Scope of Work Humidifier Repair.docx
DOCX document 29 KB Posted
- Attached to
- SA Repair of Humidifiers in two Air Handlers
- Solicitation number
- SRC0000032779
- Issued by
- Erie County, Ohio
About this file
This document is a Scope of Work (SOW) Request for Proposal (RFP) issued by the Ohio Department of Veterans Services (ODVS)/Ohio Veterans Home (OVH) - Sandusky, seeking bids for the repair of two humidifiers in air handlers located at 3416 Columbus Avenue, Sandusky, OH. The project involves repairing and replacing parts in two specific Air Handling Units (AHU 6 and AHU 8), including water level sensor boards and connection plugs. An optional site visit is scheduled for August 01, 2025, at 08:30am at the Secrest Main Entrance, with suppliers required to sign in. The state intends to award the contract to the lowest responsive bidder, with work to be performed Monday through Friday between 7:00am and 3:30pm, excluding Ohio state holidays.
The contractor will be responsible for providing all necessary personnel, tools, equipment, and ensuring compliance with ADA and OSHA standards. The project requires the contractor to disconnect and reconnect water and electrical systems, install specified parts, and verify proper operation of the humidifiers. Additional requirements include maintaining a clean work environment, providing 48-hour advance notice of service, and submitting detailed invoices within 30 days of project completion. The contractor must also adhere to strict security protocols, including sign-in procedures and potential background checks, and maintain a drug-free workplace subject to random testing. Invoices should be emailed to invoices@dvs.ohio.gov and include a breakdown of labor hours, rates, and material costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| State of Ohio Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OHIO DEPARTMENT OF VETERANS SERVICES
REQUEST FOR PROPOSAL (RFP)
Executive Summary The Ohio Department of Veterans Services (ODVS)/Ohio Veterans Home (OVH) – Sandusky is seeking bids for the Repair of two Humidifiers in Air Handlers at 3416 Columbus Avenue, Sandusky, OH 44870.
Optional Site Visit A optional site visit will be held. Suppliers attending the optional site visit are required to sign in and attendance will be taken. The site visit will commence promptly on the date and time listed below, barring any unforeseen circumstances that result in a delay of the site visit. The State will not be responsible to a Supplier for their failure to obtain information discussed during the site visit due to their arriving after the site visit has convened.
| Arrival Time and Date |
| Building |
| Location |
| Entrance |
August 01, 2025 Will begin promptly at 08:30am.
| Secrest |
| 3416 Columbus Avenue |
Sandusky, OH 44870 Secrest Main Entrance (Strub Road)
State of Ohio Terms and Conditions Terms and Conditions can be located on the Documents tab in this solicitation.
Purpose Objective To repair and replace needed parts, and humidifiers in two Air Handlers.
Scope of Work (SOW) ODVS/OVHS is Requesting a Quote (RFQ) for Repair, replacement of needed parts, and repair humidifiers in two (2) air handlers.
ODVS/OVHS is requiring the Contractor to test and verify that humidifiers are working properly after completion of their work.
AHU 6:
1.) Two (2) bad water level sensor boards.
2.) Two (2) connection plug 5 position Scope: Disconnect water and electric to humidifier. Provide and install all the parts stated above. Reinstall unit. Reconnect water and electricity. Test and verify proper operation of unit.
AHU 8:
1.) One (1) bad water level sensor boards.
2.) One (1) connection plug 5 position Scope: Disconnect water and electric to humidifier. Provide and install all the parts stated above. Reinstall unit. Reconnect water and electricity. Test and verify proper operation of unit.
Expectations To repair and replace needed parts, and humidifiers in two Air Handlers.
The Contractor shall provide all personnel, tools, equipment, transportation, testing, safety measure, and all other items necessary to complete this work.
ODVS/OVH General Requirements All work must comply with any ADA and OSHA Standards and all federal, state, and local regulations.
In addition to General Requirements listed in MAC038, see our ODVS/OVH requirements below.
1. Contractor shall at all times in the performance of this work exercise due care and caution for the safety and welfare of the workmen employed on the job, the ODVS/OVH employees, residents and property.
2. The Contractor shall be responsible to repair any and all damages, caused by contractor negligence, to the ODVS/OVH property and grounds at the contractor’s expense.
3. All work shall be performed by qualified personnel. Qualifications shall be presented upon request.
4. All Contractor scheduled services must be done at times approved by the appropriate ODVS site representative. All service activities should be performed during mutually agreed upon hours unless the particular service request requires otherwise.
5. The Contractor and its personnel shall follow all ODVS/OVH security check-in procedures upon arrival and while at the facility.
6. The Contractor must sign-in and out of ODVS/OVH and pick up an ODVS/OVH Contractor badge when performing services at OVH. Failure to sign in and/or out may be grounds for termination and/or deemed as not providing services.
7. Permits and licenses of any nature, necessary for any and all work, shall be secured and paid for by the Contractor.
8. All Contractor provided services must be performed by Original Equipment Manufacturer (OEM) trained or properly certified personnel, where applicable.
9. The Contractor will be expected to maintain a neat and tidy working environment.
10. The Contractor shall be responsible for removal of all debris, scrap and trash from the worksite and cleaning work areas. The Contractor shall keep the premises free of any debris, scrap and trash resulting from their work as work progresses. The Contractor shall remove such debris and materials from property.
11. Contractor shall furnish all necessary equipment and crews for the completion of the work outlined in the SOW.
12. ODVS/OVH-S’s invoice for payment. Costs for all parts and materials shall not be in excess of market prices. Contractor shall retain market price information, (e.g., quotes), for future inspection.
13. Contractor shall provide forty-eight (48) hour notice of intended dates and times of service before scheduled service. Services shall be performed Monday through Friday (excluding State of Ohio Holidays) between the hours of 7:00am and 03:30pm unless a different time and/or date is approved by ODVS/OVH Site Representative(s) in advance.
14. Rescheduling Services – if for any reason, service is not completed at the mutually agreed upon time, the contractor will reschedule the scheduled service in coordination with ODVS/OVH staff.
15. Contractor supplier invoices for billable parts and materials must be submitted with ODVS/OVHS’s invoice for payment.
Additional Terms and Conditions for Contracts
1. Criminal Convictions. Employees of Contractor or subcontractor(s) with criminal convictions, as identified in Ohio Revised Code (ORC) section 109.572 (A) (2) (a) and Ohio Administrative Code (OAC) rule 3701-13-05 (A) (1), or any other criminal conviction; which in the opinion of ODVS may endanger staff and/or visitors, shall not be permitted to perform work at ODVS under any agreement resulting from this solicitation and responses thereto, unless specifically approved, in advance, by ODVS.
2. Failure to disclose a criminal conviction as identified above shall be grounds for non-award and/or immediate cancellation of the contract.
3. Drug Free Workplace – Contractor will make a good faith effort to ensure that all of the Contractor’s agents’ employees, representative, and sub-contractors while working on State property, will not have or been under the influence of marijuana, medical marijuana, illegal drugs, or alcohol or abuse prescription drugs in any way.
To ensure a safe, productive, and drug-free work environment, all Contractors are subject to random drug testing at any time during their engagement with the Department. Drug tests will be conducted in a manner consistent with applicable laws and regulations.
A random selection process will be used to identify contractors for testing. Selected contractors will be notified and required to submit to a drug test within a specified time frame. The test will be conducted by a certified laboratory chosen by the Department, and contractors will be required to provide a sample under supervision. Contractors will be notified of the results within a reasonable time frame.
All cost associated with random drug testing shall be the responsibility of the Department.
All drug testing results and related information will be treated as confidential and will only be disclosed to individuals with a legitimate need to know.
Bid Submission Contractors shall submit all bids in OhioBuys.
Bid Awarding Process The intent is to award this solicitation to the lowest and responsive bidder.
Invoicing Invoice shall be detailed to show a breakdown of labor hours, hourly rate and material used and associated cost for material with the Purchase Order and notated on the invoice. Invoices must be considered a proper invoice under ORC 125.01. Invoices shall be submitted within 30 days of completion of the work.
Proper invoice shall be emailed to invoices@dvs.ohio.gov .
File details come from the government source that posted it. Updated .