Scope.pdf

PDF 199 KB Posted

Attached to
3500 Sanford Avenue Housing - Residential Grinder Lift Station
Solicitation number
CC-7278-26/NBM
Issued by
Seminole County, Florida

About this file

This is a Construction Narrative document prepared by CPH Corporation for LaShay Henderson Community Services and Seminole County, detailing the scope of work for a residential housing construction project at 3500 Sanford Avenue in Sanford, Florida (CPH Project #S09113). The project involves the installation of five residential grinder lift stations and associated site improvements. The construction narrative outlines five primary work phases: demolition activities including concrete removal and tree removal with protection measures for retained trees and fire hydrants; stormwater pollution prevention measures including construction entrance, silt fence, and inlet protection per Florida standards; site improvements including concrete driveway installation and signage coordination with the City; site grading and drainage following design specifications; and composite utilities installation including package lift stations, sanitary force mains, and water service lines. The project timeline requires 150 days to substantial completion and an additional 30 days to final completion, for a total of 180 days inclusive of permitting and engineering activities.

The Engineer's estimate for this project is $540,000.00. The contractor is responsible for all installation work, permitting, engineering coordination, and compliance with referenced construction plans and City of Sanford design details. Driveway installation and off-site signage are to be coordinated between Seminole County and Habitat for Humanity during construction. The bid documents are available through the Seminole County procurement portal, with M/WBEs encouraged to participate. All responses to this competitive solicitation are subject to Florida's public records law, and prospective bidders are restricted from contacting Seminole County staff or officials except through the designated contact person.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

July 15, 2026

LaShay Henderson Community Services / Community Development 520 West Lake Mary Boulevard, Suite 100 Sanford, FL 32773

Re: Seminole County Housing Construction Narrative 3500 Sanford Ave, Sanford FL CPH Project #: S09113

CONSTRUCTION NARRATIVE

DESCRIPTION OF NARRATIVE

This narrative has been written in accordance with the construction plans to give an overview of the required construction activities for this project. The items and sections included mirror the proposed plans and contain descriptions based on the noted design standards and procedures held within them. This narrative does not include any permitting instructions or close out instructions that will be the responsibility of the contractor.

Note: This is intended as a guide to the construction process as a supporting document, not as a replacement or alternative to the approved construction. The contractor is held responsible for the implementation of these activities.

CONSTRUCTION NARRATIVE OUTLINE

1. C1.0 - DEMOLITION PLAN

a. CONCRETE REMOVAL

i. The extents of concrete to be removed are shown on sheet C1.0. The concrete is to be neatly saw cut and removed as indicated.

b. TREE REMOVAL

i. The trees to be removed have been shown on the demolition plan, sheet C1.0, marked distinctly with a bolded “X” indicating the exact tress to be removed from the project site.

c. TREE PROTECTION

i. The trees NOT indicated to be removed on the Demolition Plan shall be required to protected by either boxing, fencing, or other protection as shown in the Tree Protection Detail on sheet C1.2.

500 West Fulton Street Sanford, FL 32771

Phone: 407.322.6841 Fax: 407.330.0639

2 | P a g e

d. FIRE HYDRANT PROTECTION

i. The fire hydrants shown on the plan shall be protected during the duration of the project’s construction.

2. C1.1 - STORMWATER POLLUTION PREVENTION PLAN

a. CONSTRUCTION ENTRANCE

i. The construction entrance will be created on the North-East portion of the site as indicated on sheet C1.1. The construction entrance must be installed per the latest edition of the Florida Erosion & Sediment Control Manual.

b. SILT FENCE IMPLEMENTATION

i. The silt fence shall be constructed in accordance with the latest edition of the Florida

Erosion & Sediment Control Manual. The dimensions and layout of the fence are indicated on the plan.

c. INLET PROTECTION

i. Inlet protection is required on all inlets in proximity to the project site construction.

Inlet protection details have been provided for various inlet types on sheet C1.2. The locations of the inlets to be protected have been indicated on the SWPPP sheet C1.1.

3. C2.0 - SITE DIMENSION PLAN

a. CONCRETE DRIVEWAY

i. It is assumed that the driveway construction will not be included with original construction contract. Driveway installation shall be coordinated during construction between Seminole County and Habitat for Humanity for furnishing and installation.

ii. Upon construction, driveways shall be installed as shown on sheet C2.0, in accordance with the detail on sheet C6.0.

b. SIGNAGE

i. Contractor shall coordinate with the City for installation of the offsite signage on

Sanford Ave

4. SITE GRADING & DRAINAGE PLAN

a. SITE GRADING

i. Site grading shall follow the design grading intent shown on sheet C3.0. Lot Grading will need to be in accordance with the FHA detail on sheet C6.0.

b. SWALE GRADING

i. The swales indicated on sheet C3.0 will be graded following the indicated grading lines and dimensions.

3 | P a g e

5. COMPOSITE UTILITIES PLAN

a. PACKAGE LIFT STATIONS

i. Each lot shall have its own E-One package lift station in the location shown on sheet C4.0 in accordance with the detail shown on sheet C6.0.

b. SANITARY FORCE MAIN

i. The sanitary force main as well as its associated fittings and connections shall be installed as indicated on sheet C4.0.

ii. As indicated on sheet C4.0, open cuts will be required at existing driveways and roadways to enable the installation of the proposed sanitary force main. City details for performing the open cut are on sheet C5.0.

c. WATER SERVICE LINE

i. The water service lines as well as its associated fittings, connections, meters and RPZ assemblies shall be installed as indicated on sheet C4.0. Please refer to the City Detail Sheets as needed.

Should you have any questions or concerns on the above responses, please contact me at 407- 322-6841, tfitzgerald@cphcorp.com, or hunter.rayl@cphcorp.com.

Sincerely, Tyler Fitzgerald, P.E.

File details come from the government source that posted it. Updated .