- North Rd IRA - Bath Renovation
- Solicitation number
- 054F642C-485E-4EB1-97B5-773433D36967
- Issued by
- Seneca County, New York
About this file
This document is a Scope of Work for a bathroom renovation project at the North Rd IRA Facility in Waterloo, New York, which is being solicited by the Finger Lakes DDSO. The vendor shall provide all labor and materials necessary to complete the work according to the scope of work and architectural drawings. This is a New York State public works project, and prevailing wages must be paid. The work must be completed within 90 days of receiving the purchase order and coordinated with the House Director and Point of Contact. A mandatory site visit is scheduled for March 18, 2024, at 10:00 am, and bids will not be accepted from vendors that do not attend.
The bid price is to include all materials, labor, disposal of materials fees, and site clean-up. The work must be performed between the hours of 9 am and 2 pm, Monday through Friday, as the home may be occupied during these times. The contractor must take all reasonable care to safeguard the residents and staff, and any property damage caused by the work must be corrected. This project is not a Service-Disabled Veteran-Owned Set Aside, and the due date for bids is March 26, 2024, at 8:00 pm.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Bid.pdf | ||
| Design.pdf | ||
| Permit.pdf | ||
| ACM Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICIAL BID FORM
DESCRIPTION:
This is for a complete bathroom renovation. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of the bathroom, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Point of Contact.
SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Follow Prints by Patriot design Dated 2-23-23, Approved by Jeff Stroud
GENERAL REQUIREMENTS:
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.
Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of 9am and 2pm, Monday through Friday.
Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each work day.
4. Any unforeseen conditions that may alter the established price are to be reported to the Point of Contact listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by
OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Point of Contact prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.
Facility: North Rd IRA
Facility Address: 1750 North Rd Waterloo NY 13165
Point of Contact: David Greco
Contact Phone Number: 585-259-4122
Project Title: Bathroom Renovation
Summary of Work:
SITE VISIT
A site visit is mandatory. The site visit date is scheduled for Monday, March 18, 2024 @ 10:00am at the project site. All prospective bidders are encouraged to attend.
A. Lawn Damage/Property Damage
• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.
• Personal vehicles are not to be parked on the grass.
• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.
B. Continuity of Work/Communication/Scheduling
• Once the job has begun, it is to be worked on continuously until completed.
• If there are any delays, even if due to inclement weather, a Work Control Representative
MUST be contacted.
• Work must be completed within 90 days of receiving the purchase order.
C. House Safety
• The residence will be occupied during the job.
• The contractor must take all reasonable care to safeguard the residents and the staff.
• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.
• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.
• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Point of Contact listed above.
| SCOPE OF WORK includes, but is not necessarily limited to the following: |
| 1. Follow Prints by Patriot design Dated 2-23-23, Approved by Jeff Stroud |
| 1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. |
| 2. Work is to be done between the hours of 9am and 2pm, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times. |
| 3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each work day. |
| 4. Any unforeseen conditions that may alter the established price are to be reported to the Point of Contact listed above immediately upon discovery. |
| 5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. |
| 6. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. |
| 7. Safety Data Sheets as applicable will be provided to the Point of Contact prior to the start of work and a copy maintained at the property. |
| 8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. |
SITE VISIT
File details come from the government source that posted it. Updated .