This document contains a schedule of material submittals and a related federal contract opportunity notice. The material submittals schedule outlines 73 line items of products and documents required to be submitted by the contractor for a project to repair dormitories at Building 114. Submittals include items like construction schedules, safety plans, equipment specifications, warranties, and as-built drawings. Due dates for initial submissions and resubmissions are specified. The related federal contract opportunity is a solicitation to perform repairs to RPR Dormitories Building 114 with an estimated value between $500,000 and $1,000,000 USD. A pre-proposal site visit will be held on June 4th, and final proposals are due by July 23rd. In accordance with agreements between the US and Spain, Spanish materials, labor, and equipment should be used where feasible for the project requirements. Funding is not presently guaranteed and no award will be made until funds are available.

View the file

Other files for this federal contract opportunity

Other files attached to RPR Dormitories Bldg 114, newest first.
File Type Posted
Amendment FA557521B00030001 SF 30.pdf PDF
DRAWINGS 21-1003.pdf PDF
Solicitation Amendment FA557521B00030001.pdf PDF
Attachment A - Integrated Natural Resources Management Plan for Moron Air Base.pdf PDF
Specifications Dated 26 Feb 2021.pdf PDF
Solicitation FA557521B0003.pdf PDF
Especificaciones Dated 26 Feb 2021.pdf PDF
Construction Cost Estimate KTOR 21-1003 R1.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 21-1003PROJECT TITLE

RPR DORMITORIES, BUILDING 114

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 01
01Warranty letter1Acceptance+15
02Construction Schedule1CNTP+7
03Progress Schedule1CNTP+10
04Work Plan1CNTP+7
05Mobility Plan1CNTP+15
06Project Sign1CNTP+15
07Quality Control Plan1CNTP+15
08Environmental Protection Plan1CNTP+15
09DD Form 13541FI+15
10Waste & construction debris management1Final Inspection
11As-Built drawings1FI+15
12Spatial Data1As Built+10
13Key Staff1CNTP+15
14Health and safety Plan1CNTP +15
SECTION 01 11 02
15Work Phasing Plan1Commencement of work - 15
16Operation & Maintenance (O&M) Manuals1FI + 15
SECTION 06 20 00
17Compartment system1
18Prefabricated millwork1
19Frame profiles and panel finishes1
SECTION 07 92 00
20Sealants, primers and bond breakers1
SECTION 08 14 00
21Wood doors11
SECTION 08 71 00
22Hardware items1
23Installation1
24Master Keying Program1
SECCIÓN 09 23 24
25Repair mortar1111
26Repair Tape1111
27Waterproof paint1111
SECTION 09 90 00
28Coating and/or product furnished1
29Delivery notes1
SECTION 10 28 13
30WC bowl and cover1
31Shower head1
32Wash basin1
33Urinal1
SECTION 23 73 33
34Radiator regulating valve1
35Wall exhaust fan1
36Thermostat1
37Fan coil supply grille1
38Vertical fan coil1
39Condition Report1
SECTION 26 20 00
40Power Installation Drawings110 Working days before electrical works start date
41RMC Conduit and fittings, 1 x type1
42EMT Conduit and fittings, 1 x type1
43Flexible Metal Conduit and fittings (one of each type)1
44Outlet boxes and covers1
45Panelboard doors, covers and required accessories1
46Receptacles1
47Toggle Switches1
48Device Plates1
49Occupancy sensor switches1
50Field Test Plan130 Calendar days before testing date
51Exhaust System Operational Test1
SECTION 26 51 00
52Lighting Installation Drawing110 Working days before electrical works start date
53Lighting fixtures (all types)1
54Lamps (all types)1
55Fluorescent electronica ballasts1
56LED Drivers1
57Emergency lighting equipment1
58Fixture mounting hardware1
59Local/Regional Materials1
60Field Test Plan130 Calendar days before testing date
61Operating Test1
62Electronic Ballast Warranty11
63LED Luminaire Warranty/Useful Life Certificate1
SECTION 28 31 60
64Fire Alarm Installation Drawing110 Working days before fire alarm works start date
65Heat detectors1
66Smole alarms1
67Manual pull stations1
68Audiovisual device1
69Field Test Plan130 Calendar days before testing date
70Qualifications of installer1
ANNEX 2
71Fire door1
ANNEX 3
72Curtain's bar, ring and pleat hooks111111
73Curtain fabric111111

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 21-1003TÍTULO DE PROYECTO:
REPARAR DORMITORIOS, EDIFICIO 114SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMERO DE COPIAS REQUERIDAS
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 01
1Carta de garantía1Antes de Inspección final (IF)
2Plan de obra1CNTP+7
3Programa de avance de obras1CNTP+10
4Plan de obra1CNTP+7
5Plan de movilización1CNTP+15
6Cartel de proyecto1CNTP+15
7Plan de control de calidad1CNTP+15
8Plan de protección medioambiental1CNTP+15
9Formularino DD 13541Inspección Final + 15
10Certificado de gestión de residuos y escombros1Antes de Inspección final (IF)
11Planos As-Builts1Inspección Final + 15
12Datos espaciales1Antes de Inspección final (IF), tras la aprobación de as-builts + 10
13Personal Clave1CNTP+15
14Plan de salud y seguridad1CNTP+15
SECCIÓN 01 11 02
15Plan de Fases del Trabajo1Comienzo de los Trabajos - 15
16Manuales de Operación y Mantenimiento1Antes de Inspección final (IF) + 15
SECCIÓN 06 20 00
17Sistema de compartimentación1
18Carpintería prefabricada1
19Perfilería y acabado de paneles1
SECTION 07 92 00
20Sellantes, imprimación y desencofrantes1
SECCIÓN 08 14 00
21Puertas de madera11
SECCIÓN 08 71 00
22Componentes de cerrajería1
23Instalaciones11
24Programa de amaestramiento de llaves1
SECCIÓN 09 23 24
25Mortero de reparación1111
26Venda reparadora1111
27Pintura antihumedad1111
SECTION 09 90 00
28Revestimientos y/o productos provistos1
29Albaranes de envio1
SECCIÓN 10 28 13
30Asisento/tapa inodoro1
31Rociador ducha1
32Lavabo1
33Urinario1
SECCIÓN 23 73 33
34Válvula de regulación termostática de radiador1
35Extractor de pared1
36Termostato1
37Rejilla de impulsión de fan coil1
38Fan coil vertical1
39Informe de inspección1
SECCIÓN 26 20 00
40Planos de Distribución de Fuerza110 Días hábiles antes de comienzo de trabajos eléctricos
41Tubo RMC y accesorios, 1 x tipo1
42Tubo EMT y accesorios, 1 x tipo1
43Conducto flexible metálico y accesorios, 1 x tipo1
44Cajas y tapas para mecanismos1
45Puertas de cuadros, tapas y accesorios necesarios1
46Enchufes1
47Interruptores1
48Placas de mecanismos1
49Sensores de movimiento1
50Plan de Pruebas en Campo130 Días naturales antes de fecha de pruebas
51Prueba de funcionamiento sistema de extracción1
SECCIÓN 26 51 00
52Planos de Distribución de Alumbrado110 Días hábiles antes de comienzo de trabajos eléctricos
53Aparatos de alumbrado (todos los tipos)1
54Lámparas (todos los tipos)1
55Reactancias fluorescentes electrónicas1
56Drivers LED1
57Equipos de alumbrado de emergencia1
58Material montaje de luminarias1
59Materiales Locales/Regionales1
60Plan de Pruebas en Campo130 Días naturales antes de fecha de pruebas
61Ensayos de funcionamiento1
62Garantía de Reactancias Electrónicas1
63Garantía de Luminarias LED1
SECCIÓN 28 31 60
64Planos de Distribución de Alarma de Incendios110 Días hábiles antes de comienzo de trabajos de alarma de incendios
65Detectores de calor1
66Detectores autónomos de humo1
67Tiradores manuales1
68Dispositivos audiovisuales1
69Plan de Pruebas en Campo130 Días naturales antes de fecha de pruebas
70Cualificaciones del instalador1
ANEXO 2
71Puerta contraincendios1
ANEXO 3
72Barra, anillas y ganchos para cortinas111111
73Materialk de cortina111111

File details come from the government source that posted it. Updated .