Scope of Work _ Fire.docx

DOCX document 28 KB Posted

Attached to
RFQ - Commercial Contractor
Solicitation number
PE-66397-NONST-2026-000000016
Issued by
Georgia

About this file

This is a Scope of Work document issued by the City of Sylvania Fire Department on November 5, 2025, detailing construction requirements for a fire department addition located on Mims Road in Sylvania, Georgia. The project encompasses concrete pier replacement, metal building frame fabrication and installation, reinforced concrete drive addition, roofing installation, masonry work, door installation, interior finishing, electrical systems installation, and provision of engineered stamped drawings. Specific work items include sawcutting and replacing six 3'x3'x3' concrete piers with rebar and anchor bolts, fabricating and installing a 24'L x 38'W x 15'H PEMB frame, forming and pouring a 33'x93' reinforced concrete addition (6" thick, 5,000 PSI, air entrained), installing 26-gauge metal screw roofing with condensation control, blocking and installing matching brick facade between columns, removing and reinstalling two 12'x12' garage doors, furnishing and installing two 3'x7' walk doors, painting interior block, installing new LED lights with outlets and switches, and providing Georgia-engineered stamped drawings. The contractor must also furnish a dumpster and porta potty for the project duration. No specific response dates, due dates, site visit requirements, bidder conferences, award dates, or contract terms are specified in this Scope of Work document.

No pricing terms, set-asides, incumbent information, funding sources, or contract amounts are detailed in this Scope of Work document. The document serves as a technical specification guide for contractors responding to the related commercial contractor RFQ for the 2026 fire department addition project.

View the file

Other files

File Type Posted
Scope of Work_Cail.docx DOCX document
PUBLIC NOTICE_contractor 2026.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF SYLVANIA

Fire Department Addition Issued: 11/5/2025

1. Project Overview The City of Sylvania is planning to extend the fire department, located on Mims Rd, Sylvania, Georgia. The project will include the following:

2. Scope of Work Sawcut, remove, and replace six (6) 3’x3’x3’ concrete piers with rebar and anchor bolts Fabricate and install PEMB 24’Lx38’Wx15’H frame Form, pour, & finish drive addition reinforced w/ wire, 6”, 5,000 PSI, air entrained concrete (33’x93’) Install new 26 Ga. metal screw roof with Drip X for condensation Block between columns and install matching brick façade on outside Remove and reinstall the two (2) 12’x12’ garage doors Furnish and install two (2) new 3/0x7/0 walk doors Paint interior block Install new LED lights, outlets, and switches for the addition Provide GA Engineered Stamped Drawings Provide dumpster and porta potty

File details come from the government source that posted it. Updated .