Scope of Service - Elm Cottage Fencing~1.odt
ODT document 6 KB Posted
- Attached to
- DHS Murray SP - Elm Patio Fencing
- Solicitation number
- 23-444DHS-DEVDI-B-36876
- Issued by
- Illinois
About this file
The document is a Scope of Work for a contract opportunity issued by the W.G. Murray Developmental Center. The Center is seeking bids for the purchase and installation of patio fencing at the Elm Cottage facility. The vendor must provide and install Westbury Riviera style aluminum fencing, approximately 101 linear feet per patio, with a 4-foot gate for each of the 3 patios. The vendor must follow all applicable labor and safety codes and regulations, as well as the Center's own rules. The work must be performed during normal business hours, and the vendor must provide daily progress reports to the Facility Chief Engineer. This procurement is subject to Illinois public works and prevailing wage requirements.
The scope also outlines several additional requirements, including that the vendor must supply all labor, tools, materials, and equipment, and that the Center will not be liable for any lost, stolen, or broken items. The work must be performed in compliance with all relevant codes and regulations, and the vendor will be required to inspect the site prior to submitting a bid.
Text of this file
SCOPE OF WORK
Murray Developmental Center is seeking bids for purchase and to install Patio Fencing at A1, B1 and B2 Wing Patio at Elm Cottage.
Specifications:
Vendor must purchase and install a Westbury Riviera style fencing, aluminum construction, on each patio that has approximately one hundred one (101) foot area for installation.
Vendor must install a four (4) foot gate for egress from sidewalk to patio floor in all three (3) patios.
Vendor must ensure fencing and gate does not exceed forty-eight (48) inches in height. All posts and fencing must be capped at exposed ends.
Bidder must inspect prior to bid.
Vendor must supply all labor, tools, materials and equipment for project.
Vendor must follow all Illinois Dept. of Labor/OSHA/MSHA Codes and Regulations.
Vendor must follow all rules, regulations and policies of W.G. Murray Developmental Center.
W.G. Murray Developmental Center will not be held liable for any lost, stolen, broken tools, material and equipment.
Vendor must perform project during normal business hours of 7:00AM to 3:30PM, Monday thru Friday excluding weekends and holidays.
Vendor must give Facility Chief Engineer daily work progress report.
This procurement is subject to Public Works Requirements- 820 ILCS 130/4 and Prevailing Wages 30 ILCS 500 /25-60.
Other files
| File | Type | Posted |
|---|---|---|
| RMU50-B-36485.docx | DOCX document | |
| Standard-Terms-and-Conditions~2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .