Schedule of Material Submittals R1.xlsx
XLSX spreadsheet 52 KB Posted
- Attached to
- RPR Dormitories Bldg 114 Federal contract opportunity
- Solicitation number
- FA557521B0003
About this file
This document contains a schedule of material submittals and a related federal contract opportunity notice. The material submittals schedule outlines 73 line items of products and documents required to be submitted by the contractor for a project to repair dormitories at Building 114. Submittals include items like construction schedules, safety plans, equipment specifications, warranties, and as-built drawings. Due dates for initial submissions and resubmissions are specified. The related federal contract opportunity is a solicitation to perform repairs to RPR Dormitories Building 114 with an estimated value between $500,000 and $1,000,000 USD. A pre-proposal site visit will be held on June 4th, and final proposals are due by July 23rd. In accordance with agreements between the US and Spain, Spanish materials, labor, and equipment should be used where feasible for the project requirements. Funding is not presently guaranteed and no award will be made until funds are available.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment FA557521B00030001 SF 30.pdf | ||
| DRAWINGS 21-1003.pdf | ||
| Solicitation Amendment FA557521B00030001.pdf | ||
| Attachment A - Integrated Natural Resources Management Plan for Moron Air Base.pdf | ||
| Specifications Dated 26 Feb 2021.pdf | ||
| Solicitation FA557521B0003.pdf | ||
| Especificaciones Dated 26 Feb 2021.pdf | ||
| Construction Cost Estimate KTOR 21-1003 R1.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 21-1003 | PROJECT TITLE |
RPR DORMITORIES, BUILDING 114
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | ||||||||||||
| 01 | Warranty letter | 1 | Acceptance+15 | |||||||||
| 02 | Construction Schedule | 1 | CNTP+7 | |||||||||
| 03 | Progress Schedule | 1 | CNTP+10 | |||||||||
| 04 | Work Plan | 1 | CNTP+7 | |||||||||
| 05 | Mobility Plan | 1 | CNTP+15 | |||||||||
| 06 | Project Sign | 1 | CNTP+15 | |||||||||
| 07 | Quality Control Plan | 1 | CNTP+15 | |||||||||
| 08 | Environmental Protection Plan | 1 | CNTP+15 | |||||||||
| 09 | DD Form 1354 | 1 | FI+15 | |||||||||
| 10 | Waste & construction debris management | 1 | Final Inspection | |||||||||
| 11 | As-Built drawings | 1 | FI+15 | |||||||||
| 12 | Spatial Data | 1 | As Built+10 | |||||||||
| 13 | Key Staff | 1 | CNTP+15 | |||||||||
| 14 | Health and safety Plan | 1 | CNTP +15 | |||||||||
| SECTION 01 11 02 | ||||||||||||
| 15 | Work Phasing Plan | 1 | Commencement of work - 15 | |||||||||
| 16 | Operation & Maintenance (O&M) Manuals | 1 | FI + 15 | |||||||||
| SECTION 06 20 00 | ||||||||||||
| 17 | Compartment system | 1 | ||||||||||
| 18 | Prefabricated millwork | 1 | ||||||||||
| 19 | Frame profiles and panel finishes | 1 | ||||||||||
| SECTION 07 92 00 | ||||||||||||
| 20 | Sealants, primers and bond breakers | 1 | ||||||||||
| SECTION 08 14 00 | ||||||||||||
| 21 | Wood doors | 1 | 1 | |||||||||
| SECTION 08 71 00 | ||||||||||||
| 22 | Hardware items | 1 | ||||||||||
| 23 | Installation | 1 | ||||||||||
| 24 | Master Keying Program | 1 | ||||||||||
| SECCIÓN 09 23 24 | ||||||||||||
| 25 | Repair mortar | 1 | 1 | 1 | 1 | |||||||
| 26 | Repair Tape | 1 | 1 | 1 | 1 | |||||||
| 27 | Waterproof paint | 1 | 1 | 1 | 1 | |||||||
| SECTION 09 90 00 | ||||||||||||
| 28 | Coating and/or product furnished | 1 | ||||||||||
| 29 | Delivery notes | 1 | ||||||||||
| SECTION 10 28 13 | ||||||||||||
| 30 | WC bowl and cover | 1 | ||||||||||
| 31 | Shower head | 1 | ||||||||||
| 32 | Wash basin | 1 | ||||||||||
| 33 | Urinal | 1 | ||||||||||
| SECTION 23 73 33 | ||||||||||||
| 34 | Radiator regulating valve | 1 | ||||||||||
| 35 | Wall exhaust fan | 1 | ||||||||||
| 36 | Thermostat | 1 | ||||||||||
| 37 | Fan coil supply grille | 1 | ||||||||||
| 38 | Vertical fan coil | 1 | ||||||||||
| 39 | Condition Report | 1 | ||||||||||
| SECTION 26 20 00 | ||||||||||||
| 40 | Power Installation Drawings | 1 | 10 Working days before electrical works start date | |||||||||
| 41 | RMC Conduit and fittings, 1 x type | 1 | ||||||||||
| 42 | EMT Conduit and fittings, 1 x type | 1 | ||||||||||
| 43 | Flexible Metal Conduit and fittings (one of each type) | 1 | ||||||||||
| 44 | Outlet boxes and covers | 1 | ||||||||||
| 45 | Panelboard doors, covers and required accessories | 1 | ||||||||||
| 46 | Receptacles | 1 | ||||||||||
| 47 | Toggle Switches | 1 | ||||||||||
| 48 | Device Plates | 1 | ||||||||||
| 49 | Occupancy sensor switches | 1 | ||||||||||
| 50 | Field Test Plan | 1 | 30 Calendar days before testing date | |||||||||
| 51 | Exhaust System Operational Test | 1 | ||||||||||
| SECTION 26 51 00 | ||||||||||||
| 52 | Lighting Installation Drawing | 1 | 10 Working days before electrical works start date | |||||||||
| 53 | Lighting fixtures (all types) | 1 | ||||||||||
| 54 | Lamps (all types) | 1 | ||||||||||
| 55 | Fluorescent electronica ballasts | 1 | ||||||||||
| 56 | LED Drivers | 1 | ||||||||||
| 57 | Emergency lighting equipment | 1 | ||||||||||
| 58 | Fixture mounting hardware | 1 | ||||||||||
| 59 | Local/Regional Materials | 1 | ||||||||||
| 60 | Field Test Plan | 1 | 30 Calendar days before testing date | |||||||||
| 61 | Operating Test | 1 | ||||||||||
| 62 | Electronic Ballast Warranty | 1 | 1 | |||||||||
| 63 | LED Luminaire Warranty/Useful Life Certificate | 1 | ||||||||||
| SECTION 28 31 60 | ||||||||||||
| 64 | Fire Alarm Installation Drawing | 1 | 10 Working days before fire alarm works start date | |||||||||
| 65 | Heat detectors | 1 | ||||||||||
| 66 | Smole alarms | 1 | ||||||||||
| 67 | Manual pull stations | 1 | ||||||||||
| 68 | Audiovisual device | 1 | ||||||||||
| 69 | Field Test Plan | 1 | 30 Calendar days before testing date | |||||||||
| 70 | Qualifications of installer | 1 | ||||||||||
| ANNEX 2 | ||||||||||||
| 71 | Fire door | 1 | ||||||||||
| ANNEX 3 | ||||||||||||
| 72 | Curtain's bar, ring and pleat hooks | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 73 | Curtain fabric | 1 | 1 | 1 | 1 | 1 | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 21-1003 | TÍTULO DE PROYECTO: | |||
| REPARAR DORMITORIOS, EDIFICIO 114 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMERO DE COPIAS REQUERIDAS | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 01 | ||||||||||||
| 1 | Carta de garantía | 1 | Antes de Inspección final (IF) | |||||||||
| 2 | Plan de obra | 1 | CNTP+7 | |||||||||
| 3 | Programa de avance de obras | 1 | CNTP+10 | |||||||||
| 4 | Plan de obra | 1 | CNTP+7 | |||||||||
| 5 | Plan de movilización | 1 | CNTP+15 | |||||||||
| 6 | Cartel de proyecto | 1 | CNTP+15 | |||||||||
| 7 | Plan de control de calidad | 1 | CNTP+15 | |||||||||
| 8 | Plan de protección medioambiental | 1 | CNTP+15 | |||||||||
| 9 | Formularino DD 1354 | 1 | Inspección Final + 15 | |||||||||
| 10 | Certificado de gestión de residuos y escombros | 1 | Antes de Inspección final (IF) | |||||||||
| 11 | Planos As-Builts | 1 | Inspección Final + 15 | |||||||||
| 12 | Datos espaciales | 1 | Antes de Inspección final (IF), tras la aprobación de as-builts + 10 | |||||||||
| 13 | Personal Clave | 1 | CNTP+15 | |||||||||
| 14 | Plan de salud y seguridad | 1 | CNTP+15 | |||||||||
| SECCIÓN 01 11 02 | ||||||||||||
| 15 | Plan de Fases del Trabajo | 1 | Comienzo de los Trabajos - 15 | |||||||||
| 16 | Manuales de Operación y Mantenimiento | 1 | Antes de Inspección final (IF) + 15 | |||||||||
| SECCIÓN 06 20 00 | ||||||||||||
| 17 | Sistema de compartimentación | 1 | ||||||||||
| 18 | Carpintería prefabricada | 1 | ||||||||||
| 19 | Perfilería y acabado de paneles | 1 | ||||||||||
| SECTION 07 92 00 | ||||||||||||
| 20 | Sellantes, imprimación y desencofrantes | 1 | ||||||||||
| SECCIÓN 08 14 00 | ||||||||||||
| 21 | Puertas de madera | 1 | 1 | |||||||||
| SECCIÓN 08 71 00 | ||||||||||||
| 22 | Componentes de cerrajería | 1 | ||||||||||
| 23 | Instalaciones | 1 | 1 | |||||||||
| 24 | Programa de amaestramiento de llaves | 1 | ||||||||||
| SECCIÓN 09 23 24 | ||||||||||||
| 25 | Mortero de reparación | 1 | 1 | 1 | 1 | |||||||
| 26 | Venda reparadora | 1 | 1 | 1 | 1 | |||||||
| 27 | Pintura antihumedad | 1 | 1 | 1 | 1 | |||||||
| SECTION 09 90 00 | ||||||||||||
| 28 | Revestimientos y/o productos provistos | 1 | ||||||||||
| 29 | Albaranes de envio | 1 | ||||||||||
| SECCIÓN 10 28 13 | ||||||||||||
| 30 | Asisento/tapa inodoro | 1 | ||||||||||
| 31 | Rociador ducha | 1 | ||||||||||
| 32 | Lavabo | 1 | ||||||||||
| 33 | Urinario | 1 | ||||||||||
| SECCIÓN 23 73 33 | ||||||||||||
| 34 | Válvula de regulación termostática de radiador | 1 | ||||||||||
| 35 | Extractor de pared | 1 | ||||||||||
| 36 | Termostato | 1 | ||||||||||
| 37 | Rejilla de impulsión de fan coil | 1 | ||||||||||
| 38 | Fan coil vertical | 1 | ||||||||||
| 39 | Informe de inspección | 1 | ||||||||||
| SECCIÓN 26 20 00 | ||||||||||||
| 40 | Planos de Distribución de Fuerza | 1 | 10 Días hábiles antes de comienzo de trabajos eléctricos | |||||||||
| 41 | Tubo RMC y accesorios, 1 x tipo | 1 | ||||||||||
| 42 | Tubo EMT y accesorios, 1 x tipo | 1 | ||||||||||
| 43 | Conducto flexible metálico y accesorios, 1 x tipo | 1 | ||||||||||
| 44 | Cajas y tapas para mecanismos | 1 | ||||||||||
| 45 | Puertas de cuadros, tapas y accesorios necesarios | 1 | ||||||||||
| 46 | Enchufes | 1 | ||||||||||
| 47 | Interruptores | 1 | ||||||||||
| 48 | Placas de mecanismos | 1 | ||||||||||
| 49 | Sensores de movimiento | 1 | ||||||||||
| 50 | Plan de Pruebas en Campo | 1 | 30 Días naturales antes de fecha de pruebas | |||||||||
| 51 | Prueba de funcionamiento sistema de extracción | 1 | ||||||||||
| SECCIÓN 26 51 00 | ||||||||||||
| 52 | Planos de Distribución de Alumbrado | 1 | 10 Días hábiles antes de comienzo de trabajos eléctricos | |||||||||
| 53 | Aparatos de alumbrado (todos los tipos) | 1 | ||||||||||
| 54 | Lámparas (todos los tipos) | 1 | ||||||||||
| 55 | Reactancias fluorescentes electrónicas | 1 | ||||||||||
| 56 | Drivers LED | 1 | ||||||||||
| 57 | Equipos de alumbrado de emergencia | 1 | ||||||||||
| 58 | Material montaje de luminarias | 1 | ||||||||||
| 59 | Materiales Locales/Regionales | 1 | ||||||||||
| 60 | Plan de Pruebas en Campo | 1 | 30 Días naturales antes de fecha de pruebas | |||||||||
| 61 | Ensayos de funcionamiento | 1 | ||||||||||
| 62 | Garantía de Reactancias Electrónicas | 1 | ||||||||||
| 63 | Garantía de Luminarias LED | 1 | ||||||||||
| SECCIÓN 28 31 60 | ||||||||||||
| 64 | Planos de Distribución de Alarma de Incendios | 1 | 10 Días hábiles antes de comienzo de trabajos de alarma de incendios | |||||||||
| 65 | Detectores de calor | 1 | ||||||||||
| 66 | Detectores autónomos de humo | 1 | ||||||||||
| 67 | Tiradores manuales | 1 | ||||||||||
| 68 | Dispositivos audiovisuales | 1 | ||||||||||
| 69 | Plan de Pruebas en Campo | 1 | 30 Días naturales antes de fecha de pruebas | |||||||||
| 70 | Cualificaciones del instalador | 1 | ||||||||||
| ANEXO 2 | ||||||||||||
| 71 | Puerta contraincendios | 1 | ||||||||||
| ANEXO 3 | ||||||||||||
| 72 | Barra, anillas y ganchos para cortinas | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 73 | Materialk de cortina | 1 | 1 | 1 | 1 | 1 | 1 |