Scope of Work.pdf

PDF 145 KB Posted

Attached to
Tower Removal in Greene County
Solicitation number
645-RFQ-1690-2025
Issued by
Floyd County, Davenport City, Iowa

About this file

This Scope of Work document is for the Greene County Tower Removal project issued by the Iowa Department of Transportation (DOT) for a tower located at 610 N. Pinet St. in Jefferson, Iowa. The project involves the complete disassembly of a 140-foot Rohn-Radian self-supporting tower, with specific requirements including removal of all antennas, antenna mounts, safety fall equipment, and cabling. The contractor will be responsible for laying tower sections on the ground as directed by the Iowa DOT project leader, and must obtain all necessary permits from State, County, City, and Union Pacific Railroad authorities.

The contractor must employ certified tower workers with minimum qualifications as a Telecommunications Tower Technician, accredited by the National Association of Tower Erectors (NATE) or equivalent. The DOT Garage will handle disposal of the scrapped tower and associated equipment, with the contractor responsible for all costs associated with third-party work and permit acquisition. The project is located adjacent to Union Pacific Railroad, which will require specific access and removal process permits. The contractor is not responsible for removing the concrete tower piers, and all utilities must be disconnected prior to tower removal.

View the file

Other files

File Type Posted
1306568-event.pdf PDF
Tower Drawings.pdf PDF
Ad1.pdf PDF
Site Photos.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tower removal Greene County - Scope of Work

Green County tower

610 N. Pinet St.

Jefferson, IA 50129

LAT: 42:01:17.7 N / LON: -94:22:56.4 W

Overview: 140-foot Rohn-Radian tower/self-supporting. The DOT Garage is located on this property. The

DOT Garage will dispose of the scrapped tower. The Union Pacific Railroad is next to the tower location and will require permits for access and removal process.

1. Removal of all antennas, antenna mounts, and cabling. This includes any of the safety fall equipment on the tower. All antennas, mounts, and cabling will be placed on the ground, in an orderly pile. The DOT Garage will safely dispose of the antennas, Mounts, and cabling. The local garage staff will safely crush and dispose of the tower as scrap metal.

All utilities should be disconnected.

2. Tower sections will be laid on the ground as directed by the project leader from the Iowa

DOT.

3. Cost of rented or contracted work by a third party is the responsibility of the tower contractor.

4. The Contractor is responsible for obtaining all permits from State, County, City, and

Union Pacific. The contractor is responsible to purchase and pay any costs for these permits. Contractor is required to work with and follow all the requirements working with

Union Pacific Railroad. Contractor will work within the requirements for removal next to

Union Pacific Railroad.

5. Attached is the plans for the tower, Rohn-Radian 12-N, 11-N, 10-N, 9-N, 8-N, 7-N, 6-

STRAIGHT, tower sections.

6. The DOT requests the Disassembly, by section, of the tower by a tower contractor. Each section will be placed on the ground.

7. The contractor is not responsible for removal of the concrete piers.

8. Contractor tower workers are required to be Certified Tower Workers. Minimum requirements are a Telecommunications Tower Technician, (or equivalent), and certified and /or accredited by the National Association of Tower Erectors, (NATE), or equivalent.

(NATE is the leading authority in the telecommunications industry and sets the standards for tower climbing and safety.) Contractor will provide proof of current Tower

Climbing Certificates and any other safety, OSHA, and other credentials, at the time of bid.

File details come from the government source that posted it. Updated .