SCOPE AND PROCEDURE _ Restriping _ Rumble str.docx
DOCX document 7 KB Posted
- Attached to
- Re-striping & Rumble Strips Various Roads
- Solicitation number
- PE-77725-NONST-2027-000000011
- Issued by
- Dade County, Georgia
About this file
This is a Scope and Procedure document for a roadway re-striping and rumble strips installation project managed by Crawford County Board of Commissioners in Georgia. The project encompasses approximately 27.40 miles of various county roadways throughout Crawford County and involves the installation of roadway center line and edge line striping, along with rumble strips at intersections. Sealed bids were accepted until 1:00 pm on Thursday, August 20, 2026, at Crawford County Board of Commissioners, 640 GA Highway 128, Roberta, GA 31078. The successful contractor must furnish all labor, materials, equipment, and traffic control necessary to complete the project in compliance with current Georgia Department of Transportation (GDOT) Standard Specifications, Standard Details, and all applicable state and local requirements.
The contractor shall be responsible for all materials and labor, ensuring that all re-striping installations conform to current GDOT marking standards and construction specifications. The scope includes stop crossbars and thermoplastic striping at each intersection, with three thermoplastic rumble strips per stop sign. The contractor is also responsible for providing all necessary signage and traffic control during project execution. All bids must be submitted in a sealed envelope clearly marked "Roadway Re-Striping and Rumble Strips Bid" and accompanied by required Certificates of Insurance. The Crawford County Board of Commissioners reserves the right to reject any or all bids, waive technicalities or informalities, and accept the bid deemed to be in the best interest of Crawford County. Bid documents and the roadway list are available from Crawford County Board of Commissioners or the county website at www.crawfordcountyga.org.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Restriping Ad 2026.docx | DOCX document | |
| SAP Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE AND PROCEDURE
The Contractor shall be responsible for providing all material and labor for completion of the Project as proposed.
The Contractor shall be responsible for assuring all re-striping are installed per the current GDOT marking.
The Contractor shall be responsible for making sure the project is in compliance with current GDOT Construction Specifications and Standards.
Price is to also include stop crossbars, thermoplastic striping and thermoplastic rumble strips at each intersection (3 per stop sign).
The Contractor will be responsible for signage and traffic control during the project.