Attachment #1 - Bid Chart Cucuta Barrier Wall

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF STATE

BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS

1 2 3 4 5 6

DIVISION/DESCRIPTION LABOR MATERIALS OVERHEAD PROFIT TOTAL

1. General Requirements/Mobilization

2. Site Work

3. Concrete

4. Masonry

5. Metals

6. Wood and Plastic

7. Thermal and Moisture

8. Doors and Windows

9. Finishes

10. Specialties

11. Equipment

12. Furnishings

13. Special Construction

14. Conveying Systems

15. Mechanical

16. Electrical

TOTAL

Colombian Pesos

Allowance Items:

PROPOSAL PRICE TOTAL:

Alternates (list separately do not total)

Offeror: Date

OFICIAL BREAKDOWN CHART

PROJECT:

Place:

Date: Apr-17

ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST SUB TOTAL TOTAL COST BY CHAPTER

1 PERIMETER CONCRETE T-WALL AT CUCUTA $ 0.00

1.01 GENERAL REQUIREMENTS $ 0.00

1.01.01 Geotechnical survey GBL 1.00

1.01.02 Location and Layout GBL 1.00

1.01.03 Temporary Facilities (Including enclousure) GBL 1.00

1.01.04 Excavations GBL 1.00

1.02 FOUNDATION STRUCTURES $ 0.00

1.02.01 Filling in compacted granular material GBL 1.00

1.02.02 Construction of Concrete T-Wall (as shown in drawings) GBL 1.00

1.02.03 Transportation GBL 1.00

VALUE DIRECT COSTS $ 0.00

A.U.P. - VAT $ 0.00

A . U . P .

Administration %

Unforenseens %

Profit %

VAT(Over the profit total value) %

TOTAL PROJECT(COLOMBIAN PESOS) $ 0.00

PERFORMANCE TIME (in calendar days)

Construction of Concrete T-Wall for CNP Base Perimeter

CNP BASE AT CUCUTA, NORTE DE SANTANDER

BASE CONTRACT

Item Description Unit Quantity Unit Price Total Price

Civil works

Excavations for piping m3 35

Excavations for foundations m3 150

Back fill for slab m3 100

Plaster for walls M

Electrical and Cabling works

110 Outlets Un 20

Voice and data outlets Un 14

Electrical channeling Ml 80

Furniture

Interlocutor Chairs Un 18

Work stations 1.50 Un 18

Floor to ceiling panels Ml 60

Admin costs %

Unforeseen

Profit %

Taxes IVA

DETAILED BIDDING CHART - Guide-

These are examples of how to present this chart. Note this is a guide and just some few examples were included and are not referenced to this specific project.

DIRECT COST

SUBTOTAL

TOTAL