This is a Scope of Work document for epoxy flooring paint application prepared by Escambia County Facilities Management in Florida. The project involves surface preparation and application of a high-performance epoxy flooring system at the Escambia County Equestrian Center across 4 bathrooms and 2 showers, totaling 2,100 square feet with a 4-inch epoxy base. The contractor must provide all labor, materials, tools, and equipment necessary to complete the work, including concrete surface cleaning and degreasing, mechanical grinding or shot-blasting to remove contaminants, crack and hole repairs using epoxy patching compounds, moisture content verification, primer coat application, one or more coats of 100% solids grey epoxy paint with color flakes, non-slip additive application, and a topcoat for durability and UV resistance. The project timeline specifies a three-week completion period from a to-be-determined start date, with work conducted during daytime hours. Quality assurance requirements mandate inspection and approval by the Facilities Management Department or designated representative, with any areas of poor adhesion, bubbling, or uneven finish corrected at no additional cost to the county.
The flooring system must include a non-slip additive and topcoat, with all work performed in accordance with manufacturer specifications and OSHA safety regulations. The contractor is responsible for proper ventilation during application, appropriate personal protective equipment use, and waste material disposal compliant with local environmental regulations. The contract includes a two-year warranty on both workmanship and materials, with all curing areas protected from dust, debris, and unauthorized access during the curing period. No specific pricing information, bidding deadlines, site visit dates, or pre-bid conference details are provided in this Scope of Work document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Equestrian_center_epoxy_flooring_(parks).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work: Epoxy Flooring Paint Application
1. Project Overview
This project involves the surface preparation and application of a high-performance epoxy flooring system at the Escambia County Equestrian Center. The goal is to provide a durable, chemical-resistant, non-slip, and aesthetically pleasing floor finish suitable for industrial or commercial use.
2. Work Location
4 Bathrooms 2 Showers
Total area: 2100 Sq. Ft.
4 inch epoxy base all around
3. Contractor Responsibilities
The contractor shall provide all labor, materials, tools, and equipment necessary to complete the following:
A. Surface Preparation
Clean and degrease the existing concrete surface.
Mechanically grind or shot-blast the floor to remove contaminants and ensure proper adhesion.
Repair cracks, holes, and surface imperfections using epoxy patching compounds.
Ensure moisture content is within acceptable limits before coating.
Follow all manufacture’s recommendations.
B. Epoxy Coating System
Use an approved floor leveling compound as needed
Apply a primer coat of epoxy resin.
Apply one or more coats of 100% solids epoxy paint (color as specified).
Apply a non-slip additive or topcoat (e.g., polyurethane or polyaspartic) for added durability and UV resistance.
Ensure uniform coverage and thickness as per manufacturer specifications.
C. Curing and Protection
Allow proper curing time between coats and before foot or vehicle traffic.
Protect the area from dust, debris, and unauthorized access during curing.
4. Materials
Epoxy system
Color: Grey with color flake
Non-slip additive: Yes
Topcoat: Yes
5. Safety and Compliance
Follow all OSHA safety regulations.
Use appropriate PPE.
Ensure proper ventilation during application.
Dispose of waste materials in accordance with local environmental regulations.
Protect the area from traffic while working and curing.
6. Schedule
Start Date: TBD
Completion Date: 3 weeks
Work hours: Daytime
7. Quality Assurance
All work shall be inspected and approved by the Facilities Management Dept. or designated representative.
Any areas of poor adhesion, bubbling, or uneven finish shall be corrected at no additional cost.
Warranty on workmanship and materials: 2 years