Scope of Work for OPWDD - Oldfield IRA Sidewalk and Pad.pdf
PDF 317 KB Posted
- Attached to
- Oldfield Sidewalk Replacement
- Solicitation number
- 2134881
- Issued by
- Herkimer County, New York
About this file
This is a Scope of Work document for the New York State Office for People with Developmental Disabilities (OPWDD) regarding sidewalk removal and replacement at the Oldfield IRA facility located at 15226 Oldfield Drive, Herkimer, New York. The project encompasses the demolition of existing concrete sidewalks, site preparation, installation of reinforced concrete sidewalks to ADA compliance standards, and addition of a concrete pad in front of a shed. Work includes saw-cutting existing concrete edges, excavation and compaction of subgrade materials, installation of a minimum 4-inch crushed aggregate base at 95% compaction, placement of #3 rebar at 18-inch centers, pouring of ready-mix concrete with minimum 3,000-4,000 PSI compressive strength, and finishing with a transverse broom finish for non-slip surfaces. All work must be completed within 30 days of award. A mandatory site visit is scheduled for Thursday, May 14th, 2026, at approximately 11:00 AM at the project site. Work hours are restricted to 8:00 AM to 3:00 PM, Monday through Friday, and the residence will be occupied during execution.
The bid price must include all materials, labor, disposal fees, and site cleanup costs. This is a New York State Public Works project subject to prevailing wage requirements (PRC# 2026011305). Contractors must maintain site safety and security throughout the project, with all tools, materials, and debris secured at day's end. A mandatory pre-work meeting with DDSO Operations and Maintenance staff is required to establish safety protocols. The contractor is responsible for any property damage caused during work and must restore the property to its pre-project condition. Communication with the Work Control Representative is mandatory in case of delays, including weather-related postponements. The point of contact for the project is Rodney Townsend at (315) 359-8752.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CNY BID FORM.doc | DOC document | |
| CNY DDSO Contractor Requirements 2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SCOPE
DESCRIPTION:
Sidewalk removal and replacement. Refer to drawings. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid, PRC# 2026011305.
Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of sidewalk replacement before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with project manager.
A. Preparation and Demolition
• Saw Cutting: Saw-cut the edges of the existing concrete to be removed to ensure a clean, straight joint with any adjacent concrete that is to remain.
• Demolition: Break up and remove the existing concrete sidewalk.
• Disposal: Load, haul away, and legally dispose of all concrete debris, excavated soil, and organic matter off-site.
• Tree Root Pruning (If applicable): Carefully prune any invasive tree roots that caused previous sidewalk upheaval, under the direction of an arborist or municipal representative, to prevent future damage while protecting the health of the tree.
B. Subgrade Preparation
Facility:
Oldfield IRA
Facility Address: 15 226 Oldfield DR Herkimer, N.Y. 133350
Point of Contact:
Rodney Townsend
Contact phone Number: (315)3598752
Project Title:
Sidewalk removal and replacement
Summary of Work:
Remove and replace old sidewalk. Add concrete pad Infront of shed.
• Excavation: Grade and excavate the pathway to the required depth to accommodate the new base material and concrete thickness.
• Compaction: Compact the existing subgrade dirt.
• Base Material: Supply, place, and compact a minimum of 4” of crushed aggregate base (e.g., Class II base rock). Base material must be compacted to 95% relative compaction to prevent future settling.
C. Forming, Reinforcing, and Pouring
• Formwork: Install straight, rigid forms securely braced to maintain proper alignment and elevation.
• ADA Compliance: Ensure proper cross-slopes (maximum 2%) and running slopes. Install ADA-compliant curb ramps with detectable warning panels (truncated domes) where the sidewalk intersects with roadways.
• Reinforcement: Install #3 rebar at 18-inch centers, or 6x6 wire mesh supported on chairs to remain in the center third of the concrete slab.
• Pouring: Pour concrete to a minimum thickness of 4 inches for pedestrian paths, 6 inches across driveways
• Finish: Apply a light-to-medium transverse broom finish to ensure a non-slip surface. Edge all margins smoothly.
• Joints:
o Saw-cut or tool control joints at intervals equal to the width of the sidewalk o Install half-inch preformed asphalt expansion joint material at all property lines, curbs, existing structures, and at intervals not exceeding
Curing, Cleanup, and Restoration
• Curing: Apply a liquid curing compound immediately after finishing, or cover with wet burlap/plastic sheeting as dictated by weather conditions.
• Form Removal: Remove all wooden or steel forms without damaging the new concrete.
• Backfill and Restoration: Backfill the edges of the new sidewalk with high-quality topsoil. Grade to match the existing landscape, seed with local turf grass, or replace sod as necessary.
• Site Cleanup: Sweep the immediate and surrounding street area, wash down pavement (ensuring slurry does not enter storm drains), and remove all construction materials, tools, and trash.
D. 4. Material Specifications
• Concrete: Ready-mix concrete with a minimum compressive strength of [e.g., 3,000 or 4,000 PSI] at 28 days.
• Aggregate Base: Local standard crushed stone/gravel.
GENERAL REQUIREMENTS:
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.
Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of _8am__ and _3pm__, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by
OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.
SITE VISIT
A site visit is mandatory. The site visit date is scheduled for Thursday, May 14th, 2026, at approx.
11 am at the project site. All prospective bidders are encouraged to attend.
A. Lawn Damage/Property Damage
• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.
• Personal vehicles are not to be parked on the grass.
• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.
B. Continuity of Work/Communication/Scheduling
• Once the job has begun, it is to be worked on continuously until completed.
• If there are any delays, even if due to inclement weather, a Work Control Representative
MUST be contacted.
• Work must be completed within __30_ days of receiving the purchase order.
C. House Safety
• The residence will be occupied during the job.
• The contractor must take all reasonable care to safeguard the residents and the staff.
• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.
• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.
• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House
Director and project manager above.