SCOPE OF WORK - AQ9 STICHTER Hennepin Canal~1.docx
DOCX document 20 KB Posted
- Attached to
- DNR - Hennepin Canal Tree and Brush Removal
- Solicitation number
- 18-422DNR-DIREC-B-1408
- Issued by
- Bureau County, Illinois
About this file
This document is a Scope of Work for the Illinois Department of Natural Resources detailing the requirements for the Aqueduct #9 Cleanout project at the Hennepin Canal in Sheffield, Illinois. The purpose of this project is to remove debris, including trees, brush, and logs up to 24-inches in diameter, that has accumulated and blocked the three bays of the aqueduct, preventing the full flow of the Green River. The work must be completed by June 30, 2018. A mandatory pre-bid meeting is scheduled for May 24, 2018, and the successful contractor will be required to comply with prevailing wage rates, submit certified payroll records, and provide appropriate insurance coverage.
The contract requires the contractor to secure and pay for all necessary permits and licenses, coordinate work activities with the site superintendent, utilize new products, provide a one-year warranty on workmanship, and accept payments as outlined in the State Prompt Payment Act. Change orders must be approved by the DNR Architect/Engineer. This work is part of a larger State and Local contract opportunity, identified as the "DNR - Hennepin Canal Tree and Brush Removal" project, located in Bureau County, Illinois.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hennepin Canal Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: February 13, 2018
| LOCATION: | Hennepin Canal Lock Aqueduct # 9 | |
| 16006 875 East Street | ||
| Sheffield, IL. 61361 |
PROJECT TITLE: Aqueduct # 9 Cleanout
NARRATIVE OF WORK:
Aqueduct # 9 carries the Hennepin Canal over the Green River. It is the largest water crossing of the eight remaining aqueducts. Flooding and regular water flow carries debris that creates blockages in the aqueduct, preventing the flow of the Green River.
SCOPE OF WORK:
The purpose of this project is to remove numerous trees and brush and any other debris that has created a blockage in all three bays of aqueduct 9 to restore the entire flow of the Green River at all times. The work will require removing debris ranging from 3-inch diameter sticks to 24-inch diameter logs or greater from each of the three bays. The debris should be removed to a location that does not allow it to end up directly back in the aqueduct again during the next flood. This job may require a machine to get in the river at the proper water level.
PROJECT SPECIFICATIONS & REQUIREMENTS:
A. Project Specifications:
1. Vendor Shall consult with the Site Superintendent for coordination of park activities during hours of construction.
2. Prior to submitting proposal, the bidder shall visit the site and take field assessments and note conditions affecting the performance of the work.
3. Bidder shall be responsible for quantities. No extra payment shall be provided for conditions which could have been anticipated by a thorough field inspection prior to start of work.
B. Project Requirements:
| 1) | Project Meeting |
| PROJECT MEETING TO BE HELD: YES |X| NO |_| | |
| MANDATORY ATTENDANCE: YES |X| NO |_| |
PREBID MEETING; May 24, 2018 10:00 AM
| 2) | Duration |
| Quotes shall be good for thirty (30) calendar days after the submittal date, or for an extended | |
| period of time, if agreed to in writing by the Contractor and DNR. |
| 3) | Prevailing Wage Rates |
| The Contractor must comply with provisions of the Prevailing Wage Act, 820 ILCS 130/, and the | |
| Illinois Procurement Code (30 ILCS 500/25-60), which applies to the wages of laborers, | |
| mechanics and other workers employed in any public works. The Contractor is responsible for | |
| contacting the Illinois Department of Labor (DOL) at 217/782-6206 or | |
| (http://www.state.il.us/agency/idol) to ensure understanding of prevailing wage requirements. |
| 4) | Certified Payroll |
| State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state | |
| construction projects to submit certified payroll records to the Department of Natural | |
| Resources. The payroll records must include all workers employed by contractors on the | |
| project. |
In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.
5) Coordination of Work Activities:
All work activities and entry to the site must be coordinated with the site superintendent.
| 6) | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-Owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
7) Construction Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a construction bond shall be required if the project cost exceeds $50,000.
8) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.
9) Utilities Before starting work, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.
10) Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.
11) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.
| 12) | Steel Products |
| Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/). |
13) Warranty The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date.
14) Change Orders Change orders must be determined by the DNR Architect/Engineer to be germane to the original contract and that the price is fair and reasonable. When changes in or modifications to the work become necessary, the Contractor shall submit an itemized cost for the work and shall include appropriate documentation to support the cost for the labor, material and equipment.
15) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
| 16) | Term of Contract |
| All work shall be completed by June 30, 2018. |
| 17) | Contact Information |
| Site Superintendent and Billing: | |
| Tom Vandemore | |
| 16006 875 East Street |
Hennepin Canal State Park Sheffield, IL. 61361
| Phone: | 815-454-2328 | |
| Fax: | 815-454-2042 | |
| E-mail: | tom.vandemore@illinois.gov |