prior to final payment request.
8. Extended Warranty:
Workmanship, materials and equipment will be in conformance with the contract and free from defects for a period of two years, commencing from the goods acceptance date.
9. FEDERAL ASSISTANCE PROVISIONS and ASSURANCES:
This project is wholly or partially funded by the federal government and is subject to all federal laws and regulations pertaining to federally assisted construction projects. As such, these special provisions hereinafter amended are expressly incorporated by reference into the Contract and all rights, duties and liabilities set forth therein shall be deemed to specifically apply to the Contractor and his employees. In the event of a conflict caused by these provisions, the more restrictive requirements will govern.
A. INSPECTION AND AUDIT. The authorized representatives of the Federal Government and the State of Illinois shall be permitted to inspect all work, material, payrolls, personnel records, invoices for materials and other data and records relevant to the Contract.
| B. | Whereas Federal grants-in-aid funds have been granted for execution of this contract, the Contractor hereby assures and certifies that he will comply with applicable regulations, policies, guidelines, and requirements of Office of Management and Budget Circular A-102: Uniform Administrative Requirements for Grants-in-Aid to State and Local Government. Also, the Contractor gives assurance and certifies with respect to the Federal grant that: | |
| 1. | He and all Subcontractors will comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act 42 U.S.C. 1857 (h), section 508 of the Clean Air Act (33 U.S.C. 1368), Executive Order 11738, and Environmental Protection Agency regulations (40 CFR Part 15), and Executive Order 11738 implementing provisions of the Clean Air Act (P.O. 91-604) and the Federal Water Pollution Control Act (P.L. 92-500). |
| 2. | He and all Subcontractors will comply with the Copeland Anti-Kick Back Act |
| (18 U.S.C. 874) as supplemented in Department of Labor regulations (29 CFR Part 3). |
3. He and all Subcontractors awarded subcontracts for construction having a value of more than $10,000 will comply with Executive Order 11246, entitled Equal Employment Opportunity as amended by Executive Order 11375, and as supplemented in Department of Labor regulations (41 CFR Part 60).
4. He and all Subcontractors awarded subcontracts which involve employment of mechanics or laborers in excess of $2,500 or subcontracts for construction in excess of $2,000, will comply with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor regulations (29 CRF Part 5).
5. He and all subcontractors, materialmen, and suppliers agree that only domestic construction material will be used, in the performance of this contract, except for foreign construction materials, if any, listed in this contract, as provided by the Buy American Act (41 U.S.C 10). The Buy American Act provides that the Government give preference to domestic construction material defined as components, construction material and domestic construction material.
a. Components, as used in this clause, means those articles, materials, and supplies incorporated directly into construction materials.
b. Construction material, as used in this clause, means an article, material, and supply brought to the construction site for incorporation into the building or work. Construction material also includes an item brought to the site pre-assembled from articles, materials and supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, which are discrete systems incorporated into a public building or work and which are produced as a complete system, shall be evaluated as a single and distinct construction material regardless of when or how the individual parts or components of such systems are delivered to the construction site.
| c. | Domestic construction material, as used in this clause, means: |
| (i) an unmanufactured construction material mined or produced in the | |
| United States, or (ii) a construction material manufactured in the United |
States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind as the construction materials determined to be unavailable pursuant to 12.810(a)(3) of 43 CFR part 12, subpart E shall be treated as domestic.
| C. | Section 10 of the River and Harbor Act of 1899 |
| D. | Copeland Anti-Kick Back Act; 18 USC 874 as supplemented in the Department of Labor Regulations, (29 CFR Part 3) |
| E. | The Civil Rights Act of 1964, Title VI (nondiscrimination of federally assisted programs), P.L. 88-352, as amended; as well as 43 CFR 17, and Part 506 of the Department of the Interior Manual |
| F. | The Anadromous Fish Conservation Act of 1965, P.L. 89-304 as amended |
| G. | Land and Water Conservation Fund Act of 1965, P.L. 88-578, as amended |
| H. | National Historic Preservation Act of 1966 (P.L. 89-665) |
| I. | Department of Transportation Act of 1966, Section 4 (f) (P.L. 89-670) as amended |
| J. | Architectural Barriers (denying use by the physically handicapped) Act of 1968, P.L. 90-480, as amended |
| K. | National Environmental Policy Act of 1969 (P.L. 91-190) as amended |
| L. | Occupational Safety and Health Act of 1970 (P.L. 91-596) |
| M. | Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (P.L. 91-646) |
| N. | Section 401 of the Federal Water Pollution Control Act (P.L. 92-500) |
| O. | Section 402 (Other Pollutants) and 405 (Sewage Sludge) of the Federal Water Pollution Control Act (P.L. 92-500) |
| P. | Section 404 of the Federal Water Pollution Control Act (P.L. 92-500) |
| Q. | Federal Environmental Pesticide Control Act of 1972 (P.L. 92-516) |
| R. | Endangered Species Act of 1973 (P.L. 93-205) |
| S. | Flood Disaster Protection Act of 1973 (P.L. 93-234) |
| T. | Archaeological and Historic Preservation Act of 1974 (P.L. 93-291) |
| U. | Hatch Act Amendments of 1974, 5 CFR 151, 5 USC 1501 et. seq. |
| V. | Contract Compliance for Equal Employment Opportunity Executive Orders 11246, 11375 and Department of Labor Regulations 41 CFR 60 |
| W. | Executive Order 11296 of August 10, 1966; Evaluation of Flood Hazard in Locating Federally Owned or Financed Buildings, Roads and Other Facilities; also see 24 CFR 1909-15 |
| X. | Executive Order 11644 of February 8, 1972; Use of Off-Road Vehicles on Public Lands |
| Y. | Executive Order 11738 of September 10, 1974; Administration of the Clean Air Act and the Federal Water Pollution Control Act with Respect to Federal Contracts, Grants, or Loans |
| Z. | OMB Circular A-21; Principles for Determining Costs Applicable to Research and Development under Grants and Contracts with Educational Institutions |
| AA. | OMB Circular A-84; Reporting of Federal Outlays by Geographic Location |
| BB. | OMB Circular A-87; Cost Principles Applicable to Grants and Contracts with State and Local Governments |
| CC. | OMB Circular A-102; Uniform Administrative Requirements for Grants-In-Aid to State and Local Governments |
| DD. | Buy American Act (41 U.S.C 10) |
| 10) | Other: |
C. Project Requirements:
| 1. | Project Meeting |
| PROJECT MEETING TO BE HELD: NO | |
| MANDATORY ATTENDANCE: NO |
| 2. | Duration |
| Bids shall be good for ninety (90) calendar days after the Bid Opening Date. |
| 3. | Prevailing Wage Rates |
| This contract [or agreement] calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current “prevailing rate of wages” (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor (IDOL) publishes the prevailing wage rates on its website at https://www2.illinois.gov/idol/laws-rules/conmed/pages/rates.aspx . IDOL revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the IDOL’s web site for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to IDOL’s website. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage requirements and notice and record keeping duties. |
| 4. | Certified Payroll |
| State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state | |
| construction projects to submit certified payroll records to the Department of Natural | |
| Resources. The payroll records must include all workers employed by contractors on the | |
| project. |
In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.
5. Small Business Set-Aside The Contractor awarded the project must be registered as a small business, as required by the Small Business Set-Aside Program. (For complete requirements, to become registered, or to certify your business is in the Small Business Set-Aside Program, visit the Illinois Procurement Gateway (IPG) at https://ipg.vendorreg.com/ or call (217) 782-1270.
6. Apprenticeship-in-Training When applicable, the contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .
7. Illinois Office The bidder must certify that the bidder will maintain an Illinois office as the primary place of employment for persons employed in the construction authorized by the contract.
| 8. | Subcontractors |
| The Contractor shall identify the names of all subcontractors to be utilized by them in the | |
| performance of this contract, together with the anticipated amount of money that each | |
| subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois Procurement | |
| Code (30 ILCS 500/1-15-108), a person or entity is not a “subcontractor” if that person only | |
| Provides goods or supplies that are incidental to the performance of a contract by a person | |
| who has a contract subject to the Code. |
| 9. | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
10. Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.
11. Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.
12. Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.
13. Utilities Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.
14. Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.
15. New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.
| 16. | Steel Products |
| Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/). |
17. Specified Materials Bids shall be based on providing all products/materials exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.
18. Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.
19. Warranties The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of two years from the goods acceptance date.
20. Change Orders Change order shall be defined as a change in a contract term, other than as specifically provided for in the contract, which authorizes or necessitates any increase or decrease in the cost of the contract or the time for completion. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed. Change orders that increase or decrease the cost of a contract or an estimated contract by a total of $10,000 or more or the time of completion by more than 30 days shall be published on the Illinois Procurement Bulletin, pursuant to Section 15-25 of the Code and documented pursuant to Section 33E-9 of the Criminal Code of 2012, in advance of execution of the change order.
21. Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.
22. Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
| 23. | Contract Award |
| Contract award will be made to the lowest, responsible, responsive bidder. The Department of Natural Resources reserves the right to reject any or all bids. |
| 24. | Term of Contract |
| All work shall be completed by June 30, 2021. |
25. Bid Submittal Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form to Frederick.Murphy@illinois.gov .
| 26. | Bid Submittal Date and Time |
| Refer to the BIDBUY solicitation for the bid date and time. |
27. Questions
ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST
BE DIRECTED TO – Frederick.Murphy@Illinois.gov -- ALL QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN THREE (3) BUSINESS DAYS BEFORE THE BID DATE.