This document contains a schedule of values and solicitation for the demolition of two buildings. The schedule of values provides line item details for the demolition of Buildings 1101 and 1103 at the Spring Creek School in St. Francis, South Dakota. It includes specifications for the removal of concrete slabs, walls, roofing materials, and temporary irrigation, as well as site work such as backfilling, hydroseeding, and installation of crushed stone base and concrete slabs. The related solicitation is set aside for Native American-owned small businesses under the Buy Indian Act. Quotes must be submitted to the Bureau of Indian Affairs by July 16, 2021 at 3:00pm Eastern Time. A pre-bid site visit will take place on June 28, 2021 at 11:00am Central Time at the Spring Creek School. The selected offeror will demolish Buildings 1101 and 1103 per the specifications in the schedule of values.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line Qty Unit Material Labor Equipment Total

1 Moblization LS

2 Erosion Control LS

3 CHAIN LINK CONSTRUCTION FENCE

4 INSTALL 6' HIGH FENCE

5 450 LF

6 Chain link driveway gates

7 INSTALL 6' HIGH GATE

8 25 LF

9 DEMOLITION OF SITE:

10 Removal of reinforced concrete sidewalks

11 (55 SF per CY)

12 1525 SF

13 Underground double wall steel oil storage tanks

14 1,500 gallon

15 1 Ea

16 DEMOLITION OF BUILDING:

17 OVEREXCAVATION OUTSIDE BUILDING FOUNDATION

18 600 LF

19 BACKFILL AND COMPACTION OF OVEREXCAVATION

20 1800 CY

21 Water for Compaction of Fill

22 1 LS

23 BASEMENT

24 Removal of steel reinforced concrete slab in basement

25 4 slab thickness (55 SF per CY)

26 2100 SF

27 Removal of concrete walls, 12 thick

28 (20 SF per CY and 46 lbs. per SF)

29 3000 SF

30 Removal of steel reinforced concrete foundations

31 12 W x 24 D ( 9 LF per CY)

32 375 LF

33 1ST FLOOR

34 Removal of steel reinforced concrete slab over basement

35 8 slab thickness (30 SF per CY)

36 2100 SF

37 Removal of non‐reinforced floor slab concrete slabs

38 4 slab thickness (60 SF per CY )

39 3500 SF

40 Removal of floor assemblies main level

41 2 x 10 (88 SF per CY and 5.42 lbs. per SF)

42 3600 SF

43 Removal of stud walls main level walls

44 2 x 6 (190 SF per CY and 3.74 lbs. per SF)

45 4000 SF

46 2ND FLOOR

47 Removal of floor assemblies upper level

48 2 x 10 (88 SF per CY and 5.42 lbs. per SF)

49 2300 SF

50 Removal of stud walls upper level

51 2 x 6 (190 SF per CY and 3.74 lbs. per SF)

52 2000 SF

Main Building #1101

Schedule of Values

Spring Creek School Demolition

Date ‐ April‐2021

Main Building #1101

Schedule of Values

Spring Creek School Demolition

Date ‐ April‐2021

53 Roofing Demolition

54 Asphalt shingles (2.50 Sq per CY)

55 50 SQ

56 Fink truss W”, 2” x 4” top and bottom chords

57 40' to 50' span

58 3600 SF

59 Removal of plywood on roof and walls

60 (200 SF per CY and 2 lbs. per SF)

61 9000 SF

62 NEW SITE WORK

63 Slab base, crushed stone

64 4 base (1.23 CY per CSF)

65 240 SF

66 Slabs, walks and driveways

67 4 thick

68 240 SF

69 Leveling the surface for lawn or planting bed

70 By hand, 110 SY per hour

71 1225 SY

72 Work grass seed into soil

73 By hand, 220 SY per hour

74 1225 SY

75 Hydroseeding subcontract

76 10,001 to 20,000 SF job

77 11 MSF

78 Large sprinkler irrigation systems

79 TEMPORARY IRRIGATION

80 11000 SF

81 Environmental Work

82 Asbestos removal

83 FLOOR TILE

84 1100 SF

86 Total

1 Moblization LS

2 Erosion Control LS

3 CHAIN LINK CONSTRUCTION FENCE

4 INSTALL 6' HIGH FENCE

5 LF

6 Chain link driveway gates

7 INSTALL 6' HIGH GATE

8 LF

9 DEMOLITION OF SITE:

10 Removal of reinforced concrete sidewalks

11 (55 SF per CY)

12 SF

13 Underground double wall steel oil storage tanks

14 1,500 gallon

15 Ea

16 DEMOLITION OF BUILDING:

17 OVEREXCAVATION OUTSIDE BUILDING FOUNDATION

18 LF

19 BACKFILL AND COMPACTION OF OVEREXCAVATION

20 CY

21 Water for Compaction of Fill

22 LS

23 BASEMENT

24 Removal of steel reinforced concrete slab in basement

25 4 slab thickness (55 SF per CY)

26 150 SF

27 Removal of concrete walls, 12 thick

28 (20 SF per CY and 46 lbs. per SF)

29 SF

30 Removal of steel reinforced concrete foundations

31 12 W x 24 D ( 9 LF per CY)

32 LF

33 1ST FLOOR

34 Removal of steel reinforced concrete slab over basement

35 8 slab thickness (30 SF per CY)

36 SF

37 Removal of non‐reinforced floor slab concrete slabs

38 4 slab thickness (60 SF per CY )

39 SF

40 Removal of floor assemblies main level

41 2 x 10 (88 SF per CY and 5.42 lbs. per SF)

42 SF

43 Removal of stud walls main level walls

44 2 x 6 (190 SF per CY and 3.74 lbs. per SF)

45 300 SF

46 2ND FLOOR

47 Removal of floor assemblies upper level

48 2 x 10 (88 SF per CY and 5.42 lbs. per SF)

49 SF

50 Removal of stud walls upper level

51 2 x 6 (190 SF per CY and 3.74 lbs. per SF)

52 SF

Garage Building #1103

Schedule of Values

Spring Creek School Demolition

Date ‐ April‐2021

Garage Building #1103

Schedule of Values

Spring Creek School Demolition

Date ‐ April‐2021

53 Roofing Demolition

54 Asphalt shingles (2.50 Sq per CY)

55 2 SQ

56 Fink truss W”, 2” x 4” top and bottom chords

57 40' to 50' span

58 3600 SF

59 Removal of plywood on roof and walls

60 (200 SF per CY and 2 lbs. per SF)

61 9000 SF

62 NEW SITE WORK

63 Slab base, crushed stone

64 4 base (1.23 CY per CSF)

65 SF

66 Slabs, walks and driveways

67 4 thick

68 SF

69 Leveling the surface for lawn or planting bed

70 By hand, 110 SY per hour

71 50 SY

72 Work grass seed into soil

73 By hand, 220 SY per hour

74 50 SY

75 Hydroseeding subcontract

76 10,001 to 20,000 SF job

77 0.5 MSF

78 Large sprinkler irrigation systems

79 TEMPORARY IRRIGATION

86 Total

0.07143

0.075

0.04