About this file

This Scope of Work document outlines engineering and planning services for the City of Dallas Water Utilities Department, Transportation & Public Works, and Office of Economic Development to evaluate infrastructure needs in the MLK Jr Station Focus Area. The project requires a comprehensive assessment of water, wastewater, stormwater, paving, and transportation infrastructure to support future development within a half-mile radius of the MLK Jr DART Station. The consultant must conduct preliminary investigations, review existing utility plans and models, evaluate infrastructure capacity, analyze land use and development potential, and assess alley and street configurations to improve redevelopment feasibility. Specific deliverables include technical memoranda addressing existing conditions, future development needs, community engagement results, infrastructure recommendations, alley and right-of-way abandonment recommendations, street extension opportunities, and an engineer's estimate of probable costs. The project requires conversion of existing XPSWMM 2013 drainage models to InfoWorks ICM 2025 format to reflect conditions following completion of the Mill Creek Drainage Relief Tunnel, scheduled for completion by late 2028 or early 2029. The consultant must produce all deliverables in Bentley MicroStation CADD format and provide five bound copies plus digital files of the final report.

The scope requires the consultant to provide all personnel, equipment, software, and services necessary to complete the work, including project management, coordination with multiple city departments and external agencies (FEMA, Army Corps of Engineers, TXDOT, TCEQ, Dallas County), monthly status reporting, meeting preparation and minutes, quality control, and two community engagement presentations. The consultant must maintain a decisions log, coordinate with other city projects, follow all applicable regulatory requirements and city design standards, and obtain written approval from the City Project Manager before undertaking any out-of-scope work. Special services items such as advanced surveying, subsurface utility engineering levels A and B, and condition checks on water and wastewater mains require advance written authorization and are billed separately on a direct cost and hourly basis. The project anticipated duration and specific contract award date are not stated in this document; however, the scope indicates regular meetings and coordination throughout the project duration with two executive briefings planned.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Services for MLK Jr Station Focus Area Page 1 09-10-2026

CITY OF DALLAS

WATER UTILITIES DEPARTMENT

TRANSPORTATION & PUBLIC

WORKS

AND OFFICE OF ECONOMIC

DEVELOPMENT

EXHIBIT “A”

SCOPE OF SERVICES

for

Water, Wastewater, Stormwater, Paving, and Transportation Infrastructure Needs Assessment

For the MLK Jr Station Area

A. GENERAL

Provide necessary Engineering and Planning Services required for evaluating water, wastewater, stormwater, paving, and transportation infrastructure needs for future development and land use of the MLK Jr Station Development Area. The focus area is shown in the attached Exhibit 1. Services that the Consultant (Engineer) is required to perform shall include, but are not limited to the following:

1. Preliminary Investigation

2. Land use and future development evaluation

3. Review of existing water, wastewater, and stormwater utility plans, records, and models

4. Review of existing paving and transportation plans, records, and thoroughfare/master plans

5. Review of current and planned water, wastewater, stormwater, paving, and transportation projects

6. Water, wastewater, and stormwater flow demand and capacity evaluation to determine needs to support future development.

7 . Preparation of exhibits and technical report with recommendations.

8. Surveying (as needed) [Special Services]

9. General Contract Services

B. PROJECT DESCRIPTION

This scope of services are generally described as follows:

LAND USE AND FUTURE DEVELOPMENT: The purpose of the evaluation is to investigate existing land use and future development based on existing Dallas development plans and zoning and anticipated future land use to aid in the determination of infrastructure needs to support future development in the focus area.

WATER: The purpose of the evaluation is to investigate the water infrastructure within the focus area and determine improvements needed including pipeline size and capacity to support future development.

WASTEWATER: The purpose of the evaluation is to investigate the wastewater infrastructure within the focus area and determine improvements needed including pipeline size and capacity to support future development.

Scope of Services for MLK Jr Station Focus Area Page 2 09-10-2026

STORMWATER: The purpose of the evaluation is to investigate the stormwater infrastructure within the focus area and determine improvements needed including drainage infrastructure size and capacity to support future development.

PAVING AND TRANSPORTATION: The purpose of the evaluation is to investigate the paving and transportation infrastructure within the focus area and determine improvements needed including pavement widths and configurations and transportation signalization and control needs to support future development.

This should also include an analysis of existing public “alleys” and other public ROW (and identification of which ROW abandonments would be supported/recommended by the City under certain conditions to support lot consolidation and redevelopment of certain blocks). Further, an analysis should identify which existing public streets should/could be extended in strategic locations in a way that would improve access to certain blocks (and would thereby improve the redevelopment feasibility of certain blocks).

Evaluation of existing Dallas Water Utilities models, plans, and drainage studies may be required to complete the above evaluations, including development of new hydrologic and hydraulic flood models, updates and/or modifications to existing models, software conversions, and related activities. The Interim Conditions XPSWMM 2013 model is anticipated to require conversion to InfoWorks ICM 2025 to reflect Flood Hazard Areas following completion of the Mill Creek Drainage Relief Tunnel, currently scheduled for completion by the end of 2028/early 2029. Exhibits 2 and 3 show the Flood Hazard Areas for the Peaks Branch – Lower Middle Drainage Segment before and after the tunnel is in service, as previously developed using the 2013 model.

The 2019 Peaks Branch and 2024 Mill Creek Master Drainage Plans should also be reviewed, including their recommendations for interim drainage guidelines for new development prior to implementation of the recommended drainage improvements. Updated and/or similar recommendations should be developed for the focus area and, as appropriate, the entire Peaks Branch – Lower Middle Drainage Segment to reflect conditions with the Mill Creek Drainage Relief Tunnel in service while other recommended components remain incomplete due to the time required for development, funding, and construction. In addition, recommended lateral line improvements within the focus area, which are separate from the Mill Creek Drainage Relief Tunnel project, should be considered as part of this assessment, as shown in Exhibit 4.

C. GENERAL REQUIREMENTS

1. Project Management & Administration - Provide accounting/invoice preparation and review, subconsultant management, project work plan, progress tracking, filing, mailing, copying, monthly updates to project manager and stakeholders, participate in routine internal progress meetings, and maintain an issues log.

Develop project task schedule and provide monthly progress/status reports of sufficient detail to support monthly billings. The monthly status report shall be consistent with the billing period. Deliverables: Monthly Invoice, Monthly Project Manager Status Report, Project Work Plan with updates, Decision Log.

2. Meetings - Participate in regularly scheduled meetings for the anticipated duration of the project. Prepare and provide to City of Dallas a meeting agenda and materials required for the meeting a minimum of one (1) week prior to the meeting. Prepare meeting minutes for each meeting and provide to City of Dallas within five (5) working days of the meeting date. Establish sections within the minutes that clearly identify project team decisions and action items with responsible party. Deliverables: Meeting Agenda, Meeting Materials, Meeting Minutes with Action Items.

3. Coordinate and schedule work to meet agreed upon schedule for the evaluation and recommendations at the beginning of the project. If delayed, Consultant shall document reasons for any delays and indicate how

Scope of Services for MLK Jr Station Focus Area Page 3 09-10-2026 the project may be brought back on schedule.

4. Provide all personnel, equipment, supplies, software, transportation, services, deliveries, incidentals, etc., necessary to accomplish the scope of services.

5. Identify and coordinate recommendations of this project to meet legal and regulatory parameters, constraints, codes and applicable requirements set forth by all governing agencies, including, (FEMA), Army Corps of Engineers (ACOE), State of Texas, Texas Highway Department of Transportation (TXDOT), Texas Commission on Environmental Quality (TCEQ), City of Dallas, Dallas County and other local codes as they may apply within the project limits.

6. Promptly advise City’s Project Manager of comments/requests which are out of scope, or which will affect construction/engineering costs. Written approval is required prior to proceeding with work by the consultant team on any out of scope items. Work performed without prior written approval from City’s Project Manager or Program Manager will be deemed to be within the scope of work and will not be subject to additional compensation. Note that neither the City’s Project Manager nor the Program Manager have the authority to authorize work in excess of the contract amount awarded by Council. The Consultant team shall not perform any additional work in excess of that amount without written approval from the City of Dallas Director or receipt of a Supplemental Agreement which has been approved by the Dallas City Council or by Administrative Action.

7. The Consultant shall, after a thorough review of all available data from the City of Dallas and other applicable agencies, including discussions with City of Dallas, and in accordance with the General and Specific Requirements stated herein, formulate, analyze, present alternatives and make reasonable and appropriate recommendations.

8. The Consultant shall maximize the use of existing City of Dallas information, such as reports, land use and zoning plans, surveys, and available data. The Consultant shall confirm existing City of Dallas information and data as necessary. The Consultant will have access to DWU records through use of DWU Consultant Kiosk located at 2121 Main Street, Suite 500, Dallas, TX 75201. The Consultant shall notify DWU two (2) days in advance to reserve the kiosk.

9. Provide internal quality control for deliverables prior to submission to City of Dallas.

10. Evaluate City of Dallas comments and coordinate responses between City’s Project Manager and Consulting

Engineer’s Project Manager. Incorporate responses, as appropriate into reports and technical memoranda.

11. Consultant shall provide written response by a licensed professional engineer to Owner’s comments received on reports, technical memoranda, and plans and specifications. Submittals, Request for Information, and other similar types of information shall be approved, rejected, or answered by a licensed professional engineer.

12. Consultant shall maintain a “Decisions Log” detailing action items identified in meetings or during the design process, which includes the date the issue was identified, the individual raising the issue, the individual responsible for responding, resolution/solution, and resolution date.

13. The recommendations of proposed infrastructure shall be coordinated with the City of Dallas Project

Manager, other Consultants and City of Dallas Project Managers for other projects. Coordination shall include, but not be limited to, consideration of other projects and activities within and adjacent to the focus area, ongoing and proposed plans within the City of Dallas including private development, and other construction or planning activities that may come up from time to time.

Scope of Services for MLK Jr Station Focus Area Page 4 09-10-2026

14. The Consultant shall produce any conceptual designs in the latest version of Bentley System, Inc’s.

MicroStation Computer Aided Design and Drafting system (CADD). In addition, the Consultant shall submit all electronic data in the form and format listed herein.

15. Consultant shall work through the City of Dallas Project Manager for all communication and requests from the

City of Dallas.

16. Consultant should plan for two (2) community engagement presentations. The first to engage the community within the focus area to discuss the purpose, scope, and approach for the needs assessment. This meeting should occur at the beginning of the project to receive feedback for consideration in the delivery of the project tasks and deliverables. The second engagement meeting should focus on the results of the assessment and recommendations to receive feedback and inform final recommendations to the City of

Dallas.

17. Services identified as special services items in this Scope of Work are items which must be authorized in advance and in writing by the City Project Manager and will be paid only on a direct expenses and hourly billings of time expended by consultant. Such items are so designated because it is difficult to determine an accurate level of services required for the items at this time. Estimated amounts will be established for each item and consultant shall notify City’s Project Manager in advance and receive written authorization to exceed the estimated amounts on items. Total payment for these items shall not exceed the total amount authorized by City; however, the amounts allocated to each item may be adjusted by City’s Project Manager as needed.

D. Investigations

1. Preliminary Investigation:

Review existing materials and reports obtained from City of Dallas that are relevant to this project and perform field investigations necessary. Coordinate with utility companies, other agencies and City of Dallas Departments to obtain information on existing and proposed facilities in the focus area. Coordinate with property owners/developers in order to confirm conceptual development plans for specific properties.

Obtain, review, and incorporate all available data such as survey files, base maps, subsurface engineering, environmental reports, geotechnical reports, plans of proposed improvements, etc. as a part of the Preliminary Investigation. The information and data may include but is not limited to the following:

a. Existing survey data obtained from the project scope or others.

b. Existing water and sewer GIS Maps, record drawings, and design drawings can be obtained from the DWU Consultant Kiosk located at 2121 Main Street, 5th Floor, Dallas, TX 75201

c. Existing paving and drainage maps, record drawings, and design drawings can be obtained from the Transportation and Public Works vault located at 320 E. Jefferson, Dallas, TX 75201

d. City of Dallas Project manager will provide an “Agreement for the Use of GIS Data” form at the consultant’s request to obtain relevant GIS data/shapefiles limited to the project area.

e. Property ownership and tax plat information from Dallas County, Dallas Central Appraisal District, etc.

f. Available data from the Water and Wastewater Operations Divisions, and Permits Section.

Scope of Services for MLK Jr Station Focus Area Page 5 09-10-2026

g. DWU Bid Item and Cost Estimating Manual, Latest Edition, available from the following location:

http://www.dallascityhall.org/dwu/dwu_design_standards.html

h. DWU Water and Wastewater Procedures and D e s i g n Manual, Latest Edition, available from the following location:

i. Transportation & Public Works Standards and Guides, Latest Edition, available from the following location:

https://dallascityhall.com/departments/transportation/Pages/standards.aspx

j. Texas Commission on Environmental Quality (TCEQ), although DWU adheres to all of the design guidelines required by TCEQ, the following chapters are often referred to:

Chapter 290: Public Drinking Water:

http://www.tceq.texas.gov/rules/indxpdf.html#290

Chapter 217: Design Criteria for Domestic Wastewater Systems:

http://www.tceq.texas.gov/rules/indxpdf.html#217

k. DWU Water Distribution Master Plan, as provided by DWU.

l. DWU Wastewater Collection System Master Plan, as provided by DWU.

2. Water and Wastewater Main Condition Checks

a. Existing Wastewater Collection TV inspection files or reports including but not limited to CCTV, Red Zone and Inframetrix. This information is available from DWU.

b. Review existing condition checks on adjacent water and wastewater mains including physical inspection, required TV inspection, examination of maintenance records, etc. as provided by DWU.

c. Identify additional condition checks necessary to complete the evaluation and r e c o m m e n d a t i o n s a n d request the condition check through the DWU.

3. Vertical and Horizontal Survey

If recommended by Consultant and approved by the City Project Manager, the Consultant shall perform vertical and horizontal survey. The Consultant shall follow provisions of Appendix C and D of DWU Water and Wastewater Pipeline Design Manual, Latest Edition and City of Dallas Public Works and Transportation Field Note Guidelines, Latest Edition. The Consultant shall obtain the following survey data and apply them in the development of any conceptual plans:

a. Locate and establish control from the City’s existing benchmarks (at least two Benchmarks for each location). Water Department benchmarks description will need to be field verified and their elevations and coordinates obtained. Benchmark file can be found at:

b. Establish base line control, locate, and tie existing above ground utility appurtenances, structures, bridge piers, retaining walls, property lines, trees, curbs, pavements, fences, etc. to the base line.

c. Determine depths and elevations of existing water and wastewater mains through Subsurface Utility http://www.dallascityhall.org/dwu/dwu_design_standards.html https://dallascityhall.com/departments/transportation/Pages/standards.aspx http://www.tceq.texas.gov/rules/indxpdf.html#290 http://www.tceq.texas.gov/rules/indxpdf.html#217

Scope of Services for MLK Jr Station Focus Area Page 6 09-10-2026

Engineering (SUE) level C and D.

e. SUE Level A or B. This is particularly needed in areas of high utility congestion. This item needs to be requested and/or authorized by the City Project Manager and will be paid under Special Services.

f. Identify existing manhole diameters, invert(s) and rim elevation(s).

g. Identify existing pavement type and thickness.

h. Identify locations and elevations of all underground utilities, which may be in conflict with the proposed infrastructure. Identify and locate all underground utilities or structures that may be within four (4) foot parallel to or across the proposed embedment zone.

i. The Consultant shall utilize the DWU drafting resource files to create design files found at:

http://www.dallascityhall.org/dwu/dwu_design_standards.html.

5. Project Coordination

a. The Consultant shall obtain from DWU and other utility agencies, information regarding existing and proposed utilities affected by the project. Include size and location of DWU laterals and services where available information exists.

b. The Consultant shall contact the property owners and the City of Dallas Transportation & Public Works Department to coordinate excavation locations, street closures, traffic routing, etc. Provide City of Dallas Project Manager with copies of all correspondence.

c. The Co n s u l t a nt s h a l l obtain any conceptual development plans for properties within the focus area. Printing, reproduction and delivery costs associated with this task shall be considered part of Basic Services.

d. The Consultant shall meet with City of Dallas personnel to present any possible design problems based on the above gathered information.

e. The Consultant shall contact each utility company, the City of Dallas T r a n s p o r t a t i o n & Public Works Department, Dallas County Public Works, TXDOT, NTTA, DART and other outside agencies to obtain the latest information on proposed improvements in the project area. Provide the City of Dallas Project Manager with copies of all correspondence.

E. Recommendations and Deliverables

1. Interim and draft reports and technical memorandums should be provided at the completion of each task. Reports and technical memorandums when finalized should be incorporated into final evaluation and recommendations report.

2. At a minimum, it is anticipated that the following reports/technical memorandums will be prepared to inform and be included in the final report.

a. Existing Data, Models and Reports

b. Land Use and Future Development

c. Existing water, wastewater, stormwater, paving, and transportation infrastructure including capacity.

d. Meeting minutes and technical memorandum that summarizes community engagement efforts and feedback received during those engagements. Technical memorandum should also include how feedback was considered and incorporated into final recommendations.

e. Water, wastewater, stormwater, paving, and transportation infrastructure needs to support future

Scope of Services for MLK Jr Station Focus Area Page 7 09-10-2026 development.

f. Identification and recommendation of alley or other public ROW abandonments that could be supported/recommended by the City under certain conditions to support lot consolidation and redevelopment of certain blocks.

g. Identification and recommendation of existing public streets that should/could be extended in strategic locations in a way that would improve access to certain blocks (and would thereby improve the redevelopment feasibility of certain blocks).

3. Conceptual plans and exhibits should include alignments, limits of proposed improvements/existing facilities as well as all surface and subsurface facilities found during the Preliminary Investigation.

4. An Engineer’s Estimate of Probable Costs should be prepared for all recommendations.

5. Final report should be provided in PDF digital format along with all support files used or referenced.

Provide 5 bound copies of final report.

6. Plan for two (2) briefings with City of Dallas executives to cover findings and initial recommendations and final findings and recommendations.

Exhibit 1: MLK Jr Station Focus Area

Note: The map is a basic illustration of the Focus Area (1/2-mile radius from MLK Jr DART Station)

Scope of Services for MLK Jr Station Focus Area Page 11 09-10-2026

Exhibit 2: Before Mill Creek Drainage Relief Tunnel (2013 Model)

Scope of Services for MLK Jr Station Focus Area Page 12 09-10-2026

Exhibit 3: After Mill Creek Drainage Relief Tunnel (2013 Model)

Scope of Services for MLK Jr Station Focus Area Page 13 09-10-2026

Exhibit 4: Peaks Branch – Lower Middle Lateral Improvement

Recommendations (2013 Model)