Scope of Work Large~7.docx

DOCX document 38 KB Posted

Attached to
DNR WM G Stratton Boat Dock Repairs
Solicitation number
21-422DNR-DIREC-B-16996
Issued by
Grundy County, Illinois

About this file

This document is a Scope of Work from the Illinois Department of Natural Resources (IDNR) regarding a small purchase procurement for the repair of a floating boat dock system located at the William G. Stratton State Park in Morris, Grundy County, Illinois. The project seeks to perform routine maintenance and selected replacement activities to restore the nearly 20-year-old aluminum floating dock system to its original design. The scope of work includes replacing various dock components such as handrails, floats, and truss elements. The work must be completed by October 31, 2020, and the contract will be awarded to the lowest responsible, responsive bidder. Bids may be submitted electronically or via email, and all questions must be directed to the IDNR representative in writing at least three business days prior to the bid date.

The contract will be paid for or reimbursed from the proceeds of tax-exempt bonds issued by the State. Prevailing wage rates apply, and the contractor must comply with the Illinois Prevailing Wage Act. A performance bond and labor and material payment bond are required if the project cost exceeds $50,000. There is a 30% self-performance requirement for the prime contractor, and the contractor must identify all subcontractors. A $15 fee is required to cover expenses related to the Minority Contractor Opportunity Initiative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ILLINOIS DEPARTMENT OF NATURAL RESOURCES

SMALL PURCHASE PROCUREMENT

SCOPE OF WORK & PROJECT REQUIREMENTS

Date: July 31, 2020 File#: 2-20-030

LOCATION: I & M Canal – William G. Stratton SP Address: Griggs Dr, Morris, IL 60450 Park Office address: 401 Ottawa Street, Morris, IL 60450

PROJECT TITLE: Floating boat dock repair.

PROJECT NARRATIVE:

The current floating dock system, situated on the Illinois River and located at the William G. Stratton State Park located in Morris, Grundy County, Illinois, is nearly 20 years old and has survived a number of flooding and ice events in that time, with very minimal damage to its structural system. This project seeks to perform routine maintenance, with selected replacement activities to restore the dock to its original design.

The aluminum floating dock is in need of a full assessment of the dock system components, with known replacements required to bladder floats, minor truss repairs, and ADA handrail replacement. The modular dock system is a Shoremaster Inc, Floating Dock System, FTS9, as shown in the attached photographs.

SCOPE OF WORK:

The contractor shall provide all equipment, materials and labor needed to repair the existing floating dock system. The repair need is summarized below and also identified in the attached exhibits with current photographs, however contractor shall do full assessment of the dock system damage and identify each item needing repair or replacement and submit with a lump sum bid for the project.

All the components being replaced shall be matching the existing material, sizes and quality, in kind replacement preferably obtained from the dock manufacturer or authorized dealer. Following are the known repair/replacement need, also shown in the attached repair overview sketch:

· Replace two missing ADA handrail returns on gangway.

· Replace one missing segment of ADA railing at gangway to dock transition area.

· Replace two pipe anchor floats at the east end of dock.

· Replace four broken floats underneath the gangway and the floating dock.

· Replace four broken or detached truss frame elements.

· Verify and repair as needed the pipe anchor cable at dock end that ties to shore which was repaired by the site staff in 2018.

ATTACHMENTS:

The following documents are included:

1) Location Map

2) Illustration Sketch and photos

PROJECT SPECIFICATIONS & REQUIREMENTS:

A. Project Specifications:

N/A

B. Project Instructions and Notes:

1) Work Completed by Prime Contractor:

A minimum of thirty percent (30%) of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources.

2) Coordination of Work Activities:

All work activities and entry to the site must be coordinated with the Site Superintendent.

3) Contractor’s Licensing and/or Certifications:

Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency.

C. Project Requirements:

1) Project Meeting

PROJECT MEETING TO BE HELD:YES
MANDATORY ATTENDANCE:NO

Refer to the BidBuy solicitation for meeting date and time.

2) Duration Quotes shall be good for ninety (90) calendar days after the Bid Opening Date.

3) Prevailing Wage Rates This contract [or agreement] calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current “prevailing rate of wages” (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor (IDOL) publishes the prevailing wage rates on its website at https://www2.illinois.gov/idol/laws-rules/conmed/pages/rates.aspx. IDOL revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the IDOL’s web site for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to IDOL’s website. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage requirements and notice and record keeping duties.

4) Certified Payroll State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state construction projects to submit certified payroll records to the Department of Natural Resources. The payroll records must include all workers employed by contractors on the project.

In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.

No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.

5) Small Business Set-Aside N/A

8) Subcontractors The Contractor shall identify the names of all subcontractors to be utilized by them in the performance of this contract, together with the anticipated amount of money that each subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois Procurement Code (30 ILCS 500/1-15-108), a person or entity is not a “subcontractor” if that person only Provides goods or supplies that are incidental to the performance of a contract by a person who has a contract subject to the Code.

9) Insurance Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims.

10) Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.

11) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.

12) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.

13) Utilities Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.

14) Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.

15) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.

16) Steel Products Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/).

17) Specified Materials Bids shall be based on providing all products/materials exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of IDNR.

18) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.

19)Warranties
The Contractor warrants that all work provided under the contract will be inconformance with the contract and free from defects in workmanship, materials, and equipment for at least a period of one year from the goods acceptance date. See Section B. Project Instructions and Notes, for any extended warranties that may apply.

20) Change Orders Change order shall be defined as a change in a contract term, other than as specifically provided for in the contract, which authorizes or necessitates any increase or decrease in the cost of the contract or the time for completion. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed. Change orders that increase or decrease the cost of a contract or an estimated contract by a total of $10,000 or more or the time of completion by more than 30 days shall be published on the Illinois Procurement Bulletin, pursuant to Section 15-25 of the Code and documented pursuant to Section 33E-9 of the Criminal Code of 2012, in advance of execution of the change order.

21) Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.

22) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.

23) Contract Award Contract award will be made to the lowest, responsible, responsive bidder. The Illinois Department of Natural Resources reserves the right to reject any or all bids.

24) Term of Contract All work shall be completed by October 31, 2020.

25) Bid Submittal Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form to Frederick.Murphy@illinois.gov .

26)Bid Submittal Date and Time
Refer to the BIDBUY solicitation for the bid date and time.

27) Questions ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST BE DIRECTED TO Frederick.Murphy@illinois.gov . ALL QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN THREE (3) BUSINESS DAYS BEFORE THE BID DATE.

File details come from the government source that posted it. Updated .