SCO-DPS-NGFortBragg-RTSM2 Classroom Replacement (8-2026) (003).pdf

PDF 145 KB Posted

Attached to
North Carolina Department of Public Safety – NC National Guard (NCNG) - Construction Facilities Management Office (CFMO)
Solicitation number
SCO-DPS-NGFortBragg-RTSM2 Classroom Replacement (8-2026) (003)
Issued by
Cumberland County, North Carolina

About this file

This is a Scope of Work document issued by the North Carolina Department of Public Safety – NC National Guard (NCNG) Construction Facilities Management Office (CFMO) for design and construction administration services. The project involves the replacement of an existing 3,550 square foot modular classroom facility at Fort Bragg, North Carolina with a new permanent structure. The design scope requires development of comprehensive plans and technical specifications for a facility containing four classrooms meeting modern occupancy standards, gender-segregated ADA-compliant latrines, staff breakroom, janitorial closet, administrative office space, and climate-controlled IT closet. The scope also includes civil and site drawings for outdoor improvements, including rinsing stations, perimeter security fencing, site grading with gravel surfacing, and an outdoor break area pavilion. The selected architect-engineering (A/E) firm will deliver a complete 100% design-bid-build package and subsequently provide comprehensive Construction Administration (CA) services during the construction phase, including submittal reviews, RFI responses, on-site quality inspections, and final commissioning. The solicitation closing date is Tuesday, September 15, 2026, at 4:00 pm, with submissions consisting of one copy of a Letter of Interest (not exceeding ten single-sided or five double-sided pages) and current Standard Form 254, submitted to the specified mailing address.

The total project budget is $1,353,000 with 100% state funding. Initial design funds are fully funded through Construction Documents (CD), while Bidding, Construction Administration, and Closeout are budgeted from the 2025-2027 Biennium, contingent upon receipt of state appropriations. The A/E firm must be properly licensed to practice architecture, engineering, or landscape architecture in North Carolina. Design standards shall follow NC State Construction Manual, Army Regulation 420-1, applicable NGR standards, the ARNG Design Guide 415-5, and Unified Facilities Criteria (UFC) standards including DoD Building Code and Installation Master Planning guidelines. Selection criteria include specialized expertise in similar projects, past performance, adequate staffing and consultant team capabilities, current workload, proposed design approach, experience with project costs and schedules, construction administration capabilities, familiarity with the Fort Bragg area, and record of successfully completed projects. Contact for questions is Spencer N. Colburn at (984) 664-7711 or spencer.n.colburn.nfg@army.mil.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department/Agency NC Department of Public Safety – NC National Guard (NCNG) - Construction Facilities Management Office (CFMO)

Project Title Fort Bragg - RTSM 2 Classroom Replacement Design Services Architecture/Engineering

Scope of Work

The objective of this contract is to secure professional Architect- Engineering (A/E) services to deliver a comprehensive, biddable design package and provide subsequent construction administration services for a facility replacement project. The A/E firm shall be responsible for conducting site investigations and developing complete plans, technical specifications, and independent government cost estimates (IGCE) to demolish an existing 3,550 SF modular, double-wide trailer classroom and construct a new, permanent replacement facility within the same footprint. The structure designed must accommodate four (4) classrooms configured to modern occupancy standards, gender-segregated ADA-compliant latrines, a staff breakroom, a janitorial closet, administrative office space, and a dedicated, climate-controlled IT closet.

Additionally, the design scope must include comprehensive civil and site drawings for exterior improvements, featuring outdoor rinsing stations with dedicated utility connections, a new perimeter security fence, site grading with heavy-use gravel surfacing, and a permanent outdoor break area pavilion.

Following the successful delivery and approval of the final 100% design-bid-build package, the A/E firm shall transition to providing comprehensive Construction Administration (CA) services to support the government throughout the construction phase.

During this construction phase, the designer shall act as the government's technical representative to oversee the General Contractor's (GC) execution of the work. The A/E's CA responsibilities shall include reviewing and approving contractor submittals, answering Requests for Information (RFIs), conducting periodic on-site quality assurance inspections to verify compliance with the approved design plans, and performing a final inspection to facilitate project commissioning and closeout.

This project is contingent upon receipt of State funds. Initial design funds are fully funded. These funds will support 100% design, through Construction Documents (CD).

Funding for Bidding, Construction Administration, and Closeout is budgeted from the 2025-2027 Biennium.

ADDRESS:

A-4505 Gruber Road, Fort Bragg, NC, 28310

The NCNG will provide planning documents, and other related program documents that detail potential future force structure and work activities on the complex for the Designer to Develop and Evaluate Alternatives.

As a federally funded, state executed project this project will follow both State and Federal guidelines. The design team should use the following references as basis for design and construction requirements:

NC State Construction Manual Army Regulation 420-1, Army Facilities Management, Chapter 10 NGR 415-5, Military Construction Program Execution NGR 420-10, Construction & Facilities Management Office Operations NG Pamphlet 415-12, Army National Guard Facilities Allowances ARNG Design Guide 415-5, General Facilities Information Design Guide Unified Facilities Criteria (UFC) 1-200-1, DoD Building Code w/ Change 3 Unified Facilities Criteria (UFC) 2-100-01, Installation Master Planning with Change 3

IN ADDITION TO the paper submittals, please email a PDF copy of the Letter of Interest and SF-254 to Gail Simms at gail.n.simms.nfg@army.mil for easier electronic sharing with the pre-selection committee members (hard copies are still required).

Contact Spencer N. Colburn Telephone (984) 664-7711 Email spencer.n.colburn.nfg@army.mil Total Project Budget $1,353,000 Source of Funds 100% State Funds Approved OC-25 # #202770920523 Publish Date August 25, 2026 Closing Date Tuesday - September 15, 2026 at 4:00 pm Submit ONE (1) Copies of Letter of Interest and SF-254 (Mailing Address):

North Carolina National Guard-CFMO-DCM Attn: Gail Simms 1636 Gold Star Drive Raleigh, NC 27607

Physical Location for Fed Ex/UPS Delivery (Delivery Address):

North Carolina National Guard-CFMO-DCM Attn: Gail Simms 1636 Gold Star Drive Raleigh, NC 27607

NC Licensing Statement

In order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. More information on the North Carolina state boards may be found at the following websites:

NC Board of Architecture: (http://www.ncbarch.org) NC Board of Examiners for Engineers & Surveyors:

(http://www.ncbels.org) NC Board of Landscape Architects: (http://www.ncbola.org) mailto:gail.n.simms.nfg@army.mil http://www.ncbarch.org/ http://www.ncbels.org/ http://www.ncbola.org/

STATE BUILDING COMMISSION - SELECTING CRITERIA

In selecting designers, the selection committee should take into consideration qualification information including such factors as:

1. Specialized or appropriate expertise in the type of project.

2. Past performance on similar projects.

3. Adequate staff and proposed design or consultant team for the project.

4. Current workload and State projects awarded.

5. Proposed design approach for the project including design team and consultants.

6. Recent experience with project costs and schedules.

7. Construction administration capabilities.

8. Proximity to and familiarity with the area where the project is located.

9. Record of successfully completed projects without major legal or technical problems.

10. Other factors which may be appropriate for the project.

STATE BUILDING COMMISSION - SUBMITTAL CRITERIA

Proposing firms must submit THREE (3) copies of the Letter of Interest and THREE (3) copies of your current Standard Form 254 (SF 254) with the information package. The current SF 254 template is located at http://ncadmin.nc.gov/businesses/construction/forms-documents which is the State Building Commission approved form.

In the interest of cost-savings to the designers, consistency of the submittals and more efficient use of time by the pre-selection committee, the submitted information package should not include any notebooks, binders, tab, clips, etc. The format should be 8-1/2" x 11" pages stapled in the upper left-hand corner. The Letter of Interest should not exceed ten (10) single-sided pages or five (5) double-sided pages plus the SF 254.

E-mail and Fax submittals will not be accepted.

http://ncadmin.nc.gov/businesses/construction/forms-documents

Fort Bragg - RTSM 2 Classroom Replacement
Project Title
Design Services
Scope of Work
The NCNG will provide planning documents, and other related program documents that detail potential future force structure and work activities on the complex for the Designer to Develop and Evaluate Alternatives.
Spencer N. Colburn
Contact
(984) 664-7711
Telephone
spencer.n.colburn.nfg@army.mil
Email
$1,353,000
Total Project Budget
100% State Funds
Source of Funds
Approved OC-25 #
Publish Date
Closing Date
Submit ONE (1) Copies of Letter of Interest and SF-254 (Mailing Address):
Physical Locationfor Fed Ex/UPS Delivery (Delivery Address):
NC Licensing Statement

File details come from the government source that posted it. Updated .