Scope of Work Sand Key Gas Lines.pdf

PDF 181 KB Posted

Attached to
USCG Station Sand Key Gas Line Replacement
Solicitation number
30321PR240000003
Issued by

About this file

This statement of work outlines the requirements for replacing corroded natural gas lines at US Coast Guard Station Sand Key. The scope of work involves demolishing existing gas pipes to the galley and living quarters, furnishing and installing approximately 250 feet of black iron gas pipe ranging from one to two inches in diameter, installing necessary fittings including elbows, unions, and a reducer, painting all new pipe yellow, marking all new pipe, and removing and replacing the existing galvanized lines to the water heaters and female bathroom with black iron pipe. The related federal contract opportunity is a solicitation issued by the US Coast Guard under solicitation number 30321PR240000003 to obtain these gas line replacement services at Station Sand Key.

View the file

Other files

File Type Posted
Synopsis Solicitation 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #: TBD

STATEMENT OF WORK SSK REV.01 26OCT23

LAST UPDATED: 10/26/2023 PAGE 1/2

STATEMENT OF WORK

FOR

STATION SAND KEY GAS LINE REPLACEMENT

1.0 GENERAL

1.1 BACKGROUND

USCG Station Sand Key’s gas lines are severely corroded and detiorated.

1.2 SCOPE

1. Demo Natural Gas Pipe to Galley & Living Quarters

2. Furnish and Install 100’ of 2 ½” Black Iron

3. Furnish and Install 150’ of 1 ½” Black Iron

4. 6’ of ¾” Black Iron to Water Heater

5. (4) 2 ½” Cut Offs

6. (4) 1 ½” Cut Offs

7. (4) ¾” Cut Offs

8. (1) 2 ½” to 1 ½” Reducer

9. All Pipes and Fittings Must be Painted Yellow Before Installing

10. All Pipes will be Marked

11. (10) 2 ½” Ells

12. (10) 1 ½” Ells

13. Remove All Galvanized Pipe to Water Heaters and Female Bathroom-Replace with Black Iron

14. (2) 2 ½” Unions

15. (4) 1 ½” Unions

1.3 OBJECTIVE

Restore Station Sand Key’s heavily corroded natural gas lines.

1.4 APPLICABLE DOCUMENTS

TBD

1.4.1 Compliance Documents

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:

1.4.2 Reference Documents

The following documents may be helpful to the Contractor in performing the work described in this document:

file://///hqnas/SHARED/G-A/G-ACS/CAAT%20Team/TOOLBOX/SCOPE%20PARAGRAPHS.doc

PR #: TBD

STATEMENT OF WORK SSK REV.01 26OCT23

LAST UPDATED: 10/26/2023 PAGE 2/2

2.0 SPECIFIC REQUIREMENTS/TASKS

2.1 TASK ONE. Demo Natural Gas Pipe to Galley & Living Quarters

2.2 TASK TWO. Furnish and Install 100’ of 2 ½” Black Iron

2.3 TASK THREE. Furnish and Install 150’ of 1 ½” Black Iron

2.4 TASK FOUR. 6’ of ¾” Black Iron to Water Heater

2.5 TASK FIVE. (4) 2 ½” Cut Offs

2.6 TASK SIX. (4) 1 ½” Cut Offs

2.7 TASK SEVEN. (4) ¾ Cut Offs

2.8 TASK EIGHT. (1) 2 ½ to 1 ½ Reducer

2.9 TASK NINE. ALL PIPES MUST BE YELLOW BEFORE INSTALLING

2.10 TASK TEN. ALL PIPES WILL BE MARKED

2.11 TASK ELEVEN. (10) 2 ½ Ells

2.12 TASK TWELVE. (10) ½ Ells

2.13 TASK THIRTEEN. REMOVE ALL GALVANIZED PIPE TO WATER HEATERS AND FEMALE

BATHROOM-REPLACE WITH BLACK IRON

2.14 TASK FORTEEN. (2) 2 ½ Unions

2.15 TASK FIFTEEN. (4) 1 ½ Unions

File details come from the government source that posted it. Updated .