Attachment__1_-_Bid_Chart_Cucuta_Barrier_Wall.pdf
PDF 164 KB Posted
- Solicitation number
- SCO15017R0013
- Issued by
-
Department of State US Embassy Bogota
About this file
Attachment #1 - Bid Chart Cucuta Barrier Wall
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF STATE
BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS
1 2 3 4 5 6
DIVISION/DESCRIPTION LABOR MATERIALS OVERHEAD PROFIT TOTAL
1. General Requirements/Mobilization
2. Site Work
3. Concrete
4. Masonry
5. Metals
6. Wood and Plastic
7. Thermal and Moisture
8. Doors and Windows
9. Finishes
10. Specialties
11. Equipment
12. Furnishings
13. Special Construction
14. Conveying Systems
15. Mechanical
16. Electrical
TOTAL
Colombian Pesos
Allowance Items:
PROPOSAL PRICE TOTAL:
Alternates (list separately do not total)
Offeror: Date
OFICIAL BREAKDOWN CHART
PROJECT:
Place:
Date: Apr-17
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST SUB TOTAL TOTAL COST BY CHAPTER
1 PERIMETER CONCRETE T-WALL AT CUCUTA $ 0.00
1.01 GENERAL REQUIREMENTS $ 0.00
1.01.01 Geotechnical survey GBL 1.00
1.01.02 Location and Layout GBL 1.00
1.01.03 Temporary Facilities (Including enclousure) GBL 1.00
1.01.04 Excavations GBL 1.00
1.02 FOUNDATION STRUCTURES $ 0.00
1.02.01 Filling in compacted granular material GBL 1.00
1.02.02 Construction of Concrete T-Wall (as shown in drawings) GBL 1.00
1.02.03 Transportation GBL 1.00
VALUE DIRECT COSTS $ 0.00
A.U.P. - VAT $ 0.00
A . U . P .
Administration %
Unforenseens %
Profit %
VAT(Over the profit total value) %
TOTAL PROJECT(COLOMBIAN PESOS) $ 0.00
PERFORMANCE TIME (in calendar days)
Construction of Concrete T-Wall for CNP Base Perimeter
CNP BASE AT CUCUTA, NORTE DE SANTANDER
BASE CONTRACT
Item Description Unit Quantity Unit Price Total Price
Civil works
Excavations for piping m3 35
Excavations for foundations m3 150
Back fill for slab m3 100
Plaster for walls M
Electrical and Cabling works
110 Outlets Un 20
Voice and data outlets Un 14
Electrical channeling Ml 80
Furniture
Interlocutor Chairs Un 18
Work stations 1.50 Un 18
Floor to ceiling panels Ml 60
Admin costs %
Unforeseen
Profit %
Taxes IVA
DETAILED BIDDING CHART - Guide-
These are examples of how to present this chart. Note this is a guide and just some few examples were included and are not referenced to this specific project.
DIRECT COST
SUBTOTAL
TOTAL
File details come from the government source that posted it. Updated .