This solicitation is for a project to repair and expand a dining facility utility vault and generator at Moron Air Base in Spain. Work requirements will be governed by specifications and drawings. A pre-proposal conference will be held on 13 August 2020, with questions due by 19 August. Proposals must be received by 31 August 2020. Per the agreement between the U.S. and Spain, Spanish materials, labor, and equipment shall be used whenever feasible and consistent with requirements. The magnitude of the project is estimated between $250,000 to $500,000. Funds are not presently available and no award will be made until funding is in place. The government reserves the right to cancel the solicitation before or after closing.

View the file

Other files for this federal contract opportunity

Other files attached to RPR/ADD DACF Utility Vault & Generator, B183, newest first.
File Type Posted
Solicitation Amendment 0001.pdf PDF
Solicitation FA557520B0004.pdf PDF
Construction Cost Estimate Breakdown.xlsx XLSX spreadsheet
Drawings Dated 10 June 2020.pdf PDF
Especificaciones Espanol Dated 10 June 2020.pdf PDF
English Specifications Dated 10 June 2020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 16-1014PROJECT TITLE

RPR/ADD DFAC UTILITY VAULT & GENERATOR, B183

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule31/5/009/16/169/19/169/26/16001
2Work Plan31/5/009/16/169/19/169/26/16001
SECTION 01 11 01
3Warranty letter3Prior to Final Inspection (FI)
4Base utility connection request31/15/00
5Progress Schedule31/10/00
6Mobility Plan31/15/00
7Project sign31/15/00
8Quality Control Plan31/15/00
9Environmental protection plan31/15/00
10Waste & construction debris management certificate3Prior to FI
11As-Built drawings3Prior to FI
12Spatial Data3Prior to FI
13Key Personnel31/15/00
14Personel listing31/15/00
15Health and safety program31/15/00
16O&M Manuals3Prior to FI
SECTION 02 82 14
17Respiratory protection equipment1
18Glovebag1
19EPIs1
20Landfill1
21Industrial Hygienist1
22Risk Prevention training1
23Laboratory1
24Registration of Asbestos Risk1
25Industrial Hygiene Report1
26Asbestos Hazard Abatement Plan1
SECTION 03 30 00
27Concrete batch plant1
28Concrete Control Test Program1
29Results of the Concrete Control Tests1
30Polypropylene fiber1
SECTION 26 11 16
31Pre-Fabricated Transformer Shelter1
32Pre-Fabricated Transformer Shelter1
33Transformer1
34HV Switchgear1
35Capacitor Bank1
36High Voltage Cable RHZ1 OL1
37Capacitor Bank1
38Spare Parts1After Approval of Equipment
39Transformer Losses Report1
40Installation of HV installations - Company AT11NTP+15
41Installation of HV installations - Individual AT11NTP+30
42Transformer Routine Test1
43Field Quality Control1
SECTION 26 20 00
44RMC Conduit and fittings, 1 x type1
45Weatherproof Metal Raceway1
46Junction and pull boxes1
47Outlet boxes and covers1
48Wires and cables1
49Circuit breakers1
50Panelboards1
51Surge Protective Device1
52Device Plates1
53Receptacles1
54Toggle Switches1
55Network Analyzer1
56Labels1
57Panelboards1
58One-line Diagram1
59Devices subject to manual operation1Facility Acceptance -5
601000-Volt wiring test1Facility Acceptance -5
61Panelboards1
62Single line diagram of the "as-built"1
63Schematic diagram1
64Active electrical equipment O&M Manuals1
SECTION 26 32 13.00 20
65Engine-generator set and auxiliary equipment1
66Auxiliary systems1
67Engine generator set data1
68Engine generator set efficiencies1
69Diesel engine data1
70Generator and exciter data1
71Auxiliary systems and equipment1
72Capacity calculations for engine-generator set1
73Calculations for brake mean effective pressure1
74Torsional vibration stress analysis computations1
75Capacity calculations for batteries1
76Acceptance checks and tests1Before Functional Tests
77Functional acceptance tests1Facility Acceptance -15
78Functional acceptance tests procedure1
79Vibration isolation system certification1
80Fuel system certification1
81Start-up technician qualification resume1
82Instructor's qualification resume1
83Engine tests1Before shipment
84Generator set routine tests1Before shipment
85Generator set design tests1
86Diesel engine-generator set1
87Auxiliary systems and equipment1
88Preliminary assembled O&M manuals1
89Posted operating instructions1
90Training plan1
SECTION 26 36 00.00 10
91Detail drawings1
92Equipment1
93Installation1
94Equipment11
95Material11
96Testing1Facility Acceptance -7
97Switching equipment1
98Switching equipment1
99Instructions1
SECTION 26 51 00
100LED Luminaire Type A, Driver and accessories1
101LED Luminaire Type B, Driver and accessories1
102LED Luminaire Type C, Driver and accessories1
103Local/Regional Materials1
104LED Luminaires1
105Photocell1
106Operating Test1
107LED Luminaire Warranty1
108LED Luminaire Useful Life Certificate1
109Lighting Calculation Results1
110Spare Parts Delivery1
111Instruction to Government Personnel1
SECTION 31 23 00.00 20
112Material proposed as backfill, soil & topsoil1
113Backfill material1Upon test execution
114Compaction1Upon test execution
SECTION 32 92 19
115Seed1
116Fertilizer1
117Topsoil1
SECTION 32 93 00
118Time Restrictions and Conditions1
119Anticipated Dates and Locations1
120Materials1
121Nursery1
122Plant Passport1
SECTION 33 71 02.00 20
123Conduits1
124Underground Low-Voltage Cables1
125Buried Warning and Identification Tape1
126Ground wires1
127Handholes11
128Handhole covers111
129Pre-manufactured low voltage splices1
130Grounding test/Bar wells1
131Grounding Bars1
132Ground rods1
133Exothermic welding11
134Field acceptance checks and tests1

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 16-1014TÍTULO DE PROYECTO:
REPARAR/AMPLIAR CENTRO DE TRANSFORMACIÓN Y GRUPO ELECTRÓGENO DEL COMEDOR, B183SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Cronograma de obra3NTP+5
2Plan de obra3NTP+5
SECCIÓN 01 11 01
3Carta de garantía3Antes de Inspección final (IF)
4Petición de conexión a servicios de la base3NTP+15
5Programa de avance de obras3NTP+10
6Plan de movilización3NTP+15
7Cartel de proyecto3NTP+15
8Plan de control de calidad3NTP+15
9Plan de protección medioambiental3NTP+15
10Certificado de gestión de residuos y escombros3Antes de Inspección final (IF)
11Planos As-Builts3Antes de Inspección final (IF)
12Datos espaciales3Antes de Inspección final (IF)
13Personal clave3NTP+15
14Listado de personal3NTP+15
15Plan de salud y seguridad3NTP+15
16Manuales de Funcionamiento y Mantenimiento3Antes de Inspección final (IF)
SECCIÓN 02 82 14
17Equipo de protección respiratoria1
18Bolsas de guantes1
19EPIs1
20Vertedero1
21Higienista industrial1
22Formación en riesgos que conllevan los trabajos con amianto1
23Laboratorio1
24Registro como empresa con Riesgo de Amianto1
25Higiene industrial1
26Plan de trabajo con tiesgo por amianto1
SECCIÓN 03 30 00
27Inspección de la central de fabricación del hormigón1
28Programa ensayos control del hormigón1
29Resultado de los ensayos de control del hormigón1
30Fibra de polipropileno1
SECCIÓN 26 11 16
31Centro de transformación prefabricado1
32Centro de transformación prefabricado1
33Transformador1
34Celdas de alta tensión1
35Batería de Condensadores1
36Cable de media tensión RHZ1 OL1
37Batería de Condensadores1
38Repuestos1Tras aprobación de los equipos
39Informe de pérdidas de transformadores1
40Instalaciones de AT - AT1 Empresa1NTP+15
41Instalaciones de AT - AT1 Instalador1NTP+30
42Pruebas rutinarias de transformadores1
43Control de Calidad en Obra1
SECCIÓN 26 20 00
44Tubo RMC y accesorios, 1 x tipo1
45Canaleta metálica estanca1
46Cajas de conexión y paso1
47Cajas y tapas para mecanismos1
48Conductores y cables1
49Interruptores automáticos1
50Cuadros1
51Descargadores de sobretensiones1
52Placas de mecanismos1
53Enchufes1
54Interruptores1
55Analizador de redes1
56Etiquetas1
57Cuadros1
58Diagrama unifilar1
59Dispositivos sujetos a operación manual1Aceptación Edificio -5
60Pruebas de cableado de 1000 voltios1Aceptación Edificio -5
61Cuadros1
62Esquema unifialr del sistema eléctrico del edificio1
63Diagrama esquemático del sistema de control eléctrico1
64Manuales Uso y Mto de equipo eléctrico activo1
SECCIÓN 26 32 13.00 20
65Grupo electrógeno y equipo auxiliar1
66Sistemas auxiliares1
67Datos de grupo electrógeno1
68Eficiencias de grupo electrógeno1
69Motor diesel1
70Grupo electrógeno y excitatriz1
71Equipos y sistemas auxiliares1
72Cálculos de capacidad del grupo electrógeno1
73Cálculos de presión efectiva al freno1
74Análisis por ordenador de fatiga por vibraciones1
75Cálculos de capacidad de baterías1
76Ensayos y pruebas de aceptación1Antes de ensayos funcionales
77Ensayos funcionales de aceptación1Aceptación Edificio -15
78Procedimiento de ensayos funcionales de aceptación1
79Certificado del sistema antivibracional1
80Certificado del sistema de combustible1
81Cualificación del técnico de puesta en marcha1
82Cualificación del formador1
83Pruebas del motor1Antes de embarque
84Pruebas rutinarias del grupo electrógeno1Antes de embarque
85Pruebas de diseño del grupo electrógeno1
86Grupo electrógeno1
87Equipos y sistemas auxiliares1
88Manuales preliminares de operación y mantenimiento1
89Instrucciones de funcionamiento expuestas1
90Plan de formación1
SECCIÓN 26 36 00.00 10
91Planos de detalle1
92Equipo1
93Instalación1
94Equipo11
95Materiales11
96Ensayos1Aceptación Edificio -7
97Equipo de conmutación1
98Equipo de conmutación1
99Instrucciones1
SECCIÓN 26 51 00
100Luminaria LED Tipo A, Driver y accesorios1
101Luminaria LED Tipo B, Driver y accesorios1
102Luminaria LED Tipo C, Driver y accesorios1
103Materiales Locales/Regionales1
104Luminarias LED1
105Célula Fotoeléctrica1
106Ensayos de funcionamiento1
107Garantía de Luminarias LED1
108Certificado de Vida Útil de Luminarias LED1
109Resultados de Cálculo Luminotécnico1
110Entrega de Repuestos1
111Formación del Personal del Gobierno1
SECCIÓN 31 23 00.00 20
112Material de relleno propuesto para suelo y terreno vegetal1
113Ensayo del material de relleno1Tras real.

ensayo 114 Ensayos de densidad 1 Tras real.

ensayo

SECCIÓN 32 92 19
115Semilla1
116Fertilizante1
117Capa Vegetal1
SECCIÓN 32 93 00
118Restricciones y Condiciones de Plantación1
119Fechas y ujbicaciones Previstas1
120Materiales1
121Vivero1
122Pasaporte Fitosanitario1
SECCIÓN 33 71 02.00 20
123Conductos1
124Cables de Baja Tensión Enterraods1
125Cinta de Aviso e Identificación1
126Conductores de tierra1
127Arquetas11
128Tapas de arquetas111
129Empales de baja tensión pre-fabricados1
130Arquetas para lecturas de tierra1
131Barras equipotenciales1
132Picas de tierra1
133Soldadura exotérmica11
134Ensayos y pruebas en obra1

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .