SCOPE of WORK ICIDS.docx
DOCX document 21 KB Posted
- Attached to
- ICIDS Maintenance Services Fort Hamilton NY
- Solicitation number
- W15QKN26QA137
About this file
This is a Scope of Work (SOW) for Integrated Commercial Intrusion Systems (ICIDS-IV) maintenance services at United States Army Garrison (USAG) Fort Hamilton, NY. The contractor shall provide comprehensive preventive maintenance, inspection, testing, troubleshooting, and repair services for the ICIDS-IV system, which supports the installation's physical security program by monitoring sensitive facilities including arms rooms and controlled access areas. The contractor is responsible for maintaining all system components—including intrusion detection sensors, passive infrared motion detectors, magnetic switches, door position switches, glass break sensors, alarm control panels, annunciation devices, communication modules, servers, workstations, network connections, and backup power supplies—in fully operational condition to detect and report unauthorized entry attempts to the installation monitoring station.
The SOW requires quarterly preventive maintenance activities comprising equipment inspection, sensor alignment verification, functional testing of alarm points, communication link testing, and backup power system validation. The contractor must provide corrective maintenance and emergency repairs upon government notification, maintain detailed documentation of all maintenance activities including preventive maintenance logs, inspection reports, and repair records with monthly status reports to the Contracting Officer's Representative, and ensure all personnel complete required Department of Defense and Army training prior to performing work, including Level I Antiterrorism Awareness Training, DoD Cyber Awareness Challenge (completed annually), OPSEC Awareness training, and installation-specific safety and security orientation. All work shall comply with Army physical security regulations including AR 190-13 (Army Physical Security Program) and AR 190-11 (Securing Arms, Ammunition, and Explosive), applicable manufacturer maintenance requirements, and installation physical security policies.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE of WORK (SOW) USAG Fort Hamilton Integrated Commercial Intrusion Systems (ICIDS-IV) Maintenance Services March 12, 2026
1.0 Purpose
The purpose of this Scope of Work (SOW) is to provide preventive maintenance, inspection, testing, troubleshooting, and repair services for the ICIDS-IV located at Fort Hamilton, NY.
The ICIDS-IV system supports the installation physical security program by providing electronic intrusion detection monitoring for sensitive facilities including arms rooms, controlled access areas, and other designated secure locations.
2.0 Scope
The contractor shall provide all labor, supervision, tools, equipment, materials, transportation, and technical expertise necessary to perform maintenance and sustainment of ICIDS-IV equipment installed throughout Fort Hamilton.
The contractor shall ensure the ICIDS-IV system remains fully operational and capable of detecting and reporting unauthorized entry attempts to the installation monitoring station.
3.0 Applicable Standards
All work shall comply with applicable Department of Defense and Army physical security guidance including:
· AR 190-13 Army Physical Security Program
· AR 190-11 Securing Arms, Ammunition, and Explosive (AA&E)
· Applicable manufacturer maintenance requirements
· Installation of physical security policies
4.0 Contractor Responsibilities
The contractor shall perform maintenance services for all ICIDS-IV components including but not limited to:
· Intrusion detection sensors
· Passive infrared motion detectors
· Balanced magnetic switches
· Door position switches
· Glass break sensors
· Alarm control panels
· Annunciation devices
· Communication modules
· System servers and workstations
· Network connections supporting ICIDS-IV
· Backup of power supplies and UPS systems
5.0 Preventive Maintenance
The contractor shall perform scheduled preventive maintenance on all ICIDS-IV equipment. Preventive maintenance tasks include:
· Inspection of intrusion detection devices
· Verification of sensor alignment and calibration
· Functional testing of alarm points
· Testing communication links between sensors and control panels
· Verification of alarm annunciation at monitoring stations
· Testing back up power system
· Cleaning and servicing system components as necessary
Preventive maintenance shall be performed quarterly or as required by manufacturer guidance.
6.0 Inspection and Testing
The contractor shall conduct routine inspections and operational testing to ensure the ICIDS-IV system remains fully functional. Testing shall include:
· Alarm deactivation testing
· Sensor functionality verification
· Communication line integrity testing
· Alarm reporting verification
· System diagnostics checks
All test results shall be documented and provided to the Government.
7.0 Corrective Maintenance and Repairs
The contractor shall provide troubleshooting and repair services to restore ICIDS-IV functionality when system failures occur. Corrective maintenance includes:
· Diagnosing system malfunctions
· Repairing wiring or communication links
· Replacing defective sensors or components
· Restoring alarm monitoring capability
· Reconfiguring system components when necessary
Emergency repairs shall be addressed promptly upon notification by the Government.
8.0 Documentation and Reporting
The contractor shall maintain accurate records of all maintenance activities. Required documentation includes:
· Preventive maintenance logs
· Inspection reports
· Repair records
· Equipment replacement documentation
· System operational status reports.
Monthly reports shall be submitted to the Government Contracting Officer’s Representative (COR).
9.0 Security Requirements
Contractor personnel performing work on ICIDS-IV systems shall comply with all installation security policies. Personnel may be required to:
· Undergo background screening
· Coordinate work with installation physical security personnel
· Follow escort requirements when working in restricted areas
10. Performance Requirements The contractor shall maintain ICIDS-IV systems in fully operational conditions to support installation security operations. Performance expectations include:
· Timely completion of preventive maintenance
· Rapid response to system failures
· Accurate maintenance documentation
· Compliance with Army physical security requirements
11.0 Training Requirements
All contractor personnel performing work under this contract shall complete required Department of Defense and Army training prior to performing work on the installation. Proof of training completion shall be provided to the Contracting Officer’s Representative (COR) upon request.
· Anti-Terrorism Awareness Training – Contractor personnel shall complete Level I Antiterrorism Awareness Training (AT Level I) prior to accessing the installation.
· Cyber Awareness Training – Contractor personnel requiring access to Government information systems, networks, or equipment shall complete the DoD Cyber Awareness Challenge prior to obtaining system access. Training shall be completed annually to ensure compliance with Department of Defense cybersecurity policies.
· Operational Security (OPSEC) Awareness – Contractor personnel shall complete Operations Security (OPSEC) Awareness training to ensure protection of sensitive informati8on associated with installation operations and security systems.
· Physical Security Compliance – Contractor personnel performing maintenance on the Installation-wide ICIDS-IV shall comply with Army physical security regulations including:
· AR 190-13
· AR 190-11
Personnel shall follow all installation physical security procedures when accessing controlled or restricted facilities.
· Installation Safety and Security Orientation – Contractor personnel shall complete installation-specific safety and security orientation requirements prior to beginning work at Fort Hamilton.
Orientation may include:
· Installation access procedures
· Emergency response procedures
· Safety compliance requirements
· Environmental Protection Policies
File details come from the government source that posted it. Updated .