Scope of Work Project Synopsis 538-20-206 .pdf

PDF 109 KB Posted

Attached to
Z1DA--Repair Elevators-Install Elevator CLC 538-20-206 Federal contract opportunity
Solicitation number
36C25023B0040
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Repair Elevators-Install Elevator CLC 538-20-206, newest first.
File Type Posted
36C25023B0040 0001_1.docx DOCX document
Virtual Bid Opening Instructions.docx DOCX document
Addendum_1.pdf PDF
Wage Determination Ross County 20230303.pdf PDF
538-20-206 Bid Set Specifications.pdf PDF
36C25023B0040_1.docx DOCX document
538-20-206 Bid Set Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work / Synopsis

Project #: 538-20-206

Project Title: Repair Existing Elevators and Install Elevator in CLC Main Entry

Synopsis: For project 538-20-206, Repair Existing Elevators and Install Elevator in CLC Main Entry at

VAMC Chillicothe, Ohio the contractor shall completely prepare the site for building operations, including demolition and removal of existing items, and furnish labor, materials and equipment necessary to complete all new construction which includes, but is not limited to, architectural, mechanical, electrical, and plumbing as shown on drawings and specifications.

The general scope of this project includes performing work such as installing car top safety rails, maintenance of doors, repair of leaking power units, and replacement of pump fittings at (8) elevators and (2) machine rooms. It also includes modernization of (2) elevators which includes tasks such as new

HVAC temperature sensors in the existing machine rooms, demo and installation of a new split system heat pump unit (1 location only), lighting upgrades, new elevator controller, new interior finishes, etc.

Lastly, the project also includes installation of a new elevator system in B210/B211 CLC Connector (shaft and empty machine room is existing).

The work shall include infection control and dust prevention measures as well as noise and vibration from construction reduction measures. The work will include phasing to accommodate the Medical

Centers on-going operations.

Base bid work to be completed within 365 calendar days after receipt of Notice to Proceed.