About this file
This document is a set of specifications and drawings for a Bathroom Renovation project at the North Rd IRA facility located in Waterloo, NY. The project is being solicited by the Finger Lakes DDSO, a New York state agency. The general scope of work includes removing all existing finishes, fixtures, and equipment down to the existing wood framing and providing all new electrical wiring, supply and sanitary piping, and a new quartz flooring system with epoxy mortar base and urethane topcoat. There is a mandatory site visit on March 18, 2024 at 10:00 am for all prospective bidders, and bids are due by March 26, 2024 at 8:00 pm. The contract term is 30 days after completion of the project.
This is a New York state public works project, so prevailing wages must be paid. The project is not designated as a Service-Disabled Veteran-Owned Set Aside. Pricing and funding details are not included in the specifications, but it is noted that this is a capital improvement project for the state agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scope of Work.pdf | ||
| Request for Bid.pdf | ||
| Permit.pdf | ||
| ACM Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION TAG
ELEVATION
DETAIL/SECTION
WINDOW TAG
WALL TAG
ROOM TAG
DOOR TAG
A
A101
W1
A
ROOM
101B
COLUMN GRID
CL
A101
INTERIOR ELEVATION 2
+2'-0"
AX.X
X
P
T R
I O
T S
T
IL
L S
E R
V
IN
G
D E
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
U
O C
H E
S T
E R
N
Y
(5
(5
F
A X
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION
"ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
FOR PERMIT
/4
'-0
B A
T H
R O
O M
R E
N O
V A
T
IO
N
N O
R T
H R
O A
D
W A
T E
R L
O O
N
Y
C O
V E
R S
H E
E T
C S
F
E B
B F
W
F S
W
F S
W
O P
D
-0
AB ANCHOR BOLT
AC AIR CONDITIONING
ACT ACOUSTIC TILE
ADJT ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALUM ALUMINUM
ANOD ANODIZED
ARCH ARCHITECTURAL
BD BOARD
BLK BLOCK
BLKG BLOCKING
BO BOTTOM OF
BOT BOTTOM
CER CERAMIC
CIRC CIRCUMFERENCE
CJ CONTROL JOINT
CK CAULKING
C.L. CENTER LINE
^^C CENTER LINE
CLG CEILING
CLR CLEARANCE
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
CONT CONTINUOUS
COL COLUMN
CONC CONCRETE
CPT CARPET
CT CERAMIC TILE
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DS DOWNSPOUT
DWG DRAWING
EA EACH
EB EXPANSION BOLT
EIFS EXTERIOR INSULATION
FINISHING SYSTEM
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATION
ETC ETCETERA
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISHED FLOOR ELEVATION
FLG FLASHING
FLR FLOOR
FLCO FLOOR CLEANOUT
FLUR FLUORESCENT
FND FOUNDATION
FOIC FURNISHED BY OWNER,
INSTALLED BY CONTRACTOR
F.V. FIELD VERIFY
FR FRAMING
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRABBAR
GC GENERAL CONTRACTOR
GL GLASS
GYP GYPSUM
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HDR HEADER
HDWR HARDWARE
HM HOWLLOW METAL
HORIZ HORIZONTAL
HVAC HEATING/VENTILATION
AIR CONDITIONING
HWH HOT WATER HEATER
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
INV INVERT
JC JANITOR'S CLOSET
JT JOINT
L ANGLE
LAM LAMINATE
LAV LAVATORY
LBL LABEL
LT LIGHT
LTL LINTEL
LVR LOUVER
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MIN MINIMUM
MFR MANUFACTURER
MH MANHOSE
MO MASONRY OPENING
MTL METAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OP OPAQUE
OPNG OPENING
OPP OPPOSITE
PCC PRE CAST CONCRETE
PCF POUNDS PER LINEAR FOOT
PFL PUNDS PER SQUARE FOOT
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PNL PANEL
PSF PER SQUARE FOOT
PT PAINT
PT PRESSURE TREATED
PTD PAINTED
PWD PLYWOOD
PLYWD PLYWOOD
QT QUARRY TILE
R RISER
RD ROOF DRAIN
REINF REINFORCING
REF REFER/REFERNCE
RES RESILIENT
RFG ROOGIN
RFH ROOF HATCH
RL RAILING
RM ROOM
RO ROUGHT OPENING
SC SOLID CORE
SCH SCHEDULE
SHTG SHEATHING
SIM SIMILAR
SNT SEALANT
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STR STRUCTURAL
STRUCT STRUCTURAL
SUSP SUSPENDED
SYS SYSTEM
TEL TELEPHONE
T TREAD
TO TOP OF
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TYPE TYPICAL
UNF UNFINISHED
UON UNLESS OTHERWISE NOTED
VB VAPOR BARRIER
VB VINYL BASE
VCT VINLYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VIN VINYL
VWC VINYL WALL COVERING
VT VINYL TILE
W/ WITH
W WIDE
WB WOOD BASE
WP WATERPROOFING
WD WOOD
WWF WELDED WIRE FABRIC
WT WALL TILE
ABBREVIATIONSSYMBOLS
LOCATION MAP
N
BATHROOM RENOVATION
1750 NORTH ROAD WATERLOO, NY 13165
620 WESTFALL ROAD
ROCHESTER, NY 14620
A1 PLANS, ELEVATIONS AND DETAILS
A2 SPECIFICATIONS
CS COVER SHEET
DRAWING LIST
N RD
IN
S
L E
E S
T
PROJECT LOCATION
R E
V
IS
IO
N
D A
T E
B Y
/2
/2
REVISION 1 ISSUED 02/23/2023
CAPITAL SERVICES
ACCEPTED FOR CONSTRUCTION
By: stroudjj 03/20/2023Date:
3' - 8" 3' - 0"
A
B
C
NOTE:
PROVIDE SEPARATE
SINGLE POLE SWITCH
FOR EACH LIGHT
FIXTURE
PAINT EXISTING
SOFFIT, BOTTOM
AND FRONT SIDE
V.I.F.
4' - 0"
V .I.
F
D
EQ EQ
FILL GAP BTWN. NEW
WALL AND EXISTING
SOFFIT WITH WOOD
BLOCKING. PATCH AS
REQUIRED TO MATCH
PIPE INSULATION KIT
V E R
IF
Y
IN
F
IE
L D
LIGHT FIXTURE
SOLID
SURFACE
CURTAIN ROD OPTIONAL PER OWNER
MIN. HT. TO BE AT 80" AFF
D
A1
TYP.
C B
SOLID SURFACE
1' - 6"
4"
E
C
C
A
SOLID SURFACE
A1
TYP.
SOLID SURFACE
E
LIGHT FIXTURE SCHEDULE
DESIGNATION MANUFACTURER MODEL SPECIFICATION
TYPE A BROAN 50110DCL
FLEX DC SERIES FAN LIGHT COMBINATION. SURFACE MOUNTED
LED. PROVIDE NEW RIGID EXHAUST DUCT TO ROOF. SEE DETAIL.
LED 9" DIAMETER SURFACE (CEILING) MOUNTED, WHITE.
LED 48" LINEAR WRAP FIXTURE. SURFACE (CEILING) MOUNTED.
RIBBED POLYCARBONATE LENS.
FM9WRCCR HALO
4NLW4040C-EL7W
METALUX
METALUX
TYPE B
TYPE C
6" LED DOWNLIGHT. RECESSEDMOUNTED. SEMI FROST LENS.
WET LOCATION LISTED
HLB6HALOTYPE D
GRAB BAR SCHEDULE
DESIGNATION SIZE MODEL NOTES
A 3701-42P
3701-36PB
C
42" LONG x 1.25" DIA.
36" LONG x 1.25" DIA.
3701-18P18" LONG x 1.25" DIA.
PEENED GRAB BAR
PEENED GRAB BAR
PEENED GRAB BAR, VERTICALLY MOUNTED
NOTES:
PROVIDE CONCEALED BLOCKING FOR ALL WALL MOUNTED GRAB BARS AND ACCESSORIES.
PROVIDE ESCUTCHEON PLATES FOR ALL GRAB BARS TO HIDE FASTENERS.
GRAB BARS AS MANUFACTURED BY "AMERICAN SPECIALTIES" OR APPROVED EQUAL.
D 3701-48P48" LONG x 1.25" DIA. PEENED GRAB BAR
E 3701-24P24" LONG x 1.25" DIA. PEENED GRAB BAR
PLUMBING FIXTURE SCHEDULE
DESIGNATION MANUFACTURER MODEL SPECIFICATION
WC-1 KOHLER CIMARRON
MODEL #K-3619
ONE PIECE WATER CLOSET, ELONGATED BOWL, 4" DIAMETER
FLUSH VALVE, 2-1/2" DIAMETER TRAP, VITREOUS CHINA, WHITE
OPERATING HANDLE ON THE LEFT SIDE (WHEN FACING TOILET).
INCLUDE TOILET SEAT AND ANGLE SUPPLY WITH STOP MODEL
K-76737 (OR APPROVED EQUAL).
WATER CLOSET SHALL BE 1.28 GPF MAXIMUM.
SOLID SURFACE VANITY TOP WITH INTEGRAL SINK. THREE 1-3/4"
DIAMETER DECK HOLES AT 2" O.C. COLOR AS SELECTED BY OWNER.
PROVIDE STAINLESS STEEL P-TRAP. REFER TO DETAIL FOR MORE
INFORMATION.
FAUCET - PIVOT ACTION LEVER STYLE SINGLE-HANDLE, METAL
CONSTRUCTION. FLOW LIMITED TO 1.5 GPM MAXIMUM AT 60 PSI,
METAL POP UP WASTE ASSEMBLY, "MOEN" CHATEAU MODEL L4621.
VT1B2237
37"W x 22"D
SWANSTONELAV-1
SH-1 KOHLER AWAKEN G110
MODEL #K-99242-G
MULTIFUNCTION HANDSHOWER, 24" SLIDEBAR W/ADJSTABLE
MOUNTING BRACKETS AND A 60" SMOOTH HOSE (OR APPROVED
EQUAL). FINISH AS SELECTED BY OWNER.
REMOVE EXISTING VINYL FLOORING, TOILET, SINK, FLOOR DRAINS, AND ALL ASSOCIATED PIPING WITHIN BATHROOM SPACE.
REMOVE ALL GRAB BARS, TOWEL BARS, AND MIRROR.
REMOVE ALL SWITCHES, RECEPTACLES, LIGHT FIXTURES, EXHAUST FAN, AND CONDUCTORS BACK TO ELECTRICAL PANEL.
REMOVE GYPSUM WALL BOARD ON CEILING AND ALL WALLS BACK TO EXISTING FRAMING.
REMOVE EXISTING CABINETRY
KEY NOTES
EXISTING DOOR AND CAST TRIM TO REMAIN2
"ZURN" FD2 SERIES FLOOR DRAIN WITH STAINLESS STEEL STRAINER, AS MANUFACTURED BY "ZURN" (OR APPROVED EQUAL).
FLOOR DRAIN DISCHARGE TO MATCH EXISTING SANITARY PIPING DIAMETER. CONNECT NEW FLOOR DRAIN TO EXISTING
SANITARY PIPING SYSTEM. MODIFY THE EXISTING PIPING AS NECESSARY FOR INSTALLATION.
NEW EPOXY FLOOR FINISH SYSTEM OVER ENTIRE BATHROOM FLOOR AREA AND SHOWER FLOOR AREA WITH INTEGRAL 6"
HIGH COVE BASE. DUR-A-QUARTZ WITH STANDARAD SLIP-RESISTANT FINISH TEXTURE AS MANUFACTURED BY DUR-A-FLEX OR
APPROVED EQUAL. SLOPE NEW EPOXY FLOORING TOWARDS DRAINS AND AS NOTED ON DRAWINGS. COLOR OF FLOORING BY
OWNER. REFER TO SPECIFICATIONS. PREP / REPAIR EXISTING PLYWOOD SUBFLOOR AS REQUIRED TO MEET SPECIFICATION OF
NEW FLOOR MATERIAL. PROVIDE MARINE GRADE PLYWOOD AT SHOWER.
1/4" THICK SOLID SURFACE WALL PANEL MATERIAL AS MANUFACTURED BY "WILSONART" (OR APPROVED EQUAL) ON ALL
WALLS IN BATHROOM. SEE DETAILS FOR MORE INFORMATION.
5/8" GOLD BOND HI-ABUSE XP GYPSUM PANELS AS MANUFACTURED BY NATIONAL GYPSUM (OR APPROVED EQUAL)
THROUGHOUT BATHROOM WALLS AND CEILING. PRIME AND PAINT CEILING.
WATER CLOSET AND GRAB BARS. SEE PLUMBING FIXTURE SCHEDULE.
SOLID SURFACE VANITY TOP ASSEMBLY WITH INTEGRAL BOWL. SEE PLUMBING FIXTURE SCHEDULE AND DETAILS. ALL
EXPOSED PIPING TO BE INSULATED. PROVIDE (2) ADA COMPLIANT SUPPORT BRACKETS, MODEL #EH-1818-LV MANUFACTURED
BY "RAKKS" (OR APPROVED EQUAL) PROVIDE IN WALL BLOCKING AS REQUIRED.
BATHROOM STORAGE WALL CABINET, "DESIGN HOUSE" WYNDHAM 24"W x 26"H x 8"D (WHITE).
FRAMED MIRROR MODEL #0535-2436 AS MANUFACTURED BY "AMERICAN SPECIALTIES" (OR APPROVED EQUAL).
THRESHOLD AT EXISTING DOOR. SEE DETAIL.
RECESSED MOUNTED TOILET PAPER DISPENSER HOLDER MODEL #7402 AS MANUFACTURED BY "AMERICAN SPECIALTIES"
(OR APPROVED EQUAL). FINISH AS SELECTED BY OWNER.
INFILL PARTITION TO MATCH EXISTING.
EXISTING DOOR AND FRAME. PREP, PRIME, AND PAINT. COLOR BY OWNER.
ELECTRICAL SWITCHES. SEE CEILING PLAN.
GFCI ELECTRICAL RECEPTACLE.
SUPPLY AIR GRILLE WITH DAMPER TO MATCH EXISTING. (WHITE).
EXHAUST FAN/LIGHT. RIGID DUCTWORK TO ROOF. SEE DETAIL.
NEW HAND HELD SHOWER HEAD UNIT. SEE PLUMBING FIXTURE SCHEDULE. MOUNT CONTROLS AT 42" AFF.
DEMOLITION
NEW CONSTRUCTION
WATER CLOSET
CL
7" MIN
9" MAX
36" MIN
42" MIN 12" MAX
M
IN 39" - 41"
1' - 6"
MIRROR
S U
R
FA
C E
M A
X . T
O R
E F
LE
C
TI
V E
COUNTER & SINK
8" MIN
17" MIN
M
A X
M
IN
M
IN
STANDARD ACCESSIBLE MOUNTING HEIGHTS
- 1
- 1
- 3
- 4
6" MAX
ACCESSIBLE SHOWER UNIT
M
IN
M A
X
M
IN
- 6
- 3
4" MAX
6" MAX
24" MIN
6" MAXA1
WC-1
LAV-1
NOTE:
1. PROVIDE CONCEALED
BLOCKING IN WALLS
FOR GRAB BARS AND
OTHER ACCESSORIES.
2. NO FLOOR
THRESHOLDS SHALL BE
MORE THAN 1/2".
5' - 0" CLR.
SH-1
A1
'-0
C
L R
A1
FLUSH THRESHOLD FROM ROOM
TO SHOWER INDICATES HIGH
POINT OF FLOOR (+1/2" MAX.)
EXISTING CEILING FRAMING
EXISTING FLOOR STRUCTURE
5/8" HI ABUSE XP GYPSUM
PANELS SYSTEM AT CEILING
PRIMED AND PAINTED
1/8" EXPANSION GAP FILLED WITH
SILICON
1/4" SOLID SURFACE PANELS
SECURED TO GYPSUM BOARD WITH
100% SILICONE ADHESIVE PER
MANUFACTURER RECOMMENDATIONS
5/8" HI ABUSE XP GYPSUM PANELS
SYSTEM IN ENTIRE BATHROOM OVER
EXISTING FRAMING
1/4" SOLID SURFACE PANELS
SECURED TO GYPSUM BOARD WITH
100% SILICONE ADHESIVE PER
MANUFACTURER RECOMMENDATIONS
5/8" HI ABUSE XP GYPSUM PANELS
SYSTEM IN ENTIRE BATHROOM OVER
EXISTING FRAMING
1/8" EXPANSION GAP FILLED WITH
SILICON
SCHLUTER Q100E STRIP (CONTINUOUS)
HARD BOARD BACKER TO CREATE
FLUSH TRANSITION
3/4" RADIUS COVE AT BASE, FLASH BELOW
EPOXY FLOORING AT BASE
PROVIDE LEVELING COMPOUND BELOW
EPOXY FLOORING TO PITCH FLOOR
TOWARD SHOWER DRAIN
SOLID BLOCKING IN WALL
5/8" HI ABUSE XP GYPSUM
WALL PANELS
GRAB BAR
SECURE GRAB BAR INTO STUDS
/ SOLID WOOD BLOCKING
SILICONE AT WALL FLANGES
1/4" SOLID SURFACE PANELS
EXISTING FLOOR STRUCTURE
MARBLE THRESHOLD WITH
SINGLE HOLLYWOOD BEVEL,
INSTALLED OVER THIN SET,
COLOR SLECTED BY OWNER
/4
M
A X
/2
M
A X
EXISTING FLOOR OUTSIDE
OF BATHROOM TO REMAIN
NEW BATHROOM FLOORING,
SEE FLOOR PLAN
1/2" MIN.
EXISTING ASPHALT ROOF SHINGLE SYSTEM
NEW EXHAUST FAN VENT TERMINATION CAP
FLASHING FLANGE
PROVIDE SELF ADHERING SHEET
UNDERLAYMENT MIN. 18"
AROUND ROOF PENETRATION
PROVIDE AND INSTALL NEW RIGID
DUCTWORK FROM EXHAUST FAN
TO ROOF CAP COMPLETE
REMOVE AND REINSTALL SHINGLES
TO FLASH IN VENT HOOD
WALL BRACKETS, SEE NOTES
PL. LAM. ON 3/4" PT SUBSTRATE
APRON ON TWO SIDES OF VANITY,
PROVIDE PT BLOCKING BEHIND
PROVIDE CONCEALED BLOCKING
AS REQUIRED IN WALL
PL. LAM. ON 3/4" TREATED PLYWOOD
SUBSTRATE. REMOVABLE PANEL
SECURED WITH Z-CLIPS MOUNTED TO
3"x3" CLEAT AT EACH END
SOLID SURFACE INTEGRAL
SINK / VANITY TOP
6" MAX.
1"
8" MIN.
(9
M
IN
FIN. FLR.
PROVIDE ADDITIONAL
WALL CLEATS TO
SECURE VANITY TOP
AS REQUIRED
EXISTING WALL FRAMING
1/4" SOLID SURFACE PANELS SECURED TO
GYPSUM BOARD WITH FLEXIBLE PANEL ADHESIVE
1/8" EXPANSION GAP FILLED WITH SILICON
5/8" HI ABUSE XP GYPSUM PANELS SYSTEM IN
ENTIRE BATHROOM OVER EXISTING FRAMING
EXISTING WALL FRAMING
1/4" SOLID SURFACE PANELS SECURED TO GYPSUM
BOARD WITH FLEXIBLE PANEL ADHESIVE
1/8" EXPANSION GAP FILLED WITH SILICON
5/8" HI ABUSE XP GYPSUM PANELS SYSTEM IN
ENTIRE BATHROOM OVER EXISTING FRAMING
1/4" SOLID SURFACE PANELS SECURED TO GYPSUM
BOARD WITH FLEXIBLE PANEL ADHESIVE
1/8" EXPANSION GAP FILLED WITH SILICON
5/8" HI ABUSE XP GYPSUM PANELS SYSTEM
OVER NEW FRAMING; BOTH SIDES
1/4" SOLID SURFACE PANELS SECURED TO GYPSUM
BOARD WITH FLEXIBLE PANEL ADHESIVE; BOTH SIDES
2x4 STUDS 16" O.C.; COORDINATE STUD LOCATION W/
PLUMBING SUPPLY & RETURN
1/4" SOLID SURFACE CORNER TRIM WITH HALF
BULLNOSE OR EASED EDGE PER MFR. SECURED TO
GYPSUM BOARD WITH FLEXIBLE PANEL ADHESIVE
PROVIDE 2 LAYERS 3/4" MARINE
GRADE PLYWOOD SUBFLOOR;
GLUED & SCREWED 6" O.C.
SHOWER DRAIN
EPOXY MORTAR BASE PER FLOORING MFR,
SLOPE TO DRAIN
EPOXY/URETHANE COATING -
TERMINATE AT DRAIN W/ KEYED EDGE
NEW SHOWER DRAIN. PLUG WEEPS
PRIOR TO TROWELING EPOXY MORTAR.
NEW SANITARY LINE. CONNECT TO
EXISTING SANITARY. PROVIDE
ACCESSIBLE CLEAN OUT IN BASEMENT.
EXISTING FLOOR STRUCTURE
ELAST-O-COAT WATERPROOF MEMBRANE
- IMBED W/ FIBERGLASS TAPE
3/4" MARINE GRADE PLYWOOD - FULLY
SUPPORT AND SCREW INTO CONTINUOUS
WOOD BLOCKING BELOW
DRAIN BOX TO BE PRIMED W/ ELAST-O-COAT
EPOXY MEMBRANE - PACK W/ DUR-A-CRETE
EPOXY MORTAR TO 1/8" BELOW TOP OF DRAIN.
COAT W/ DUR-A-FLEX COVE REZ (ALL AS PER
MANUFACTURER'S RECOMMENDATIONS)
SLOPE TOWARD DRAIN
PROVIDE 1/2" MARINE GRADE PLYWOOD O/
3/4" MARINE GRADE PLYWOOD SUBFLOOR;
GLUED & SCREWED 6" O.C.
FLOOR DRAIN
EPOXY/URETHANE COATING -
TERMINATE AT DRAIN W/ KEYED EDGE
NEW FLOOR DRAIN. PLUG WEEPS PRIOR
TO TROWELING EPOXY MORTAR.
NEW SANITARY LINE. CONNECT TO
EXISTING SANITARY. PROVIDE
ACCESSIBLE CLEAN OUT IN BASEMENT.
EXISTING FLOOR STRUCTURE
3/4" MARINE GRADE PLYWOOD - FULLY
SUPPORT AND SCREW INTO CONTINUOUS
WOOD BLOCKING BELOW
DRAIN BOX TO BE PRIMED W/ ELAST-O-COAT
EPOXY MEMBRANE - PACK W/ DUR-A-CRETE
EPOXY MORTAR TO 1/8" BELOW TOP OF DRAIN.
COAT W/ DUR-A-FLEX COVE REZ (ALL AS PER
MANUFACTURER'S RECOMMENDATIONS)
ELAST-O-COAT WATERPROOF MEMBRANE
- IMBED W/ FIBERGLASS TAPE
EPOXY MORTAR BASE PER FLOORING MFR
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C
H E
S T
E R
N
Y
(5
(5
F
A X
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION
"ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
FOR PERMIT
A s i n d ic a te d
B A
T H
R O
O M
R E
N O
V A
T
IO
N
N O
R T
H R
O A
D
W A
T E
R L
O O
N
Y
P L
A N
S
E L
E V
A T
IO
N S
A N
D
D E
T A
IL
S
A
F
E B
F S
W
E H
A /C
R B
F S
W
O P
D
-0
1/4" = 1'-0"
DEMO FLOOR PLAN
1/4" = 1'-0"
REFLECTED CEILING PLAN
1/4" = 1'-0"
ELEVATION A
1/4" = 1'-0"
ELEVATION B
1/4" = 1'-0"
ELEVATION C
1/4" = 1'-0"
ELEVATION D
1/4" = 1'-0"
FIRST FLOOR - NEW WORK
3" = 1'-0"
TYPICAL WALL SECTION
3" = 1'-0"
BLOCKING AT GRAB BAR
6" = 1'-0"
DOOR THRESHOLD
3" = 1'-0"
EXHAUST CAP AT ROOF
1 1/2" = 1'-0"
SINK BASE DETAIL
3" = 1'-0"
SOLID SURFACE WALL PANELS AT
VERTICAL JOINT
3" = 1'-0"
TYPICAL INSIDE CORNER SOLID
SURFACE WALL PANELS
3" = 1'-0"
PARTITION - PLAN VIEW
R E
V
IS
IO
N
D A
T E
B Y
/2
/2
3" = 1'-0"
FLOOR DRAIN DETAILS
1.01 Project Overview
The Bathroom Renovation project consists of the following general scope
(refer to specifications and drawings for more detail):
1. Remove all existing finishes, fixtures, etc. down to existing wood framing
2. Contractor is responsible to Field Measure all existing conditions and coordinate with new work.
3. Provide all new electrical wiring back to panel board for new bathroom lighting, fan, and receptacles.
4. Provide all new supply and sanitary waste piping within bathroom space.
1.02 General
1. General Contractor will perform the work. This is a NYS Public Works Project which requires a Prevailing Wage.
2. The General Contractor will work with and cooperate with OPWDD Project
Manager for the coordination and installation of the work described herein.
Contractor shall familiarize themselves with the work pertaining to each trade. Contractor shall verify existing conditions and measurements including demolition work. Contractor shall inspect all drawings and immediately report any discrepancies to the OPWDD Project Manager and Architect.
3. Prior to commencement of any Work, Contractor shall notify the OPWDD
Project Manager. Contractor shall keep the grounds clear of all debris, dust and any other hazardous conditions throughout the project each day. Take all necessary steps to keep all areas clean.
4. All General Construction, Electrical, Plumbing, and Mechanical Work shall be provided in accordance with New York State Building Code and all other agencies having jurisdiction.
5. Contractor shall review OPWDD requirements and coordinate work of their various trades for compliance. Contractor shall notify the OPWDD Project
Manager at each stage of completion of the project.
SECTION 09 67 26 QUARTZ FLOORING
DUR-A-QUARTZ TM (Trowel Method) EPOXY FLOORING WITH URETHANE TOPCOAT
PART 1 GENERAL
1.01 Related Documents
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.02 Summary
A. This section includes the following:
1. Quartz flooring system as shown on the drawings and in schedules.
1.03 System Description
A. The work shall consist of preparation of the substrate, the furnishing and application of an epoxy based trowel applied flooring system with Q11/Q28 colored quartz aggregate with clear epoxy grout coat and urethane topcoat.
The system shall have the color and texture as specified by the Owner with a nominal thickness of 3/16 inch. It shall be applied to the prepared area(s) as defined in the plans strictly in accordance with the Manufacturer's recommendations.
B. Cove base to be applied all at locations in this project and per Manufacturer's standard details unless otherwise noted.
1.04 Submittals
A. Product Data: Latest edition of Manufacturer's literature including performance data and installation procedures.
B. Manufacturer's Safety Data Sheet (SDS) for each product being used.
C. Samples: Provide a 3" Square sample of the proposed system. Color, texture, and thickness shall be representative of overall appearance of finished system.
REMOVALS, CUTTING, AND PATCHING
PART 1 GENERAL
1.03 Project Conditions
A. Existing Conditions: Do not disturb existing structures, construction, materials, or equipment unless required by the contract.
1. Do not cut, drill, or remove structural members such as joists, beams, and columns which support construction which is scheduled to remain unless expressly required by the Contract Documents.
2. Remove all demolished materials from the premises and dispose of on a daily basis.
B. Items to remain the property of OPWDD: The following items shall remain the property of OPWDD and shall be stored at the site where directed by the OPWDD project manager.
This includes excess wood trim and existing windows if requested.
Coordinate with OPWDD Project Manager.
1. Construction Work Contract. Remove and salvage existing building materials or other accessories as designated by OPWDD.
2. Store all items at a location as directed by OPWDD.
3. Properly dispose of all remaining scrap items and remove from the site each day.
PART 2 PRODUCTS
2.01 Materials
A. Match the appearance and performance of existing corresponding materials as closely as possible.
PART 3 EXECUTION
3.01 Examination
A. Prior to cutting, drilling, or removal investigate both sides of the surface involved with the Work. Determine the exact location of all structural members.
B. If unforeseen obstructions are encountered., take necessary precautions to prevent damage and obtain instruction from the
OPWDD Project Manager before proceeding with the Work.
3.02 Preparation
A. Prepare existing surfaces properly to receive, and where required, bond with the new Work.
3.03 Patching
A. Patch existing construction and finishes which are disturbed, damaged, or left incomplete due to alterations and removals.
Patching: except as otherwise indicated, shall be limited to the areas which have been cut or altered with this Work. Finish patched surfaces to match existing adjacent surfaces as closely as possible.
B. Perform patching around items in a manner which will maintain the water and fire resistance capabilities of the existing construction.
C. Paint patched areas and cover plates to match existing adjacent surfaces as closely as possible using the same type of paint. Painting, except as otherwise indicated, shall be limited to areas which have been patched.
D. Where surfaces exposed by removals are to remain as exposed surfaces, paint these areas to match existing surfaces as closely as possible using the same type of paint.
3.03 Application
A. General
1. The system shall be applied in six distinct steps as listed below:
a. Substrate preparation
b. Priming
c. Trowel Epoxy Quartz Mortar
d. Grout coat application
e. Topcoat application
1. Immediately prior to the application of any component of the system, the surface shall be dry and any remaining dust or loose particles shall be removed using a vacuum or clean, dry, oil-free compressed air.
2. The handling, mixing and addition of components shall be performed in a safe manner to achieve the desired results in accordance with the Manufacturer's recommendations.
3. Slope to drains as noted with Manufacturer's Epoxy Mortar.
The system shall follow the contour of the substrate.
4. A neat finish with well-defined boundaries and straight edges shall be provided by the Applicator.
B. Primer
1. The primer shall consist of a liquid resin and hardener that is mixed at the ratio of 2 parts resin to 1 part hardener per the manufacturer's instructions.
2. The primer shall be applied by a flat squeegee and back rolled at the rate of
200 sf/gal to yield a dry film thickness of 4 mils.
C. Epoxy Quartz Mortar
1. The epoxy quartz mortar shall be applied as a troweled epoxy mortar at 3/16" thickness over a wet epoxy primer.
2. The epoxy quartz mortar shall be comprised of two components, a resin, and hardener as supplied by the Manufacturer and mixed in the ratio of 2 parts resin to 1 part hardener. A blend of 2 parts Q11 Quartz and 1 part Q28 Quartz is mixed with the epoxy and troweled onto the substrate with a flat trowel at a thickness of 3/16". Allow material to fully cure overnight.
D. Grout Coat
1. The grout coat shall be comprised of a liquid resin and a liquid hardener that is mixed in the ratio of 1 part hardener to 2 parts resin and installed per the manufacturer's recommendations.
2. The grout coat shall be squeegee applied and back rolled with a coverage rate of 90-100 sf/gal.
E. Topcoat
1. The topcoat of Armor Top shall be roller applied at the rate of 500 sf/gal to yield a dry film thickness of 3 mils.
2. The topcoat shall be comprised of a liquid resin, hardener and grit that is mixed per the manufacturer's instructions.
3. The finish floor will have a nominal thickness of 3/16 inch.
3.04 Field Quality Control
A. Tests, Inspection
1. The following tests shall be conducted by the Applicator.
a. Temperature
i. Air, substrate temperatures and, if applicable, dew point.
b. Coverage Rates
i. Rates for all layers shall be monitored by checking quantity of material used against the area covered.
3.05 Cleaning and Protection
A. Cure flooring material in compliance with manufacturer's directions, taking care to prevent their contamination during stages of application and prior to completion of the curing process.
B. Remove masking. Perform detail cleaning at floor termination, to leave cleanable surface for subsequent work of other sections.
PART 3 EXECUTION
3.01 Examination
A. Examine substrates, areas and conditions, with Applicator present for compliance with requirements for maximum moisture content, installation tolerances and other conditions affecting flooring performance.
1. Verify that substrates and conditions are satisfactory for flooring installation and comply with requirements specified.
3.02 Preparation
A. General
1. New and existing concrete surfaces shall be free of oil, grease, curing compounds, loose particles, moss, algae growth, laitance, friable matter, dirt, and bituminous products.
2. Moisture Testing: Perform tests recommended by manufacturer and as follows
a. Perform anhydrous calcium chloride test ASTM F 1869-98.
Application will proceed only when the vapor/moisture emission rates from the slab is less than and not higher than 3 lbs/1,000 sf/24 hours.
b. Perform relative humidity test using in situ probes, ASTM F 2170. Proceed with installation only after substrates have a maximum 75% relative humidity level measurement.
c. If the vapor emission exceeds 75% relative humidity or
3 lbs/1,000 sf/24 hrs then Dur-A-Flex, Inc. Dur-A-Glaze
MVP Primer moisture mitigation system must be installed prior to resinous flooring installation. Slab-on-grade substrates without a vapor barrier may also require the moisture mitigation system.
3. There shall be no visible moisture present on the surface at the time of application of the system. Compressed oil-free air and/or a light passing of a propane torch may be used to dry the substrate.
4. Mechanical surface preparation
a. Shot blast all surfaces to receive flooring system with a mobile steel shot, dust recycling machine (Blastrac or equal).
All surfaces and embedded accumulation of paint, toppings hardened concrete layers, laitance, power trowel finishes and other similar surface characteristics shall be completely removed leaving a bare concrete surface having a minimum profile of CSP 3-4 as described by the International Concrete
Repair Institute.
b. Floor areas inaccessible to the mobile blast machines shall be mechanically abraded to the same degree of cleanliness, soundness and profile using diamond grinders, needle guns, bush hammers, or other suitable equipment.
c. Where the perimeter of the substrate to be coated is not adjacent to a wall or curb, a minimum of 1/4 inch key cut shall be made to properly seat the system providing a smooth transition between areas. The detail cut shall also apply to drain perimeters and expansion joint edges.
d. Cracks and joints (non-moving) greater than 1/8 inch wide are to be chiseled or chipped-out and repaired per manufacturer's recommendations.PART 2 PRODUCTS
2.01 Flooring
A. Dur-A-Flex, Inc. Dur-A-Quartz, Epoxy-Based seamless flooring system.
1. System Materials
a. Primer: Dur-A-Flex, Inc. Dur-A-Glaze #4 resin and hardner.
b. Epoxy Quartz Mortar: Dur-A-Flex, Inc. Dur-A-Glaze
#4 Cove Rez and hardner.
c. The quartz aggregate shall be Dur-A-Flex, Inc.
Q-11/Q-28 colored quartz aggregate.
d. Grout coat: Dur-A-Flex, Inc. Dur-A-Glaze #4 Cove
Rez and Water Clear hardener.
e. Topcoat: Dur-A-Flex, Inc. Armor Top resin, hardener, and grit.
2. Patch Materials
a. Shallow Fill and Patching: Dur-A-Flex, Inc.
Dur-A-Glaze #4 Cove Rez.
b. Deep Fill and Sloping Material (over 1/4 inch):
Dur-A-Flex, Inc. Dur-A-Crete.
2.02 Manufacturer
A. Dur-A-Flex, Inc. 95 Goodwin Street, East Hartford, CT 06108, Phone
(877) 251-5418, email: contact_us@dur-a-flex.com
B. Manufacturer of Approved System shall be single source and made in the USA.
2.03 Product Requirements
A. Primer Dur-A-Glaze #4
1. Percent Solids 100%
2. VOCs 0 g/L
3. Compressive Strength, ASTM D 695 16,000 psi
4. Tensile Strength, ASTM D 638 3,700 psi
5. Flexural Strength, ASTM D 790 4,700 psi
6. Abrasion Resistance, ASTM D 4060
C-10 Wheel, 1,000 gm load, 1,000 cycles 35 mg loss
7. Flame Spread/NFPA-101, ASTM E 84 Class A
8. Izod Impact ASTM D-256 0.50
9. Water Absorption ASTM D-570 0.04%
10. Pot Life @70 deg F 20 minutes
B. Epoxy Quartz Mortar Dur-A-Glaze #4/Q11-Q28 Quartz
1. Percent Solids 100%
2. VOCs 0 g/L
3. Compressive Strength, ASTM D 695 16,000psi
4. Tensile Strength, ASTM D 638 3,700 psi
5. Flexural Strength, ASTM D 790 4,700 psi
6. Abrasion Resistance, ASTM D 4060
C-10 Wheel, 1,000 gm load, 1,000 cycles 35 mg loss
7. Flame Spread/NFPA-101, ASTM E 84 Class A
8. Izod Impact ASTM D-256 0.50
9. Water Absorption ASTM D-570 0.04%
10. Pot Life @70 deg F 20 minutes
C. Topcoat Armor Top
1. Percent Solids 95.2%
2. VOCs 0 g/L
3. Tensile Strength, ASTM D 2370 7,000 psi
4. Adhesion, ASTM 4541 Substrate Failure
5. Hardness, ASTM D 3363 >4H
6. 60 Gloss ASTM D 523 Satin 50 +/-10 Gloss 75 +/-10
7. Abrasion Resistance, ASTM D4060 Gloss Satin
CS Wheel (1,000 gm load) 1,000 cycles 4 8 mg loss with grit
10 12 mg loss without grit
8. Pot Life @ 70 deg F, 50% RH 45 minutes
9. Full Chemical Resistance 7 days
1.05 Quality Assurance
A. The Manufacturer shall have a minimum of 10 years experience in the production, sales, and technical support of epoxy and urethane industrial flooring and related materials.
B. The Applicator shall have been approved by the flooring system manufacturer in all phases of surface preparation and application of the product specified.
C. No requests for substitutions shall be considered that would change the generic type of the specified System.
D. System shall be in compliance with the Indoor Air Quality requirements of
California Section 01350 as verified by a qualified independent testing laboratory.
F. A pre-installation conference shall be held between Applicator, General Contractor, and the Owner for review and clarification of this specification, application procedure, quality control, inspection and acceptance criteria and production schedule.
1.06 Product Delivery
A. Packing and Shipping
1. All components of the system shall be delivered to the site in the Manufacturer's packaging, clearly identified with the product type and batch number.
B. Storage and Protection
1. The Applicator shall be provided with a storage area for all components. This area shall be between 60 deg F and 90 deg F, dry, out of direct sunlight and in accordance with the Manufacturer's recommendations and relevant health and safety regulations.
C. Waste Disposal
1. The Applicator shall be provided with adequate disposal facilities for non-hazardous waste generated during installation of the system.
1.07 Project Conditions
A. Site Requirements
1. Application may proceed while air, material and substrate temperatures are between 60 deg F and 90 deg F providing the substrate temperature is above the dew point. Outside of this range, the Manufacturer shall be consulted.
2. The relative humidity in the specific location of the application shall be less than 85% and the surface temperature shall be at least 5 deg F above the dew point.
3. The Applicator shall ensure that adequate ventilation is available for the work area.
4. The Applicator shall be supplied with adequate lighting equal to the final lighting level during the preparation and installation of the system.
B. Conditions of new concrete to be coated with epoxy material
1. Concrete shall be moisture cured for a minimum of 7 days and have fully cured a minimum of twenty eight days in accordance with ACI-308 prior to the application of the coating system pending moisture tests.
C. Safety Requirements
1. All open flames and spark-producing equipment shall be removed from the work area prior to commencement of application.
2. "No Smoking" signs shall be posted at the entrances to the work area.
3. The Owner shall be responsible for the removal of foodstuffs from the work area.
4. Non-related personnel in the work area shall be kept to a minimum.
1.08 Warranty
A. Dur-A-Flex, Inc. warrants that material shipped to buyers at the time of shipment substantially free from material defects and will perform substantially to Dur-A-Flex, Inc.
published literature if used in accordance with the latest prescribed procedures and prior to the expiration date.
B. Dur-A-Flex, Inc. liability with respect to this warranty is strictly limited to the value of the material purchase.
I O
T S
T
IL
L S
E R
V
S I G
N
C O
N S
U L
T I N
G
T
IT
U S
A V
E N
C
H E
S T
E R
N
Y
(5
(5
F
A X
A P
P R
O V
E D
C H
E C
K E
D B
Y
D R
A W
N B
Y
S C
A L E
P R
O J E
C T
I D
E N
T
IF
IC
A
T
IO
N N
O
D A
T E
N U
M B
E R
S H
E E
T
S H
E E
T T
IT
L E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL AND NOTATION
"ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
FOR PERMIT
B A
T H
R O
O M
R E
N O
V A
T
IO
N
N O
R T
H R
O A
D
W A
T E
R L
O O
N
Y
S P E C
IF
IC
A T
IO
N S
A
F
E B
B F
W
F S
W
F S
W
O P
D
-0
R
E V
IS
IO
N D
A T
E B
Y
| CS - COVER SHEET |
| A1 - PLANS, ELEVATIONS AND DETAILS |
| A2 - SPECIFICATIONS |
File details come from the government source that posted it. Updated .