Construction Cost Estimate Breakdown.xlsx
XLSX spreadsheet 57 KB Posted
- Attached to
- RPR/ADD DACF Utility Vault & Generator, B183 Federal contract opportunity
- Solicitation number
- FA557520B0004
About this file
This document contains cost estimate breakdowns and specifications for a construction project solicitation. The solicitation is for the RPR/ADD DACF Utility Vault & Generator project at Moron Air Base in Spain, with an estimated value between $250,000 and $500,000. Work includes renovating an existing utility vault, installing a new transformer vault and underground lines, constructing a concrete slab and installing a 300kW generator and automatic transfer switch. The cost estimates provide line item materials, labor, and direct costs for standard demolition, civil works, electrical works, and two additive alternates for additional electrical work and asbestos abatement. A pre-proposal conference will be held on August 13, 2020, and proposals are due by August 31, 2020. In accordance with agreements between the U.S. and Spain, Spanish materials, labor and equipment should be used where feasible. The solicitation notes that funds are not presently available and no award will be made until funding is in place.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 0001.pdf | ||
| Solicitation FA557520B0004.pdf | ||
| Schedule of Material Submittals.xlsx | XLSX spreadsheet | |
| Drawings Dated 10 June 2020.pdf | ||
| Especificaciones Espanol Dated 10 June 2020.pdf | ||
| English Specifications Dated 10 June 2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR-ADD DFAC Utility Vault & Generator, B183 | SUMMARY | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 16-1014 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| SUMMARY | ||||||||||
| RESÚMEN | ||||||||||
| TOTAL BASE BID - RENOVATION | ||||||||||
| TOTAL OFERTA BASE - RENOVACIÓN | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL BASE BID - NEW CONSTRUCTION | 0.01 | |||||||||
| TOTAL OFERTA BASE - NUEVA CONSTRUCCIÓN | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL ADDITIVE ITEM #1 - ADDTNL ELECT WORKS | ||||||||||
| ADICIONAL 1 - TRABAJOS ADICIONALES ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL ADDITIVE ITEM #2 - ACM DEMOLITION | ||||||||||
| ADICIONAL 2 - DEMOLICIÓN AMIANTO | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONTRACTOR'S CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
BASE BID - RENOVATION
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR-ADD DFAC Utility Vault & Generator, B183 | BASE BID - RENOVATION | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 16-1014 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| STANDARD DEMOLITION WORKS | ||||||||||
| TRABAJOS DE DEMOLICIÓN ESTÁNDAR | ||||||||||
| 1 | Take samples & submit lab. report on asbestos content | |||||||||
| Tomar muestras y enviar infor. lab. sobre amianto techos | Ea | |||||||||
| 2 | Remove and dispose off pre-fabricated vault, Bldg #183 | |||||||||
| Eliminar y transportar a vertedero edificio prefabricado #183 | JOB | |||||||||
| 3 | Demolish existing vault roof with all its elements | |||||||||
| Demolición de cubierta existente con todos sus elementos | JOB | |||||||||
| 4 | Electrical demolition and disposal to authorized dump site | |||||||||
| Demolición eléctrica y transporte a vertedero autorizado | JOB | |||||||||
| 5 | Remove/relocate trees. | |||||||||
| Eliminar/recolocar arboles | Ea | |||||||||
| STANDARD DEMOLITION WORKS TOTAL | ||||||||||
| TOTAL TRABAJOS DE DEMOLICIÓN ESTÁNDAR | 0.00 | 0.00 | 0.00 | 0.00 |
| CIVIL WORKS | ||||||
| TRABAJOS DE CIVIL | ||||||
| 6 | Tree felling | |||||
| Tala de árboles | Ea | |||||
| 7 | Levelling of the area | |||||
| Nivelación de la zona | CM | |||||
| 8 | Excavation for new utility vault, inc. sand bed | |||||
| Excavaciónm para nuevo centro de transformación, con lecho de arena | CM | |||||
| 9 | Install pre-manufactured building 6.44 x 2.50 m | |||||
| Instalación edificio prefabricado 6.44 x 2.50 m | Ea | |||||
| 10 | Supply & planting of olive tree (Olea Europaea) 100-120cm perímeter | |||||
| Suministro y plantación de olivo singular (Olea Europae) 100-120 cm perimeter | Ea | |||||
| 11 | Supply and planting cypress (Cupressus Sempervirens) 3,5-4,0 m height | |||||
| Suministro y plantación de ciprés común (Cupressus Sempervirens) 3,5-4,0 m altura | Ea | |||||
| 12 | Turf seeding | |||||
| Siembra de césped | Sm | |||||
| CIVIL WORKS TOTAL | ||||||
| TOTAL TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS | ||||||
| TRABAJOS DE ELECTRICIDAD | ||||||
| New Transformer Vault, Bldg #186 and UG lines | ||||||
| Nuevo Centro de Transformación, Edif #186 y líneas enterradas | ||||||
| 13 | High Voltage Cable Terminals Indoors/Outdoors | |||||
| Terminales Cable Alta Tensión Uso Interior/Exterior | Ea | |||||
| 14 | Line Cabinet SM6-IM | |||||
| Celda de Línea SM6-IM | Ea | |||||
| 15 | Transformer Protection Cabinet SM6-QM | |||||
| Celda de Proteccion Transformador SM6-QM | Ea | |||||
| 16 | Transformer 12470/440V, 400 KVA 60 Hz | |||||
| Transformador 12470/440V, 400 KVA 60 Hz | Ea | |||||
| 17 | Copper cable 1x185 mm2 RZ1-K (AS) 0.6/1 kV | |||||
| Cable de cobre 1x185 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |||||
| 18 | 6" RMC including couplings & accessories | |||||
| Conducto rígido acero galv. 6", incluso manguitos y accesorios | Lm | |||||
| 19 | Capacitor Bank 125 KVAr and acc. | |||||
| Batería de Condensadores 125 KVAr y acc. | Ea | |||||
| 20 | Main distribution panelboard MDP | |||||
| Cuadro de distribución principal MDP | Ea | |||||
| 21 | Weatherproof lighting fixture (Type A) 32W (+10% spares) | |||||
| Luminaria estanca (Tipo A)32 W (+10% recambio) | Ls | |||||
| 22 | LED floodlighting fixture (Type B) 8600lm (+10% spares) | |||||
| Proyectores LED 8600 lm (Tipo B) (+10% recambio) | Ea | |||||
| 23 | LED flashing lighting fixture (Type C) (+10% spares) | |||||
| Luminaria destellos LED (Tipo C) (+10% recambio) | Ea | |||||
| 24 | Life Saving Kit | |||||
| Kit de Seguridad | Ea | |||||
| 25 | Grounding system | |||||
| Sistema de puesta a tierra | Ls | |||||
| 26 | Receptacles with conduit and wiring | |||||
| Enchufes con cableado y conducto | Ea | |||||
| New Transformer Vault, Bldg #186 and UG lines Total | ||||||
| Total Nuevo Centro de Transformación, Edif #186 y líneas enterradas | 0.00 | 0.00 | 0.00 | 0.00 |
| New UG lines | ||||||
| Nuevas líneas enterradas | ||||||
| 27 | High voltage RHZ1 OL 12/20 kV 1x35 mm² Cu | |||||
| Cable alta tensión RHZ1 OL 12/20 kV 1x35 mm² Cobre | Lm | |||||
| 28 | New HV underground line and accessories concrete encased | |||||
| Nueva línea enterrada de alta tensión y accesorios en hormigón | Lm | |||||
| 29 | High voltage A1 type prefabricated manhole with cover | |||||
| Arqueta prefabricada tipo A1 alta tension con tapa | Ea | |||||
| 30 | New LV underground line and accessorires | |||||
| Nueva línea enterrada de baja tensión y accesorios | Lm | |||||
| 31 | Low voltage A1 type prefabricated manhole with cover | |||||
| Arqueta prefabricada tipo A1 baka tension con tapa | Ea | |||||
| 32 | Copper cable 1x185 mm2 RZ1-K (AS) 0.6/1 kV | |||||
| Cable de cobre 1x185 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |||||
| 33 | Copper cable 1x16 mm2 RV-K 1000V | |||||
| Cable de cobre 1x16 mm2 RV K 1000V | Lm | |||||
| 34 | Copper cable 1x10 mm2 RV-K 1000V | |||||
| Cable de cobre 1x10 mm2 RV K 1000V | Lm | |||||
| New UG lines Total | ||||||
| Total Nuevas líneas enterradas | 0.00 | 0.00 | 0.00 | 0.00 | ||
| ELECTRICAL WORKS TOTAL | ||||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| STANDARD DEMOLITION WORKS | ||||
| TRABAJOS DE DEMOLICIÓN ESTÁNDAR | 0.00 | 0.00 | 0.00 | 0.00 |
| CIVIL WORKS | ||||
| TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS | ||||
| TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| GRAND TOTAL | ||||
| GRAN TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONTRACTOR'S CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
BASE BID - NEW CONSTRUCTION
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR-ADD DFAC Utility Vault & Generator, B183 | BASE BID - NEW CONSTRUCTION | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 16-1014 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| CIVIL WORKS | ||||||||||
| TRABAJOS DE CIVIL | ||||||||||
| 1 | Excavation for generator concrete slab | |||||||||
| Excavaciónm para losa de hormigón de grupo electrógeno | CM | |||||||||
| 2 | Backfill and compaction | |||||||||
| Relleno y compactación | CM | |||||||||
| 3 | Lean Concrete | |||||||||
| Hormigón de limpieza | CM | |||||||||
| 4 | Pour new 8 x 4.40 x 0.40 m concrete slab HA-25 | |||||||||
| Nueva losa de hormigón HA-25 de 8 x 4.40 x 0.40 m | Cm | |||||||||
| CIVIL WORKS TOTAL | ||||||||||
| TOTAL TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS | ||||||
| TRABAJOS DE ELECTRICIDAD | ||||||
| Generator and Automatic Transfer Switch | ||||||
| Grupo electrógeno y Conmutador Automático | ||||||
| 5 | Grupo electrógeno 300 kW, cableado, conductos y acc. | |||||
| Generator 300 kW, wiring, conduits & acc. | Ea | |||||
| 6 | Conmutador automático, 4 polos, 1200 A, cableado y acc. | |||||
| 4-Pole, 1200 A,Automatic Transfer Switch, wiring and acc. | Ea | |||||
| 7 | Seccionador de by-pass, cableado y acc. | |||||
| By-pass/Isolation Switch, wiring and acc. | Ea | |||||
| 8 | Copper cable 1x185 mm2 RZ1-K (AS) 0.6/1 kV | |||||
| Cable de cobre 1x185 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |||||
| 9 | 6" RMC including couplings & accessories | |||||
| Conducto rígido acero galv. 6", incluso manguitos y accesorios | Lm | |||||
| 10 | Puesta a tierra | |||||
| Grounding System | Ea | |||||
| Generator and Automatic Transfer Switch Total | ||||||
| Total Grupo electrógeno y Conmutador Automático | 0.00 | 0.00 | 0.00 | 0.00 | ||
| ELECTRICAL WORKS TOTAL | ||||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| CIVIL WORKS | ||||
| TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS | ||||
| TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| GRAND TOTAL | ||||
| GRAN TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONTRACTOR'S CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
ADDITIVE #1 - ADDTNL ELECT WORK
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR-ADD DFAC Utility Vault & Generator, B183 | ADDITIVE ITEM #1 - ADDTNL ELECT WORK | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 16-1014 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ELECTRICAL WORKS ADDITIVE #1 | ||||||||||
| ADICIONAL 1 - TRABAJOS ADICIONALES ELECTRICIDAD | ||||||||||
| Architectural Works | ||||||||||
| Trabajos de Albañilería | ||||||||||
| 1 | Demolition and repairs of brick wall enclosure | |||||||||
| Demolición y reparaciones de hueco en fábrica de ladrillo | Ea | |||||||||
| 2 | Paint mechanical room interior walls | |||||||||
| Pintar paredes interiores cuarto técnico | SM | |||||||||
| Total Removal and disposal of asbestos materials | ||||||||||
| Total eliminación y envío a vertedero de amianto | 0.00 | 0.00 | 0.00 | 0.00 |
| Interior Electrical Distribution Modifications | ||||||
| Modificationes de Distribución Eléctrica Interior | ||||||
| 3 | Install New Busbar Enclosure | |||||
| Instalación de Nuevo Embarrado en Caja Repartidora | Ea | |||||
| 4 | Install new NSX100N TM100D Circuit Breaker 4P4D | |||||
| Instalación de Int. Automático NSX100N TM100D 4P4D | Ea | |||||
| 5 | Install new NS800N Micrologic 2.0 4P4D | |||||
| Instalación de Int. Automático NS800N Micrologic 2.0 4P4D | Ea | |||||
| 6 | Wiring modifications to DPP panelboard | |||||
| Modificaciones de cableado en panel DPP | Ea | |||||
| Total Interior Electrical Distribution Modifications | ||||||
| Total Modificationes de Distribución Eléctrica Interior | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS ADDITIVE #1 TOTAL | ||||
| TOTAL ADICIONAL 1 - TRABAJOS ADICIONALES ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONTRACTOR'S CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
ADDITIVE #2 - ACM DEMO
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR-ADD DFAC Utility Vault & Generator, B183 | ADDITIVE ITEM #2 - ACM DISPOSAL | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 16-1014 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| DEMOLITION WORKS ADDITIVE #2 | ||||||||||
| ADICIONAL 2 -TRABAJOS DE DEMOLICIÓN | ||||||||||
| Removal and disposal of asbestos materials | ||||||||||
| Eliminación y envío a vertedero de amianto | ||||||||||
| 1 | Asbestos Hazard Abatement and Disposal Plan | |||||||||
| Elaboración del plan de gestión y eliminacion de amianto | JOB | |||||||||
| 2 | Remove roof layers, fill and seal the approp. Containers | |||||||||
| Demoler capas de cubierta, llenar y sellar contenedores. | JOB | |||||||||
| 3 | Transport and disposal waste to authorized dump | |||||||||
| Transportar y depositar materiales en vertedero autoriz. | JOB | |||||||||
| Total Removal and disposal of asbestos materials | ||||||||||
| Total eliminación y envío a vertedero de amianto | 0.00 | 0.00 | 0.00 | 0.00 |
| Demolition Works (To be subtracted) | ||||||
| Trabajos de demolición (A deducir) | ||||||
| 4 | Demolish existing vault roof with all its elements | |||||
| Demoler la cubierta existente con todos sus elementos | JOB | |||||
| Total Demolition Works (To be subtracted) | ||||||
| Total Trabajos de demolición (A deducir) | 0.00 | 0.00 | 0.00 | 0.00 |
| DEMOLITION WORKS ADDITIVE#2 TOTAL | ||||
| TOTAL ADICIONAL 2 -TRABAJOS DE DEMOLICIÓN | 0.00 | 0.00 | 0.00 | 0.00 |
| SUMMARY | ||||
| RESÚMEN | ||||
| ACM DEMOLITION ADDITIVE#2 TOTAL | ||||
| TOTAL ADICIONAL 2 - DEMOLICION AMIANTO | 0.00 | 0.00 | 0.00 | 0.00 |
| GRAND TOTAL | ||||
| GRAN TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00% 0.00
SUBTOTAL 0.00
PROFIT 0.00% 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
TITLE: BY:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"CONTRACTOR'S CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .