SCOPE OF WORK ~1.docx
DOCX document 14 KB Posted
- Attached to
- FY26 Fox Boiler Tube Replacement
- Solicitation number
- 26-444DHS-DEVDI-B-52391
- Issued by
- Illinois
About this file
This is a Scope of Work for the State of Illinois Department of Human Services for the FY26 Fox Center Boiler Tube Removal and Replacement project (Contract 26-444DHS-DEVDI-B-52391). The project requires the vendor to provide labor and materials to remove 163 faulty tubes from a Kewanee Boiler, install 163 new replacement tubes, and perform a hydro test of the boiler following completion of the tube replacement work. The contract term begins on an unspecified date and extends through June 30, 2026. All work must be scheduled and coordinated through the Chief Engineer, who must be notified of any regulatory or statutory changes affecting compliance with applicable laws and standards.
The vendor is responsible for supplying all tools, parts, and materials necessary to complete the work in accordance with State of Illinois requirements. All welding and materials must meet state specifications, and all technicians performing the work must hold appropriate certifications and meet all state licensing requirements. The project is subject to the prevailing wage act. No specific pricing information, set-asides, or funding sources are detailed in the scope of work document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IL Standard Terms and Conditions~11.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
FY 26 Fox Center Boiler Tube Removal and Replacement
26-444DHS-DEVDI-B-52391
Term: To begin date to last dated signature of both parties– June 30, 2026
Vendor is to provide the labor and material to remove 163 faulty tubes in a Kewanee Boiler Vendor is to provide the labor and material to install 163 new tubes in a Kewanee Boiler Vendor is to provide the labor and to hydro test the Kewanee boiler after removal and replacement of all 163 tubes is completed.
The Vendor will supply the tools and parts needed to make necessary repairs and to perform. The vendor will assure all welding performed and materials used will be in accordance with the State of Illinois requirements. All technicians performing work will be certified appropriately for field of work being performed and meet all state licensing requirements.
All work is to be scheduled through the Chief Engineer. The Chief Engineer will be made aware of any regulatory or statutory changes that would affect the scope of compliance with the laws and standards Subject to prevailing wage act.