SCO-06-06920-03A- Addendum #2.pdf
PDF 680 KB Posted
- Attached to
- North Carolina Department of Natural & Cultural Resources - Division of Parks and Recreation
- Solicitation number
- SCO-06-06920-03A
- Issued by
- Orange County, North Carolina
About this file
Summary
This is Addendum No. 2 to the contract documents for the Hammocks Beach State Park Cow Channel Dredging project, issued by Andrew Consulting Engineers, P.C. on behalf of the North Carolina Department of Natural & Cultural Resources, Division of Parks and Recreation. The addendum announces a critical change to the bid submission deadline, moving it from Wednesday, July 22, 2026, at 3:00 PM to Thursday, July 30, 2026, at 3:00 PM. Sealed proposals must be delivered to the Hammocks Beach State Park Visitors Center, 1572 Hammocks Beach Road, Swansboro, NC 28584, addressed to Park Superintendent Sarah Kendrick in an opaque sealed envelope clearly marked with the proposal title, bidder name, and contractor's license number. The project involves dredging approximately 42,000 cubic yards of material from Cow Channel to a maximum depth of 8.0 feet below mean lower low water with a tolerance of plus or minus 1 foot, with dredged material placed on the ocean-side beach of Bear Island. General contractors must hold an Unlimited Building Contractor license classification under North Carolina General Statutes Chapter 87, Article 1. All work must comply with requirements of the North Carolina Department of Environmental Quality, the United States Army Corps of Engineers, and applicable state and federal regulations.
The addendum clarifies that sealed proposals cannot be submitted electronically and must be delivered in physical form to the specified location. Revised Specification Section 312000—Earth Moving is included as an attachment and governs the dredging, dike construction, spoil deposit management, and beach nourishment activities. The CAMA Major Permit (Permit No. 81-26), issued July 14, 2026, with an expiration date of July 14, 2031, authorizes excavation and filling in Onslow County adjacent to Cow Channel and the park ferry dock to the oceanfront of Bear Island. Key permit conditions include excavation depth limitations of 9 feet below mean lower low water level, maintenance of dredge pipe alignment, protection of coastal wetlands, proper handling of dredge material, and implementation of sedimentation and erosion control measures. Beach nourishment activities are prohibited from May 1 through November 15 without prior approval to protect sea turtles, and all contractors must schedule a pre-construction conference with the Division of Coastal Management prior to initiating any dredging or mobilization activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCO-06-06920-03A - NTB.pdf | ||
| SCO-06-06920-03A- Addendum #1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANDREW CONSULTING ENGINEERS, P.C.
STRUCTURAL, MARINE & FORENSIC ENGINEERING AND PROJECT MANAGEMENT
3811 PEACHTREE AVE SUITE 300 :: WILMINGTON, NC 28403 :: ANDREWENGINEERS.COM :: PHONE: 910.202.5555
ADDENDUM NO. 2
CONTRACT DOCUMENTS FOR: July 16, 2026 Hammocks Beach State Park Cow Channel Dredging Hammocks Beach State Park, Swansboro, NC
SCO ID #: 06-06920-03A
ACE Project #: 25001
The bid date HAS BEEN CHANGED From Wednesday, July 22, 2026, 3:00 PM to Thursday, July 30, 2026, 3:00 PM.
ATTENTION ALL BIDDERS:
The following items shall take precedence over drawings and specifications of the above named project, and shall become part of the contract documents. Any original item in the specifications or indicated on the drawings not herein specifically amended, voided, or suspended shall remain in effect. Failure to acknowledge receipt of this Addendum will result in the bid being deemed non-responsive.
The bidding date CHANGED: From Wednesday, July 24, 2026, 3:00 PM to Thursday, July
30, 2026, 3:00 PM.
The NC Division of Parks and Recreation has hired Andrew Consulting Engineers to be their representative on the project. Any and all correspondence must go through our office.
The following questions were submitted by prospective bidders to Andrew Consulting Engineers during the bidding period. The responses below constitute the official interpretation and clarification of the Contract Documents.
RESPONSE TO QUESTIONS:
Question No. 1 Are these bids allowed to be sent in electronically?
Response:
• Sealed proposals will be received by the North Carolina Department of Natural & Cultural. Resources Division of Parks and Recreation for the state of North Carolina, at Hammocks Beach State Park Visitors Center, 1572 Hammocks Beach Road, Swansboro, NC 28584, attention to the office of Sarah Kendrick, Park Superintendent
(Page 3 Project Manual).
• Proposals should be addressed as indicated in the Advertisement for Bids and be delivered, enclosed in an opaque sealed envelope, marked "Proposal" and bearing the title of the work, name of the bidder, and the contractor’s license number of the bidder. Bidders should clearly mark on the outside of the bid envelope which contract(s) they are bidding. (Page 8 Project Manual).
Question No. 2 In addition to asking if the bid can be submitted electronically, I need a definite answer from you in regard to what contractor license is required for this project. It is unfortunately not the Contractors decision on which to use, and we cannot ask the license board which license we should use being that we are not the engineers on this project. An Unlimited Building Contractors license CAN NOT be used for projects that require an Unlimited Marine Contractors license and vice versa, thus making it pretty important that you let us know what this project requires being that you are the engineers on the project. If in fact this project requires an Unlimited Building Contractors license, which is very clearly described in the specs, then this is a project that we will not be able to bid, being that we are not licensed as a Building Contractor. I however think that the specs are incorrect and where not put together with the mindset of this being a marine proejct, but the fact that you are doing piling work (which should still fall under a marine license) and also having to repave a road to specs that were not provided, that could trigger needing a building contractors license.
Response:
• General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for Unlimited Building Contractor (Page 4).
REVISIONS TO THE CONTRACT DOCUMENTS:
The Contract Documents are revised as follows:
Specification Revisions:
Specification Section 312000 - Earth Moving has been revised.
Guidelines must follow the permit and all contract documents.
ATTACHMENTS:
Revised Specification 312000 - Earth Moving Other: CAMA Major Permit
Except as specifically modified by this Addendum, all other requirements of the Contract Documents shall remain unchanged and in full force and effect.
ACKNOWLEDGEMENT: I acknowledge receipt of Addendum No. 2 and include it with the Contract Documents.
Company: ___________________________________________________ Printed Name: ______________________________________________ Signature: ___________________________________________________
By:____________________________________ Date:_______________
END OF ADDENDUM NO. 2
EARTH MOVING 312000 - 1
Hammocks Beach State Park
Cow Channel Dredging
SCO #06-06920-03A
SECTION 312000 - EARTH MOVING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Excavating and filling for rough grading the Site.
2. Dredging
3. Construction of dikes and flow structures for spoil deposits.
B. Related Requirements:
1. Section 013200 "Construction Progress Documentation"
1.2 UNIT PRICES
A. Work of this Section is affected by unit prices for hydraulic dredging specified in
Section 012200 "Unit Prices."
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct preinstallation conference at Project site with Engineer, Owner, and NC Division of Coastal Management representatives.
1. Review methods and procedures related to earthmoving, including, but not limited to, the following:
a. Personnel and equipment needed to make progress and avoid delays.
b. Coordination of Work and equipment movement with the locations of tree- and plant-protection zones.
c. Field quality control.
1.4 FIELD CONDITIONS
A. Every reasonable effort has been made to provide accurate information on existing site conditions. The Contractor should become familiar with the site and satisfy himself as to the scope of the work involved and the materials to be encountered. Any significant change in conditions should be immediately brought to the attention of the Owner's representative.
B. Do not commence earth-moving operations until temporary site fencing and erosion- and sedimentation-control measures specified in Section 015000 "Temporary Facilities and
Controls" are in place.
EARTH MOVING 312000 - 2
Cow Channel Dredging
SCO #06-06920-03A
PART 2 - EXECUTION
2.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth-moving operations.
B. Protect and maintain erosion and sedimentation controls during earth-moving operations.
C. All lines and grades necessary for accomplishing the work shall be the responsibility of the
Contractor. After dredging, soundings shall be made by the Engineer for payment purposes.
D. Permits: The dredge permits required by the State of North Carolina and U.S. Army Corps of
Engineers has been obtained by the Owner. The Contractor shall be responsible for all other requirements for obtaining permits, navigational notices, approvals, safety compliance, etc.
2.2 DREDGING
A. It is the intention of the Owner under the provisions of this contract to accomplish dredging and or excavating as required to obtain the depths indicated on the drawings. It will be the responsibility of all bidders to carefully examine the site and determine requirements of the work necessary to accomplish this dredging. Dredging excavation shall be classified as
“unclassified” which shall require the dredging contractor to remove material in the indicated dredge area to the depths shown and dispose of this in the spoil area. Dredging may be done by hydraulic dredge and/or other approved equipment, etc., at the Contractor’s option and subject to approval by CAMA.
B. Side slopes are a requirement of this contract. Method of shaping shall be the Contractor’s choice. Dredge cut alignment shall be within plus or minus 5 feet average distance of lines shown. Dredge depth shall be 8.0 feet below Mean Low Water with an average tolerance of plus or minus 1 foot. Cuts made beyond the lines shown or below the 1 foot tolerance will not be paid for and shall be the Contractor’s responsibility. Areas shallower than 8 feet below Mean
Low Water shall be re-dredged to 8 feet below Mean Low Water prior to payment. Contractor shall take all necessary precautions and obtain the Park Staff’s or applicable jurisdiction’s approval for installation and routing of hydraulic piping and pumping activity from Cow
Channel to Bear Island.
2.3 DIKES AND SPILLWAYS
A. All spoil areas will be diked to fully contain all dredging materials. A different type of spillway may be used provided the Contractor submits a drawing of such and obtains approval for its use prior to construction. The proper maintenance of all dikes, spillways, pipes and devices necessary for control of the deposited material shall be part of this contract and no separate payment will be made for such. Placement of dredging material in the indicated spoil area shall be controlled in accordance with the requirements of the State Department of Environmental
Quality and the U.S. Army Corps of Engineers. Deposits shall be made above the high water line in confined areas to allow solids to settle within. Direct discharge into any existing body of
EARTH MOVING 312000 - 3
Cow Channel Dredging
SCO #06-06920-03A
water or wetland is strictly prohibited. Deposit or discharge shall not alter existing drainage ditches and canals. Fill placement shall be in uniform deposits no thicker than 3 feet.
Overfilling shall be removed at the Contractor’s expense.
2.4 CLEARING
A. Any trees and other vegetation in the designated spoil areas which will hamper filling activities shall be removed prior to the placement of fill. These methods will be disposed of off-site at an acceptable location selected by the Contractor. The Contractor shall furnish proof to the owner’s representative that all excess debris has been disposed of legally off the park property.
Clearing will be required directly in front of the weir structure to allow water flow into the structure.
B. On Bear Island, clearing may be required in areas where vegetation restricts access to the dredge pipeline. It is not anticipated that over-vegetated areas will exist at the time of the
Dredging, but if vegetation is present the guidelines for removing and disposing of it shall follow the same parameters as set forth in the above paragraph and any clearing must be approved by Park staff prior to commencing work.
2.5 MEASUREMENT
A. The cross sections and grades established and shown on the plans shall be considered to be pre -dredging existing grade. After dredging, soundings shall be made for determining conformity to contract requirements. Should the cross section provided be less than the average tolerance stated, the Owner shall have the right to take either of the following actions at his sole option:
1. Require the Contractor to accomplish additional work sufficient to complete the cross section.
2. Terminate the contract and deduct from the contract amount monies sufficient to cover uncompleted work based on the formula: contract amount divided by total cubic yards equals unit price adjustment.
3. Terminate the contract and employ others to complete the work and deduct from the contract amount sufficient funds required to accomplish the work.
2.6 EXCESS WATER CONTROL
A. Grade and maintain all areas of the site to preclude surface run off into excavations and prevent ponding of water and redirect all concentrated flow through erosion control measures.
2.7 FINISH GRADING
A. Perform finish grading to the lines and grades shown on the drawings. Finished grades should be smooth and uniform and provide positive drainage. Provide a smooth transition between adjacent existing grades and new grades.
EARTH MOVING 312000 - 4
Cow Channel Dredging
SCO #06-06920-03A
PART 3 - EXECUTION
3.1 BEACH TOPOGRAPGIC SURVEYS
A. The Contractor shall retain a North Carolina Registered Professional Land Surveyor to perform a topographical survey of the entire beach placement area prior to commencement of beach placement operations and upon completion of the Work.
B. The pre-construction survey shall be completed within three (3) months prior to commencement of beach placement activities. The post-construction survey shall be completed within three (3) months following completion of beach placement activities, or as otherwise required by the applicable permits.
C. Surveys shall document the project limits, final grades, Mean High Water (MHW) Line, and beach profile transects, and shall be referenced to the project horizontal and vertical datums.
D. Submit survey deliverables to the Engineer in both AutoCAD (.dwg) and PDF format.
E. Surveys shall satisfy the applicable permit monitoring requirements.
3.2 GRAIN SIZE QUALITY CONTROL AND DOCUMENTATION
A. During the first week of placing dredge material on the beach, the contractor shall collect one (1) grab sample per day for photographic representation of the dredge material. The material shall be placed on a piece of white paper for photographing, and the photos shall be submitted to the DCM, USACE, NC FWS, and US FWS and within 24 hours of being taken for their review and comment. In addition, grain size quality control (QC) samples should be collected from the three zones on the beach face (i.e., toe of dune, berm crest, and intertidal beach) at least once during this period.
B. After the first week and for the duration of the beach nourishment work, one (1) grab sample per week and one (1) grain size QC sampling, within the three zones of the beach face, shall be performed. Photos of the grab samples shall be submitted to the DCM, USACE, NC FWS, and US FWS and within 24 hours of being taken. The results of the grain size QC sampling shall be kept in a log and provided immediately upon request of any regulating agency representative.
C. Photographs shall be dated, include the approximate project station or location, and clearly document the appearance and color of the placed material.
D. The grain size quality control (QC) samples shall be collected and analyzed in accordance with 15A NCAC 07H .0312.
END OF SECTION 312000
Permit Class Permit Number
NEW 81-26
STATE OF NORTH CAROLINA
Department of Environmental Quality and Coastal Resources Commission for
X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to NC Div. of Parks & Recreation – Hammocks Beach SP, 1615 Mail Service Center, Raleigh, NC 27699
Authorizing development in Onslow County adj. to Cow Channel and the Park ferry dock to the
Oceanfront of Bear Island, as requested in the permittee’s application submitted 3/24/26 (PA-2057), including attached workplan drawings (8), G-001,C-101,C-102,C-301,C-302,C-303,C-304,C-501 all dated “Rev 3/12/26”.
This permit, issued on July 14, 2026 , is subject to compliance with the application (where, consistent with the permit), all applicable regulations, special conditions set forth below. Any violation of these terms may be subject to civil or criminal penalties; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered hereunder requires further Division approval.
All work must cease when the permit expires on
July 14, 2031
In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program.
Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission.
for Tancred Miller, Director Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Excavation
1) No excavation shall take place outside of the area indicated on the workplan drawings. [07H
.0208(b)(1)]
2) Excavation shall not exceed -9 feet below the mean lower low water level. In no case shall the depth of excavation exceed the depth of connecting waters. [07H .0208(b)(1)]
3) The dredge pipe alignment shall follow the alignment as depicted in the workplan drawings. [07H
.0208(b)(2)]
4) In order to prevent leakage, dredge pipes shall be routinely inspected. If leakage is found and repairs cannot be made immediately, pumping of material shall stop until such leaks are fixed. [113-229(e)] (See attached sheets for Additional Notes and Conditions)
NC Div. of Parks & Recreation – Hammocks Beach SP Permit No. 81-26
ADDITIONAL NOTES AND CONDITIONS
5) The permittee is responsible for properly installing and maintaining appropriate warning and marking devices to alert the boating public of any navigation dangers along the dredge pipe alignment. All warning and marking devices shall be installed and maintained in accordance with the U.S. Coast Guard Standards. [113-229(e); 113A-120(b); 07H .0208(a)(2)(G)]
6) In accordance with commitments made by the permittee, no excavation shall take place within 10 feet of any Coastal Wetlands. [07H .0208(b)(1); 07H .0205; 07J .0202(c)]
Beach Nourishment
7) This permit authorizes beach nourishment activities to be carried out one (1) time along the entire reach of the requested project area. Any request to carry out additional activities within an area where nourishment activities have been completed under this permit shall require a modification of this permit.
[G.S. 113A-120(b); G.S. 113-229(e); 07J .0202(c)]
NOTE: The permittee is advised that the State of North Carolina claims title to all currently submerged lands and any future lands that are raised above the mean high-water level as a result of this project. [G.S. 146-6]
8) Prior to initiation of beach nourishment activity along each section of beach, the existing mean high water line shall be surveyed, and a copy of the survey provided to the Division of Coastal Management.
[G.S. 146-6(f)]
9) The seaward nourishment limit shall be conducted in accordance with the attached work plats labeled C- 102 dated “Rev 3/12/26”. [07J .0202(c)]
10) The applicant shall continually monitor and inspect the material while active pumping is taking place.
Should dredging operations encounter sand deemed non-compatible with 15A NCAC 07H .0312 (Technical Standards for Beach Fill Projects), the dredge operator shall immediately cease operation and contact the Division of Coastal Management (DCM). Dredge operations shall resume after resolution of the issue of sand compatibility.
11) All fill material shall be clean and free of any pollutants except in trace quantities. [G.S. 113A-120(b);
G.S. 113-229€; 07H .0208(a)(G)(2); 07J .0208(a)]
12) Once a section is complete, piping and heavy equipment shall be removed or shifted to a new section and the area graded and dressed to final approved slopes. [113-229(e)]
13) Fill shall tie into exiting profile elevations and not create any troughs, back slopes or areas where water can pond. [07J .0208(a); 07H .0306(a)(7)]
14) Land-based equipment necessary for beach nourishment work shall be brought to the site through existing accesses. Should the work result in any damage to existing accesses, the accesses shall be restored to pre-project conditions immediately upon project completion in that specific area. [G.S.
113A-120(6); G.S. 113A-120(9); 07H .0308(c)(1); 07H .0308(c)(8)]
15) In accordance with commitments made by the permittee, and in order to protect threatened and endangered species and to minimize adverse impacts to offshore, nearshore, intertidal and beach resources, no fill or beach nourishment activities, including mobilization and demobilization, shall occur from May 1 to November 15 of any year without prior approval from the Division of Coastal Management in consultation with the appropriate resource agency personnel. [G.S. 113- 229(e); G.S.
113A-120; 07H .0312(4)(a)]
Monitoring
16) In order to ensure protection of sea turtles, the permittee shall implement the following activities throughout the entire project area from May 1 through November 15 for the duration of the authorized project, unless altered herein; [G.S. 113- 229(e); G.S. 113A-120(b)]
a) In each case of observation of sea turtles (nesting females, hatchlings or eggs) during nourishment activities, designated local personnel shall immediately be notified for further assistance;
b) Visual surveys for escarpments along the project area shall be made immediately after completion of sand placement, and within 30 days prior to May 1 for two subsequent years after any construction or sand placement event. Escarpments shall be leveled and the beach profile reconfigured to minimize scarp formation by May 1. Escarpment removal shall be reported by location and the NCWRC and the USFWS shall be contacted immediately if subsequent reformation of escarpments that interfere with sea turtle nesting or exceed 18 inches in height for a distance of 100 feet occur during the nesting and hatching season to determine the appropriate action to be taken.
Navigational Aids
17) Unless specifically altered herein, this permit authorizes the removal, replacement and/or relocation of existing day markers and the installation of 8-day marker type navigational aids, all as expressly and specifically set forth in the attached permit application and workplan drawings. [07H .0208(a)(1)]
18) The navigational aids shall conform with any and all appropriate regulations governing such structures, including but not limited to marking and lighting requirements of the N.C. Wildlife Resources Commission and/or the U.S. Coast Guard. [07H .0208(a)(2)(G)]
USACE Conditions [G.S. 113-229(a); G.S. 113A-107(a)]
NOTE: In order to satisfy Private Aids to Navigation (PATON) requirements of the U.S. Coast Guard
(USCG), a PATON application must be approved by the USCG prior to dredging or aids operations.
Sedimentation and Erosion Control
19) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. [07H .0208(a)(2)(B); 07H .0209(d)(4)]
20) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. [07H .0208(a)(2)(B); 07H .0209(d)(4)]
General
21) Any mitigative measures or environmental commitments specifically made by the applicant in the narrative for this project shall be implemented, regardless of whether or not such commitments are addressed by individual conditions of this permit. [07H .0208(a)(2)]
22) Sediment sample monitoring and quality control logs shall be provided to the DCM when available or requested. An updated survey showing current beach conditions shall be performed within 3 months of project initiation for the entire project area and plans with updated survey conditions shall be submitted to DCM and USACE. These plans shall be approved by DCM and USACE prior to the initiation of construction. An additional survey or approval may be required in the case of significant changes in shoreline. Any additional surveys not detailed here but required by the USACE shall also be provided to DCM. [G.S. 113A-120(b); G.S. 113-229(e); 07J .0209(c)]
23) The permittee and/or his contractor shall provide for proper storage and handling of all oils, chemicals hydraulic fluids, etc., necessary to carry out the project. [G.S. 113A-120(b); G.S. 113-229(e)]
24) All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the National Response Center at (800) 424-8802 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. [07H .0208(a)(2)(A); 07H .0208(a)(2)(B)]
25) If the crossing of wetlands or public trust bottom with mechanized construction equipment is necessary, a single 10ft wide construction corridor shall be utilized for the areas to be crossed. If temporary mats are used the mats shall be anchored to prevent movement and removed immediately upon completion of construction. If the post-project elevation of the work corridor is rutted or otherwise significantly impacted, the permittee shall restore the affected area to pre-project elevations. [07H .0205]
26) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. [07J .0406(b)]
27) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. [07J .0209(a); G.S. 113A-120(b)]
28) In order to ensure compliance with the conditions of this Permit, the permittee and their contractor shall schedule a pre-construction conference with the Division of Coastal Management prior to the initiation of any dredging or mobilization activities. [07J .0209(a)]
NOTE: A CAMA/Dredge and Fill Permit is a determination that the proposed development meets the CAMA/Dredge and Fill laws and CRC’s rules for coastal development. It is not a determination of private property ownership or an authorization to trespass onto property owned by someone other than the Permittee.
NOTE: This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. Any development authorized under this permit that occurs prior to the expiration of the twenty (20) day appeal period or completion of an appeal process, shall be done at the permittee’s risk.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required.
NOTE: The permittee is strongly advised to review and understand all additional permits, approvals or authorizations that may be required, including but not limited to any permits, approvals or authorizations provided by the N.C Division of Water Resources, U.S. Army Corps of Engineers and other state and local regulatory agencies.
NOTE: The N.C. Division of Water Resources has authorized the proposed project under Individual
Water Quality Certification No. 008999 (DWR Project No. 2026-0552). The water quality certification shall expire on the same day as the expiration date of the corresponding federal permit that is current at the time the certification was issued.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW-2026-00810). The Programmatic General Permit 198000291 used to authorize this project expires 12/31/26.
NOTE: Future development of the permittee’s property may require a modification of this permit. Contact a representative of the Division at (252) 515-5400 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high-water level.
NOTE: An application processing fee of $563 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources.
| ATTENTION ALL BIDDERS: |
| RESPONSE TO QUESTIONS: |
| Question No. 1 |
| Question No. 2 |
| REVISIONS TO THE CONTRACT DOCUMENTS: |
| ATTACHMENTS: |