This document contains a cost estimate and construction proposal for repairing dormitory building 114 at Moron Air Base in Spain. The proposal includes estimated costs for architectural, mechanical, electrical, and fire door work required to complete repairs to the exterior enclosure, interior construction, interior finishes, plumbing fixtures, HVAC systems, electrical systems, and fire doors. The total proposed contract price is not provided. The cost estimate breakdown includes line items for materials, labor, and other direct costs for each aspect of the repair work. The solicitation requests proposals by July 23, 2021 for the RPR Dormitories Bldg 114 project with a value between $500,000 and $1,000,000 USD. In accordance with the agreement between the U.S. and Spain, Spanish materials, labor, and equipment should be used where feasible for requirements.

View the file

Other files for this federal contract opportunity

Other files attached to RPR Dormitories Bldg 114, newest first.
File Type Posted
Amendment FA557521B00030001 SF 30.pdf PDF
DRAWINGS 21-1003.pdf PDF
Solicitation Amendment FA557521B00030001.pdf PDF
Attachment A - Integrated Natural Resources Management Plan for Moron Air Base.pdf PDF
Specifications Dated 26 Feb 2021.pdf PDF
Schedule of Material Submittals R1.xlsx XLSX spreadsheet
Solicitation FA557521B0003.pdf PDF
Especificaciones Dated 26 Feb 2021.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Repair dorm. Bldg 114
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 21-1003MORÓN AIR BASE, SPAIN
`UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SUMMARY
RESUMEN
ARCHITECTURAL WORK
TRABAJOS DE ARQUITECTURA
B20 EXTERIOR ENCLOSURE
B20 CERRAMIENTOS EXTERIORES
C10 INTERIOR CONSTRUCTION
C10 CONSTRUCCIONES INTERIORES
C30 INTERIOR FINISHES
C30 ACABADOS INTERIORES
TOTAL ARCHITECTURAL
TOTAL ARQUITECTURA
MECHANICAL WORK
TRABAJOS MECANICOS
D2010 PLUMBING FIXTURES
D2010 APARATOS DE ASEO
D30 HVAC
D30 HVAC
TOTAL MECHANICAL
TOTAL MECANICA
ELECTRICAL WORK
TRABAJOS ELECTRICOS
D50 ELECTRICAL
D50 ELECTRICIDAD
TOTAL ELECTRICAL
TOTAL ELECTRICIDAD
FIRE DOORS
PUERTAS CONTRAINCENDIOS
FIRE DOORS
PUERTAS CONTRAINCENDIOS
TOTAL FIRE DOORS
TOTAL PUERTAS CONTRAINCENDIOS
SUMMARY
RESUMEN
TOTAL ARCHITECTURAL
TOTAL ARQUITECTURA
TOTAL MECHANICAL
TOTAL MECANICO
TOTAL ELECTRICAL
TOTAL ELECTRICIDAD
TOTAL FIRE DOORS
TOTAL PUERTAS CONTRAINCENDIOS
GRAND TOTAL
GRAN TOTAL
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

BY:

&"Times New Roman,Bold"&8CONSTRUCTION COST ESTIMATE BREAKDOWN Page &P of &N

Architecture

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Repair dorm. Bldg 114
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 21-1003MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
B20 EXTERIOR ENCLOSURE
B20 CERRAMIENTOS EXTERIORES
B20 10 EXTERIOR WALLS
B20 10 MUROS EXTERIORES
B2010 230 Paint & Covering
B2010 230 Pinturas y Recubrimientos
1Cover dents, scratches, cracks and holes and seal joints
Cubrir rayaduras, arañazos y fisuras y sellar juntsSm
2B2010 230 0140 Walls roller works. Primer & 2 coats
Aplicar imprimación y dos manos paramentos exterioresSm
3B2010 100 0150 Metal brushwork, exposed metal, primer & 2 coat
Imprimar y aplicar dos manos a superf, metalicasSm
Total B20 10 EXTERIOR WALLS
Total B20 10 MUROS EXTERIORES
B20 20 -B20 30 EXTERIOR DOORS & WINDOWS
B20 20 - B20 30 VENTANAS Y PUERTAS EXTERIORES
B2020 106 Aluminun windows
B2020 106 Ventanas de Aluminio
1Replace gasquet, rollers and hardware of windows
Reemplazar juntas, rodillos y pestilleras de ventanasEa
2Reeplace insulated glazing and gasquet of windows
Reemplazar vidrioaislante y juntas de ventanasEa
3Repair aluminun doors & restore hardware
Reparar puertas de aluminio, reponer cerrajeríaEa
Total B20 20 -B20 30 EXTERIOR DOORS & WINDOWS
total B20 20 - B20 30 VENTANAS Y PUERTAS EXTERIORES
TOTAL B20 EXTERIOR ENCLOSURE
TOTAL B20 CERRAMIENTOS EXTERIORES
C10 INTERIOR CONSTRUCTION
C10 CONSTRUCCIONES INTERIORES
C10 20 INTERIOR DOORS
C10 20 PUERTAS INTERIORES
1C10 20 120 3400 Solid core door oak
C10 20 120 3400 Puerta maciza frisada de robleEa
2C10 20 120 6400 Repair solid core door oak
C10 20 120 6400 Reparar puerta maciza frisada de robleLs
3C10 20 130 6100 Replace metal door hardware
C10 20 130 6100 Reponer cerrajería de puertas metalicasEa
TOTAL C10 20 INTERIOR DOORS
TOTAL C10 20 PUERTAS INTERIORES
C10 30 SPECIALTIES
C10 30 EPECIALIDADES
1C10 30 05 120 Cabinets. Repair and replace missing parts
C10 30 05 120 Armarios. reparar, reporner piezas rotasLs
2C10 30 910 Repair, restore parts and install new curtains
C10 30 910 Reponer piezas e instalar nuevas cortinasEa
TOTAL C10 30 SPECIALTIES
TOTAL C10 30 EPECIALIDADES
TOTAL C10 INTERIOR CONSTRUCTION
TOTAL C10 CONSTRUCCIONES INTERIORES
C30 INTERIOR FINISHES
C30 ACABADOS INTERIORES
C30 10 WALL FINISHES
C3010 ACABADOS EN PAREDES
C3010 230 Paint & Covering
C3010 230 Pinturas y Recubrimientos
1Repair cracks walls, ceiling& below windows & clean mildew
Reparar grietas paredes techos y bajo ventnas y limp mohoLS
2Restore missing parts and fix loose baseboard
Reponer piezas perdidas y fijar rodapiés sueltosLS
3Cover dents, scratches, cracks and holes and seal joints
Cubrir rayaduras, arañazos y fisuras y sellar juntsSm
4C3010 230 0140 Walls and ceiling, roller works. Primer & 2 coats
Aplicar imprimacion, media y terminación paredes y techosSm
TOTAL C30 10 WALL FINISHES
TOTAL C3010 ACABADOS EN PAREDES
TOTAL C30 INTERIOR FINISHES
TOTAL C30 ACABADOS INTERIORES
ARCHITECTURAL WORK
RESUMEN TRABAJOS DE ARQUITECTURA
B20 EXTERIOR ENCLOSURE
B20 CERRAMIENTOS EXTERIORES
C10 INTERIOR CONSTRUCTION
C10 CONSTRUCCIONES INTERIORES
C30 INTERIOR FINISHES
C30 ACABADOS INTERIORES
TOTAL ARCHITECTURAL
TOTAL TRABAJOS DE ARQUITECTURA
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

BY:

&"Times New Roman,Bold"&8CONSTRUCTION COST ESTIMATE BREAKDOWN Page &P of &N

Mechanical

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Repair dorm. Bldg 114
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 21-1003MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
MECHANICAL WORKS
TRABAJOS MECÁNICOS
D2010 PLUMBING FIXTURES
D2010 APARATOS DE ASEO
1Replace WC covers
Reemplazar tapas de inodorosEa
2Replace shower heads
Reemplazar difusores de duchaEa
3Replace wash basins/urinals
Reemplazar lavabos/urinariosEa
TOTAL D2010 PLUMBING FIXTURES
TOTAL D2010 APARATOS DE ASEO
D30 HVAC
D30 HVAC
3Replace radiator regulatiung valves in latrines
Reemplazar válvulas de regulación de radiadores de las letrinasEa
4Replace latrines exterior wall exhaust fans
Reemplazar extractores de pared exterior de letrinasEa
5Disassemble/reinstall shower wall exhaust fans
Desmotar/reinstalar extractores de pared duchaEa
6Replace room thermostat
Reemplazar termostato de habitaciónEa
7Replace fan coil grille
Reemplazar rejilla de fan coilEa
8Replace vertical fan coils in common areas
Reemplazar váalvulas de regulación de radiadores de las letrinasEa
9Horizontal fan coils inspection
Inspección de fan coils horizontalesEa
TOTAL D30 HVAC
TOTAL D30 HVAC
TOTAL MECHANICAL WORKS
TOTAL TRABAJOS MECÁNICOS
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

BY:

&"Times New Roman,Bold"&8CONSTRUCTION COST ESTIMATE BREAKDOWN Page &P of &N

Electrical

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
GOVERNMENT ESTIMATEMORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Repair dorm. Bldg 1140.00 €$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 21-1003MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
D50 ELECTRICAL
D50 ELECTRICIDAD
D5010 ELECTRICAL AND SERVICE DISTRIBUTION
D5010 SUMINISTRO Y DISTRIB. EL�ÉCTRICA
1Repair panelboard doors
Repara puertas paneles eléctricosEa
Total D5010 ELECTRICAL AND SERVICE DISTRIBUTION
Total D5010 SUMINISTRO Y DISTRIB. EL�ÉCTRICA
D5020 LIGHTING AND BRANCH WIRING
D5020 ALUMBRADO Y CABLEADO DE DERIVACIÓN
2Replace/Install device plates
Reemplazar/Instalar tapas mechanismosEa
3Replace receptacles, various types
Reemplazar bases de enchufe, varios tiposEa
4Replace light toggle switch
Sustituir interruptor de alumbradoEa
5Replace defective Type B Luminaires (incl. driver)
Sustituir luminariaa Tipo B (incl. driver)Ea
6Corridor lights installation to walls/ceilings
Instalación de luminaris de pasillo a paredes/techosEa
7Replace Type H Emergency Lighting Fixtures
Sustituir Luminarias Alumbrado Emergencia Tipo HEa
8Replace defective Type G Emergency Lighting Fixtures
Sust. Lum. Alumbrado Emergencia defectuosas Tipo GEa
8Replace EXIT lights (Type I)
Sustituir luces EXIT (Tipo I)Ea
9Replace Miscellaneous lights (Types A, C, D, E, F, J & L)
Sustituir Varios Tipos Luminarias(Tipos A, C, D, E, F, J y L)Ea
10Re-install Type K lighting fixtures
Reinstalar luminarias tipo KEa
11Replace latrines defective motion sensors
Sustituir detectores movimiento defectuosos en bañosEa
12Reconnect latrines motion sensors/exhaust fan switces
Reconectar detect. movimiento baños/interrup extractoresEa
Total D5020 LIGHTING AND BRANCH WIRING
Total D5020 ALUMBRADO Y CABLEADO DE DERIVACIÓN
D5030 COMMUNICATION, SECURITY & ALARM SYSTEMS
D5030 COMUNICACIONES, SEGURIDAD Y ALARMA DE INCENDIOS
13Replace/Install comm device plates
Reemplazar/Instalar tapas tomas comunicacionesEa
14Replace defective smoke detectors
Reemplazar detectores de humo defectuososEa
15Replace defective heat detectors
Reemplazar detectores de calor defectuososEa
16Replace defective manual pull stations
Reemplazar tiradores de alarma manual defectuososEa
17Replace defective audiovisual devices
Reemplazar dispositivos audiovisuales defectuososEa
Total D5030 COMMUNICATION, SECURITY & ALARM SYSTEMS
Total D5030 COMUNICACIONES, SEGURIDAD Y ALARMA DE INCENDIOS
TOTAL D50 ELECTRICAL
TOTAL D50 ELECTRICIDAD
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

BY:

&"Times New Roman,Bold"&8COSTRUCTION COST ESTIMATE BREAKDOWN Page &P of &N

Fire Doors

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Repair dorm. Bldg 114 Fire Doors
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 21-1003MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
FIRE DOORS
PUERTAS CONTRAINCENDIOS
1Removal existing doors and frames
Desmontar puertas y marcos existentesLs
2Repair existing holes and frames installation
Reparar huecos existentes e instalacion marcosLs
3Supply and install single door (Right and Left Side)
Suministro y montaje puerta simple (Dcha o Izda)Ea
4Supply and install single door frame
Suministro y montaje marco puerta simpleEa
5Supply and install double door
Suministro y montaje puerta dobleEa
6Supply and install double door frame
Suministro y montaje marco puerta dobleEa
7Provide and install fire door hardware
Suministro y montaje herraje puerta contraincendiosEa
TOTAL FIRE DOORS
TOTAL PUERTAS CONTRAINCENDIOS
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

BY:

&"Times New Roman,Bold"&8CONSTRUCTION COST ESTIMATE BREAKDOWN Page &P of &N

File details come from the government source that posted it. Updated .