This solicitation is for a project to repair and expand a dining facility utility vault and generator at Moron Air Base in Spain. Work requirements will be governed by specifications and drawings. A pre-proposal conference will be held on 13 August 2020, with questions due by 19 August. Proposals must be received by 31 August 2020. Per the agreement between the U.S. and Spain, Spanish materials, labor, and equipment shall be used whenever feasible and consistent with requirements. The magnitude of the project is estimated between $250,000 to $500,000. Funds are not presently available and no award will be made until funding is in place. The government reserves the right to cancel the solicitation before or after closing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 0001.pdf | ||
| Solicitation FA557520B0004.pdf | ||
| Construction Cost Estimate Breakdown.xlsx | XLSX spreadsheet | |
| Drawings Dated 10 June 2020.pdf | ||
| Especificaciones Espanol Dated 10 June 2020.pdf | ||
| English Specifications Dated 10 June 2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 16-1014 | PROJECT TITLE |
RPR/ADD DFAC UTILITY VAULT & GENERATOR, B183
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | ||||||||||||||||
| 1 | Construction Schedule | 3 | 1/5/00 | 9/16/16 | 9/19/16 | 9/26/16 | 001 | |||||||||
| 2 | Work Plan | 3 | 1/5/00 | 9/16/16 | 9/19/16 | 9/26/16 | 001 | |||||||||
| SECTION 01 11 01 | ||||||||||||||||
| 3 | Warranty letter | 3 | Prior to Final Inspection (FI) | |||||||||||||
| 4 | Base utility connection request | 3 | 1/15/00 | |||||||||||||
| 5 | Progress Schedule | 3 | 1/10/00 | |||||||||||||
| 6 | Mobility Plan | 3 | 1/15/00 | |||||||||||||
| 7 | Project sign | 3 | 1/15/00 | |||||||||||||
| 8 | Quality Control Plan | 3 | 1/15/00 | |||||||||||||
| 9 | Environmental protection plan | 3 | 1/15/00 | |||||||||||||
| 10 | Waste & construction debris management certificate | 3 | Prior to FI | |||||||||||||
| 11 | As-Built drawings | 3 | Prior to FI | |||||||||||||
| 12 | Spatial Data | 3 | Prior to FI | |||||||||||||
| 13 | Key Personnel | 3 | 1/15/00 | |||||||||||||
| 14 | Personel listing | 3 | 1/15/00 | |||||||||||||
| 15 | Health and safety program | 3 | 1/15/00 | |||||||||||||
| 16 | O&M Manuals | 3 | Prior to FI | |||||||||||||
| SECTION 02 82 14 | ||||||||||||||||
| 17 | Respiratory protection equipment | 1 | ||||||||||||||
| 18 | Glovebag | 1 | ||||||||||||||
| 19 | EPIs | 1 | ||||||||||||||
| 20 | Landfill | 1 | ||||||||||||||
| 21 | Industrial Hygienist | 1 | ||||||||||||||
| 22 | Risk Prevention training | 1 | ||||||||||||||
| 23 | Laboratory | 1 | ||||||||||||||
| 24 | Registration of Asbestos Risk | 1 | ||||||||||||||
| 25 | Industrial Hygiene Report | 1 | ||||||||||||||
| 26 | Asbestos Hazard Abatement Plan | 1 | ||||||||||||||
| SECTION 03 30 00 | ||||||||||||||||
| 27 | Concrete batch plant | 1 | ||||||||||||||
| 28 | Concrete Control Test Program | 1 | ||||||||||||||
| 29 | Results of the Concrete Control Tests | 1 | ||||||||||||||
| 30 | Polypropylene fiber | 1 | ||||||||||||||
| SECTION 26 11 16 | ||||||||||||||||
| 31 | Pre-Fabricated Transformer Shelter | 1 | ||||||||||||||
| 32 | Pre-Fabricated Transformer Shelter | 1 | ||||||||||||||
| 33 | Transformer | 1 | ||||||||||||||
| 34 | HV Switchgear | 1 | ||||||||||||||
| 35 | Capacitor Bank | 1 | ||||||||||||||
| 36 | High Voltage Cable RHZ1 OL | 1 | ||||||||||||||
| 37 | Capacitor Bank | 1 | ||||||||||||||
| 38 | Spare Parts | 1 | After Approval of Equipment | |||||||||||||
| 39 | Transformer Losses Report | 1 | ||||||||||||||
| 40 | Installation of HV installations - Company AT1 | 1 | NTP+15 | |||||||||||||
| 41 | Installation of HV installations - Individual AT1 | 1 | NTP+30 | |||||||||||||
| 42 | Transformer Routine Test | 1 | ||||||||||||||
| 43 | Field Quality Control | 1 | ||||||||||||||
| SECTION 26 20 00 | ||||||||||||||||
| 44 | RMC Conduit and fittings, 1 x type | 1 | ||||||||||||||
| 45 | Weatherproof Metal Raceway | 1 | ||||||||||||||
| 46 | Junction and pull boxes | 1 | ||||||||||||||
| 47 | Outlet boxes and covers | 1 | ||||||||||||||
| 48 | Wires and cables | 1 | ||||||||||||||
| 49 | Circuit breakers | 1 | ||||||||||||||
| 50 | Panelboards | 1 | ||||||||||||||
| 51 | Surge Protective Device | 1 | ||||||||||||||
| 52 | Device Plates | 1 | ||||||||||||||
| 53 | Receptacles | 1 | ||||||||||||||
| 54 | Toggle Switches | 1 | ||||||||||||||
| 55 | Network Analyzer | 1 | ||||||||||||||
| 56 | Labels | 1 | ||||||||||||||
| 57 | Panelboards | 1 | ||||||||||||||
| 58 | One-line Diagram | 1 | ||||||||||||||
| 59 | Devices subject to manual operation | 1 | Facility Acceptance -5 | |||||||||||||
| 60 | 1000-Volt wiring test | 1 | Facility Acceptance -5 | |||||||||||||
| 61 | Panelboards | 1 | ||||||||||||||
| 62 | Single line diagram of the "as-built" | 1 | ||||||||||||||
| 63 | Schematic diagram | 1 | ||||||||||||||
| 64 | Active electrical equipment O&M Manuals | 1 | ||||||||||||||
| SECTION 26 32 13.00 20 | ||||||||||||||||
| 65 | Engine-generator set and auxiliary equipment | 1 | ||||||||||||||
| 66 | Auxiliary systems | 1 | ||||||||||||||
| 67 | Engine generator set data | 1 | ||||||||||||||
| 68 | Engine generator set efficiencies | 1 | ||||||||||||||
| 69 | Diesel engine data | 1 | ||||||||||||||
| 70 | Generator and exciter data | 1 | ||||||||||||||
| 71 | Auxiliary systems and equipment | 1 | ||||||||||||||
| 72 | Capacity calculations for engine-generator set | 1 | ||||||||||||||
| 73 | Calculations for brake mean effective pressure | 1 | ||||||||||||||
| 74 | Torsional vibration stress analysis computations | 1 | ||||||||||||||
| 75 | Capacity calculations for batteries | 1 | ||||||||||||||
| 76 | Acceptance checks and tests | 1 | Before Functional Tests | |||||||||||||
| 77 | Functional acceptance tests | 1 | Facility Acceptance -15 | |||||||||||||
| 78 | Functional acceptance tests procedure | 1 | ||||||||||||||
| 79 | Vibration isolation system certification | 1 | ||||||||||||||
| 80 | Fuel system certification | 1 | ||||||||||||||
| 81 | Start-up technician qualification resume | 1 | ||||||||||||||
| 82 | Instructor's qualification resume | 1 | ||||||||||||||
| 83 | Engine tests | 1 | Before shipment | |||||||||||||
| 84 | Generator set routine tests | 1 | Before shipment | |||||||||||||
| 85 | Generator set design tests | 1 | ||||||||||||||
| 86 | Diesel engine-generator set | 1 | ||||||||||||||
| 87 | Auxiliary systems and equipment | 1 | ||||||||||||||
| 88 | Preliminary assembled O&M manuals | 1 | ||||||||||||||
| 89 | Posted operating instructions | 1 | ||||||||||||||
| 90 | Training plan | 1 | ||||||||||||||
| SECTION 26 36 00.00 10 | ||||||||||||||||
| 91 | Detail drawings | 1 | ||||||||||||||
| 92 | Equipment | 1 | ||||||||||||||
| 93 | Installation | 1 | ||||||||||||||
| 94 | Equipment | 1 | 1 | |||||||||||||
| 95 | Material | 1 | 1 | |||||||||||||
| 96 | Testing | 1 | Facility Acceptance -7 | |||||||||||||
| 97 | Switching equipment | 1 | ||||||||||||||
| 98 | Switching equipment | 1 | ||||||||||||||
| 99 | Instructions | 1 | ||||||||||||||
| SECTION 26 51 00 | ||||||||||||||||
| 100 | LED Luminaire Type A, Driver and accessories | 1 | ||||||||||||||
| 101 | LED Luminaire Type B, Driver and accessories | 1 | ||||||||||||||
| 102 | LED Luminaire Type C, Driver and accessories | 1 | ||||||||||||||
| 103 | Local/Regional Materials | 1 | ||||||||||||||
| 104 | LED Luminaires | 1 | ||||||||||||||
| 105 | Photocell | 1 | ||||||||||||||
| 106 | Operating Test | 1 | ||||||||||||||
| 107 | LED Luminaire Warranty | 1 | ||||||||||||||
| 108 | LED Luminaire Useful Life Certificate | 1 | ||||||||||||||
| 109 | Lighting Calculation Results | 1 | ||||||||||||||
| 110 | Spare Parts Delivery | 1 | ||||||||||||||
| 111 | Instruction to Government Personnel | 1 | ||||||||||||||
| SECTION 31 23 00.00 20 | ||||||||||||||||
| 112 | Material proposed as backfill, soil & topsoil | 1 | ||||||||||||||
| 113 | Backfill material | 1 | Upon test execution | |||||||||||||
| 114 | Compaction | 1 | Upon test execution | |||||||||||||
| SECTION 32 92 19 | ||||||||||||||||
| 115 | Seed | 1 | ||||||||||||||
| 116 | Fertilizer | 1 | ||||||||||||||
| 117 | Topsoil | 1 | ||||||||||||||
| SECTION 32 93 00 | ||||||||||||||||
| 118 | Time Restrictions and Conditions | 1 | ||||||||||||||
| 119 | Anticipated Dates and Locations | 1 | ||||||||||||||
| 120 | Materials | 1 | ||||||||||||||
| 121 | Nursery | 1 | ||||||||||||||
| 122 | Plant Passport | 1 | ||||||||||||||
| SECTION 33 71 02.00 20 | ||||||||||||||||
| 123 | Conduits | 1 | ||||||||||||||
| 124 | Underground Low-Voltage Cables | 1 | ||||||||||||||
| 125 | Buried Warning and Identification Tape | 1 | ||||||||||||||
| 126 | Ground wires | 1 | ||||||||||||||
| 127 | Handholes | 1 | 1 | |||||||||||||
| 128 | Handhole covers | 1 | 1 | 1 | ||||||||||||
| 129 | Pre-manufactured low voltage splices | 1 | ||||||||||||||
| 130 | Grounding test/Bar wells | 1 | ||||||||||||||
| 131 | Grounding Bars | 1 | ||||||||||||||
| 132 | Ground rods | 1 | ||||||||||||||
| 133 | Exothermic welding | 1 | 1 | |||||||||||||
| 134 | Field acceptance checks and tests | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 16-1014 | TÍTULO DE PROYECTO: | |||
| REPARAR/AMPLIAR CENTRO DE TRANSFORMACIÓN Y GRUPO ELECTRÓGENO DEL COMEDOR, B183 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | ||||||||||||
| 1 | Cronograma de obra | 3 | NTP+5 | |||||||||
| 2 | Plan de obra | 3 | NTP+5 | |||||||||
| SECCIÓN 01 11 01 | ||||||||||||
| 3 | Carta de garantía | 3 | Antes de Inspección final (IF) | |||||||||
| 4 | Petición de conexión a servicios de la base | 3 | NTP+15 | |||||||||
| 5 | Programa de avance de obras | 3 | NTP+10 | |||||||||
| 6 | Plan de movilización | 3 | NTP+15 | |||||||||
| 7 | Cartel de proyecto | 3 | NTP+15 | |||||||||
| 8 | Plan de control de calidad | 3 | NTP+15 | |||||||||
| 9 | Plan de protección medioambiental | 3 | NTP+15 | |||||||||
| 10 | Certificado de gestión de residuos y escombros | 3 | Antes de Inspección final (IF) | |||||||||
| 11 | Planos As-Builts | 3 | Antes de Inspección final (IF) | |||||||||
| 12 | Datos espaciales | 3 | Antes de Inspección final (IF) | |||||||||
| 13 | Personal clave | 3 | NTP+15 | |||||||||
| 14 | Listado de personal | 3 | NTP+15 | |||||||||
| 15 | Plan de salud y seguridad | 3 | NTP+15 | |||||||||
| 16 | Manuales de Funcionamiento y Mantenimiento | 3 | Antes de Inspección final (IF) | |||||||||
| SECCIÓN 02 82 14 | ||||||||||||
| 17 | Equipo de protección respiratoria | 1 | ||||||||||
| 18 | Bolsas de guantes | 1 | ||||||||||
| 19 | EPIs | 1 | ||||||||||
| 20 | Vertedero | 1 | ||||||||||
| 21 | Higienista industrial | 1 | ||||||||||
| 22 | Formación en riesgos que conllevan los trabajos con amianto | 1 | ||||||||||
| 23 | Laboratorio | 1 | ||||||||||
| 24 | Registro como empresa con Riesgo de Amianto | 1 | ||||||||||
| 25 | Higiene industrial | 1 | ||||||||||
| 26 | Plan de trabajo con tiesgo por amianto | 1 | ||||||||||
| SECCIÓN 03 30 00 | ||||||||||||
| 27 | Inspección de la central de fabricación del hormigón | 1 | ||||||||||
| 28 | Programa ensayos control del hormigón | 1 | ||||||||||
| 29 | Resultado de los ensayos de control del hormigón | 1 | ||||||||||
| 30 | Fibra de polipropileno | 1 | ||||||||||
| SECCIÓN 26 11 16 | ||||||||||||
| 31 | Centro de transformación prefabricado | 1 | ||||||||||
| 32 | Centro de transformación prefabricado | 1 | ||||||||||
| 33 | Transformador | 1 | ||||||||||
| 34 | Celdas de alta tensión | 1 | ||||||||||
| 35 | Batería de Condensadores | 1 | ||||||||||
| 36 | Cable de media tensión RHZ1 OL | 1 | ||||||||||
| 37 | Batería de Condensadores | 1 | ||||||||||
| 38 | Repuestos | 1 | Tras aprobación de los equipos | |||||||||
| 39 | Informe de pérdidas de transformadores | 1 | ||||||||||
| 40 | Instalaciones de AT - AT1 Empresa | 1 | NTP+15 | |||||||||
| 41 | Instalaciones de AT - AT1 Instalador | 1 | NTP+30 | |||||||||
| 42 | Pruebas rutinarias de transformadores | 1 | ||||||||||
| 43 | Control de Calidad en Obra | 1 | ||||||||||
| SECCIÓN 26 20 00 | ||||||||||||
| 44 | Tubo RMC y accesorios, 1 x tipo | 1 | ||||||||||
| 45 | Canaleta metálica estanca | 1 | ||||||||||
| 46 | Cajas de conexión y paso | 1 | ||||||||||
| 47 | Cajas y tapas para mecanismos | 1 | ||||||||||
| 48 | Conductores y cables | 1 | ||||||||||
| 49 | Interruptores automáticos | 1 | ||||||||||
| 50 | Cuadros | 1 | ||||||||||
| 51 | Descargadores de sobretensiones | 1 | ||||||||||
| 52 | Placas de mecanismos | 1 | ||||||||||
| 53 | Enchufes | 1 | ||||||||||
| 54 | Interruptores | 1 | ||||||||||
| 55 | Analizador de redes | 1 | ||||||||||
| 56 | Etiquetas | 1 | ||||||||||
| 57 | Cuadros | 1 | ||||||||||
| 58 | Diagrama unifilar | 1 | ||||||||||
| 59 | Dispositivos sujetos a operación manual | 1 | Aceptación Edificio -5 | |||||||||
| 60 | Pruebas de cableado de 1000 voltios | 1 | Aceptación Edificio -5 | |||||||||
| 61 | Cuadros | 1 | ||||||||||
| 62 | Esquema unifialr del sistema eléctrico del edificio | 1 | ||||||||||
| 63 | Diagrama esquemático del sistema de control eléctrico | 1 | ||||||||||
| 64 | Manuales Uso y Mto de equipo eléctrico activo | 1 | ||||||||||
| SECCIÓN 26 32 13.00 20 | ||||||||||||
| 65 | Grupo electrógeno y equipo auxiliar | 1 | ||||||||||
| 66 | Sistemas auxiliares | 1 | ||||||||||
| 67 | Datos de grupo electrógeno | 1 | ||||||||||
| 68 | Eficiencias de grupo electrógeno | 1 | ||||||||||
| 69 | Motor diesel | 1 | ||||||||||
| 70 | Grupo electrógeno y excitatriz | 1 | ||||||||||
| 71 | Equipos y sistemas auxiliares | 1 | ||||||||||
| 72 | Cálculos de capacidad del grupo electrógeno | 1 | ||||||||||
| 73 | Cálculos de presión efectiva al freno | 1 | ||||||||||
| 74 | Análisis por ordenador de fatiga por vibraciones | 1 | ||||||||||
| 75 | Cálculos de capacidad de baterías | 1 | ||||||||||
| 76 | Ensayos y pruebas de aceptación | 1 | Antes de ensayos funcionales | |||||||||
| 77 | Ensayos funcionales de aceptación | 1 | Aceptación Edificio -15 | |||||||||
| 78 | Procedimiento de ensayos funcionales de aceptación | 1 | ||||||||||
| 79 | Certificado del sistema antivibracional | 1 | ||||||||||
| 80 | Certificado del sistema de combustible | 1 | ||||||||||
| 81 | Cualificación del técnico de puesta en marcha | 1 | ||||||||||
| 82 | Cualificación del formador | 1 | ||||||||||
| 83 | Pruebas del motor | 1 | Antes de embarque | |||||||||
| 84 | Pruebas rutinarias del grupo electrógeno | 1 | Antes de embarque | |||||||||
| 85 | Pruebas de diseño del grupo electrógeno | 1 | ||||||||||
| 86 | Grupo electrógeno | 1 | ||||||||||
| 87 | Equipos y sistemas auxiliares | 1 | ||||||||||
| 88 | Manuales preliminares de operación y mantenimiento | 1 | ||||||||||
| 89 | Instrucciones de funcionamiento expuestas | 1 | ||||||||||
| 90 | Plan de formación | 1 | ||||||||||
| SECCIÓN 26 36 00.00 10 | ||||||||||||
| 91 | Planos de detalle | 1 | ||||||||||
| 92 | Equipo | 1 | ||||||||||
| 93 | Instalación | 1 | ||||||||||
| 94 | Equipo | 1 | 1 | |||||||||
| 95 | Materiales | 1 | 1 | |||||||||
| 96 | Ensayos | 1 | Aceptación Edificio -7 | |||||||||
| 97 | Equipo de conmutación | 1 | ||||||||||
| 98 | Equipo de conmutación | 1 | ||||||||||
| 99 | Instrucciones | 1 | ||||||||||
| SECCIÓN 26 51 00 | ||||||||||||
| 100 | Luminaria LED Tipo A, Driver y accesorios | 1 | ||||||||||
| 101 | Luminaria LED Tipo B, Driver y accesorios | 1 | ||||||||||
| 102 | Luminaria LED Tipo C, Driver y accesorios | 1 | ||||||||||
| 103 | Materiales Locales/Regionales | 1 | ||||||||||
| 104 | Luminarias LED | 1 | ||||||||||
| 105 | Célula Fotoeléctrica | 1 | ||||||||||
| 106 | Ensayos de funcionamiento | 1 | ||||||||||
| 107 | Garantía de Luminarias LED | 1 | ||||||||||
| 108 | Certificado de Vida Útil de Luminarias LED | 1 | ||||||||||
| 109 | Resultados de Cálculo Luminotécnico | 1 | ||||||||||
| 110 | Entrega de Repuestos | 1 | ||||||||||
| 111 | Formación del Personal del Gobierno | 1 | ||||||||||
| SECCIÓN 31 23 00.00 20 | ||||||||||||
| 112 | Material de relleno propuesto para suelo y terreno vegetal | 1 | ||||||||||
| 113 | Ensayo del material de relleno | 1 | Tras real. |
ensayo 114 Ensayos de densidad 1 Tras real.
ensayo
| SECCIÓN 32 92 19 | |||||||
| 115 | Semilla | 1 | |||||
| 116 | Fertilizante | 1 | |||||
| 117 | Capa Vegetal | 1 | |||||
| SECCIÓN 32 93 00 | |||||||
| 118 | Restricciones y Condiciones de Plantación | 1 | |||||
| 119 | Fechas y ujbicaciones Previstas | 1 | |||||
| 120 | Materiales | 1 | |||||
| 121 | Vivero | 1 | |||||
| 122 | Pasaporte Fitosanitario | 1 | |||||
| SECCIÓN 33 71 02.00 20 | |||||||
| 123 | Conductos | 1 | |||||
| 124 | Cables de Baja Tensión Enterraods | 1 | |||||
| 125 | Cinta de Aviso e Identificación | 1 | |||||
| 126 | Conductores de tierra | 1 | |||||
| 127 | Arquetas | 1 | 1 | ||||
| 128 | Tapas de arquetas | 1 | 1 | 1 | |||
| 129 | Empales de baja tensión pre-fabricados | 1 | |||||
| 130 | Arquetas para lecturas de tierra | 1 | |||||
| 131 | Barras equipotenciales | 1 | |||||
| 132 | Picas de tierra | 1 | |||||
| 133 | Soldadura exotérmica | 1 | 1 | ||||
| 134 | Ensayos y pruebas en obra | 1 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N