Scope of Service - Water Softeners Apple - Cherry Cottage.odt

ODT document 6 KB Posted

Attached to
DHS Murray SP - Procurement of 2 Commercial Water Softeners
Solicitation number
23-444DHS-DEVDI-B-33295
Issued by
Illinois

About this file

The document provided is a Scope of Work for a procurement issued by the W.G. Murray Developmental Center for the replacement of two commercial water softeners at the Apple Cottage and Cherry Cottage facilities. The Center is seeking bids to replace the existing Kinetico water softeners with new Kinetico CP 210 or equivalent models, including all labor, tools, materials, and equipment required for the installation. The vendor must follow all Illinois Department of Labor/OSHA codes and regulations as well as the Center's rules and regulations, and perform the work during normal business hours excluding weekends and holidays. Bidders are required to inspect the site prior to submitting a bid.

This procurement is subject to Public Works requirements and Prevailing Wages regulations. The document provides detailed technical specifications for the water softeners, including performance, regeneration, and media volume requirements.

Text of this file

SCOPE OF WORK

W.G. Murray Developmental Center is seeking bids for two (2) Commercial Water Softeners to replace existing Kinetico Water Softeners at Apple Cottage and Cherry Cottage.

Vendor must replace existing Kinetico Water Softener with Kinetico Water Softener Model CP 210 or equivalent at Apple/Cherry Cottages.

Specifications:

Alternating Set-Up. Performance: Minimum Flow-2L/min. Maximum flow- @ 1 Bar-45L/min. Hardness as CaCO3 (max)- 975 mg/L. Overdrive: Minimum flow- 3 L/min. Maximum Flow @1 Bar- 79 L/min. Hardness as CaCo3 (max)- 975 mg/L. Regeneration: Standard, Salt Used/Capacity- 2,5-6,6/114 kg. time- 90 Minutes. Volume- 386 Liters. Overdrive: Salt Used/Capacity- 2,5-6,8/114 kg. time- 90 minutes. Volume- 386 liters. Media Volume – 2 x 42 liters. Inlet/Outlet Connections- Custom. Maximum Temperature- 50 degree Celsius. Inlet Pressure (min/max)- 2,5/8,5 bar.

Vendor must remove existing Softeners and install new Softeners in Apple Cottage and Cherry Cottage.

Vendor must supply all labor, tools, materials, equipment and all other incidentals for project.

Vendor must follow all Illinois Dept. of Labor/OSHA codes and regulations.

Vendor must follow W.G. Murray Developmental Center rules and regulations.

Vendor will perform project during normal business hours of 7:00 AM to 3:30 PM Monday thru Friday excluding weekends and holidays.

Bidder must inspect prior to bid.

This procurement is subject to Public works requirements- 820 ILCS 130/4 and Prevailing Wages 30 ILCS 500/25-60.

Other files

File Type Posted
StandardCertificationsV181a~46.docx DOCX document
COVID PROTECTIONS~36.docx DOCX document
Mandatory Onsite Visit Guidance for Vendors Murray~45.docx DOCX document
standard-terms-and-conditions.23.2.pdf PDF
RMU50-B-33295.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file